The CMS Silicon Strip Tracker Overview and Status

Similar documents
The CMS Silicon Strip Tracker Overview and Status

CMS Conference Report

Status of ATLAS & CMS Experiments

Strip Detectors. Principal: Silicon strip detector. Ingrid--MariaGregor,SemiconductorsasParticleDetectors. metallization (Al) p +--strips

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

CMS Tracker Upgrades. R&D Plans, Present Status and Perspectives. Benedikt Vormwald Hamburg University on behalf of the CMS collaboration

Phase 1 upgrade of the CMS pixel detector

`First ep events in the Zeus micro vertex detector in 2002`

CMS Silicon Strip Tracker: Operation and Performance

The Commissioning of the ATLAS Pixel Detector

A new strips tracker for the upgraded ATLAS ITk detector

The CMS Outer HCAL SiPM Upgrade.

ATLAS strip detector upgrade for the HL-LHC

Tracking and Alignment in the CMS detector

Anders Ryd Cornell University April 24, Outline: CMS Pixel and Strip tracker Implementation Current status and plans

arxiv: v2 [physics.ins-det] 20 Oct 2008

Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1 upgrade of the Muon Spectrometer

D. Ferrère, Université de Genève on behalf of the ATLAS collaboration

ATLAS ITk and new pixel sensors technologies

Silicon Sensor and Detector Developments for the CMS Tracker Upgrade

Thin Silicon R&D for LC applications

Operational Experience with the ATLAS Pixel Detector

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring

Pixel sensors with different pitch layouts for ATLAS Phase-II upgrade

Test Beam Measurements for the Upgrade of the CMS Phase I Pixel Detector

Commissioning and operation of the CDF Silicon detector

Preparing for the Future: Upgrades of the CMS Pixel Detector

Track Triggers for ATLAS

The CMS HGCAL detector for HL-LHC upgrade

The CMS Silicon Strip Tracker and its Electronic Readout

Construction and Performance of the stgc and Micromegas chambers for ATLAS NSW Upgrade

Spectrometer cavern background

ITk silicon strips detector test beam at DESY

Layout and prototyping of the new ATLAS Inner Tracker for the High Luminosity LHC

Testing Silicon Detectors in the Lab

8.882 LHC Physics. Detectors: Muons. [Lecture 11, March 11, 2009] Experimental Methods and Measurements

PoS(EPS-HEP2017)476. The CMS Tracker upgrade for HL-LHC. Sudha Ahuja on behalf of the CMS Collaboration

Monitoring of the Fabrication Process of Silicon Strip Sensors for Large Scale Productions

The Compact Muon Solenoid Experiment at the LHC. Images of Assembly and Installation

Pixel detector development for the PANDA MVD

Silicon Sensor Developments for the CMS Tracker Upgrade

A High-Granularity Timing Detector for the Phase-II upgrade of the ATLAS Calorimeter system Detector concept description and first beam test results

THE SILICON SENSOR FOR THE COMPACT MUON SOLENOID CONTROL OF THE FABRICATION PROCESS

The upgrade of the ATLAS silicon strip tracker

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Reminder on the TOB electronics architecture Test of the first SS rod prototype

CMS Tracker Upgrade for HL-LHC Sensors R&D. Hadi Behnamian, IPM On behalf of CMS Tracker Collaboration

Resolution studies on silicon strip sensors with fine pitch

What do the experiments want?

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. CMS detector performance.

Attilio Andreazza INFN and Università di Milano for the ATLAS Collaboration The ATLAS Pixel Detector Efficiency Resolution Detector properties

Tracking Detectors for Belle II. Tomoko Iwashita(Kavli IPMU (WPI)) Beauty 2014

Construction and Performance of the stgc and MicroMegas chambers for ATLAS NSW Upgrade

Operation and performance of the CMS Resistive Plate Chambers during LHC run II

The ATLAS detector at the LHC

Operation and Performance of the ATLAS Level-1 Calorimeter and Level-1 Topological Triggers in Run 2 at the LHC

High Luminosity ATLAS vs. CMOS Sensors

A Large Low-mass GEM Detector with Zigzag Readout for Forward Tracking at EIC

Lecture 2. Part 2 (Semiconductor detectors =sensors + electronics) Segmented detectors with pn-junction. Strip/pixel detectors

