Waste Treatment Plant Project Supply Chain Collaboration Event. QVD How To Get Started

Similar documents
MIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A

MIL- B Rev NAVSEA 0900-LP

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

QUALITY ASSURANCE SPECIFICATION

PRACTICAL UNDERSTANDING AND INTERPRETATION OF TECHNICAL STANDARD TS30a WELDING SPECIFICATION

MEC-QW-E-2002 Senior QA/QC Welding Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Inspection and Test Plan for Water Tube Boiler

Fasteners. Massachusetts Institute of Technology Kavli Institute for Astrophysics and Space Research (MKI) Dwg. No Revision D March 24, 2015

INSPECTION AND TEST PLAN

INSPECTION REPORT N o

CESSNA QUALITY REQUIREMENTS. For SUPPLIERS (CQRS)

Electroimpact Supplier Inspection Documentation

CIRRUS AIRCRAFT FAI INSTRUCTION

AS9102B - APPLICABLE TO FORM # 1, 2, 3

(R) Aerospace First Article Inspection Requirement FOREWORD

for industry.com

Production Part Approval Process (PPAP) Marion Body Works, Inc.

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

AS9102 Training. First Article Inspection Guide. Rev A

Weldment Visual Inspection Requirements

Overview of Textron Systems Supplier First Article Inspection (FAI) expectations

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 30 November Approved. Frank Mariot

BHARAT HEAVY ELECTRICALS LIMITED

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

a. Does a written detailed procedure exist and is it utilized for the soldering process? Identify procedure number and revision.

Report Number B0622. Requirements for Sellers of Special Tooling to the Boeing St. Louis Tooling Center

Merck VENDOR DOCUMENT REQUIREMENTS. Caustic Tank. Elkton, VA PRESSURE GAUGES 63PZ0234-J-VD PZ PZ02XX Report For: Project: Document No.

CORPORATE QUALITY SYSTEM PROCEDURE

SQS Supplement A. Bridge Fabricators and Minor Structural. Component Manufacturers. MnDOT Supplier Qualification Standard

This specification describes the general requirements for Engineering Services provided to Vale.

TOOLING ADDENDUM TO PPG QC Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

TCN 01. Page No. 1 of 2 Ref: PSER:SCT:ABJ:T1178:TCN-01 Date:

PPAP 3rd Edition Check List

The surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample.

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

Electroimpact Supplier Inspection Documentation

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

(AMMA) American Maritime Modernization Association

TECHNICAL SPECIFICATION & DRAWINGS

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/24/03

Conformity Assessment. Gerardo Moino PRT Certificate Program April 2018

AAI CORPORATION D/B/A TEXTRON SYSTEMS

SAMAMAT FLOW CONTROL L.L.C.

PPAP REQUIREMENTS. Revision: March Methode Electronics, Inc. G-MB of 12 Printed copies are not controlled.

Fasteners Testing Capabilities. 1

Module 4 Design for Assembly IIT BOMBAY

A. Section includes administrative and procedural requirements for project record documents, including the following:

Requirements for manufacture of anchors

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2

Market Survey for the F4E Diagnostics Team

PIP REDP003 Documentation Requirements for High Power Centrifugal Pumps for Water Service

ULTRASONIC QUALIFICATION CARD GUIDANCE INSTRUCTIONS

1.0 DESCRIPTION. This specification covers steel snowplow blades with tungsten carbide inserts.

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

Section Meetings Section Material and Equipment. None Required

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

Engineering Drawing System

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings.

NDT KONFERANSEN ZENOVIEA VOROSCIUC

Booster Pumping Station 115 Booster Pump Procurement

Scheduling, dimensioning, bending and cutting of steel reinforcement for concrete Specification

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

SECTION SUBMITTAL PROCEDURES

SEI Certification Program Manual

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Couplings used for torque transmission in propulsion or auxiliary plants

SPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Edition

Threaded Products Gaskets & Seals Precision Machining

TECHNICAL SPECIFICATION FOR LEVEL CONTROL VALVE HANDLING WATER

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

Effective Date: October Rev. 5/11/2018- Void After: October 2018

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

INTRODUCTION TO FIXED LIMIT GAGING (Back to Contents)

ISO INTERNATIONAL STANDARD

SUBMITTAL PROCEDURES

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Engineering Drawing System

DNVGL-CP-0338 Edition October 2015

REPAIR OF NE KRSKO STEAM GENERATOR TUBES BY SLEEVING METHOD

STANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines.

