Installation Guidelines

Similar documents
INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

How To Install Windows: Nail-Fin Application

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

Panel Installation Instructions

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

Installation Guide Classic Series Wood Siding

Installation Instructions for New Construction. Installation Instructions for New Construction

Flashing Materials. Rough Opening Preparation

Panel Installation Instructions

Installation Guide - Evolution Series Wood Siding

NAIMA. Insulation Between (filling) Purlins and Over Purlins. What Does Metal Building Insulation Do? Installation Instructions for New Construction

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Panel Guard Installation For Adhesive Attachment

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Tuff-Rib Install Guide

window installation Guide wood FRaMinG New Construction

SIM. Mass Loaded Vinyl

Attic Installation Tips:

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

Installation of Fiberglass Windows

ClearSpan Twin-Wall Polycarbonate End Panel Kit

Please read through the entire document before starting your installation process to better understand what is required.

I n s t a l l a t i o n I n s t r u c t i o n s

Installation Instructions

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008)

Installation Materials Required: Tools Required: 6" self-adhesive flashing. Shims. 3-foot level 6-foot level Tape measure 1/8" drill bit

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

Installation Manual for Thermo Panel

Window with Nail fin (New construction)

Framing & Electrical Rough-in for Recess Mount IS Panel System

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Three layer Felt Roofing using cold applied adhesive

RV ENTRY DOOR REMOVAL AND SHIPPING BLOCK INSTALLATION AND ALIGNMENT

Dura-Lock Roof System

Installation Instructions for TruWood Reversible Trim

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

Vinyl Windows and Doors Manufactured by Pella Corporation

Storing, Handling, and Cutting Steel Panels

Five Star Panel Installation Instructions

Integrate the Window and WRB (1/2)

Installation Instructions for Panel Siding and Soffit

Effective February, 2015

INS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...

Eagle clad double-hung window installation instructions

3M Air and Vapour Barrier 3015 Technical guide

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

E-Z BUILD STEEL BARN 12' 12' 12' 16' 12' 20'

Vinyl Windows Manufactured by VPI Quality Windows

RIDGEMASTER PLUS CAUTION INSTALLATION INSTRUCTIONS ALWAYS WEAR SAFETY GLASSES TOOLS NEEDED GENERAL GUIDELINES FOR RIDGEMASTER PLUS AND HIPMASTER

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

Chapter 23. Garage Construction

Armourvent Multi application guide

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

ClearSpan Mini Cold Frames

CFDTT-01. Control Joint Study (General)

GlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing

Common Safety Concerns

Installation Instructions

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

Pocket Door Installation Instructions

PANEL INSTALLATION GUIDE

GrowSpan Heavy-Duty Commercial Cold Frame

Building Wrap and Flashing

Tools required by installer: Materials required by installer:

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

INSTALLATION LAMTON INSTALLATION INSTRUCTIONS. Lamton Laminate Flooring with Underlay Attached Glueless Installation. Tools and Accessories

Installation Instructions for Siding

Norwood Windows Permaglass Fiberglass Products Installation Instruction

Bitumen Roofshingles ARMOURVENT MULTI APPLICATION GUIDE VENTILATION

10. Vents, Baffle Guard and Blocking

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

Curtain Wall Installation Guide

Chapter 14. Wall Sheetrock

HR175 Sash Replacement Kit Installation Instructions

Dubnium 11 Installation Instructions & Parts List

GIRTS ON BACK OF BUILDING

Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Worthington Sauna Installation & Owner s Manual

The Sealed Attic System with. DuPont Tyvek AtticWrap INSTALLATION USING DRAPE METHOD

Nanton Grain Mill Assembly

INSTALLATION INSTRUCTION FOR CLAD BOW WINDOWS WITHOUT HEAD AND SEAT BOARD

HipMaster Installation Instructions

Xenon 05 Installation Instructions & Parts List

APPENDIX A, UMC STANDARD 6-5 STANDARD FOR INSTALLATION OF FACTORY-MADE AIR DUCTS

Installation Instructions

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar

Vinyl Windows and Doors

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.

INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING

Integrity Polygon and Round Top Installation and Finishing Instructions

1. Tile Roof Installation:!

Transcription:

TM TM Installation Guidelines * Guidelines also apply to installation of astroeco products More For Pre-Engineered Metal and Post-Frame Buildings icient, Safer To Use and Easier To Install Than Regular Bulk Mineral Fiber Or Foamboard Insulation AstroShield & AstroArmour is a revolutionary type of industrial, commercial and general purpose insulation incorporating state-of-the-art technology in design and manufacture. It includes a building code approved vapor barrier, air infiltration barrier and powerful insulation all in one. Its unique composite design consists of layers of polyethylene air bubble pockets, surrounded by a thin layer of reflective metalized film that is inorganic, water-resistant, puncture-resistant, termite and fungus resistant, non-allergenic and inhospitable to nesting rodents. AstroShield & AstroArmour is easy to install its thin, pliable, lightweight design is especially suited for pre-engineered and post-frame buildings. AstroShield & AstroArmour offers increased energy efficiency over traditional insulation products. And it s safe... there are no protective masks, gloves or safety glasses required. Standard 4 and 6 wide rolls can be easily trimmed with a utility knife or pair of scissors to fit any application. AstroShield & AstroArmour lightweight design makes it easy on your building s design load.