Micromegas calorimetry R&D

OPTICAL LINK OF THE ATLAS PIXEL DETECTOR

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Muon detection in security applications and monolithic active pixel sensors

CMS Phase II Tracker Upgrade GRK-Workshop in Bad Liebenzell

CMS SLHC Tracker Upgrade: Selected Thoughts, Challenges and Strategies

The BaBar Silicon Vertex Tracker (SVT) Claudio Campagnari University of California Santa Barbara

Development of Pixel Detectors for the Inner Tracker Upgrade of the ATLAS Experiment

arxiv: v1 [physics.ins-det] 25 Oct 2012

The ATLAS tracker Pixel detector for HL-LHC

CMS Conference Report

Development and Test of a Demonstrator for a First-Level Muon Trigger based on the Precision Drift Tube Chambers for ATLAS at HL-LHC

The LHCb VELO Upgrade. Stefano de Capua on behalf of the LHCb VELO group

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

BaBar and PEP II. Physics

Totem Experiment Status Report

Development of Double-sided Silcon microstrip Detector. D.H. Kah*, H. Park, H.J. Kim (BAERI JikLee (SNU) E. Won (Korea U)

CALICE AHCAL overview

Status of the LHCb Experiment

arxiv:physics/ v1 [physics.ins-det] 19 Oct 2001

Lecture 11. Complex Detector Systems

Module Integration Sensor Requirements

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

LHC Experiments - Trigger, Data-taking and Computing

Beam Condition Monitors and a Luminometer Based on Diamond Sensors

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Development of n-in-p Active Edge Pixel Detectors for ATLAS ITK Upgrade

Performance of the ATLAS Muon Trigger in Run I and Upgrades for Run II

Serial Powering vs. DC-DC Conversion - A First Comparison

A High-Granularity Timing Detector for the Phase-II upgrade of the ATLAS Detector system

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Construction and first beam-tests of silicon-tungsten prototype modules for the CMS High Granularity Calorimeter for HL-LHC

Large Silicon Tracking Systems for ILC

Measurement of the charged particle density with the ATLAS detector: First data at vs = 0.9, 2.36 and 7 TeV Kayl, M.S.

The CMS Muon Trigger

Micromegas for muography, the Annecy station and detectors

The CMS Pixel Detector Upgrade and R&D Developments for the High Luminosity LHC

Understanding the Properties of Gallium Implanted LGAD Timing Detectors

Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data

GEM beam test for the BESIII experiment

Transcription:

Overview and Status 1.Physikalisches Institut B, RWTH Aachen Seminar über Teilchen und Hadronenphysik, Bonn, 26. Januar 2006

Overview Requirements for tracking at the LHC & expected performance of the CMS tracker The design of the CMS silicon strip tracker Experience from mass production and detector integration Challenges and issues Measurements, e.g. from test beam experiments and integration Aachen involvement Track & laser alignment Martin Weber, 2.2.2006 2/46

Silicon Strip Detectors Reverse biased diode MIP ionizes detector material: 24000 e in 300 m of silicon Electric field electrons and holes drift to electrodes Segmented p implants in n type bulk spatial information AC coupled read out of induced charge Signal amplification and shaping 3/46

Silicon Strip Detectors First silicon strip detector: NA11 in 1983: 5 m spatial resolution Comparison of some silicon strip detectors: 4/46

The Large Hadron Collider (LHC) P5 Fi s n o i llis o c rst 00 2 n i 7 5/46

2007 10pb 1 { 2008 5 10fb 1 05 0 2 r be m e ec D ), s R n D a Ev ysics T (L. Ph S CM ;

The Compact Muon Solenoid (CMS) Experiment electromagnetic calorimeter: 80000 PbWO4 cristals 21.6m pixel detector and silicon strip tracker A=2.2x2.2cm2, X0=0.89cm 15m superconducting solenoid, B=4T hadronic sampling calorimeter: copper and scintillating tiles myon chambers (in magnet return yoke): drift tubes (barrel), cathode strip chambers (end caps) and RPCs (barrel and end caps) 7/46

Tracking Requirements at the LHC Bunch spacing of 25ns fast detector response to resolve bunch crossings High luminosity (2 1033 1034 cm 2 s 1) up to 20 minimum bias and 1000 charged particle per bunch crossing high detector granularity to keep occupancy low and resolve nearby tracks Good momentum resolution for low and high pt tracks High track reconstruction efficiency Ability to tag b jets and identify B hadrons and 's good impact parameter resolution Unprecedented irradiation level radiation hardness Small amount of material in front of electromagnetic calorimeter Cost Risk of failure (preference for known industrial technologies) Major design change in the CMS tracker in 1999 Multi strip gas chambers (MSGCs) dropped in favour of all silicon tracker 8/46

