M1.0 MECHNANICAL FLOOR PLAN

Similar documents
PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

A/E REVIEW CHECKLIST HVAC

Ductwork Controls and Instrumentation Outlets (HVAC) HVAC Control System.

LOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing.

LINEAR DIFFUSERS AND BAR GRILLES

SECTION LOW PRESSURE DUCTWORK

BUILDING PLAN REVIEW REQUIREMENTS

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder.

Residential Construction Checklist Single and Two Family Construction

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

Facility Services Subgroup Preface for Divisions 21` through 28

COMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ADDENDUM NO. 4 November 15, Page 1

Technical Development Program

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.

Installation and Maintenance Manual IM 770-1

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

Installation and Maintenance Manual

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

City of Thousand Oaks

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

Design Deliverables. Summary. A. Expectations for Design Deliverables:

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.

State College Area School District

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

Industrial Pipe Marking

Architect s Letter of Certification

*************************************************************************************************************

Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products

U of I Facilities Standards Updates for 2017

2012 IMC Performing Commercial Mechanical Inspections

Architect s Letter of Certification

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

VILLAGE OF ALGONQUIN COMMUNITY DEVELOPMENT 2200 Harnish Drive Algonquin, IL Phone (847) Fax (847)

Bid No. B14-02 Building 100 HVAC Improvements

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

SECTION MECHANICAL IDENTIFICATION

Model ABV Pressure Independent Automatic Balancing Valve. Application: Standard Construction: Performance: Configurations Available:

TO WHOM IT MAY CONCERN:

CITY OF NEW ROCHELLE RENOVATIONS TO FIRE STATION NO WEBSTER AVENUE, NEW ROCHELLE, NEW YORK

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER

Piping & Equipment Identification

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

Residential Room Addition / Remodel Submittal Requirement Checklist

Non-Residential and Multi-Family Plan Check Submittal Requirements

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES

Rufus M Hitch Elementary School

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

MR Modulo Adjustable Constant Airflow Regulator

ADDENDUM #2 September 12, 2018

SECTION MECHANICAL IDENTIFICATION

Daniel S Wentworth Elementary School

PWM. Design, Installation, and Operation. (Pulse Width Modulation Zone Controller)

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

P1.0 MICHAEL R. WALDBIESER GENERAL MEP NOTE: EXISTING / DEMOLITION FIRST FLOOR PLUMBING PLAN SCALE: 1/4 = 1'-0" DEMOLITION NUMBERED NOTES:


SECTION MECHANICAL IDENTIFICATION

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

Morton School of Excellence

CHAPTER 6 DUCT SYSTEMS

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

Amos Alonzo Stagg Elementary School

PLAN SUBMITTAL REQUIREMENTS

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641

OCPS Submittal Register for Product Data and Shop Drawing Reviews

Jackie Robinson Elementary School

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

ADDENDUM TO RFP DOCUMENTS

Philip Rogers Elementary School

St. Monica Food Pantry

NORTHWEST FLORIDA STATE COLLEGE MONUMENT SIGNS WITH LED DISPLAYS

SECTION PROJECT COORDINATION VIA BIM

Addendum No. 1 page 1

Introduction to BAS Technology

1. State that all workmanship must conform to all pertinent laws, ordinances and regulations of all bodies having jurisdiction.

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS

Disney II Magnet School

*********************************************************************************************************

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

TFS Application Guide

BUILDING DEPARTMENT CURRENT

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

A. This Section includes plumbing fixtures and related components.

Transcription:

