A Women's Restroom North Scale: 3/8" = 1'-0" 113 Women's Restroom South Scale: 3/8" = 1'-0" Keyed Notes Scale: NTS. 108 Men's Restroom North

Similar documents
METAL CONCRETE CONCRETE BATT INSULATION, SOUND ATTENUATION BLANKET MASONRY UNIT RIGID INSULATION WOOD BITUMINOUS PAVING PLYWOOD EARTH

EARL GREY SCHOOL GYM CONSTRUCTION: 845 HILLCREST AVENUE SW, CALGARY, ALBERTA CONSULTANTS: ARCHITECTURAL: STRUCTURAL: MECHANICAL: ELECTRICAL:

Staff Review Date: August 9, 2017 HDC PID#

A '-4" 10'-10" 16'-6" 7'-0" 23'-0" 10 3/4" 9'-6" 5 1/4" 2'-11 1/2" 2'-6" 3'-2 3/4" 3'-1" 4'-8 3/4" 2'-5 3/4" 2'-6" 7'-2" R.O. HD 7'-3" R.O.

Architect s Supplemental Instructions (attachment to AIA Form G710)

LAYOUT OF STONE PILE SCALE=1:100 SECTION OF PILE FOUNDATION SCALE=1:100 BUILDING LINE TRENCH LINE

Code Review The following is a review of selected portions of the International Building Code 2015 (IBC2015) which apply to this project.

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

Disclaimer for Review of Plans

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

Staff Review Date: September 13, 2017 HDC PID#

PENINSULA - TYPE 1 3/8"=1'-0" ADA PENINSULA - TYPE 3 3/8"=1'-0" PENINSULA - TYPE 2 3/8"=1'-0" VANITY TYPES - NOTES 3/8"=1'-0"

Monogram 36" Built-In Bottom-freezer Refrigerator

MONOGRAM 36" BUILT-IN ALL-REFRIGERATOR

A101 CARVER, MINNESOTA S.P B C D E F G FLOOR PLAN CARVER PARK AND RIDE 1 FLOOR PLAN

MONOGRAM 36" BUILT-IN BOTTOM-FREEZER REFRIGERATOR

ASI #2 DATE: 10/26/17 ARCHITECT S PROJECT NUMBER: CONTRACT DATE: CONTRACT FOR: Anchorage Hyatt Place

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated

214 Wilshire Blvd., Suite 102 Santa Monica California 90401

MONOGRAM 36" BUILT-IN ALL-REFRIGERATOR

NCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice

STEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504

HOMES BY NOVARE DEVELOPMENT

REQUEST FOR QUALIFICATIONS FOR CONSILODATED RENT-A-CAR AND PUBLIC PARKING DECK C RFQ FOR DESIGN-BUILD PRE-CAST CONCRETE PROVIDER

Architectural Alliance Incorporated KEYPLAN SCALE:N.T.S. SECOND FLOOR DEMOLITION FLOOR PLAN 2 SCALE:1/4" = 1'-0"

3/4" HDWD 'B' VENEER 1'-10 5/8" SEE PLANS FOR DEPTH, WIDTH, AND GEOMETRY OF BENCH PLYWD (2 LAYERS) HDWD 'B' TRIM w/ EASED EDGES 3 1/2"

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft

846-GP. Neo-Angle Enclosure. Technical Assistance is available Monday - Friday 8:00 a.m. - 5:00 p.m. (Central Time) GP 12/05

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

CKBD Peakes Bath Scoresheet

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

GE Monogram 36" Built-In All-Freezer

Material List for Log Complete Packages

B R A D F O R D V E T E R A N S V I L L A G E

Monogram 48" Built-In Side-by-Side Refrigerator

RECAPP Facility Evaluation Report

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

CENTRAL PARK VILLAGE 3068 Gladwin Road, Abbotsford, BC. Prepared By: Daniel Lee,* Principal

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

PRILEX STEEL DETAILING LLC

SECTION BATHROOM ACCESSORIES

A-1. CDP and Use Permit Amendment. Title Sheet. the. Attachment. 1. Railing a soffit: trex Composite d in tree hous. 2. storefro BRonze ano aluminum F

This is being reviewed, additional comment to follow Marmoleum tile has been removed and replaced with a biobased VCT.