The CMS Tracker Outer barrel TOB Pixel End cap TEC Inner barrel TIB Inner disks TID 2.4m Support tube 5. 4 OPAL jet chamber m 3.7m 4m About 200m2 of active silicon area 1440 pixel modules with 66 million pixels 15148 silicon strip modules with 10 million strips Operating temperature < 10º C to minimize radiation damage (max. dose for strip tracker after 10 y 1.6 x1014 n(1mev) / cm2) 9/46

The CMS Pixel Detector Start with 2 barrel layers in 2008 (r = 4.4 cm & 7.3 cm) Add 3. barrel layer later (r = 10.2cm) Two turbine like endcap disks side m 53 c Active area 1m2 66 million pixels Pixel size: 100 m (r ) x 150 m (z) Charge sharing due to large Lorentz angle (23 ) + analog readout spatial resolution 10 m in r, 20 m in z 2 3 high resolution 3d measurement points 10/46

Schematic cross section of one quarter of the tracker: TOB: 6 layers 5208 modules single sided modules double sided modules (stereo angle = 5.7 ) position information along the strips r { thick sensors: 500 m high resistivity thin sensors: 320 m low resistivity { interaction point TIB: 4 layers 2724 modules z TID: 2 x 3 disks 816 modules TEC: 2 x 9 disks 6400 modules 11/46

Tracker Material Budget Conversion probability for photons almost 50% Material budget dominated by services 12/46

Performance of the CMS Tracker # of hits per track in the strip tracker: total number of hits total number of double sided hits double sided hits in thin detectors double sided hits in thick detectors At least 10 measurement points, except for region between barrel and end cap Transverse momentum resolution for muons with pt = 1 GeV, 10 GeV, 100 GeV: Resolution dominated by tracker lever arm Barrel: resolution of 1.5% for pt=100 GeV 13/46

Performance of the CMS Tracker Transverse impact parameter res. for muons with pt = 1, 10, 100 GeV: Longitudinal impact parameter res. for muons with pt = 1, 10, 100 GeV: Dominated by hit resolution and, for pt < 10 GeV, multiple scattering For tracks with pt = 100 GeV: 10 m transverse and 20 50 m longitudinal impact parameter resolution 14/46

Comparison: the Atlas Tracker 2.2m 7m Pixel: B=2T (pt)/pt 2 x [ (pt)/pt]cms 3 barrel layers, 2 x 3 disks three 3 d space points for 98% of tracks Spatial resolution 12 m in r, 60 m in z Semi conductor tracker (SCT): 4 barrel layers, 2 x 9 disks; 4088 modules, 61m2 All modules are double sided (2.3 ) Transition radiation tracker (TRT): 370 000 drift tubes; spatial res. from drift time: 170 m per straw Continuous tracking ( > 30 hits per track), low cost, less material per point Electron/pion separation Concerns: occupancy, speed (maximal drift time: 40ns) Tracking performance similar to CMS tracker! 15/46

The CMS Silicon Strip Modules glass pitch adapter 1 or 2 silicon sensors support frame graphite and carbon fiber (CF) front end (FE) hybrid 10cm direction of strips Kapton circuit wire bonds delivers bias voltage back plane isolation thermistors 16/46

The CMS Silicon Strip Modules Module design optimised for geometrical coverage, radiation hardness & cost 27 different module types: r < 60cm: 320 m thin low resistivity sensors (lower depletion voltage after irradiation); shorter strips (occupancy) r > 60cm: longer strips (cost); 500 m thick (high resistivity) sensors to maintain signal / noise 1 or 2 silicon sensors 512 or 768 strips rectangular sensors in the barrel, wedge shaped sensors on the disks ules ; d o f m caps) o s ype in end t 4 s: a l l, 3 t e r A r ba ick h n t i (1 m 5 8 all 2 17/46

Design of the CMS Silicon Sensors Single sided sensors with p+ type strips in an n type bulk 6" wafer technology (Atlas: 4") <100> cristal lattice orientation ( interstrip capacitance unchanged after irradiation) AC coupled readout Pitch ranges from 80 210 m Constant width/pitch ( constant strip capacitance) Readout strip and guard ring geometries optimised to increase breakdown voltage 18/46

