SPARTAN DAY CAMP 4814 FREEDOM RING RD

Similar documents
11SIXTY5 Weaver Dairy Road

PLAN SUBMITTAL REQUIREMENTS

Commercial Infill Project Guide

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

COMMERCIAL PERMIT APPLICATION GENERAL REQUIREMENTS

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC

SECTION IDENTIFYING DEVICES

Assignment 1.5 Pre-Design Base Building Model Investment Bank ARCH 5901 Instructor: Glenn Hill Fall 2013

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

Chuck Caesar. VIA: /Webposting April 27, 2017

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

The School District of Palm Beach County Project Name SDPBC Project No. SECTION ( ) SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

The CAD Technician s Role in Office Practice and Procedure

3 Basic Code Enforcement, Part 3

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1

752 ST. MARYS RD. LAFAYETTE, CA. PROJECT DATA FLOOR AREA

Architectural Floor Plan Symbols

CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

City of Thousand Oaks

Single-Family Dwelling Submittal Requirements

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

Addendum #1 - Bid Package #

Residential Room Addition / Remodel Submittal Requirement Checklist

*********************************************************************************************************

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY DWELLING

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

SECTION SIGNAGE

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

MTJ Outdoor Baggage Claim

Using Engineer and Architect Scales

CS2.0 COVER SHEET VOL. 2

This is being reviewed, additional comment to follow Marmoleum tile has been removed and replaced with a biobased VCT.

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

New Denver, BC FEASIBILITY REPORT OCTOBER 2018 BOSUN HALL. p f

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

214 Wilshire Blvd., Suite 102 Santa Monica California 90401

NCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice

2018 Design Competition Frequently Asked Questions. Q: Are teams allowed to register in more than one category of the competition?

BUILDING PLANS. BUILDING DEPARTMENT

Academic Standards Use the Nevada Career Information System (CIS) or a similar computerbased

Tooker Family Residence

Architectural Design Process

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

ARCHITECTURE CADD Course Syllabus

Tri-County Commercial Application Checklist

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

BUILDING PLAN REVIEW REQUIREMENTS

Article 4.0 Measurements and Exceptions

CHAPTER 5 ARCHITECTURE

SPRINKLER SF. Stair 190 SF WOMEN SF LOBBY SF MECH/ELEC CONCESSIONS SF 225 SF STORAGE SF

TO WHOM IT MAY CONCERN:

Notice of Proposed Development City of Johnston, Iowa

ADDENDUM NO. 1 November 10, 2016

CITY OF FOLSOM SUBMITTAL REQUIREMENTS FOR INSTALLATION OF A COMMERCIAL REFUSE OR CARDBOARD COMPACTOR FOR AN EXISTING BUILDING

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

C I T Y O F M c K I N N E Y PLANNING

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Lincoln County Tax Appraisal Office Project No. RFB

ADDENDUM NO. 3. Ellis County Elections Building

Residential Construction Checklist Single and Two Family Construction

WALKS AND SIDEWALKS REQUIREMENTS:

Product Guide Specification

CKBD Peakes Bath Scoresheet

Operating Standards Attachment to Development Application

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

Answer: Only to ChurchWoods, LLC.

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

3 DATE ISSUE R# Forefront Dermatology. CONFLUENCE DESIGN GROUP #2 Daniel Drive O'Fallon, MO ph: St. Peters, Missouri 63376

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

ARB MEETING DATE: APRIL 17, 2017 BUSINESS NAME: 1 WALL MOUNTED SIGN 4 WALL MOUNTED, 1 FREESTANDING SQUARE FEET

PLANNING Development Services Department

Transcription:

484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS ACCORDINGLY. CONTACT ARCHITECT WITH ANY DISCREPANCIES.. CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY UPON DISCOVERING ANY DISCREPANCIES OR CONFLICTING INFORMATION IN THESE DOCUMENTS. CONTRACTOR SHALL CAREFULLY REVIEW AND COMPARE ALL DRAWINGS DURING THE BIDDING PERIOD AND BEFORE INSTALLATION OF THEIR WORK. ANY INCONSISTENCIES IN THE DRAWINGS SHALL BE REPORTED PROMPTLY TO THE ARCHITECT AND ENGINEER(S) FOR CLARIFICATION.. DO NOT SCALE DRAWINGS. THE DRAWINGS ARE NOT NECESSARILY TO SCALE - USE GIVEN DIMENSIONS. DIMENSIONS TAKE PRECEDENCE OVER SCALE. CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD. PROJECT DESCRIPTION: NEW SINGLE STORY BUILDING 4. CONTRACTOR SHALL NOTIFY ARCHITECT AND OWNER IMMEDIATELY UPON DISCOVERING ANY UNANTICIPATED EXISTING SITE CONDITIONS AFFECTING THE EXECUTION OF THESE DOCUMENTS (SUCH AS HAZARDOUS MATERIALS, ETC.). OCCUPANCY: PRIMARY : E (DAY CARE FACILITY) CONSTRUCTION TYPE: TYPE IIB NON-COMBUSTIBLE 5. CONTRACTOR SHALL ABIDE BY ALL LOCAL, STATE AND FEDERAL CODES AND REGULATIONS GOVERNING THIS PROJECT. ALLOWABLE AREA & HEIGHT: UNLIMITED AREA (IBC 507.) HEIGHT (IBC TABLE 706.4) = () STORIES 55 FEET ADD () STORY PLUS 0 FEET FOR SPRINKLERED 6. JOB SITE SHALL BE BROOM SWEPT AND CLEAN AT THE END OF EACH DAY. ALL DEBRIS SHALL BE PICKED UP AND DISPOSED OF PROPERLY INTO APPROVED CONTAINER. AREA/ NUMBER OF OCCUPANTS: EDUCATION: st FLOOR = 0,47 SF @ 50 GROSS (EXERCISE ROOM) = 08 OCC MEZZ FLOOR =,5 SF @ 0 GROSS (CLASSROOM) = 6 OCC TOTAL OCC = LIMITED TO 50 OCC PLUMBING: REQUIRED: MEN @ /50 WOMEN @/50 TOTAL REQUIRED TOTAL PROVIDED WC/ URINAL = WC = WC = 4 WC = 8 LAV = LAV = LAV = LAV = 4 GENERAL A0. COVER SHEET 04/8/08 CIVIL C. C. C. C.4 04/8/08 04/8/08 04/8/08 04/8/08 CIVIL - LANDSCAPE C.5 LANDSCAPE PLAN 04/8/08 ARCHITECTURAL PC. PLAN PC. PLAN PC. ROOF PLAN PC. EXTERIOR ELEVATIONS PC. EXTERIOR ELEVATIONS PC. D ELEVATIONS PC4. BUILDING SECTIONS 04/8/08 04/8/08 04/8/08 04/8/08 04/8/08 04/8/08 04/8/08 EXISTING CONDITIONS SITE PLAN GRADING PLAN UTILITY PLAN BUILDING PERSPECTIVE PROJECT LOCATION SITE LOCATION 7. MAINTAIN DESIGNATED EGRESS ROUTES DURING CONSTRUCTION BY KEEPING CLEAR OF CONSTRUCTION DEBRIS AND CLEARLY MARKING THE PATH OF EGRESS TRAVEL. 8. ALL MECHANICAL (HVAC), ELECTRICAL, AND PLUMBING ("MEP") DESIGN AND CONSTRUCTION TO BE BY A DESIGN-BUILD DELIVERY METHOD AND ARE SUBSEQUENTLY NOT PART OF THESE DOCUMENTS. IT IS THE MEP CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE GENERAL CONTRACTOR AND WITH THESE DRAWINGS THE FINAL DESIGN, RETROFIT AND INSTALLATION OF THESE SYSTEMS. NOTIFY THE ARCHITECT PRIOR TO MAKING ANY REVISIONS TO THE STRUCTURE OR ARCHITECTURAL FEATURES. 9. ELECTRICIAN TO VERIFY NEW LIGHT FIXTURE LAYOUT AND SUBMIT LIGHTING ENERGY CALC'S AS REQUIRED PER CODE. REVIEW PLAN AND LIGHTING FIXTURE SELECTION WITH ARCHITECT. FIRE CONTROL: FULLY SPRINKLERED BLDG: NFPA- SPRINKLER 0. HVAC CONTRACTOR SHALL SUBMIT PROPER DESIGN DRAWINGS AS NEEDED FOR PLAN APPROVAL AND BUILDING PERMITS. SEPARATION: NONE REQUIRED: ACCESSORY OCCUPANCY. ENSURE A CLEAR PATHWAY TO ALL EXISTS IS MAINTAINED AND SUSTAINED. EXIT TRAVEL DISTANCE: FULLY-SPRINKLERED BLDG: 50 FT MAX TRAVEL (TABLE 06.) 75 FT COMMON PATH OF TRAVEL (04.). WITHIN THIS DOCUMENT "NORTH, SOUTH, EAST, WEST" ARE REFERRED TO AS PROJECT NORTH AND MAY NOT BE TRUE NORTH EXITS:. ALL EXPOSED WOOD, OR IN CONTACT WITH CONC, OR MASONRY, SHALL BE PRESSURE TREATED () EXITS FROM REQUIRED () EXITS FROM FLOOR REQUIRED 4. VERIFY ALL ROUGH OPENINGS WITH RESPECTIVE MFG ACCESSIBILITY: ALL FLOORS SHALL BE ACCESSIBLE IF GREATER THAN,000 SF ELEVATOR REQUIRED AT FLOORS >,000 SF (NONE REQUIRED) FOLLOW ANSI 7. 00 5. PROVIDE SOUND BATT INSULATION AT ALL WALLS UNO 6. PROVIDE MOISTURE RESISTANT GWB AT ALL PLUMBING WALLS 484 FREEDOM RING RD BUILDING CODE: TWIN OAKS NEIGHBORHOOD ASSOCIATION CITY OF MADISON ZONING ORDINANCES DANE COUNTY ZONING ORDINANCES WISCONSIN ADMINISTRATIVE CODE 009 INTERNATIONAL BUILDING CODE ACCESSIBILITY ANSI A7. - 00 REVISIONS MARK DATE REGULATING MUNICIPALITIES: CITY OF MADISON DANE COUNTY STATE OF WISCONSIN SHEET NAME 484 FREEDOM RING RD SHEET INDEX SHEET NUMBER 7. PROVIDE GFI OUTLETS NEAR WATER SOURCES AND AS REQUIRED BY CODE 9. PROVIDE X BLOCKING AT ALL GRAB BAR LOCATIONS IN ALL UNITS PER ANSI A7. 009 0. FIELD VERIFY ALL CABINET LAYOUTS AND COORDINATE DIMENSIONS WITH SELECTED APPLIANCES AND FIXTURES, PROVIDE END PANELS AT ALL EXPOSED CABINET ENDS BUILDING LOCATION 484 FREEDOM RING RD. PROVIDE FIRE BLOCKING THROUGHOUT ENTIRE BUILDING PER IBC 77.. INTERIOR UNIT WALLS TO BE TYPE S4A-B UNO 4/8/08 0:4:50 AM O:\projects\Bisbee\Spartan Day Camp\Drawings\Revit\Spartan.rvt COVER SHEET. SUBMIT ALL FIXTURES, APPLIANCES, MATERIALS, SHOP DRAWINGS, PLAN MODIFICATIONS TO THE ARCHITECT FOR REVIEW AND APPROVAL Project Status 04/8/08 PROJECT CONTACTS: OWNER: SPARTAN DAY CARE 475 DALE CURTAIN DR MCFARLAND, WI 5558 ARCHITECT: SKETCHWORKS ARCHITECTURE, LLC 7780 ELMWOOD AVE., STE 08 MIDDLETON, WI 556 GENERAL CONTRACTOR: NAME ADDRESS CITY, ST ZIP CONTACT: MEGAN BISBEE 608-48-00 CONTACT: NAME (ARCHITECT) NAME (DESIGNER) 608-86-7570 CONTACT: NAME PHONE STRUCTURAL ENGINEER: MP-SQUARED STRUCTURAL ENGINEERS, LLC 58 D'ONOFRIO DR STE 0 579 CONTACT: MARK PUCCIO 608-8-4770 CIVIL ENGINEER: QUAM ENGINEERING, LLC 4604 SIGGELKOW RD MCFARLAND, WI 5558 CONTACT: AARON FALKOSKY 608-88-7750 PRELIMINARY A0.