TELEPHONE: (215) Addendum No. 01

SPARTAN DAY CAMP 4814 FREEDOM RING RD

063-GP. Swing Door with In-Line Panel

INDICATIVE PRICE BID FOR FURNISHING WORKS AT UZHAMALAKKAL BRANCH (NEW PREMISES) (FOR INFORMATION ONLY - NEED NOT BE FILLED UP)

FALEALUPO CANOPY WALK PROPOSED NEW REST FALE & TOILET BLOCK REFURBISHMENT GEF CLIMATE RESILIENCE PROJECT SAMOA

S T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1" = 10' - 0" SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD

DETAIL LOCATOR PRODEMA EXPOSED FASTENER SYSTEMS ON STUD WALL. Page: 00 of 22

2016 CALIFORNIA BUILDING CODE - SECTION 11B-213 & DIVISION 6 GENERAL REQUIREMENTS FOR TOILET & BATHING FACILITIES

STATE WHEN ORDERING HI =...

Addendum No.: 001 Date: 3/15/2016. Canyon ISD City View Elementary Additions Project No.:

DESIGN DRAWING INDEX PROJECT INFO. WEATHERBY / PIPER MCKEE GROUP x 136

Table of Contents IMPORTANT

Jan H: ARCHITECTURAL WOODWORK (06410-H)

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

BASEBALL PLAYER FACILITIES CLEMSON, SOUTH CAROLINA

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

SCHEDULE OF MATERIALS - SPRINGTOWN UNITS

CITY OF NEW ROCHELLE RENOVATIONS TO FIRE STATION NO WEBSTER AVENUE, NEW ROCHELLE, NEW YORK

WASHROOM ACCESSORIES 2013 CATALOG

words 1 SINGLE WINDOW SYSTEM: 12 Rmt

MONOGRAM 48" BUILT-IN SIDE-BY-SIDE REFRIGERATOR

S.NO Description Quantity Rate Amount


White Mirrored Cabinet With EXT Shelves

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

TOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition.

TYPICAL STANDOFF GLASS RAIL ELEVATION TYPICAL SECTION RS0B20 WITH RECTANGULAR BACK PLATE TYPICAL STAIRS

222 Edgewood Crescent (Strata Lot 48) The Sequoia. 226 Edgewood Crescent (Strata Lot 49) The Douglas

Addendum #1 - Bid Package #

SECURITY IMPROVEMENTS AT 8 CAMPUSES

GE Monogram 36" Built-In Bottom-freezer Refrigerator

INSTALLATION INSTRUCTIONS

Living/ Dining Areas. Kitchen. Bedrooms. Bathroom

Brio. Weatherfold 5c 80. Codes B WC 4-80 S H SS. Sets all sets shown with hinge type H except BW2L/R-80SR. No finishes shown. Brio Weatherfold 5c

FASTENERS BUILDING DEPARTMENT

ARCH 405bL SPRING 2016 LUCY EGBE + NICK HALSEY + KELLY LYNCH ERIN YAMASHITA ISSUED 04/26/16. Site Plan. Site Plan 1" = 50'-0" 1" = 50'-0" SCALE A-500

Puerto Rico - 2 Door Shoes Cupboard

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

SEALED BID FORMAT FOR INTERIOR FURNISHING WORKS AT THE NEW PREMISES OF SBI MANIPUZHA BRANCH

Built to Benchmark Specifica ons.

