A High Granularity Timing Detector for the Phase II Upgrade of the ATLAS experiment

Similar documents
A High-Granularity Timing Detector for the Phase-II upgrade of the ATLAS Calorimeter system Detector concept description and first beam test results

A High-Granularity Timing Detector for the Phase-II upgrade of the ATLAS Detector system

ATLAS ITk and new pixel sensors technologies

ATLAS strip detector upgrade for the HL-LHC

Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4. Final design and pre-production.

Layout and prototyping of the new ATLAS Inner Tracker for the High Luminosity LHC

Pixel sensors with different pitch layouts for ATLAS Phase-II upgrade

The ATLAS tracker Pixel detector for HL-LHC

PoS(LHCP2018)031. ATLAS Forward Proton Detector

ATLAS Muon Trigger and Readout Considerations. Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration

Operational Experience with the ATLAS Pixel Detector

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

A new strips tracker for the upgraded ATLAS ITk detector

PoS(EPS-HEP2017)476. The CMS Tracker upgrade for HL-LHC. Sudha Ahuja on behalf of the CMS Collaboration

Development of n-in-p Active Edge Pixel Detectors for ATLAS ITK Upgrade

CMS Tracker Upgrades. R&D Plans, Present Status and Perspectives. Benedikt Vormwald Hamburg University on behalf of the CMS collaboration

Expected Performance of the ATLAS Inner Tracker at the High-Luminosity LHC

The upgrade of the ATLAS silicon strip tracker

The Commissioning of the ATLAS Pixel Detector

The CMS Pixel Detector Upgrade and R&D Developments for the High Luminosity LHC

Status of ATLAS & CMS Experiments

Nikhef jamboree - Groningen 12 December Atlas upgrade. Hella Snoek for the Atlas group

Strip Detectors. Principal: Silicon strip detector. Ingrid--MariaGregor,SemiconductorsasParticleDetectors. metallization (Al) p +--strips

Track Triggers for ATLAS

Preparing for the Future: Upgrades of the CMS Pixel Detector

Phase 1 upgrade of the CMS pixel detector

Development of Pixel Detectors for the Inner Tracker Upgrade of the ATLAS Experiment

A Characterisation of the ATLAS ITk High Rapidity Modules in AllPix and EUTelescope

The LHCb VELO Upgrade. Stefano de Capua on behalf of the LHCb VELO group

The CMS Pixel Detector Phase-1 Upgrade

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Upgrade of the CMS Tracker for the High Luminosity LHC

Thin Silicon R&D for LC applications

arxiv: v2 [physics.ins-det] 13 Oct 2015

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration

CMS SLHC Tracker Upgrade: Selected Thoughts, Challenges and Strategies

PoS(EPS-HEP 2009)150. Silicon Detectors for the slhc - an Overview of Recent RD50 Results. Giulio Pellegrini 1. On behalf of CERN RD50 collaboration

The CMS Silicon Pixel Detector for HL-LHC

Operation and performance of the CMS Resistive Plate Chambers during LHC run II

A timing layer for charge particles in CMS

CMS Phase II Tracker Upgrade GRK-Workshop in Bad Liebenzell

CMOS Detectors Ingeniously Simple!

Richard L. Bates SUPA, School of Physics and Astronomy, Glasgow University, Glasgow, G12 8QQ, UK

ATLAS Pixel Detector Upgrade: IBL Insertable B-Layer

arxiv: v1 [physics.ins-det] 25 Feb 2013

arxiv: v1 [physics.ins-det] 25 Oct 2012

Module Integration Sensor Requirements

The HGTD: A SOI Power Diode for Timing Detection Applications

Julia Thom-Levy, Cornell University, for the CMS Collaboration. ECFA High Luminosity LHC Experiments Workshop-2016 October 3-6, 2016

Silicon Sensor and Detector Developments for the CMS Tracker Upgrade

arxiv: v2 [physics.ins-det] 20 Oct 2008

ITk silicon strips detector test beam at DESY

Development of Telescope Readout System based on FELIX for Testbeam Experiments

D. Ferrère, Université de Genève on behalf of the ATLAS collaboration

The VELO Upgrade. Eddy Jans, a (on behalf of the LHCb VELO Upgrade group) a

What do the experiments want?