GENERAL NOTES A. CONTRACTORS AND SUB CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY DETERMINED WITHOUT REFERENCING THE COMPLETE DOCUMENT SET. B. COORDINATE WITH THE WORK OF OTHER SECTIONS, EQUIPMENT FURNISHED BY OTHERS, REQUIREMENTS OF THE OWNER AND CONSTRAINTS OF THE CONDITIONS OF THE PROJECT SITE. PROVIDE DUCT RISES AND DROPS AS REQUIRED FOR FIELD INSTALLATION AND TRADE COORDINATION. NOTIFY OWNER OF ANY DISCREPANCIES BEFORE STARTING WORK. C. ALL ROOFING WORK (CUTS, REPAIRS, SPUD WORK, ETC.) SHALL BE PERFORMED BY THE LANDLORD'S APPROVED ROOFING CONTRACTOR. D. DRAWINGS FOR THE WORK ARE DIAGRAMMATIC SHOWING THE GENERAL LOCATION, EQUIPMENT TYPE AND LAYOUT, THE DRAWINGS SHALL NOT BE SCALED FOR EXACT MEASUREMENT REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS. REFER TO S STANDARD INSTALLATION DRAWINGS FOR EQUIPMENT CONNECTIONS AND INSTALLATION REQUIREMENTS. PROVIDE DUCTWORK, INSULATION, WRAP OR LINER PER SCHEDULE, CONNECTIONS, OFFSETS, ACCESSORIES AND MATERIALS NECESSARY FOR A COMPLETE SYSTEM. SUBMIT SHOP DRAWINGS. E. ALL WORK SHALL COMPLY WITH STATE AND LOCAL CODE REQUIREMENTS AS APPROVED AND AMENDED BY THE GOVERNING CITY INCLUDING APPLICABLE SECTIONS OF NFPA, OSHA, BOCA AND UBC OR ANY INTERIM AMENDMENTS AT THE TIME OF THE PROPOSAL. PURCHASE ALL PERMITS ASSOCIATED WITH THE WORK AND OBTAIN ALL INSPECTIONS REQUIRED BY CODE. F. CONTRACTOR SHALL PROVIDE AND INSTALL NEW GALVANIZED STEEL SUPPLY AND RETURN AIR DUCTS AS INDICATED. ALL DUCT TO BE INSULATED PER IECC AND INSTALLED PER SMACNA. G. DUCT DIMENSIONS SHOWN ARE 'AIRSTREAM' DIMENSIONS. H. PLUMB CONDENSATE AND SECONDARY PER LOCAL CODE REQUIREMENTS. PRINTED BY: JHANCOCK Sep, 0-0:0am DRAWING: C:\Users\jhancock.CORPORATE\appdata\local\temp\AcPublish_8880\089-M0.dwg XREFS: 089-XBDR.DWG DRLLOGO.DWG 089-XBKG.DWG 089-XMECH.DWG MECHNANICAL FLOOR PLAN /" = ' - 0" NOTES BY SYMBOL PROVIDE TWINNING FOR FURNACES PER GUIDELINES. THERMOSTAT LOCATION AT 8" AFF. COORDINATE EXACT LOCATION WITH OWNER PRIOR TO INSTALLATION. DUCTWORK TO BE REMOVED PER ARCHITECTURAL DEMO PLANS. PROVIDE NEW DUCTWORK PER PLAN. HOLD SUPPLY DUCTWORK AS HIGH AND TIGHT AS POSSIBLE. PROVIDE NEW DUCT RUN OUT TO. REFER TO EXHAUST FAN DETAIL. MAINTAIN CODE REQUIRED CLEARANCE FROM ALL OUTSIDE AIR INTAKES. OUTDOOR CU TO BE REMOVED. MOUNT NEW UNITS PER 'S GUIDELINES. ADDITIONAL PAD(S) MAY BE REQUIRED BELOW ONE OR BOTH NEW CU'S. 7 RECONNECT OUTDOOR AIR CONNECTION TO NEW PLENUM RATED RETURN PLATFORM, SEALED CONNECTION REQUIRED. COORDINATE RECONNECTION REQUIREMENTS PRIOR TO BUILDING PLATFORM OR INSTALLING FCUS. 8 PROVIDE CONCENTRIC VENTS ROUTED TO SAME TERMINATION POINT AS. MAINTAIN CODE REQUIRED CLEARANCE FROM OUTDOOR AIR INTAKE. REFER TO DETAILS. 