A.1 KING RESTROOM DEMOLITION PLAN. KING PARK 725 Monte Diablo Ave, San Mateo, CA LEGEND A.2 4 SCALE:

SITELINE CLAD-WOOD WINDOW CASEMENT TABLE OF CONTENTS

Versatrac R-System Stock Extrusions, Clips and Accessories

L A N D M A R K K. C O M R E S I D E N T I A L A R C H I T E C T U R E

The better way to build TM. Installation Manual ROOF SIPs

BRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB

INVESTOR LANDSCAPE: SQLA INC 380 N. PALM ST. SUITE B BREA, CA

DR. FAKHOURI SKIN CARE SPECIALISTS WEST GRAND PARKWAY SOUTH SUITE 420 SUGAR LAND, TX 77479

WEST HOLLYWOOD ACCESSIBLE UNISEX BATHROOMS: COMMERCIAL CLEARANCES. Accessible Unisex Bathrooms: Commercial Page 1 of 5

Installation Instructions

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

***************************************************************************************************************

MONOGRAM 36" BUILT-IN FRENCH-DOOR BOTTOM-FREEZER

Vertical Offset Base and Safety Rail System Installation Instructions

Transcription:

'-0" '-" '-0" 6 '-6" " '-" '-6" '-6" 6'-0 " 6" 7 7 '-6" " '-" '-6" 6 '-0" '-" '-" '-0" 6 7 9 0 6 7 Toilet & Urinal Partitions, Re: Specs. oor and Frame as scheduled. Grab ar, Re: ccessory Schedule. Framed Mirror, Re: Toilet ccessory Schedule. Epoxy Painted MU, Re: Room Finish Schedule. Urinal, Re: Plumbing rawings. Lavatory, Re: Plumbing rawings. eramic Tile, Re: Specs. Toilet Tissue ispenser, Re: Schedule and Sheet 0 TV EF- RE:Plumbing Menu oard Soap ispenser, Re: Schedule and Sheet 0 Ptd. MU " Rubber ase a Women's Restroom North 9 9 9 Women's Restroom South a 0 Keyed Notes Scale: NTS '-" '-7" '-" '-" '-" '-6" '-9" 6'-0 " '-6" '-0" '-" '-0" '-0" 6 6 '-0" OTTOM OF REFL. SURFE 07 '-0" '-6" " '-" 6" '-6" X-REF: X-REF: X-REF: opyright 0 6 7'-" 6 0 Men's Restroom South - 7 9'-" 0 Entry Foyer South Lobby South East a M QURTZ OUNTERTOP 7 0 M QURTZ OUNTERTOP 7 0 Men's Restroom North 0 0 09 07 06 Entry Foyer North M QURTZ OUNTERTOP 7 7 Lobby East 7 7'-" 9'-" /" Plastic laminate clad plywood dummy panel cm Quartz composite counter compliant S.S. sink Re: MEP dwgs /" Plastic laminate clad removable plywood shield. ttach to cabinet sides with "x" aluminum angle 9 Lobby North East M QURTZ OUNTERTOP - x blocking, typ. a " 6" max. at Sink Scale: " = '-0" '-0 /" " min. /" 9" '-6 /" " /" '-0" 0/6/ Interior Elevations 0 Sheet Title Project ata Issue Revision

6 7 9 0 6 7 9 0 Toilet & Urinal Partitions, Re: Specs. oor and Frame as scheduled. Grab ar, Re: ccessory Schedule. Framed Mirror, Re: Toilet ccessory Schedule. Epoxy Painted MU, Re: Room Finish Schedule. Urinal, Re: Plumbing rawings. Lavatory, Re: Plumbing rawings. eramic Tile, Re: Specs. Toilet Tissue ispenser, Re: Schedule and Sheet 0 TV EF- RE:Plumbing Menu oard Indigo Series 00 Ice Machine, Re: Specs 00 0" High ounter, Quartz omposite Top Paper Towel isp., Re: Schedule and Sheet 0 Soap ispenser, Re: Schedule and Sheet 0 Ptd. MU Trophy ase " X " Painted Steel ounter Supports. lign Vertical Supports with Vertical Window Mullions Ptd. Gypsum oard Head Wall " Rubber ase 0 Keyed Notes Scale: NTS X-REF: X-REF: X-REF: opyright 0 '-0" '-6" '-6" 7'-" Lobby West - '-0" 0 oncession East - - '-6" '-0" Equal Windows S '-0" P.. '-0 " 0 Micro. '-0" Equal Windows 9 9 9 9 Handwash Sink 7 0 - - 0 oncession West - - S 7 '-0 " IE - 0 oncession West 0/6/ Interior Elevations 0 Sheet Title Project ata Issue Revision

