b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 26 Jun 2012 ( ENCLOSURE 1)

Similar documents
b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 2 April 2012 ( ENCLOSURE 1)

SECTION IDENTIFICATION FOR COMMUNICATIONS SYSTEMS

SECTION COMMUNICATIONS COPPER OSP CABLING

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

1. This Section specifies the ethernet Category 5E data cabling system for buildings and structures.

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

B. Division-16 Basic Materials and Methods section apply to work specified in this section.

APPENDIX 3-CLASSROOMS (review by MB) General Guidelines- All Classrooms

Communications Integrators, Inc. June S. Wilson Street, Suite 105 Tempe, Arizona Toll Free (800) Web Site

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

Campus Cable Plant Specification for Year 1 Wireless Coverage (Phase I)

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

PassReview. PassReview - IT Certification Exams Pass Review

AESA TECHNOLOGY OF LAN CABLE

LOMAH. (Location of Miss and Hit)

FORM NWC-705. Section 1: General Information. Section 2: Collocation Information. Collocation Location:

B. The designated coverage areas shall include both indoor and outdoor coverage.

PHOENIX, ARIZONA SITE SURVEY REPORT. PROVEN SOLUTIONS THAT DRIVE EFFICIENCY AND PRODUCTIVITY IN YOUR SUPPLY CHAIN

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD

Residential Construction Checklist Single and Two Family Construction

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

IMAGENET TM SYSTEM Facility Site Preparation

Dense Wavelength Division Multiplexer (DWDM) 200 GHz Spacing, Multi-Channel, 2ch, 4ch, 8ch, 16ch, 20ch in PEACOC Flexible Tray

9. Pay for the power consumed until the project has been accepted as substantially complete.

Facility Services Subgroup Preface for Divisions 21` through 28

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS)

Technical Service Note

Architectural Floor Plan Symbols

NORTHWEST FLORIDA STATE COLLEGE MONUMENT SIGNS WITH LED DISPLAYS

UFGS-16553N (Septermber 1999) UNIFIED FACILITIES GUIDE SPECIFICATIONS

Installation Guidelines, 10Gig SFP+ Direct Attach Copper Cable Assembly PN533A

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

THE BEST SOLUTION FOR TELECOMMUNICATIONS DISTRIBUTION

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

Busbar and Modular Wiring Systems

Symphony II Adaptable Table System

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS

What Plans Do I Need for a Building Permit?

Optical Cable Entry Facility (OCEF) Installation Instructions

Journeyman's Practice Exam

FEATURED PRODUCTS SECTION 1COMMSCOPE

SPACE AND ENVIRONMENTAL PLANNING FOR PUBLIC SAFETY AND CELLULAR DAS

Kitchen and Bath Design Planner

BICSI RCDD Number: RCDD-001 Passing Score: 800 Time Limit: 120 min File Version: 4.

Clark County Fire Prevention Las Vegas Nevada

i. AM. Radio Transmitter Installation and Operation Easy to follow instructions on how to program and use your Model 5.0 i. AM.

Grease Interceptor Design Checklist

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

Customer Connection Guide Updates Effective May 2017

Call For Interest PoE- plus. Chris Di Minico MC Communications

Installing the IPS 4240 and the IPS 4255

Vivato Extended Range Wi-Fi Solutions

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

NetSure ITM. Contents 1. Site Planning Data 2. One Line Diagram 3. System Outline Drawings 4. Connection Details

CONTINUING EDUC ATION

DESIGN INSTRUCTIONS TO ARCHITECTS AND ENGINEERS [ ] SCHEMATICS [ ] DESIGN [ ] CONSTRUCTION

Information for Digital Antenna System (DAS)/ Bi-Directional Amplification (BDA) Systems

Equipment Rack Grounding. Technical Note

This Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein.

POWER SERVICE DETAILS

OPTICOM Rack Mount Fiber Cassette Enclosure

SECTION TRANSFORMERS

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

10/100BASE-TX to 100BASE-FX. Fast Ethernet Media Converter. Quick Installation Guide

.2 Section Waste Management and Disposal..4 Section Electrical General Requirements.

SECTION BUILDING WIRE AND CABLE

Panduit 28 AWG Patch Cords Installation Guideline

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

City of Miami Communications Division

SECTION PROJECT COORDINATION VIA BIM

Installation & Operation Manual

FTTH ENGINEERING AND INSTALLATION INTRODUCTION

DUST COLLECTOR 70 GALLON, 2 HP

The Solar Snake Tray Advantage! Cable Management for Solar Installations

Installation requirements

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines.