9 ROUTE EXHAUST DUCT AS HIGH AND TIGHT AS POSSIBLE TO REAR. PROVIDE WEATHER PROOF TERMINATION AND MAINTAIN ALL CODE REQUIRED CLEARANCES. COORDINATION NOTE STRUCTURAL NOTE I. OUTSIDE AIR REQUIREMENTS PER SCHEDULE; IF REQUIRED, ROUTE DUCT FROM OUTSIDE PER LOCAL CODE REQURIEMENTS. J. MAINTAIN 0' CLEARANCE BETWEEN OUTSIDE AIR INTAKES AND ALL EXHAUST AND VENTS. K. THE SCHEDULED ELECTRICAL POWER VALUES AND REQUIREMENTS ARE BASED ON THE 'S DATA FOR THE SCHEDULED MODEL. ACTUAL VALUES FOR THE EQUIPMENT SELECTED BY THE CONTRACTOR MAY VARY. FIELD COORDINATE. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL COSTS DUE TO SUBSTITUTION OF EQUIPMENT FROM SCHEDULED MODEL. L. COORDINATE WITH GENERAL CONTRACTOR LOCATIONS FOR ALL ACCESS DOORS IN GYPBOARD CEILING FOR ACCESS TO SMOKE DETECTORS, FIRE DAMPERS AND OTHER OR ELECTRICAL EQUIPMENT AS REQUIRED. M. ALL EQUIPMENT AND MATERIALS CAPABLE OF BEING UL LABELED OR LISTED SHALL CARRY THE UL LABEL. N. PROVIDE PROGRAMMABLE THERMOSTATS. VERIFY LOCATIONS WITH OWNER PRIOR TO ROUGH-IN. O. RUN-OUT DUCTS ARE SAME SIZE AS DIFFUSER NECKS UNLESS NOTED OTHERWISE. P. CONSTRUCTION STANDARDS AND RECOMMENDATIONS OF SMACNA SHALL BE FOLLOWED WITH RESPECT TO CONSTRUCTION, INSTALLATION AND SUPPORTING OF ALL DUCTWORK. DUCTS SHALL BE SEALED IN ACCORDANCE WITH SMACNA CLASS C. ALL DUCTS EXCEPT FLEXIBLE RUNOUTS SHALL BE GALVANIZED SHEET METAL. NO FLEXIBLE DUCTWORK PERMITTED ABOVE INACCESSIBLE CEILINGS. Q. PROVIDE RETURN AIR FILTERS AT THE HVAC UNITS, NOT AT THE RETURN GRILLE WITHIN TENANT SPACE. R. ALL LABOR, MATERIALS, AND EQUIPMENT SHALL BE PROVIDED WITH A ONE YEAR GUARANTEE FROM ALL DEFECTS. S. ALL REQUIREMENTS FOR COMCHECK AND THE INTERNATIONAL ENERGY CODE MUST BE MET. T. UPON COMPLETION OF THE INSTALLATION AND START-UP OF THE SYSTEM A TEST AND BALANCE AGENCY (TAB) SHALL BE RESPONSIBLE TO INSPECT, CHECK, TEST, ADJUST, BALANCE AND RECORD DATA ON THE PERFORMANCE OF THE AIR SYSTEMS AND COMPONENTS THEREOF IN ACCORDANCE WITH AABC NATIONAL STANDARDS FOR FIELD MEASUREMENT AND INSTRUMENTATION AND OTHER STANDARDS AS PUBLISHED BY THE AABC. THE TAB AGENCY IS RESPONSIBLE TO AND SHALL SUBMIT ALL REPORTS DIRECTLY TO THE OWNER PER IECC. : FLOOR PLAN M.0 PROJECT ADDRESS: EAST MAIN STREET, CHARLOTTESVILLE, VIRGINIA 90