Design of the CMS Silicon Sensors 19/46

Silicon Sensor Production 24 244 silicon sensors have been delivered by two companies: 320 m thick sensors by Hamamatsu Photonics K.K. (HPK); 500 m thick sensors: 96% by HPK and 4% by ST Microelectronics (STM) HPK STM Detailed qualification of 5% of all sensors (plus all suspicious batches!): Central distribution center: CERN quality test center Rochester 1% of sensors 4% of test structures quality test center Pisa quality test center Perugia quality test center Vienna quality test center Karlsruhe Rpoly, Ccoup etc. 5% of sensors 5% of test structures Irradiation qualification centers (n, p) Louvain, Karlsruhe Process qualification & stability centers Florenz, Strassburg, Wien Module production Bari, Perugia, Lyon, Brussels, Vienna, Fermilab, UCSB IV, CV curves single strip leakage current failure in SiO2 layer (pinholes) on i t c u d o pr r o s d! e t Sen e l p m is co 20/46

Silicon Sensors: Issues Many problems with STM sensors encountered: High noise on single strips, plus high common mode of the whole readout chip (128 strips): Current [ A] Noise [ADC counts] Unstable leakage current: Raw noise = RMS of pedestal Common mode subtracted noise Strip number Time [h] [ Common mode: common deviation of a range of channels from their pedestal value in one event. Subtractable via software. ] 5% of modules with STM sensors affected Electrochemical changes (corrosion) on bias and guard rings after few hours in high humidity: quality test of 100% of STM sensors necessary, long term behaviour and evolution unknown bulk of production of thick sensors was transferred to HPK 21/46

The Front end Hybrid 4 layer Kapton substrate (flex) laminated onto ceramic carrier 4 or 6 APV25 readout chips radiation hard commercial 0.25 m CMOS technology 128 strips per APV, multiplexed to one analog output per channel: pre amplifier, CR RC shaper, 4.8 s pipeline memory 2 readout modes: Peak mode: 1 sample ( ns) Deconvolution mode (high lumi): weighted sum of 3 samples: 25ns better bunch crossing identification, but higher noise Detector Control Unit (DCU) 12 bit ADC 8 channels: hybrid and sensor 2:1 Multiplexer 2 APVs multiplexed to one readout channel temperatures low voltages leakage current PLL chip decodes clock & trigger signals 22/46

Why to use analog readout? CMS: analog readout information on deposited charge + Multi strip clusters: center of gravity method leads to improved position resolution + de/dx measurement (?) Larger data volume Needs analog optical* links (not standard few years ago) Atlas: binary readout only hit/no hit information Strip with charge above adjustable threshold fires discriminator on front end chip + Reduced data volume (cost effective) + Works with standard digital optical links Spatial resolution = pitch/ 12 (pitch=80 m (r )=23 m) Thresholds, discriminator, noise must be well controlled No common mode subtraction possible *Advantage of optical readout: low mass, no electrical pick up 23/46

Front end Hybrid Production Very long R & D phase with many different technologies developed in parallel (thick film on ceramic, full flex Kapton on CF or FR4, flex rigid, pure FR4,...). Problems: flatness ( assembly), rigidity ( bonding), thermal exp. coeff. mismatch, feature size... 2003 technology choice & start of mass production Flex circuits produced by Cicorel SA, assembly done by Hybrid SA Several problems during production phase, e.g.: 100 m vias developed bad contact solved by improved design (8 months delay) old design bad via old design good via new design good via Kapton glue Kapton glue Kapton { Kapton glue Kapton 100 m Finally a production rate of 300 400 hybrids/week was achieved A second production line (different flex producer, different assembler) was set up Production nearly completed 24/46

Module Production Pins Front End Hybrid APV and control chips Pitch Adapter Kapton Bias Circuit Carbon Fiber/Graphite Frame Silicon Sensors 27 types of modules 15 types of sensor masks 24 types of pitch adapters 12 types of hybrids 19 types of frames 25/46