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2

Voice/Data Identification. onlinecomponents.com THE LEADER IN COMMUNICATIONS LABELING 2004/2005

300 Series Racks. 19" Wide Opening Stand-Alone Wall Cabinet with Adjustable Rails. Applications. Features. In The Box. Options

3 Dynatel M Series Locating and Marking System DOCUMENT NEW- TO- THE- WORLD TECHNOLOGY OBSOLETE DAMAGE PREVENTION PIN- POINT ACCURACY SAFETY

10/100Base. 100Base-FX Switching Converter. User s Manual

NEC 2014 Code Changes

GTS High Frequency Pulser. Technical Bulletin

CLARK COUNTY FIRE CODE AMENDMENTS

SECTION WIRE AND CABLES. A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents.

Frequently Asked Questions about Wireless Facilities on Wooden Utility Poles and Streetlight Poles

CELLULAR DISTRIBUTION SYSTEM

DIVISION 26 ELECTRICAL SECTION ELECTRICAL

The maximum back wall height is eight-feet three-inches (8 3 ), including truss, and is allowed only in the rear half of the booth space.

Cisco Certification Exam

CHAPTER 29 PROJECT COMPLETION DOCUMENTS

Transcription:

CELRL-PM-R July ARCOS BULLITEN - SUBJECT: IT Design. REFERENCE: a. Army Reserve IT Manual, Change b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-/ IT Design Whitepaper, Jun ( ENCLOSURE ). This memorandum is to serve as updated guidance currently defined in Army Reserve IT Manual, Change, and the Army Reserve DPSR. The attached whitepaper has been prepared and approved by USARC G-/ and provides updates applicable to the design of Army Reserve Facilities.. The whitepaper represents recent lessons learned and frequent IT design issues and omissions. This document will be incorporated into future updates of the Army Reserve IT Manual and DPSR and is intended to be utilized as interim requirements until those updates occur.. This ARCOS Bulletin supersedes ARCOS Bulletin -. All applicable criteria from that bulletin has been incorporated into the attached whitepaper dated Jun. The point of contact for questions to this guidance is Bruce Brandt (0) -, Bruce.B.Brandt@usace.army.mil. Brian Cash, PE, PMP Army Reserve Center of Standardization Manager (0)-- Brian.Cash@usace.army.mil

USARC G-/ IT Design Whitepaper Last Updated: June This whitepaper has been designed to be used as a tool in the creation and review of the Telecommunications Narrative and Design for all Army Reserve MILCON projects. This document is a bridging document that describes lessons learned and/or frequent or typical IT design issues. It will be periodically updated until the next major revision of the Army Reserve IT Manual is issued. IT Reference Documents The Telecommunications Design and Construction for all MILCON projects follow basic industry standards and are fully compliant with standards established by the Army Reserve, ISEC and the Corps of Engineers. In addition to the industry standard telecommunications references that are included in the Design Narrative, the following IT Reference Document titles are to be incorporated in the Design Narrative Electrical and Telecommunications sections as required Reference Documents.. Army Reserve IT Manual. Technical Criteria for the Installation Information Infrastructure Architecture (IA). UFC --0 All references to UFC -0- as it pertains to Telecommunications must be removed from the Design Narrative as that UFC is obsolete for all Army Reserve MILCON projects (Per IA ALARACT Dated February ).

IT Design Pitfalls USARC G-/ has identified several design deficiencies that have occurred on a majority of the Telecommunications Designs reviewed. In order to avoid these IT design pitfalls, a description of the item and method of avoiding the design error are listed below; Pitfall: No RCDD stamp on the Certified Final Telecommunications Design Package. o Suggested Avoidance Method: IAW IA and the Army Reserve IT Manual, RCDD review, approval, certification, and stamp of telecommunications design before issuing Certified Final is required. Pitfall: Voice and Data outlet termination serving areas are not clearly defined on telecommunications drawings. o Suggested Avoidance Method: IAW IA, in buildings with the TER and TR or multiple TRs on the same floor, each telecommunications floor plan sheet (i.e. T-XXX) should clearly indicate the TER/TR the voice and data outlets are to be terminated in. For example, a General Note which states, All voice/data outlets on this sheet are to be terminated in TR ) could be added to each applicable sheet. Pitfall: Water, Gas, and Mechanical pipes that don t serve the EF, TER, and TR(s) are often designed to pass thru or above these spaces. o Suggested Avoidance Method: IAW the Army Reserve IT Manual, this is not allowed. To help avoid this issue, G-/ suggests adding the following General Note to the Fire Safety, Plumbing, and Mechanical drawings general notes pages: Equipment (piping, ductwork, machinery, etc) that does not serve the EF, TER, or TR(s) shall not be installed above or in these IT spaces nor will this equipment pass through or enter the EF, TER, or TR(s). In addition to adding this note, this is an important item for the Designer to be mindful of as the Fire Safety, Plumbing, and Mechanical designs are created. Pitfall: Motors, transformers, or other electrical devices greater than KVA are located within of Category horizontal cabling and/or copper backbone cabling. This can often cause an EMI issue. EMI issues are very difficult to isolate and often expensive to repair. That is why the BISCI TDMM th Edition recommends avoiding all possible EMI situations. o Suggested Avoidance Method: To avoid the possibility of EMI, add the following General Note to the Mechanical and Electrical drawings general notes pages: Any motor, transformer, or other electrical device greater than KVA will have a minimum of a buffer from any wall of the EF, TER, or TR(s). In addition to adding this note, this is an important item for the Designer to be mindful of as the Mechanical and Electrical designs are created.