FAN SCHEDULE DESIGNATION EF- EF- SERVES REST MOUNTING INLINE CEILING F.C.U. SCHEDULE DEISIGNATION FCU- & SERVES NOM. C.F.M. KILWIN'S 800 ea. TOTAL CFM 0 0 O.A. C.F.M. 0 ttl. TOTAL S.P. (IN. W.G.) 0. 0.7 FURNACE MOTOR HP / WATTS 8 - / TRANE DRIVE TYPE DIRECT DIRECT TUHD0 VOLT/PHASE / 0/ GAS INPUT (MBH) / AFUE / 9 WEIGHT (LBS) FAN H.P. 0.7 FANTECH GREENHECK TOTAL S.P. (IN. W.G.) 0. FR-0 SP-B70 SPEED TAP REMARKS PROVIDE ALL REQUIRED TRANSITIONS BD DAMPER INTERLOCK W/ LIGHT. EF- SHALL BE INTERLOCKED WITH MOTORIZED DAMPER AT LV-.. MOUNT FANS PER 'S RECOMMENDATIONS.. OR APPROVED EQUAL.. REST EF TO REMAIN. FILTER TYPE HIGH VEL. FILTER THICKNESS (inches) WEIGHT (lbs) 9 ELECTRICAL VOLTAGE/PHASE / CONDENSING UNIT DETAIL AIR CURTAIN SCHEDULE DESIGNATION SERVES MOUNTING ACT- ENTRY WALL TOTAL CFM 800 TOTAL S.P. (IN. W.G.) - MOTOR HP / FLA / /. MCA.9 MOCP 0 COOLING COIL TRANE TXCD0 ENTERING AIR (DB/WB F) 80/7 WEIGHT (lbs) 70 REMARKS DRIVE TYPE DIRECT VOLT/PHASE / WEIGHT (LBS) MARS LPV-7-U. PROVIDE TWINNING KIT.. PROVIDE CONCENTRIC VENT KIT.. PROVIDE MINIMUM " PLENUM RATED PLATFORM.. PROVIDE DUCT SMOKE DETECTOR PER CODE. INSTALL REMOTE TEST AND RESET AT THERMOSTAT LOCATION. PRINTED BY: JHANCOCK Sep, 0-0:am DRAWING: C:\Users\jhancock.CORPORATE\appdata\local\temp\AcPublish_8880\089-M0.dwg XREFS: 089-XBDR.DWG DRLLOGO.DWG ACCESSORIES. MOUNT FAN PER 'S RECOMMENDATIONS.. NO ALTERNATES ACCEPTED. LOUVER SCHEDULE DESIGNATION LV- MODULE SIZE (INCHES) X MAX VOL. (CFM) 0 VELOCITY (FPM) 9 PRESSURE DROP (IN WG) 0.08 FREE AREA (%). FREE AREA (SF) 0. REMARKS GREENHECK EHH-0 WIND DRIVEN LOUVER. CAREFULLY COORDINATE INSTALLATION WITH WALL TYPE. NO UNNECESSARY BLOCK REMOVAL.. PROVIDE BACK DRAFT DAMPER WITH AIR TIGHT SEAL.. COLOR TO MATCH ARCHITECTURAL FINISH. SUBMITTAL REQUIRED. AIR DEVICE SCHEDULE DESIGNATION A B C MODULE SIZE "x" "x" "x" NECK SIZE SEE PLAN SEE PLAN - FLOW RATE (CFM) SEE PLAN SEE PLAN - NECK VELOCITY (FPM) 00 MAX. 00 MAX. 700 MAX. N.C. LEVEL - MAX. 8 MAX. TITUS TITUS TITUS 0 FL TMS 0ZFL DESCRIPTION DEGREE DEFLECTION GRILLE SQUARE CEILING DIFFUSER REMARKS - - (W x H) SIDEWALL RETURN. MOUNTING FRAMES SHALL BE COMPATIBLE WITH CEILING TYPE.. PROVIDE OPPOSED BLADE DAMPER.. PROVIDE OFF WHITE FINISH.. ALL CEILING DIFFUSERS ARE -WAY DISCHARGE, UNLESS OTHERWISE INDICATED ON PLANS.. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.. DUCT RUNOUTS ARE SAME SIZE AS AIR DEVICE NECK NOTED ON PLAN. 7. OR APPROVED ALTERNATE. C.U. SCHEDULE DESIGNATION CU- & TOTAL COOLING CAP. (MBH) 8. SENS. COOLING CAP. (MBH). AMBIENT TEMP ( F) 9 COMPRESSOR NO. OF COMPRESSORS R.L.A. (EACH). CONDENSER FAN NO. OF FANS H.P. (EACH) / F.L.A. (EACH).8 ELECTRICAL VOLTAGE/PHASE 08/ MCA MOCP 0 TRANE TTR00 SEER/EER/IPLV / - / - NOMINAL TON. WEIGHT (lbs) 9 REMARKS. INDOOR UNITS SHALL BE TWINNED TO OPERATE AS ONE. VENTILATION AIR SCHEDULE DESIGNATION AREA ( SF) PEOPLE CFM / PERSON CFM / AREA EXHAUST AIRFLOW MIN. CFM REQUIRED MIN. CFM PROVIDED 00 8 7. 0-0 SERVICE 0 7. 9-9 0 7 - - - 0-0 TOILET S () 7 - - - 0 EA. - - 8-0 9-9 9 JANITOR CLOSET - - 8 8 TOTAL 0 90 EXHAUST FAN DETAIL FCU MOUNTING DETAIL CEILING DIFFUSER DETAIL SIDEWALL CONCENTRIC VENT DETAIL : SCHEDULES AND DETAILS M.0 PROJECT ADDRESS: EAST MAIN STREET, CHARLOTTESVILLE, VIRGINIA 90