PROJETION SREEN PINTE GYP. OVE 6'-0" Elec. 6 6'-0" 6'-0" '- " OUST. WLL PNELS, 'x" OVERHE FIRE OOR RILS SOREOR, OUST. WLL PNELS, 'x" SHOT LOK OVERHE FIRE OOR OVERHE FIRE OOR RILS '-0" LEHER SETING, RE: PLNS & SPES. UT TRNSFER GRILLE OUST. WLL PNELS, 'x" 7'-" LEHER SETING, RE: PLNS & SPES. WOO GYM FLOORING, WLL PING GYMNSIUM EST Scale: " = '-0" '- " learance above ourt '-" '-" 'X' RING, 0'-0" '-" '-0" REMOVE IGONL RIGING FTER ROOF EK INSTLLE, INSTLL FLT RING HV UT OUST. WLL PNELS, 'x" R/ GRILLE PROJETION SREEN T ENTER OURT, W W W W W W W W W GLV. UNPINTE PIPING T LER, GTE N GUR RIL LER TO VIEO PLTFORM LEHER SETING PINTE GYP. OVE 6'-0" PIPE RILING 6'-0" REMOVE IGONL RIGING FTER ROOF EK INSTLLE, INSTLL FLT RING HV UT OUST. WLL PNELS, 'x" 0'-0" R/ GRILLE 'X' RING, FIRE/SMOKE ETETOR/ LR, RE: ELE. OVERHE FIRE OOR 0/6/ Interior Elevations 0 Sheet Title Project ata Issue Revision X-REF: X-REF: X-REF: opyright 0 GYMNSIUM NORTH Scale: " = '-0"

' lg. Hgt. ELE. PROJETOR MOUNT ELE. PROJETOR SREEN ELE. PROJETOR MOUNT W SOREOR, OUST. WLL PNELS, 'x" PINTE GYP. OVE 6'-0" Elec. 6 FIRE/SMOKE ETETOR/ LR, RE: ELE. '-0" FIRE/SMOKE ETETOR/ LR, RE: ELE. 6'-0" LEHER SETING, RE: PLNS & SPES. '-0" LEHER SETING, RE: PLNS & SPES. WOO GYM FLOORING, 6'-0" WLL PING, GYMNSIUM WEST Scale: " = '-0" 'X' RING, W LEHER SETING, RE: PLNS & SPES. W '-" W FIRE/SMOKE ETETOR/ LR, RE: ELE. '-0" HV uct OUST. WLL PNELS, 'x" 'X' RING, W PROJETION SREEN T ENTER OURT, ELE. PROJETOR MOUNT HV UT OUST. WLL PNELS, 'x" '-0" 6'-0" 'X' RING, W W W W W FIRE/SMOKE ETETOR/ LRM, RE: ELE. REMOVE IGONL RIGING FTER ROOF EK INSTLLE PINTE GYP. OVE 6'-0" FIRE/SMOKE ETETOR/ LR, RE: ELE. '-" LEHER SETING, RE: PLNS & SPES. 0/6/ Interior Elevations 0 Sheet Title Project ata Issue Revision X-REF: X-REF: X-REF: opyright 0 GYMNSIUM SOUTH Scale: " = '-0"

