MONTH : December 2015 PHOTOGAPH NO: DESCRIPTION : Rebar Installation Work for 1 st Lift of permanent Manhole at MH-G2

Similar documents
STANDARD AND EXAMPLE DRAWINGS

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

Manholes Table of Contents

PROGRESS REPORT CGEWHO CHENNAI PHASE-III PROJECT

Pipe Product Catalog Table of Contents

Anti-Trust Statement

C-M TMR Products Index

SECTION 39 - MANHOLES TABLE OF CONTENTS

Welcome. Hong Kong Zhuhai Macao Bridge Design & Construction of Marine Viaducts for HKLR

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

Miscellaneous. Demolition

Typical Drawings for Schools

SYARIKAT BEKALAN AIR SELANGOR SDN BHD

Module 6 : Design of Retaining Structures. Lecture 30 : Dewatering [ Section 30.1 : Introduction ]

Valley Road Main Replacement

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

Title of Innovation: In-Line Inspection for Water Pipelines

Double Storey HC Precast System Drawing - 3D

POST FRAME CONSTRUCTION MANUAL

Precast Concrete Pavement

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

Breadth: Change CIP Structural Walls and Beams to Precast

i. Shoring layout. ii. Shoring sections and details (including anchor details, if required).

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

Ensure there is reasonable access for materials and working space, ensure the shed site is level and consider the disposal of run-off water.

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

SYARIKAT BEKALAN AIR SELANGOR SDN BHD

6/19/2014. Milton Madison Bridge Slide. Project Partners. The Challenge. Aaron L. Stover, PE, SE Michael Baker Jr., Inc.

Precast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6

IBS SCORING IN MALAYSIA

IOWA CITY WASTEWATER TREATMENT PLANT RELOCATION PROJECT NORTH PLANT SALVAGE AND DEMOLITION PHASE CITY OF IOWA CITY FEBRUARY, 2015

This document downloaded from vulcanhammer.net vulcanhammer.info Chet Aero Marine

s23ss sloped bollard with reflective bands

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Appendix C Construction Details

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

DIVISION APPROVED MATERIAL LIST AND STANDARD DETAILS

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

ProConcrete. Gernot Jeromin Product Manager Bentley Systems, Incorporated

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

LETTING : CALL : 029 COUNTIES : GOODHUE

1. In the Y direction: to the vertical axis of the wall (middle of the wall)

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

Bracket guide. LK Pipe Pole. LK Radiator fixture Uni

Overview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane

CITY OF WAPATO NORTH WAPATO LIFT STATION REPLACEMENT CITY OFFICIALS. JUAN OROZCO Mayor. ROBERTO REYNA Mayor Pro Tem

DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL

Construction Tolerances - The following tolerances apply to cast-in-place structures:

Phase 2 Silver Line Update

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

civil product range JUNCTION BOXES DUCT CHANNELS AND COVERS Gas Line Cover Slabs ESB Railways ROAD GULLY AND LIDS

WELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1

Current Standard Plates including Transmittal Letters are available on the web at:

MODEL AIRCRAFT STARTING BENCH

HUSSEY GAY BELL SAVANNAH, GEORGIA

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles

B17. Sewer Site Plans BULLETIN

Substation 33/11kV. General Notes. Drawn by: Hewa Qader Mustafa. Soran Rostam Aziz. C-For footings = 75 mm. B-For beams & columns = 40 mm.

Z1035, Z1036, & Z1903 FLOOR DRAIN & CLEANOUT INSTALLATION STABILIZER

2' x 3' Polymer Pull Box Cover 4'-0" 7'-0" 24" x 76" Access Opening 3'-6"

6 1/2 x 6 1/2 Flat Top Pergola

WALL TO FABRICATED FLOOR

Riverside County Flood Control & Water Conservation District

THE ONTARIO CONCRETE PIPE ASSOCIATION

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN

adopted in Hong Kong

UNDERGROUND UTILITY VAULTS

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

10x10 Trellis Pergola

The DFI Institute is organized to serve as a primary means through which members of the Institute may participate in improvement of the planning,

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

The Vienna Trellis. Tools You Will Need. General Information

Exploration Beyond Expectation. Geo-Carte Radar Technology Pvt. Ltd.

MEEVER BRACING 400 SERIES

SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS

6 1/2 x 6 1/2 Wood Grain Flat Top Pergola

Fireball Fab Welded Baluster Insert Panel System Installation Instructions

The following are OSHA Construction Standards that require self-inspection, training, and written programs or are required to be posted.

SECTION MANHOLES

Standard Plate Sheer Reinforcement for Precast Drainage Structures has been updated upon recommendation of the Bridge Office.