NOTES BY SYMBOL (LIGHT)" " LIGHTING FLOOR PLAN /" = ' - 0" NOTES BY SYMBOL (POWER) " " LIGHITNG FLOOR PLAN PROJECT ADDRESS: EAST MAIN STREET, CHARLOTTESVILLE, VIRGINIA 90 PRINTED BY: TJORDAN Sep, 0 - :00am DRAWING: K:\089\089-E0.dwg XREFS: 089-XBDR.DWG DRLLOGO.DWG 089-XBKG.DWG 089-XMECH.DWG POWER FLOOR PLAN /" = ' - 0" COORDINATION NOTE MEP SERVICES NOTE : E.0

DETAILS AND GENERAL NOTES NTS : E.0 PROJECT ADDRESS: EAST MAIN STREET, CHARLOTTESVILLE, VIRGINIA 90 ELECTRICAL SCHEDULES AND DEETAILS NTS RISER DIAGRAM PRINTED BY: TJORDAN Sep, 0-0:am DRAWING: K:\089\089-E0.dwg XREFS: 089-XBDR.DWG DRLLOGO.DWG ELECTRICAL SYMBOL LEGEND

ELECTRICAL COMCHECK NTS : E.0 PRINTED BY: TJORDAN Sep, 0-0:am DRAWING: K:\089\089-E0.dwg XREFS: 089-XBDR.DWG DRLLOGO.DWG PROJECT ADDRESS: EAST MAIN STREET, CHARLOTTESVILLE, VIRGINIA 90 ELECTRICAL SCHEDULES AND DEETAILS

GENERAL NOTES PRINTED BY: JHANCOCK Sep, 0-0:am DRAWING: C:\Users\jhancock.CORPORATE\appdata\local\temp\AcPublish_8880\089-P0.dwg XREFS: 089-XBDR.DWG DRLLOGO.DWG 089-XBKG.DWG 007-XBKG.DWG 089-XMECH.DWG PLUMBING ABOVE FLOOR PLAN /" = ' - 0" PLUMBING BELOW FLOOR PLAN /" = ' - 0" PLUMBING FLOOR PLAN PROJECT ADDRESS: EAST MAIN STREET, CHARLOTTESVILLE, VIRGINIA 90 : P.0

FIRE PROTECTION PRINTED BY: JHANCOCK Sep, 0-0:am DRAWING: C:\Users\jhancock.CORPORATE\appdata\local\temp\AcPublish_8880\089-P0.dwg XREFS: 089-XBDR.DWG DRLLOGO.DWG PIPING MATERIAL & INSULATION SCHEDULE APPLICATION PIPING MATERIAL PIPE FITTING/WELD SANITARY WASTE & VENT DOMESTIC WATER STORM SEWER CONDENSATE DRAIN PIPE SCHEDULE /TYPE INSULATION MATERIAL INSULATION THICKNESS PLUMBING SCHEDULES AND DETAILS PROJECT ADDRESS: EAST MAIN STREET, CHARLOTTESVILLE, VIRGINIA 90 : P.0

PLUMBING RISERS DIAGRAM PROJECT ADDRESS: EAST MAIN STREET, CHARLOTTESVILLE, VIRGINIA 90 PLUMBING RISER DIAGRAM-GREASE WASTE PRINTED BY: JHANCOCK Sep, 0-0:am DRAWING: C:\Users\jhancock.CORPORATE\appdata\local\temp\AcPublish_8880\089-P0.dwg XREFS: 089-XBDR.DWG DRLLOGO.DWG PLUMBING RISER DIAGRAM-SANITARY SEWER NTS : P.0