Module Production: Assembly Module assembly = precision gluing of sensor(s) and hybrid to the support frame 15148 modules need to be assembled with high precision: e.g. maximum allowed deviation in coordinate strips: 65 m, coordinate strips: 39 m fully automatic pick and place robots: gantry 9 m 8 m 6 gantries in operation Issues: precision, calibration 99% of modules are within specification Throughput: up to 20 modules / gantry / day Vienna Brussels Lyon Perugia Bari UCSB FNAL Vienna Brussels Lyon Perugia Bari UCSB FNAL y(measured) y(nom.) ( to strips) x(measured) x(nom.) ( to strips) 26/46

Module Production: Wire Bonding 23 automatic commercial wire bonding machines Throughput: > 5 modules / machine / day Readout tests before and after bonding Pull tests to monitor bond strength 5g Counts Mean force [g] 20% Counts Sigma/mean of pull force Mean force [g] Sigma/mean of pull force 27/46

Module Production Status Excellent module quality: typically 1 3 of bad strips per module However: backplane contact (conductive epoxy glue) not reliable (TOB, TEC) "Retro fitting" of significant number of modules ongoing In total, 75% of modules are built End of module production expected for spring 2006 28/46

Readout and Control Architecture Readout: analog optical link FE hybrid opto electrical conversion AOH optical link I2C protocol front end 10 bit ADC (Front End Driver) back end trigger clock control chips on substructures DOH Front End Controller Trigger, clock, control signals: digital optical link (token ring implementation) 29/46

Front End Driver (FED) Digitization (10 bit) and first data processing: pedestal and common mode subtraction cluster finding optional zero supression to reduce data volume storage of data until requested by higher DAQ developed at RAL double sided VME64x card (9 units heigh) optical / analogue / digital logic 14 layers, 6 000 components, 25 000 tracks input data volume 3GB/sec, reduced to 50MB/s per % of track occupancy Status: 110 / 500 FEDs delivered to CERN Still many firmware improvements (debugging capabilities, data rate increase, readout stability) test stand at CERN 30/46

Modularity in the Tracker TIB/TID: modules are mounted directly onto half shells and carbon fiber ring structures TOB: modules are assembled onto "rods", rods are mounted into the "wheel" TEC: modules are assembled onto carbon fiber "petals", petals are mounted into the end caps Advantage of TOB/TEC approach: single substructures can be exchanged during shutdowns Disadvantage: no access to modules once substructures are integrated into wheel / end cap 31/46

Example: TEC Petal production ca. 400 assembly pieces of 32 diff. types: "bridges", 288 petals to be built until mid 2006 washers, screws, distance pieces up to 28 silicon modules up to 10 different types bare petal up to 28 AOHs up to 13 types frame + Kapton strip hybrid + pitch adapter sensor petal mechanics motherboards (ICBs) 32/46

Petal Mechanics & Electronics Mechanical petal structure: petal body with inserts Honeycomb structure with CF skins: light but stiff (developed and built in Aachen) Modules mounted on 4 aluminum precision inserts (precision of thread positions: 5 m) Modules cooled to T < 10 C (revearse annealing) via 7m long thin walled titanium cooling pipe (coolant: C6F14) Motherboards (InterConnect Boards, ICB): "Backbone" of the petal: 6 layer PCBs ICBs are developed, tested and mounted in Aachen Petal production until February 2006 33/46

Petal Assembly Two petal types: front and back petals front side of a front petal Modules are mounted on both sides of the petals in (up to) 7 radial rings Rings overlap in the radial direction, modules overlap in R7 R5 R3 R1 Mounting of optical converters (AOHs), routing of fibers, functional test (Hamburg) Assembly of modules and functional test (7 prod. lines in 5 centers, Aachen & KA) Operator is guided by special software with photos, drawings & automatic data base operations Difficulties: handling application of thermal grease Achieved assembly rate: > 2 petals / week / production line 34/46

Petal Longterm Test "Burn in" of components & connections at level of petal 6 cooling cycles between room temp. and 20 C 3 days in total In depth qualification of petals Grading Longterm testing of fully assembled petals started May 2005 Quality of petals produced is very good: 1 3 of bad strips Norm. common mode subtracted noise of all modules of 1 petal: 49 petals warm cold Status: 5 lines operational with a capability of 1 petal / setup / week 100 / 300 petals already longterm tested 35/46

Petal Performance May 2004 test beam setup: 1 front and 1 back petal ( 1% of the TEC), operated at CMS temperature ( 10 C) May 2004 CERN X5 pions (120GeV) muons (70GeV 120GeV) Typical distributions (shown for a ring 4 module on the back petal): 36/46