COASTAL BEND COLLEGE WELDING SYLLABUS (Revised 8/10) Introduction to Blueprint Reading for Welders

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

AATC PRESENTATION INVESTMENT CASTING PROCESS (2 OF 3 PRESENTATIONS REVISION 2014_0429) AATC, Inc W. Catalina Dr. Phoenix, AZ USA

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer.

Introduction to Fitness For Service November 10, 2016, University of Alberta, Edmonton.

Government Recognized Export House OHSAS 18001:2007 ISO 14001:2004 PED Approved Company.

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

Welding Inspection Non-Destructive Testing Course Reference WIS 5

Quality Management system to Enhance Offshore & Subsea ESP Run life and Reliability Reda Elmahbes Baker Hughes / Mohamed Elmhabbes Saipem Libya

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

Transcription:

Waste Treatment Plant Project 2016 Supply Chain Collaboration Event QVD How To Get Started

Quality Verification Documentation (QVD) Discussion Topics Lessons Learned Start With The End In Mind (G-321-V Form) Define and Simplify Your Process Document Management Process? (QVD Video) Developing Requirement Basis Use of Review/Accounting Matrix When Are We Done? Plus/Delta 2

Quality Verification Documentation (QVD) Lessons Learned Two of the top five issues discovered with received equipment are specific to QVD As a result of historical documentation review, we have better defined how to account for and review QVD Corrective action drove a deeper look at how we define complete QVD Our internal procedures provide a means to define and account for what is required Roll out of the QVD Video describes to our supply base a process that is the basis for the BNI approach to QVD review We continue to get smarter and our plans include making our supply base part of making this process successful to ensure equipment pedigree is complete and accurate 3

Quality Verification Documentation (QVD) Start With The End In Mind (G-321-V Form) The requirements for the QVD/QVRP are detailed in the G-321-V Form 4

Quality Verification Documentation (QVD) Define and Simplify Your Process QVD Video (Located in Vit Plant Website) www.hanfordvitplant.com/supplier-quality Located in the QVD Management for Completeness link What We Use To Begin Our QVD Review QVD Review Report Defines (through attachments) documents required to begin and complete review Provides roll-up of requirements and review results QRR for QVD.pdf 5

Quality Verification Documentation (QVD) Developing Requirements Basis What specifically applies to this item/tag number/material? Specific PO Requirements (Scope of Work) Design/Detail Drawings Relevant Specifications Detailed in the MR/PO SDDRs Sample of QRR Attachment Some more complex than others Sample QRR with attachments.pdf 6

Quality Verification Documentation (QVD) Use of Review/Accounting Matrix After developing your requirements basis, you will need a tool to define the specific documents to be accounted for Review matrices serve that purpose Segregated primarily by material and welding This process to begin at the very beginning of order execution Blank examples of what we use for this activity QVD Material Matrix.xls QVD Weld Matrix.xls 7

Quality Verification Documentation (QVD) When Are We Done? 1. The supplier has assembled all the required documents defined in the purchase order, performed its internal review, reconciled all outstanding issues, and signed the G-321-V form. 2. The completed and supplier signed QVD package is delivered to the SQR (when applicable), this review is completed and the G-321-V form is signed by the BNI SQR. A. Note: These activities coincide with the completion of the RFSC (Readiness for Shipment Checklist) B. Keep in mind, the SQR is an integral part of assisting with solving issues, but is not to be used in the place of the supplier s review process 8

Quality Verification Documentation (QVD) Plus/Delta Discussion Topics Were the topics beneficial? What topics do we need to further address? How does QVD/QVRP review impact you? What can we do better to minimize QVD issues early in the procurement and during final review? 9