Pre-Engineered Metal Buildings: Vertical Installation of AstroShield/AstroArmour in Walls NEW CONSTRUCTION AstroShield & AstroArmour can be installed in sidewalls, either running from the top wall plate down to the foundation or running horizontal along the structure s frame, prior to the installation of the metal sheeting. Page 2 of this manual describes vertical installation; page 3, horizontal. 4. When securing bottom, staple or tape insulation to the sill plate or a furring strip secured to the floor. 1. Measure the length to be applied, then cut a similar length of AstroShield & AstroArmour. A dd a n in ch o r t wo t o assure complete coverage at top and bottom. 5. Position first length at corner, wrapping around the corner and fasten with self-tapping screws or with reflective tape, sufficient to hold in place. NOTE: If the AstroShield product you are installing on walls is one of the AstroShield 'White' products, and the reflective surface is facing toward the outside, installation must include a method of insuring a 1" airspace between Astroshield and the metal siding. 2. At corners, wrap AstroShield & AstroArmour a round the corner and continue vertical installation as described in the previous steps. Attach metal sheeting directly over insulation in the conventional manner. RETROFIT APPLICATION 3. Cut a second length and position next to the first length. Butt sides evenly together or slightly overlap. Tape all seams following the instructions on page 6. 2 Measure and cut lengths as in Step 1. Attach to the inside of the top of the wall plate as in Step 2. Begin hanging and securing subsequent strips as in Step 3. Leave approximately 1 airspace between wall and insulation. Continue installation per Step 4 and 5, following taping instructions on page 6.

Horizont al Installation of AstroShield/AstroShield in Walls NEW CONSTRUCTION 1. Install AstroShield & AstroArmour fro m t he botto m up. Snap a line across the entire wall length to establish a straight edge. Position line to leave approximately 3 of insulation below the top of the foundation. 4. Attach AstroShield & AstroArmour to opposi te corner as in Step 2. 5. Follow the taping instructions found on page 6. Continue along each wall until application is complete. Attach metal sheeting directly over AstroShield & AstroArmour in the conventional manner. 2. Measure the length to be applied from corner to corner, allowing an additional amount of overlapping. Starting at the bottom of the wall, overlap the foundation approximately 3, keeping the top edge parallel to the snap line. Wrap around the corner and staple or tape in place. NOTE: If the AstroShield product you are installing on walls is one of the AstroShield 'White' products, and the reflective surface is facing toward the outside, installation must include a method of insuring a 1" airspace between Astroshield and the metal siding. RETROFIT APPLICATION 3. Continue with the next length, installing it parallel to the first length. Staple, screw or tape to purlins across the entire length of the wall, overlapping the first layer 2 if edges don t meet at the purlins. Secure AstroShield & AstroArmour only t o t he extent t hat t he material will stay in place until the metal skin is applied. 3 Snap a line as in Step 1. Measure and cut lengths. Attach to corner on the inside lower corner of the wall as in step 2. Roll out and begin securing to purlins as in Step 3. Leave approximately 1 airspace between wall and insulation. Continue per Steps 4 and 5, following recommended taping instructions on page 6.

Installing AstroShield/AstroArmour in Post-Frame Buildings Follow the same instructions as for preengineering metal buildings using staples to secure the AstroShield & AstroArmour to the wood girts or purlins prior to installation of metal sheeting. For the best finished look, space purlins or girts on 2 or 4 centers. This will place the seams on the purlins or girt edge which will be covered and sealed by the outside of the building. In many applications, this would replace the need for taping. AstroShield GOES WHEREVER REGULAR MASS FIBER AND BOARD INSULATION CAN...AND EVEN PLACES THEY CAN'T! PIPEWRAP Use 1 wide strips of AstroShield s ecured a round pipe every 2 feet on center to create necessary air space. LOADING DOCK OR OVERHEAD DOORS Special coated AstroShield is available for these applications. DUCT WRAP Use AstroShield 3" wide strips wrapped around to create 3/4" wide airspace prior to installing AstroShield HVAC duct material. 3/4" foam spacers are also an option. Space about 2 feet on center. ENTRY DOOR INSULATION Special Note: Be sure to check technical data for temperature ranges in any high temperature application. 4