PC. A. 4 5 6 0'-0" 4'-0" '-0" '-0" 4'-0" 4'-0" 4'-0" A B PC. A. C 84'-0" '-0" '-0" '-4" 9'-0" '-4" 9'-9 7/8" OPEN GYM 0 9'-0" '-4" '-6" PC. A. '-4" 484 FREEDOM RING RD D E '-0" '-0" '-7 7/8" 0'-0" 8'- /" 5'-0 /" 4'- /" 4'- /" 0'-" RECEPTION 00 WOMEN'S ROOM 0 MEN'S ROOM 09 KITCHEN 07 STORAGE 0 OFFICE OFFICE 06 05 7'-0" PLAN 5'-4 /" 4'- /" 9'-0 7/8" '-4" 9'-0" '-4" 0'-0" '-4" 4'- /" 4'- /" 4'- /" 4'- /" '-4" 9'-" '-6 /8" 4'- /" 4'-0 /" 4 PC. A. 4'- /" 4'- /" 9'-0" '-4" 4'- /" 9'-0" 4'- /" 04/8/08 0' 4' 8' 6' ' PLAN /6" NORTH NORTH /6" = '-0" PLAN TRUE PRELIMINARY PC.

PC. A. 4 5 6 A B PC. A. C OPEN BELOW PC. A. 484 FREEDOM RING RD 9'- /4" 99'-6 /4" D E 9'-4 /" DN 00 DN PLAN 4 PC. A. 04/8/08 0' 4' 8' 6' ' PLAN /6" NORTH /6" = '-0" PLAN NORTH TRUE PRELIMINARY PC.