Issued by RPP-WTP PDC Rev 0 Title: QUALITY VERIFICATION DOCUMENT REVIEW REPORT Document No: Rev: 0 Revision History: Revision Number 0 Reason for Revision Original Issue Commodity/Type: PO: MRR/SRR #: N/A PO # Line Item No: 9 Total Items: 1 Tag ID: QVD Reviewer Name: Supplier: Review Phase: Before Receipt Drawings: See Attachment 1 Specifications: See Attachment 2 Attachments: Attachment 1 Drawings Attachment 2 Specifications and SDDRs Attachment 3 QVD Material Matrix Attachment 4 Coatings Matrix Attachment 5 Welding Matrix Attachment 6 Welding Matrix Attachment 7 Welding Matrix Attachment 8 Welding Matrix Attachment 9 Welding Matrix Attachment 10 Welding Matrix Attachment 11 Welding Matrix QRR Rev 01, 3/25/2015 Page 1 of 7

QUALITY VERIFICATION DOCUMENT REVIEW REPORT Title: Rev. 0 Document No: Rev: 0 Revision History: Revision Number 0 Reason for Revision Original Issue ; Commodity/Type: PO: MRR/SRR #: # Line Item: 3.116 Total Items: 1 Tag ID/Stock Code/Line Item: QVD Reviewer Name: Supplier: Review Phase: After Receipt Summary of Review Results: Documents were reviewed for legibility, traceability, completeness, accuracy, and compliance to QVD requirements. The QVD package found in heater element for. No issues were identified. Satisfactory. Pre Job Pre Job Pre Job Pre Job is for the replacement Doc. Category Document Description Review Result Comments Results (S/U/I) # Pages in Doc. Category Issue Code Issue Document 12.0 Weld Verification Documents records are required. No welding was performed. Not 13.0 MATERIAL VERIFICATION REPORTS records were required to be submitted. The replacement heater element did not require additional shop tests. Not 14.0 Major Repair Verification Documents Deleted per the G-321-V form N/A N/A N/A N/A 15.0 CLEANING AND COATING VERIFICATION REPORTS Review of the QVD requirements and drawings indicated that no records were required to be submitted. No heat 16.0 Heat Treat Reports treatment required for this replacment heater element. Not 17.1 17.4 18.0 MTR - MATERIAL TEST REPORTS MATERIAL CERTIFICATE OF COMPLIANCE Code Compliance (Code Data Reports) Review of the QVD requirements indicated that carbon steel material requires coating. No carbon steel items received. Not records were required to be submitted. This CM heater element doesn't require an MTR. Not Submitted document on MRR page 41 was reviewed for legibility, traceability, completeness, and compliance to the QVD requirements. No issues identified. See Attachment 2, Line 4. Satisfactory. records were required to be submitted. This CM heater element doesn't require a Code Data Report. Not S 1 N/A N/A 19.0 UT - ULTRASONIC EXAMINATION UT records are required. No welding was performed. Not 20.0 RT - RADIOGRAPHIC EXAMINATION RT records are required. No welding was performed. Not QRR Rev 01, 3/25/2015 Page 1 of 3

Doc. Category Document Description Review Result Comments Results (S/U/I) # Pages in Doc. Category Issue Code Issue Document 21.0 MT - MAGNETIC PARTICLE MT records are required. No welding was performed. Not 22.0 PT-Liquid Penetrant Examination Verification Reports PT records are required. No welding was performed. Not 24.0 Pressure Test and Verification Reports, including hydro, loop flow test, and leak test (Melter lid, Walls Modules and Base Cooling Panels) records were required to be submitted. Pressure tests are not required for this heater element. Not 25.0 Inspection and Verification Reports records were required to be submitted for this is a replacement CM heater element. Not 26.1 Mechanical Test Reports records were required to be submitted. The CM heater element did not require disassembly or fit check. Not records were required to be submitted. This replacement 26.2 Electrical Test Reports CM heater element doesn't require it to be disassembled into multiple pieces. This Not 30.0 SDDR - SUPPLIER DEVIATION DISPOSITION REQUEST There are no SDDRs against Item 10 on drawing Not Reviewer's Comment: The Attachment to the G-321-V form was provided in error. The Attachment isn't for this replacement heater element 31.0 Positive Material Identification (PMI) records were required to be submitted. PMI as specified in Purchase Order, Attachment 1, Section 3.1.4 is not required for this CM heater element. Not 34.0 Factory Acceptance Test (FAT) Report records were required to be submitted. This DCN is marked "N/A" in PO Attachment 1, Section 3.6.3. Not 33.0 Commercial Grade Dedication Deleted per the G-321-V form N/A N/A N/A N/A General Gen 1 Documents sections listed on the G 321 V form include page count totals Reviewed page counts as documented in the PRR documents submitted. Satisfactory. S 1 N/A N/A Gen 2 Verify PO listed matches revision at time of release/review Verified PO revision matches the correct revision during the time of release. Satisfactory. S N/A N/A N/A QRR Rev 01, 3/25/2015 Page 2 of 3