Installing AstroShield/AstroArmour in Roofs NEW CONSTRUCTION 1. Starting at the end of the roofing framework, measure the length across the trusses, adding enough to allow hang at both ends. Cut the first piece and lay in place. Do not pull tight. 2. Attach to trusses and purlins using self-tapping screws and washers or with pressure sensitive reflective tape. DO NOT USE DUCT TAPE. Follow taping instructions found on page 6. It is important for AstroShield & AstroArmour to sag sl ightly. Do NOT pull tight over the purlins. This will not be noticeable from the inside of the building following installation. 4. Roof sheeting can be applied in the conventional manner as soon as there is sufficient insulation in place to accommodate sheeting width. IMPORTANT When installing AstroShield or AstroArmour products over the purlins, it is important to allow the material to drape between each purlin so that there will be an air space of about 1" after the roof deck is applied. The reflective side must face an air space in order to reflect the heat that comes from the roof. Failing to provide the air space could lead to degradation of the material and void the warranty. *An alternative to taping each seam is to use our Peel & Seal version of AstroShield & AstroArmour. This version features a self-adhesive release tape, which allows for an easy peel-and-stick process; eliminating the need to nail, screw or tape down. RETROFIT APPLICATION 3. Cut the second length, laying parallel to first. Make sure to butt or slightly overlap edges. Tape ALL seams. 5 Measure the first length per Step 1. Secure the wall plate per Step 3 to left or Step 2, page 2. Remember!! Do not pull tight and secure to roof truss and purlins. Continue adding additional insulation starting from the wall plate, laying parallel to prior piece. Tape all seems following recommended taping procedure.

Extra Touches That Mean Extra Efficiency Friction fit AstroShield & AstroArmour around lighting fixtures, exhaust fans, motors, vents, or other equipment extending onto the roof. Strictly follow manufacturer s recommendations on covering or coming into contact with their fixtures. Small punctures, large rips or tears can be repaired or patched with pressure sensitive reflective tape. Eliminate cold spots by filling cracks around doors or window framing. Where possible, bow AstroShield & AstroArmour into openings. Use a closed cell foam product to fill small cracks. Follow manufacturer s recommendations for proper use. TAPING INSTRUCTIONS 1. Butt ALL seams. Use only reflective tape recommended by the manufacturer for insulation applications. NEVER USE DUCT TAPE! 2. Make sure tape and insulation are clean, dry and applied according to tape manufacturer s recommendations. Apply tape evenly over seams using a tape width that is appropriate to the job. Usually, the wider the tape, the easier it is to install. 3. Use a squeegee or flat edge to press against the tape to ensure the best adhesion. Keep insulation as smooth as possible. When taping, it helps to work from the middle out to the ends. Squeegee the tape with a flat edge to ensure a tight seal. 4. Always follow the tape manufacturer s recommendations on storage and use. 5. Manufacturer recommends using an acrylic based adhesive tape, wherever moisture or condensation is a concern. General guide to application, appearance and performance A. WARNING! Metalized fi lm is an excellent conductor of electricity. In both new construction and retrofit applications it is important to make sure there are no live, bare wires in the work area that could come in contact with AstroShield & AstroArmour or installers during or after installation. Use caution around junction boxes and electrical fixtures. Have a qualified electrician examine area for safety BEFORE INSTALLATION. B. AstroShield works best with an air space on each side of the insulation. C. Taping seams is not always necessary for good performance. In buildings where moisture or condensation in not a concern, overlapping edges or installing them behind girts or purlins is often all that is required. Animal confinement buildings, food or seed, or vegetable storage structures generally give off moisture to the air that can cause condensation in some climates. Careful taping of all seams and covering of all building truss members in direct contact with the building metal skin will improve maximum building envelope performance. AstroShield & AstroArmour properly installed and taped in a building with adequate ventilation, is your best protection against condensation problems. D. Do not paint AstroShield & AstroArmour's surface or allow it to be coated with a liquid. Metalized film will not reflect heat if painted. E. Attach to wood with staples at least 1/4 in length; attach to metal with self-tapping screws at least 1/4 in length. F. Store rolls in a dry area, out of direct sunlight and in plastic bags until ready for use. G. Do not install AstroShield & AstroArmour on top of existing mineral fiber insulation, cellulose or rock-wool in attics or roofs. However, these same products can be installed on top of AstroShield & AstroArmour. For technical information on specific applications, contact your nearest AstroShield & AstroArmour dealer or call 1-800-776-3645. www.insul.net 800-776-3645 info@insul.net Connect with us on: AstroShield is a registered trademark of Innovative Energy, Inc. 6