Petal Performance Some highlights: 320 m thick 500 m thick S/N > 19 for all rings at CMS operating temp. Decrease by at most 25% due to radiation damage S/N > 10 guarantees hit finding efficiency above 95% and low fake rate Peak ( =50ns) cold Peak ( =50ns) warm Deconv. ( =25ns) cold Deconv. ( =25ns) warm Variation between rings as expected from capacitance Agrees within 17% with expectation from APV noise Noise about 10% smaller at CMS operating temp. Peak cold Peak warm Deconv. cold Deconv. warm Common mode noise: peak mode: (173 ± 38) e deconvolution mode: (299 ± 67) e 37/46

Tracker Outer Barrel (TOB) Rod Production Modules mounted onto 688 rods 100% of rod frames produced 3 single or double sided modules per side (precision of positioning pins: = 40 m) Redesign of motherboards due to electrical problem Rod assembly & 1 2 days longterm test Motherboard (Fermilab & UCSB) 1.1m CF frame (rod) Status: Rod assembly delayed by problems with module bias contact & motherboard redesign About 70 rods assembled and longterm tested in "production exercise" Rod assembly much easier than petal assembly Expected production rate: 4 rods assembled & longterm tested per day and site all TOB rods can be built within 4 5 months 38/46

TEC Integration Overview 8 petals mounted on each side of the carbon fiber disks, 9 disks per end cap Both mechanical structures built in Aachen, precision (CERN photogrammetry) < 200 m All optical ribbons integrated (Karlsruhe) Cooling pipes with power cables still in production (issues: precision, weld joints) (Lyon) One end cap ("TEC+": +z direction) to be integrated in Aachen Second end cap to be integrated at CERN by Lyon group 39/46

TEC Integration Overview front petals back petals 1 sector (=18 petals): 1 tower of back petals (9 petals) 1 tower of front petals (9 petals) Petals are integrated sector wise Integration with TEC in upright position Petals mounted with 3 point fixation; precision of module position w.r.t. disk: 50 m Disks used as desk during insertion need possibility to rotate the TEC 40/46

TEC Integration: Overview One year of preparation! Dedicated 50m2 clean room built (class 100 000) Rotation and transport cradle designed and constructed Data acquisition system with final hardware components for 400 modules installed and comissioned (3% of the whole tracker) (48 final CAEN power supply units, 11 FEDs) 2.4km 1t of final power cables installed Cooling system for CMS coolant (C F ) constructed 6 14 41/46

Integration of the First Sector During December/January, the first sector has been integrated in Aachen All procedures have been validated and tools have been commissioned Petal insertion: tool was developed to handle petals safely insertion of 1 petal needs about 40 minutes most time consuming task: plugging of optical fibers ( 50 per petal) petal insertion tool petal being inserted connectivity of optical fibers 42/46

First TEC Sector Very dense environment Difficult access to fibers, no access to silicon modules In situ debugging & repair is difficult and in many cases impossible 43/46

First TEC Sector: Status & Plans System of 400 modules = 1092 optical channels debugged (half of CDF SVX II) on level of bare connections Basically impossible without dedicated commissioning tools First pedestal runs with high voltage taken last week Too early to make any statements about the noise (unfortunately) Large measurement program ahead: cosmics, grounding, cold test... TEC integration is the first opportunity for measurements of petals in close to final environment with many final components (cables, power supplies, DAQ, grounding,...) Exercise tracking and laser & track alignment in a final environment (talk by Martin Weber) 44/46

TIB/TID Integration Strings of 3 single or double sided modules mounted on inner & outer surfaces of half shells Functional test of strings, longterm test of entire half shells Two outer layers (single sided) of TIB+ fully integrated First layer has been longterm tested (315 modules): < 1 of bad channels Integration of double sided layers has started TIB+/TID+ shall be brought to CERN in February # of strips # of strips Peak mode Noise [ADC counts] Deconvolution mode Noise [ADC counts] 45/46

Summary The CMS tracker is a very complex subdetector with many challenges Measurements performed up to now show excellent performance 75% of modules are built Integration of TIB/TID and TEC has started Integration into the CMS detector foreseen for early 2007 On time delivery of the tracker seems still possible Looking forward to do interesting physics with a performant tracker ~ ~ 02 Z0 10 46/46