Attachment 1 DCN Specifications, SDDRs, and Drawing References Document # PO Attachment 1, Scope of Work REV Supplier or Subcon Doc. Number ATTACHMENT 1, Rev. 9 DCN 12.0 DCN 13.0 DCN 15.0 DCN 16.0 DCN 17.1 DCN 17.4 DCN 18.0 DCN 19.0 DCN 20.0 DCN 21.0 DCN 22.0 DCN 24.0 DCN 25.0 DCN 26.1 DCN 26.2 DCN 30.0 DCN 31.0 DCN 34.0 3.6.3 3.6.3 3.6.3 3.6.3 3.6.3 3.6.3 3.6.3 3.6.3 3.6.3 3.6.3 3.6.3 3.6.3 3.1.3, 3.6.3 3.6.3 3.6.3 3.6.3 3.6.3 3.6.3 5.1.2 5.1.7 6.3.1 6.4.2 5.5.2 5.4 G 321 V DCN Applicable Specification Requirements 4.1.2 4.1.6 4.1.8 6.4.9 6.3 6.3 6.3 6.3 6.4.4 6.4.5 6.4.6 6.4.7 5.2.9 5.1.20.2.4 SDDR 3.7 PMI 6.0 7.0 CGD N/A N/A N/A N/A 2.4 2.4 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 6.4.8 5.3.7.2 N/A Applicable Drawings and VDCNs REV Document Number Change Description Added Note #16, Commercial Material (CM) to Item 10 Applicable SDDR # REV Document Number Change Description No SDDRs having to do with Page 1 of 1

Attachment 1 Materials QVD Matrix 1 2 3 4 A B C D E F G H I J K L N O P Q R S T U V BOM Component ID BOM Item Description (Drawing) Change Notices Material Item # Material Description Item Description QTY Size/Thk (IN.) U 60.0X43.50X14X1.25 SH=2.0, C=3.50 Heater Element 1 U 60.0X43.50X14X1.25 SH=2.0, C=3.50 Material Type Grade SDDRs/VDCNs/ FCs Purchase Order Rev Material Heat # Size/Thk (IN.) Material Type Grade MTR Pg # Chems Silcone Carbide 58 N/A N/A N/A N/A N/A N/A DCN 17.1 DCN 17.4 DCN 31.0 MTR Material Size/Type/Grade ASME/ASTM Phys Material Size/Type/Grade Size/Thk (IN.) U 60.0X43.50X 14X1.25 Material Type Grade Silcone Carbide C of C Pg # MRR pg. 41 PMI PMI Pg # Comments Review Results N/A N/A S Page 1 of 1

QVD Material Matrix Attachment X BOM Component ID BOM - Item Description (Drawing) Material Heat # MTR Material Size/Type/Grade MTR Pg # PMI Comments Review Results Material Item # Material Description Item Description QTY Size/Thk (IN.) Material Type Grade Size/Thk (IN.) Material Type Grade Main Equipment Sub Compentents/Assembly 10JAN14, Rev 00 Page 1 of 1

QVD Welding Matrix Attachement X Weld ID Weld Type (Filet-F Groove Bevel-B) Matl Type Componet Name Piece - Piece Dwg Note Weld Verification Doc. NDE Required NDE Performed NDE Report Pg. # Reject /Accept PMI Comments Review Results Main Equipment Sub Components/Assembly 10JAN14, Rev 00 Page 1 of 1