- - - '-0" '-" oncession 0 Storage 0 '-0" Lobby uilding Scale: /" '-0" - - - '-0" 6'-0" Revision 0'-0" Lobby '-0" '-" ottom of Furr own Foyer Ticket Window06 Stucco Soffit (a.f.f.) 9'- " Entry '- " ottom of MU (a.f.f.) '-" '-" uilding Scale: /" '-0" Issue - - Scupper Joist Seat 0/6/ ' lg. Hgt. Shot lock Project ata Fin. Floor 0 Janitor Mech/Elec 09 '-" 7'-" Entry Foyer 06 oncession 0 '-0" 6'-0" '- " Entry Foyer 0 Top of eam '-7 " Women s Restroom " " opyright 0 X-REF: X-REF: X-REF: 9'-" '-" '-" Joist seat - 7" uilding Scale: /" '-0" uilding Scale: /" '-0" Sheet Title uilding s -0-0 0 - uilding Scale: /" '-0"

OLOR # RK RIK OLOR # rick Hatch Legend Not To Scale X-REF: X-REF: X-REF: opyright 0 PREFINISHE " '-" Joist seat " RIGI POLYISO. OLOR # FLSHING 0 MIL VPOR, TYP. RE: STRUTURL N SPES W NT STRIP /" OVEROR /" METL EK LINE OF OUST. WLL PNEL EYON FRI OVERE OUST WLL PNELS, LINE OF MU HSE WLL EYON Wall -Gym (North Side) Scale: /" = '-0" 6'-0" PREFINISHE OLOR # MSONRY NHORS /TIES, FOUNTION, FLSHING 0 MIL VPOR, TYP. RE: STRUTURL N SPES '- " NT STRIP FRI OVERE OUST WLL PNELS, /" OVEROR /" METL EK GLV. STEEL ROOF ESS LER WITH SFTY GE learance above ourt Wall -Gym (West End) Scale: /" = '-0" 0" MU LO ERING WLL, PT. NT STRIP /" OVEROR /" METL EK MSONRY NHORS /TIES, 0" MU Wall -Gym Scale: /" = '-0" PREFINISHE OLOR # " RIGI POLYISO. OLOR # FLSHING PREFINISHE MSONRY NHORS /TIES, " RIGI POLYISO. OLOR # /" STUO ONMETL LTH /" EXT. SHETHING ON /" FURRING HNNELS RIK EYON LUM. STOREFRONT SYSTEM, RE: SHEULE 9'- " ottom of MU (a.f.f.) Wall -Entry to Gym Scale: /" = '-0" '- " Stucco Soffit (a.f.f.) NT STRIP /" OVEROR /" GLV. METL EK 6" METL STU FRMING W/ TT SLOPE 0 MIL VPOR, TYP. RE: STRUTURL N SPES PREFINISHE OLOR # " RIGI POLYISO. 'X' RING, MSONRY NHORS /TIES, ONT. MPPROOFING OVER MU 'X' RING, 6'-0" 0 MIL VPOR, TYP. RE: STRUTURL N SPES Wall -Lobby to Gym Scale: /" = '-0" NT STRIP /" OVEROR /" METL EK 0" MU LO ERING WLL, PT. FURRE WLL EYON OVERHE ROLLING FIRE OOR HOUSING 0/6/ Wall s 0 Sheet Title Project ata Issue Revision