PC. A. A B PC. A. C 84'-0" 4 5 6 0'-0" TON RTU PC. A. 484 FREEDOM RING RD D ROOF PLAN E 4 PC. A. 0' 4' 8' 6' ' ROOF PLAN /6" NORTH /6" = '-0" PLAN NORTH TRUE PRELIMINARY 04/8/08 PC.

MATERIAL CALLOUT 5 A 6 WEST ELEVATION /6" /6" = '-0" B C D E 4 0'-0" 7'-0" 7 '-0" 00'-0" # Comment METAL PANEL "PANEL RIB" OR EQUIV, COLOR: TAN, ORIENTATION: VERTICAL METAL PANEL "PANEL RIB" OR EQUIV, COLOR: BROWN, ORIENTATION: VERTICAL METAL PANEL "BOX RIB" OR EQUIV, COLOR: BLUE, ORIENTATION: HORIZONTAL 4 METAL PANEL "BOX RIB" OR EQUIV, COLOR: GREEN, ORIENTATION: HORIZONTAL 5 PREFINISHED ALUMIN, COLOR: BROWN 6 LOW-E ALUMN STOREFRONT WINDOWS, COLOR: BROWN 7 STEEL CANOPY W/ "C" CHANNEL, COLOR: BROWN 8 HOLLOW METAL DOOR, COLOR: BROWN 9 GLASS SECTIONAL OVERHEAD DOOR METAL PANEL TAN: "PANEL RIB" OR VERTICAL 484 FREEDOM RING RD 5 6 5 4 0'-0" 7'-0" '-0" METAL PANEL BROWN: "PANEL RIB" OR VERTICAL METAL PANEL BLUE: "BOX RIB" OR HORIZONTAL EXTERIOR ELEVATIONS 9 8 00'-0" METAL PANEL GREEN: "BOX RIB" OR HORIZONTAL 04/8/08 NORTH ELEVATION /6" /6" = '-0" PRELIMINARY PC.

5 E D EAST ELEVATION /6" /6" = '-0" 6 C B A 0'-0" 7'-0" '-0" 00'-0" MATERIAL CALLOUT # Comment METAL PANEL "PANEL RIB" OR EQUIV, COLOR: TAN, ORIENTATION: VERTICAL METAL PANEL "PANEL RIB" OR EQUIV, COLOR: BROWN, ORIENTATION: VERTICAL METAL PANEL "BOX RIB" OR EQUIV, COLOR: BLUE, ORIENTATION: HORIZONTAL 4 METAL PANEL "BOX RIB" OR EQUIV, COLOR: GREEN, ORIENTATION: HORIZONTAL 5 PREFINISHED ALUMIN, COLOR: BROWN 6 LOW-E ALUMN STOREFRONT WINDOWS, COLOR: BROWN 7 STEEL CANOPY W/ "C" CHANNEL, COLOR: BROWN 8 HOLLOW METAL DOOR, COLOR: BROWN 9 GLASS SECTIONAL OVERHEAD DOOR METAL PANEL TAN: "PANEL RIB" OR VERTICAL 484 FREEDOM RING RD 5 7 4 5 6 6 4 0'-0" 7'-0" '-0" METAL PANEL BROWN: "PANEL RIB" OR VERTICAL METAL PANEL BLUE: "BOX RIB" OR HORIZONTAL EXTERIOR ELEVATIONS 00'-0" METAL PANEL GREEN: "BOX RIB" OR HORIZONTAL 04/8/08 SOUTH ELEVATION /6" /6" = '-0" PRELIMINARY PC.

ENTRY ENTRY AND BACK D ELEVATIONS 484 FREEDOM RING RD SIGGLEKOW AND FREEDOM RING Project Status 04/8/08 PRELIMINARY PC.

E PC4. D C TON RTU B PC4. A 4'-9" 5'-4" 0'-0" 7'-0" '-0" 00'-0" TO FOOTING 96'-0" BLDG CROSS SECT /8" NOT TO = '-0" SCALE TON RTU 4 5 6 PC4. 4'-9" 9'-7" 0'-0" 7'-0" '-0" 00'-0" TO FOOTING 96'-0" 484 FREEDOM RING RD BLDG LONG SECT @ MEZZ /8" NOT TO = '-0" SCALE 4 5 6 PC4. 0'-0" 7'-0" BUILDING SECTIONS '-0" Project Status 04/8/08 00'-0" TO FOOTING 96'-0" BLDG LONG SECT @ BACK WALL /8" NOT TO = '-0" SCALE PRELIMINARY PC4.