CENTRIFUGAL PUMPS FRAME MOUNT 13" FEATURES

HSD-LD-US 06/13 Page 1/5. Components

Foundation Specifications for 5.6-Meter Modular Earth Station Antennas

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

ROOM smooth cement f.f FLOOR LAYOUT

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

PERFORM WITH PRECISION MAGNETIC PRODUCTS FOR PRECASTING CONCRETE CONSTRUCTION SOLUTIONS BROCHURE

Foundation Specifications for 7.6-Meter Modular Earth Station Antennas

PVC Fencing Install Instructions

Transcription:

MONTH : December 2015 PHOTOGAPH NO: 000587 DESCRIPTION : Rebar Installation Work for 1 st Lift of permanent Manhole at MH-G2 MONTH : December 2015 PHOTOGRAPH NO: 000588 DESCRIPTION : Concrete Casting for 1 st Wall of Permanent Manhole at MH-G2

MONTH : December 2015 PHOTOGAPH NO: 000589 DESCRIPTION : Steel Pipe Sleeve Installation and Rectification of Premix Road Works at MH-G4 MONTH : December 2015 PHOTOGRAPH NO: 000590 DESCRIPTION : Steel Pipe Sleeve Installation works at MH-G4a

MONTH : December 2015 PHOTOGAPH NO: 000591 DESCRIPTION : Preparation of Works for TBM Retrieval at MH-G4a MONTH : December 2015 PHOTOGRAPH NO: 000592 DESCRIPTION : Jacked In of 1 st to 11 th RC Pipe at MH-G5 to MH-G4a

MONTH : December 2015 PHOTOGAPH NO: 000593 DESCRIPTION : Jacked In of 22 nd to 27 th RC Pipe at MH-G5 to MH-G4a MONTH : December 2015 PHOTOGRAPH NO: 000594 DESCRIPTION : Jacked In of 35 th to 42 nd RC Pipe at MH-G5 to MH-G4a

MONTH : December 2015 PHOTOGAPH NO: 000595 DESCRIPTION : Jacked In of 47 th to 50 th RC Pipe at MH-G5 to MH-G4a MONTH : December 2015 PHOTOGRAPH NO: 000596 DESCRIPTION : PJM Breakthrough at MH-G4a

MONTH : December 2015 PHOTOGAPH NO: 000597 DESCRIPTION : Soil Excavation, Fixing BRC and Casting of 11 th layer Caisson at MH-G5a MONTH : December 2015 PHOTOGRAPH NO: 000598 DESCRIPTION : Fixing BRC and Casting of Base Slab at MH-G5a

MONTH : December 2015 PHOTOGAPH NO: 000599 DESCRIPTION : Rebar Planting Preparation Works for Thrust Block at MH-G5b MONTH : December 2015 PHOTOGRAPH NO: 000600 DESCRIPTION : Rebar Installation for Thrust Block and launching Pad at MH-G5b

MONTH : December 2015 PHOTOGAPH NO: 000601 DESCRIPTION : Soil Excavation, Fixing BRC and Casting of 9 th layer Caisson at MH-G6 MONTH : December 2015 PHOTOGRAPH NO: 000602 DESCRIPTION : Soil Excavation, Fixing BRC and Casting of 12 th layer Caisson at MH-G6

MONTH : December 2015 PHOTOGAPH NO: 000603 DESCRIPTION : Fixing BRC and Casting of Base Slab at MH-G6 MONTH : December 2015 PHOTOGRAPH NO: 000604 DESCRIPTION : Jacked In of 192 nd to 206 th RC Pipe at MH-G8 to MH-G9

MONTH : December 2015 PHOTOGAPH NO: 000605 DESCRIPTION :PJM Breakthrough at MH-G9 MONTH : December 2015 PHOTOGRAPH NO: 000606 DESCRIPTION : TBM Retrieval Works at MH-G9

MONTH : December 2015 PHOTOGAPH NO: 000607 DESCRIPTION : Sheet Pile Installation Works for Temporary Drain at MH-G10 MONTH : December 2015 PHOTOGRAPH NO: 000608 DESCRIPTION : Hacking of Existing Caisson Wall at MH-G10

MONTH : December 2015 PHOTOGAPH NO: 000609 DESCRIPTION : Soil Excavation for Temporary Drain at MH-G10 MONTH : December 2015 PHOTOGRAPH NO: 000610 DESCRIPTION : Concrete Casting of Base Slab for Temporary Drain at MH-G10

MONTH : December 2015 PHOTOGAPH NO: 000611 DESCRIPTION : Fixing BRC, Formwork and Concrete Casting at MH-G10 MONTH : December 2015 PHOTOGRAPH NO: 000612 DESCRIPTION : Decking Preparation Works at MH-G10

MONTH : December 2015 PHOTOGAPH NO: 000613 DESCRIPTION : Concrete Packing and Decking Installation at MH-G10 MONTH : December 2015 PHOTOGRAPH NO: 000614 DESCRIPTION : Road Premix Laying at MH-G10

MONTH : December 2015 PHOTOGAPH NO: 000615 DESCRIPTION : Excavation and Casting of 1 st Layer Caisson at MH-G10 MONTH : December 2015 PHOTOGRAPH NO: 000616 DESCRIPTION : Cycling Path Preparation Works at MH-G10

MONTH : December 2015 PHOTOGAPH NO: 000617 DESCRIPTION : Drain Pipe Laying and Slope Trimming Works at MH-G12 MONTH : December 2015 PHOTOGRAPH NO: 000618 DESCRIPTION : Fixing BRC and Concrete Casting for Cycling Path at MH-G12

MONTH : December 2015 PHOTOGAPH NO: 000619 DESCRIPTION : Cleaning of Construction Materials at MH-G12 MONTH : December 2015 PHOTOGRAPH NO: 000620 DESCRIPTION : Reinstatement Works at MH-G12