IT Design Changes and New IT Design Items The following are updates to the latest version of the Army Reserve IT Manual, IT community changes and new IT Design methods/requirements of note; Army Reserve data cable jacket and outlet jack color are now blue. G-/ requests this item be added as a General note on the Telecommunications General notes sheet. G-/ also requests that a General note be added to indicate that white is the required Army Reserve cable jacket and jack color for voice outlets. The required size and specifications for IT wall-mounted cabinets have changed. The new requirement is that the cabinet be W, H, and D ( RU high), lockable, with louvers and fan. G-/ requests that a Keynote be added to the design to indicate this requirement when IT cabinets are used in the design (i.e. SIPRNet Café). Copper and fiber patch cables are now GFGI items and do not need to be included in the Telecommunications Design Narrative or the Telecommunications Design. Wireless Access Point Outlet infrastructure is now required to be included in the Telecommunications Design. o Provide Wireless Access Point outlets for the following areas; Training Building o o Classrooms Assembly Hall Conference Rooms Library Learning Center OMS/VMS/TEMF Workbay Coverage and Outlet Density Requirements Wireless Access Point outlet is required for every foot x foot square grid of the above areas. If grid location will support less than users, then provide one Cat cable per outlet. For grid locations with over users, provide two () Cat cables per outlet. Mounting Details For all standard height drop ceiling locations, each Wireless Access Point outlet should be mounted inches above finished ceiling. For all Assembly Halls and Work Bays, each Wireless Access Point outlet should be mounted on the wall at feet AFF. Electrical Outlet requirements for the EF, TER, and TR(s) have been significantly revised. The changes are as follows; o Clean Power circuits are no longer required. o The electrical panel for the EF, TER, and TR(s) must be located in the space that it serves.

o o Entrance Facility New requirements call for two dedicated V/ Amp circuits with one NEMA L- and one double duplex NEMA - receptacle. These receptacles will be installed on the plywood backboard at AFF near the Service Provider Conduits. TER and all TR(s) - New requirements call for one dedicated V/ Amp circuit with one double duplex NEMA - receptacle for each inch (0 mm) rack or cabinet in the TER and all TR(s). This receptacle shall be installed AFF on the rear of the rack. HVAC requirements for the TER and TR(s) have also been revised. The following is provided as additional guidance to help the HVAC Designer meet the requirements as listed in the Army Reserve IT Manual and IA; o For heat load calculations use the heat dissipation information from the actual equipment to be installed in each rack. This information should be coordinated with the USARC G/ representative for the project. If it is determined this information is not available then 0 Watts per IT rack should be used as a default value. IAW the BICSI TDMM and general manufacturer s specifications, the Army Reserve now requires the following to used for Category horizontal cabling conduit runs from the outlet box to the accessible ceiling space, cable tray, or TER/TR; o All horizontal cabling runs containing or less Category cables must use a minimum EMT conduit. o All horizontal cabling runs containing - Category cables must use a. minimum EMT conduit. o Poke-thru floor boxes for modular furniture system connections (up to workstations) must have - conduit from the box to the accessible ceiling space, cable tray, or TER/TR. o All other horizontal cabling runs containing or more Category cables must be sized for an initial fill ratio of % or less. This % fill ratio must be based on a Category cable diameter of.. In-Slab Floor Box and Conduit Guidelines o IAW IA, all in-slab floor box locations require that conduits (one in-use and one spare) be installed. Only the first conduit can have cable installed. The second must remain empty. o IAW the Army Reserve IT Manual and the BISCI TDMM, the Category cable installed in all in-slab conduits must be rated for wet locations. Category Indoor/Outdoor type cable must be specified for these locations. Conduit requirements from the TER to the UHS have been reduced. Only - conduit with -. innerduct is now required. Cable requirements from the TER to the UHS have been reduced. Only pair of OSP copper cable is now required with no requirement for Fiber Optic cable. All IDS System Panel locations will now require a voice/data outlet from the IDS system panel to the nearest TER/TR. This voice/data outlet must be installed in conduit.