PoS(VERTEX2015)008. The LHCb VELO upgrade. Sophie Elizabeth Richards. University of Bristol

ATLAS Tracker and Pixel Operational Experience

The CMS Silicon Strip Tracker and its Electronic Readout

Spectrometer cavern background

Mitigating high energy anomalous signals in the CMS barrel Electromagnetic Calorimeter

The CMS Phase II upgrade Pixel Detector. Krishna Thapa Physics 627, Spring 2016

CMS Tracker Upgrade for HL-LHC Sensors R&D. Hadi Behnamian, IPM On behalf of CMS Tracker Collaboration

Attilio Andreazza INFN and Università di Milano for the ATLAS Collaboration The ATLAS Pixel Detector Efficiency Resolution Detector properties

Beam Condition Monitors and a Luminometer Based on Diamond Sensors

The Phase-II ATLAS ITk Pixel Upgrade

The CMS electromagnetic calorimeter barrel upgrade for High-Luminosity LHC

optimal hermeticity to reduce backgrounds in missing energy channels, especially to veto two-photon induced events.

CMS Pixel Detector design for HL-LHC

The LHCb Vertex Locator (VELO) Pixel Detector Upgrade

Development of Ultra Fast Silicon Detectors for 4D Tracking

Upgrade of the ATLAS Thin Gap Chamber Electronics for HL-LHC. Yasuyuki Horii, Nagoya University, on Behalf of the ATLAS Muon Collaboration

Radiation-hard active CMOS pixel sensors for HL- LHC detector upgrades

Silicon Sensor Developments for the CMS Tracker Upgrade

UFSD: Ultra-Fast Silicon Detector

Firmware development and testing of the ATLAS IBL Read-Out Driver card

arxiv: v2 [physics.ins-det] 24 Oct 2012

Test Beam Measurements for the Upgrade of the CMS Phase I Pixel Detector

CMS Phase 2 Upgrade: Preliminary Plan and Cost Estimate

High granularity scintillating fiber trackers based on Silicon Photomultiplier

Silicon Sensors for High-Luminosity Trackers - RD50 Collaboration status report

OPTICAL LINK OF THE ATLAS PIXEL DETECTOR

The LHCb VELO Upgrade

Tracking Detectors for the LHC Upgrade

The CMS Outer HCAL SiPM Upgrade.

High Luminosity ATLAS vs. CMOS Sensors

ATLAS Phase-II Upgrade Pixel Data Transmission Development

Pixel hybrid photon detectors

PoS(Vertex 2016)049. Silicon pixel R&D for the CLIC detector. Daniel Hynds, on behalf of the CLICdp collaboration. CERN

Tracking and Alignment in the CMS detector

UFSD: Ultra-Fast Silicon Detector

VErtex LOcator (VELO)

Pixel characterization for the ITS/MFT upgrade. Audrey Francisco

Data acquisi*on and Trigger - Trigger -

Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1 upgrade of the Muon Spectrometer

Performance of the ATLAS Muon Trigger in Run I and Upgrades for Run II

PoS(Vertex 2016)071. The LHCb VELO for Phase 1 Upgrade. Cameron Dean, on behalf of the LHCb Collaboration

A common vision of a new Tracker is now essential It may not be final but a focus for shared efforts is now vital

ATLAS LAr Electronics Optimization and Studies of High-Granularity Forward Calorimetry

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. CMS detector performance.