OLOR # RK RIK OLOR # X-REF: X-REF: X-REF: opyright 0 'X' RING, 0" MU ROLLING OVERHE HE FIRE OOR EYON PINTE H.M. FRME & OOR /" OVEROR /" METL EK OLOR # PREFINISHE /" OVEROR /" METL EK Wall -Gym (East Side) Scale: /" = '-0" /" OVEROR /" METL EK SUSP. OUST. LNG. RE: 70 N SPES. 0 MIL VPOR, TYP. RE: STRUTURL N SPES '-7 " " MU MSONRY NHORS /TIES, OLOR # FLSHING Wall -Storage (East End) Scale: /" = '-0" PREFINISHE JOIST SET, " RIGI POLYISO. MSONRY NHORS /TIES, 0" MU FLSHING LEHER SETING WOO GYM FLOORING Wall -Gym (South End) Scale: /" = '-0" NT STRIP /" OVEROR /" METL EK ROOF RIN RE: /0 FRI OVERE OUST WLL PNELS, '- " ottom of Steel 6'-" Top of Video Platform NT STRIP /" OVEROR POLYISO. /" METL EK '-6" PT. GYP.. WLL EYON /" PIPE RILING @ VIEO PLTFORM ON. PLTFORM ON METL EK Elec. 6 " MU '- 7 " 0'-0" " ottom of Window MSONRY REINFOREMENT -60 SELE ONRETE Scupper Joist Seat Wall -Gym-Elec/Platform Scale: /" = '-0" " W 9'-" 7'- " Top of Masonry Fin. Floor PREFINISHE SUPPER OLOR # MSONRY NHORS /TIES, " MU PINTE GLV. STEELLINTEL - TYP. LUM. WINOW RE: SHEULE ONTINUOUS MPROOFING OLOR # " RIGI POLYISO. MSONRY NHORS /TIES, 0" MU PINTE H.M. FRME & OOR RIK RETURN EYON Fin. Flr. rick Hatch Legend Not To Scale REFER TO EXT. ELEVTIONS SHT. 0 FOR OLOR HNGE ROOFING R '- " " Wall -Janitor/Mech/Elec Scale: /" = '-0" 7 " Fin. Flr. OLOR # " MU " RIGI POLYISO. FLSHING 0/6/ Wall s 0 Sheet Title Project ata Issue Revision

Scupper 0 - a.f.f. OLOR # 7'- " '-" 7'- " RK RIK OLOR # F Scale: /" = '-0" imensions are to edge of foundation rick Hatch Legend Not To Scale '-" '-0" '-" '-0" '-" - a.f.f. NT STRIP /" OVEROR X-REF: X-REF: X-REF: opyright 0 E Scale: /" = '-0" Scale: /" = '-0" Scale: /" = '-0" '-7" '-" '-7" imensions are to edge of foundation 7'-" imensions are to edge of foundation '-" 9'-" '-" '-" Scale: /" = '-0" imensions are to edge of foundation '- " '- " imensions are to edge of foundation This section cut thru oor 6-Elec. Room W W W Partial Elevation Scale: /" = '-0" '-" F - E - - - - -0 a.f.f. 0-0 a.f.f. 6-0 a.f.f. OLOR # " POLYISO. INSUL. OLOR # FLSHING " '-" Joist seat PT. GYP. OR HV UT, RE: MEH 6" METL STUS @ 6" O.. TO EK OUST. WLL PNEL " MU PT. Wall -Mech hase Scale: /" = '-0" /" METL EK 6'-0" '-" PINTE GLV. STL. LINTEL TYP. Joist seat /" PINTE EMENT PLSTER ON METL LTH /" EXT. SHETHING ON /" FURRING HNNELS RIK EYON 0 MIL VPOR, TYP. RE: STRUTURL N SPES 9'- " 6" METL STU FRMING W/ TT Wall -Recessed Entry Scale: /" = '-0" '-0" " Slope -/" Slope -/" '-" '- " imensions are to the edge of Foundation " '- '-" 0'-9 " '- " " '- " '-0 " " 0'-9 " " 0'-9 " 0'-6 " 0'-9 " 9'- " - '-0" a.f.f. Scale: /" = '-0" Slope -/" 6'-" Slope -/" 6'-" 0'-9 " '- " " " '- " 0'-9 " '-" '-" - 0'-0" a.f.f. Scale: /" = '-0" 0/6/ Wall s/plan etails 0 Sheet Title Project ata Issue Revision