Vertical Rack Grounding Bus-bars as defined in section... of the Army Reserve IT Manual are no longer required. All IT racks should now be grounded directly the TGB using a # AWG copper wire. GPON as defined in section.. of the Army Reserve IT Manual should no longer be considered as an IT design alternative and this section is no longer applicable to Army Reserve MILCON projects. Helpful Diagrams The following pages contain diagrams of the Typical IT Rack Design for the TER, TR(s), and the OMS TR. There is also a Typical Army Reserve IT Backbone Cabling Diagram. These diagrams are designed to assist the Telecommunications Designer in their design of the Rack Elevation drawings, Telecommunications Site Plan, and Riser (One-Line) diagram.

RPS MASTR STAT DUPLX SPEED STACK SYS ACT SYS AUX SYS AUX PWR PWR PWR PWR I T EST O AMERICAN POWER CONVERSION Catalyst 0 0-V~, 0/0Hz, -A 0-V~, 0/0Hz, -A SERIES Cisco 00 Series X X X X X X X X X X X X Catalyst 0-X Series X X X X X X X X X X X X X X X X Catalyst 0-X Series X X X X X X X X X X X X Catalyst 0-X Series X X X X X X X X X X X X Catalyst 0-X Series X X X X X X X X X X Catalyst 0-X Series I T EST O AMERICAN POWER CONVERSION TER IT Racks (Typical) " Vertical Distribution Data Voice " Vertical " Vertical " Vertical Spare " Vertical U Horizontal U Horizontal U Fiber Patch Panel U Cat. Patch Panel Edge Switch U Core Switch Core CME Router U Horizontal U UPS Smart-UPS 0 0 Smart-UPS 0 0

X X X X X X X X X X X X X X Catalyst 0-X Series X X X X X X X X X X X X Catalyst 0-X Series X X X X X X X X X X X X Catalyst 0-X Series X X X X X X X X X X Catalyst 0-X Series I T EST O AMERICAN POWER CONVERSION TR IT Racks (Typical) " Vertical Data " Vertical Voice " Vertical U Horizontal U Horizontal U Fiber Patch Panel U Cat. Patch Panel Edge Switch U U Horizontal U UPS Smart-UPS 0 0

X X X X X X X X X X Catalyst 0-X Series X X X X I T EST O AMERICAN POWER CONVERSION OMS TR IT Rack (Typical) " Vertical " Vertical U Horizontal U Horizontal U Fiber Patch Panel U Cat. Patch Panel (Data) Edge Switch U Cat. Patch Panel (Voice) U Horizontal U UPS Smart-UPS 0 0

IT CABLING BACKBONE DIAGRAM (Typical) 0 Pair OSP copper cable installed w/minimum ft service loop for SP splicing Service Provider Point of Connection Maintenance Hole Training Building ea-" conduits w/ea-¼ innerducts or cable tray with a pair copper cable & SM fiber cable Installed TER ea-" conduits w/ea-¼ innerducts or cable tray with 0 pair copper cable & SM fiber cable Installed TR EF OSP ea-" Conduits Conduits w/ea-¼ innerducts Conduit empty Maintenance Hole To OMS & UHS ea-" Conduits each with ea-¼ innerducts, conduit with an OSP pair copper and SM fiber cable installed A OSP ea-" Conduits stubbed up "-" AFF on left wall, Conduits w/ea-¼ innerducts, fiber and CATV installed in separate conduits, conduit will have innerduct and no cabling, conduit without innerduct will have 0 pair copper UHS Copper and fiber will be mounted onto a 'x'x¾ Fire rated plywood Maintenance Hole Notes/Specifications OSP Conduit. AR IT Manual.. OSP Conduit Design Criteria. IA Section.,... & Table. Concrete encased conduit IA... Maintenance Hole Installation and Spacing. Do not use handholes in place of maintenance holes IA/... IA... on military installations - min every 00ft, not on military installations - min every 00ft not to exceed manufacture s pulling tension on cable. IA.. communication maintenance holes shall not be shared with electrical TR OMS