Transcription:

3 rd Workshop on LHCbUpgrade II LAPP, 22 23 March 2017 A High Granularity Timing Detector for the Phase II Upgrade of the ATLAS experiment Evangelos Leonidas Gkougkousis On behalf of the ATLAS HGTD community Annecy March 22 nd, 2018

Overview Introduction HGTD System Sensors Integration Physics Luminometer Schedule Conclusions ATLAS and HL-HLC Geometry and design Low Gain Avalanche Diodes Electronics and services Physics and Performance Online and off-line luminosity estimation Timeline and resources Conclusions and Outlook 22 / 3 / 2018 E. L. Gkougkousis 2

Introduction ATLAS and LHC A Toroidal LHC Apparatus Biggest LHC experiment with several sub-detectors 46 x 22 m cylinder, weight of 2000 t, Point 1 of LHC Two superconductive magnets: 2.6 T 5.3 m long Central solenoid 3.1 T 20.1m barrel toroid Mean Pileup (2017) ~ 34.4 ~ 128 fb-1 total integrated luminosity 22 / 3 / 2018 E. L. Gkougkousis 3

ATLAS Phase II Upgrade Timeline PileUp 13 PileUp 34.4 (2017) PileUp 200 Higgs Discovery September 2012 Phase 0 upgrades Phase 1 upgrades Phase 2 upgrades IBL New Muon Small Wheel AFP L1 LAr Trigger Inner Detector Replacement HGTD 4

HL-LHC Conditions Pileup density Luminosity Phase I: < 2.2x10 34 cm -2 s -1 (300 fb -1 ) Phase-II : 7.5x10 34 cm -2 s -1 (4000 fb -1 ) Conditions 14 TeV center of mass energy beam -6000 primary tracks per event No. of collisions per crossing from 34 to 200 within 150 psat 50 mm space Extended tracking up to < 4.0 PileUp Hard Scatter Louminus Region 1.6 Collisions per mm 45 mm RMS 5

HL-LHC Conditions Vertex Resolution Need z 0 resolution < 0.6 mm Tracker much better for central region but reaches the limit ~ = 3 0.6 mm limit Time distribution HS present a time peaked distribution with respect to PileUp that are flatter Exploit time spread within pp collisions for vertex separation 30 ps/track transfers μ=200 to μ=30 conditions 6

HL-LHC Conditions Vertex Resolution Need z 0 resolution < 0.6 mm Tracker much better for central region but reaches the limit ~ = 3 Time distribution HS present a time peaked distribution with respect to PileUp that are flatter Exploit time spread within pp collisions for vertex separation 30 ps/track transfers μ=200 to μ=30 conditions 7

HGTD System Position and geometry Specifications for 2023 Coverage 2.4 < η <4.0 R min R max Δz Δt Layers Z position 12 cm 64 cm 7.5 cm ~ 30 ps/track 2 + 1 / side ± 3500 mm Cell Size 1.3x 1.3mm 2 High Granularity Timing Detector Excellent Time resolution (< 30 psper track) Radiation Hardness (up to 4.5 x 10 15 n eq /cm 2 including mid cycle replacement and safe SF) Low volume modular design (7.5 cm total thickness) Low cost optimised layout Occupancy < 10% pad with increased granularity Technology of Choice: Silicon LGAD 7

Sensors Timing Concepts Fast time resolution: Maximizeslope(largefastsignals) Correct time walk with Constant fraction discriminator Minimizenoisetominimizejitter Estimatedclockjitter~5ps Thinsiliconsensorswithinternalgain Dependence on Capacitance H.-W. Sadrozinski, A. Seiden and N. Cartiglia, 2817 4-Dimensional Tracking with Ultra-Fast Silicon Detectors, arxiv: 1704.08666. 8

Sensors LGADs Developed and initial R&D productions at CNM(Barcelona) Secondarypimplantintroducingmoderategain HPK, CNM, FBK produced sensors 50μmthicknesson250μmsupportwafer DifferentimplantationdosesincludingGallium and Carbon Variousstructuresincluding: Paddiodesof1.3x1.3mm 2 2x2arraysof1x1mm 2 pad Single Diode 2x2 array F. Cennaet al., Weightfield2: A fast simulator for silicon and diamond solid state detector, 2822 Nucl. Instrum. Meth. A796 (2015) 149. 9

