State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

Submittal Packages Detailed with Items and Reviewers

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Section Meetings Section Material and Equipment. None Required

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

submittals 1s e c t i o n

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

East Central College

Company. Signed: Date:

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School

AIA Continuing Education

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

SECTION SUBMITTAL PROCEDURES

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

ADDENDUM #1. April 29, 2009

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

LETTER OF TRANSMITTAL

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

Specifications: Other: sign in sheet

SECTION SUBMITTAL PROCEDURES

SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1

National BIM Standard - United States Version 3

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

Procedure to Petition for Plat Review and Site Plan Review

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

Commercial Infill Project Guide

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Chapter 1 General Design Information

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Submittal Transmittal

Answer: Qualification statement should be provided with the bid.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION ADMINISTRATIVE REQUIREMENTS

CHAPTER 5 ARCHITECTURE

PROCEDURE FOR PROCESSING WORKING DRAWINGS

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

SECTION SUBMITTAL PROCEDURES

Working Drawing Procedure

LETTER OF TRANSMITTAL

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

SUBMITTAL REVIEW COVERSHEET

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

SECTION SUBMITTAL PROCEDURES

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

ADDENDUM #2 September 12, 2018

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

Estates Development & Projects

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Developer Design Review Submittal Requirements - SECTION 5

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

TAB B-9 RECORD DRAWINGS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

A. Interior and exterior non-illuminated tactile building signs including Braille.

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

CHAPTER A-15 INTERIOR DESIGN INDEX

FAST TRACK WORKSHOP OBJECTIVES

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

Working Drawing Manual

Pismo Beach Public Art Program Outline

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED HVAC WATER TREATMENT CHILLED WATER PIPING TR SUBMITTAL NUMBER: SUBMITTAL DETAILS:

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

BIM/VDC on TAA Projects:

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation

Residential Room Additions

Chuck Caesar. VIA: /Webposting April 27, 2017

Project No: Date: 02 September To: The Des Plaines Public Library Issued by: Lisa Schmidt

Transcription:

Ardmore, PA Atlantic City, NJ REQUEST FOR INFORMATION PROJECT: 1845 - Renaissance Hotel Renovations RFI NUMBER: 51.0 JONATHAN NEHMER & ASSOC ATTN: Lauren Maccherone Dacey 7361 Calhoun Place Suite 310 Rockville, MD 20855 301-670-1635-phone 301-670-9643-fax Requested Date: Requested Contractor: Generated By: Response Due By: Response Received: 08/25/2017 Sunlight Electrical Kenneth Romano 08/30/2017 08/31/2017 The required but unavailable information is resulting in a delay in fabrication of material or prosecution of the work in the field. Once the information is received we will advise you as to the impact to the schedule and cost Subject: Grand stair chandelier dimmer Reference: Information Requested: The dimmer control for grand stair chandelier is located in administrative offices which is scheduled to be demoed. It also says to maintain integrity of circuit as well. Response Requested By: Response: See ached electrical engineer's response. Regarding the grand stair chandelier dimmer control, per LDC: There is space on the dimming panel. and the dimmer control type should be coordinated with the LED modules provided by the custom fixture manufacturer. See attached reviwed fixture shop drawing for required type of dimming. New fixture is to be connected "to existing branch circuit retained under demolition SOW". Electical Contractor shall extend / rework existing branch circuit wiring for new work as required. Architect / Interior Designer and /or Light Controls Consultant (LDC) to advise on new and existing lighting controls. Request CCs: Response CCs:

Ardmore, PA Atlantic City, NJ REQUEST FOR INFORMATION PROJECT: 1845 - Renaissance Hotel Renovations RFI NUMBER: 51.0 JONATHAN NEHMER & ASSOC ATTN: Lauren Maccherone Dacey 7361 Calhoun Place Suite 310 Rockville, MD 20855 301-670-1635-phone 301-670-9643-fax Requested Date: Requested Contractor: Generated By: Response Due By: Response Received: 08/25/2017 Sunlight Electrical Kenneth Romano 08/30/2017 The required but unavailable information is resulting in a delay in fabrication of material or prosecution of the work in the field. Once the information is received we will advise you as to the impact to the schedule and cost Subject: Grand stair chandelier dimmer Reference: Information Requested: The dimmer control for grand stair chandelier is located in administrative offices which is scheduled to be demoed. It also says to maintain integrity of circuit as well. Response Requested By: Response: See attached electrical engineer's response. Regarding the grand stair chandelier dimmer control, per LDC: There is space on the dimming panel. And the dimmer control type should be coordinated with the LED modules provided by the custom fixture manufacturer. See attached reviewed fixture shop drawing for required type of dimming. Request CCs: Response CCs:

August 25, 2017 REQUEST FOR INFORMATION RESPONSE ATTN: Lauren Maccherone Dacey COMPANY: Jonathan Nehmer & Associates JOB NAME: Renaissance Hotel, Phila., PA JOB REFERENCE: JNH 15311 REQUEST/RESPONSE: RFI 51: Grand Stair Chandelier Dimmer 1. The dimmer control for grand stair chandelier is located in administra ve offices which is scheduled to be demoed. It also says to maintain integrity of circuit as well. New fixture is to be connected to exis ng branch circuit retained under demoli on SOW. Electrical Contractor shall extend / rework exis ng branch circuit wiring for new work as required. Architect / Interior Designer and/or Ligh ng Controls Consultant (LDC) to advise on new and exis ng ligh ng controls. ANSWERED BY: Christian Kremer DATE: 08/31/17 Engineering Excellence Since 1968 Commercial Industrial Ins tu onal U lity 5 Christy Drive Suite 307 Chadds Ford, PA 19317 Phone - 610-558-3464 Web - www.fxbinc.com

SHOP REVIEW TO: Hallmark Lighting DATE: 08.16.2016 SUBMITTAL: BAL-DC09 PROJECT: Renaissance, Philadelphia REVIEW BY HVS DESIGN OF THIS SUBMITTAL IS FOR GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS & SPECIFICATIONS ONLY. THIS SUBMITTAL IS NOT A CONTRACT DOCUMENT. THE MANUFACTURER HAS SOLE RESPONSIBILITY FOR THE ACCURACY OF DIMENSIONS, QUANTITIES & PROPER DETAILS. FROM: Inad Bilbeisi EMAIL: ibilbeisi@hvs.com CHECK ONE: Prototype Reviewed Reviewed as Noted Revise and Resubmit Rejected Other GENERAL NOTES 1. All criteria called out in the HVS specification/drawings are still valid unless superseded by a comment or mark up on the shop drawing. 2. Manuf to submit all finish samples for approval (if applicable). 3. HVS Design has reviewed this shop drawing for aesthetic design intent only. HVS Design has not reviewed this shop drawing for the following: coordination with, lighting consultant/equipment, F&B equipment/vendor, MEP, ADA compliance and life safety. HVS has not reviewed these shop drawings for means and method. 4. Ownership may have additional comments to be provided separately. Manufacturer to confirm with purchasing agent. 5. If items can be provided as noted resubmission is not required. If it cannot, the item(s) is rejected and resubmission is required. (Delete this note if any box other than reviewed as noted is checked.) 6. Must provide revised copy of this submittal for our records. 7. Refer to Lighting Design consultant and Food Service consultant markups for full coordination. 8. All markups either on plan, elevation, section or detail to be coordinated/cross referenced by millwork shop. 9. Provide a copy of submittal to GC for coordination. 10. Any piece larger than 80 requires it to be made in two pieces and coordinated prior to production with designer. BAL-DC09 fixture at Ballroom See attached for mark ups Provide multiple holes thru the chassis for site adjustment Provide enlarged detail where shown. 7361 Calhoun Place, Suite 310, Rockville, MD 20855 P: 240.683.7123 F:301.670.9643 www.hvsdesignservices.com