/" Gyp. d. /" Metal Studs @ 6" o.c. '-" eiling as scheduled. '-" Ptd. Headwall lack bove 0'-6" Extend Headwall to ottom of Structure above /" Gyp. d. -/" Metal Studs @ 6" o.c. REFER TO STRUTURL RWINGS FOR MU LINTLES N REINFORING - TYP. Paint Headwall rick bove 0'-6" 6" 6" Paint Stripe to Match eiling loud Trim. Paint Gyp. d. bove Stripe "Flat lack" x Wood locking /" /" 7 7/" " Suspended coustical eiling as Scheduled Recess Perimeter LE Light Fixture. Re: Electrical rawings. '- /" 0" lear anodized aluminum frame. LE Light Fixture - Re: Elec. wgs. /" sliding tempered glass doors with locks. djustable Glass Shelves Plastic laminate ends and all exposed sides. '- /" '-" lear anodized aluminum frame. LE Light fixture - Re: Elec. wgs. /" sliding tempered glass doors with locks. djustable Glass Shelves Plastic laminate ends and all exposed sides. '-0 /" Manual Push-up Stainless Steel oiling ounter Overhead oor ENTRY FOYER ONESSION Refer to rawing Sheet -60 for Window and Overhead oiling Fire oor etails lign Top of ountertop with Top of Horizontal Mullion lear anodized aluminum frame. LE Light fixture - Re: Elec. wgs. lear anodized aluminum frame. 7'- /" cm. thick Quartz ountertop '-0" cm. thick Quartz ountertop '-6" cm. thick Quartz ountertop '-" '- /" /" sliding tempered glass doors with lock. lear anodized aluminum frame. '- /" LE Light fixture - Re: Elec. wgs. /" sliding tempered glass doors with lock. lear anodized aluminum frame. EQ. EQ. " x " Painted Steel Tube Frame (Powder oated) /" '-" /" lign Vertical Support Tubes with Vertical Window Mullions REFER TO STRUTURL RWINGS FOR TYPIL MU REINFORING 6" 7 /" 6 /" MU ase. MU ase. " x " Painted Steel Tube Frame and Foot Rail EQ. EQ. " " X-REF: X-REF: X-REF: opyright 0 " isplay ase # SLE: /" Plastic laminate clad plywood countertop with -/" nosing Rubber ase x Wood Plates - Preservative Treated SLE: " = '-0" " x Wood Framing oncession Millwork " = '-0" '- /" Recess for Ice Machine x Wood locking x Wood Studs @ 6" o.c. /" MF Plywood with mw-dtl-060 " Typical isplay ase # SLE: " = '-0" /" MF Plywood with '-0" mw-dtl-0 '-0" SLE: " /" Plastic laminate clad plywood countertop with -/" nosing djustable shelves w/recessed standards x blocking, typ. '-0" Rubber ase x Wood Plates - Preservative Treated oncession Millwork " = '-0" mw-dtl-06 '-0" x Wood Framing Ticket Window SLE: " " " = '-0" '-0" /" Plastic Laminate lad Plywood oors w/ Locks x Wood locking x Wood Studs @ 6" o.c. /" MF Plywood with " Typical /" MF Plywood with '-0" '-6" '-6" mw-dtl-00 mw-dtl-0 '-0" nchor Steel Frame to Floor Window ounter SLE: " = '-0" " /" Plastic laminate clad plywood countertop with -/" nosing '-0" Rubber ase '-0" x Wood Framing " x Wood Plates - " Preservative Treated oncession Millwork SLE: " = '-0" mw-dtl-06 '-6" oncession ounter SLE: Handwash Sink /" MF Plywood with x Wood Studs @ 6" o.c. /" MF Plywood with " Typical " = '-0" '-0" '-0" mw-dtl-0 mw-dtl-00 New White 0/6/ Millwork s & etails 0 Sheet Title Project ata Issue Revision