Sensors Testbeam Results Time resolution Efficiency maps ATL-COM-LARG-2017-039 10

Sensors Radiation Hardness J. Lange, et al., JINST 12 (2017) P05003 SimilarresultsFluka-GCALOR Max. (h = 4.0) after4000 fb -1 ~ 4.5 x 10 15 n eq /cm 2 (midcycle replacement at 2 x 10 15 ) Thermal neutron irradiation single pad diodes Time resolution in the order of 40 psfor gain of 10-15 11

Integration ASIC and Signal extraction ATLAS LGAD Timing Integrated ReadOut Chip (ALTiRoC) 2 x 2 cm die, TSMC 130μmtechnology Bump-bonded to 2 x 4 cm 2 sensors Single pixel readout, 225 channels/asic Readout Rate: 1 MHz detailed hit info after L1 40 MHz number of hits on outer radii for luminosity estimation 25 psestimated time resolution Wire-bonded to capton flex 12

Integration - Mechanics Forward & backward detector disks with central half rings & stave concept. Total 6 m 2 LGAD sensors 800 modules in total 2 x 4 cm 2 per module Large eta modules, bonded to single half panel Outer modules where physical staves are considered 13

Integration Layout Optimization Stave layout Efficiency Geometry Events with 0 hits 0.7 % Longest Stave 546 mm Coverage 91.8 % Fraction of events at x ory = 0 52 % 18 staves per quadrant Sensor Overlap Resolution degrades with irradiation Inner region more affected Increase number of hits to recover Fill Factor Inter-pad Region 30 μm 94 % 50 μm 90 % 100 μm 82 % 14

Physics and Performance Track resolution Deadregionsbetweenstavesaccountedfor 4mmfor80%overlap 16mmfor20%overlap Trackresolutionalways<40psec 3 different timing scenarii Initial :30 psecper pad and 25 psecfor electronic Intermediate : timing resolution after 2000 fb -1 (with inner layer replacement) Final : timing resolution after 4000 fb -1 15

Physics and Performance Performance Electron Isolation B-tagging performance 2 layers/side with overlap Average efficiency 93% at all cases ITkonly average efficiency 83% Performance plots currently been updated for new geometry 100% Efficient does not use η parametrization nor fill factor Initial assumes 30psec across the whole detector Slight degradation between initial and final, though larger loss from hit efficiency 16

Physics and Performance Some EW channels th( bb) qqh qqww * qq+ev e μv μ 11% relative improvement 8% relative improvement 43% background rejection 3% PU efficiency BDT analysis Top dominated background due to forward b-tagging 17

HGTD as Luminometer On line and off-line estimation linear dependence of number of hits on number of interactions Count hits in the region of 320 mm < R < 640 mm 0.1% expected statistical uncertainty for 1 sec integration time Low systematics Out of time sideband subtraction Hit count per ASIC and BCID On-line Estimation 40MHz readout for real time estimation Provide per BCID interactive estimate Total latency of 440 ns (100 ASIC+ 340 ns fiber) 18

Schedule Important mile-stones 2018-2020: Sensor, ASIC, electronics and services RnD 2021-2024: Fabrication and module assembly 2025-2026: Installation and Commissioning 19

Conclusions and Outlook Sensors, ASIC, Integration and Radiation Hardness So far. Physics VerypromisingresultsforpileuprejectioninthehighηregionwhereVBFand exotics will benefit Highjetsinglepurityforinvisiblesearches Sensors 26 pstimeresolutionforsingleun-irradiated1.3mm 2 diodes 99%uniformitywithlowinefficienciesintheinter-padregions Operationsupto6e15n eq /cm 2,meetingtheradiationhardnessrequirements Anytimingdegradationduetoearlybreakdown Integration First ASIC prototypes successfully assembled at IFAE and tested in HGTD September CERN testbeam ValidatefullASICdesignandexpectfirstprototypeatthelastquarterof2018 20