Project: NEW CONCESSIONS/ TOILET BUILDINGS FOR FLOMATON HIGH SCHOOL FOR THE ESCAMBIA COUNTY BOARD OF EDUCATION BREWTON, ALABAMA

Similar documents
Jack Anderson Ball Park July 31, 2014 Concessions and Restroom Ashland, Nebraska ADDENDUM NO. 1

POOLPAK R-410A MPK SERIES

REQUEST FOR PROPOSALS ADDENDUM

RemoteTeller SYSTEM - RTS VAT 21 GX CUSTOMER UNIT COMPONENTS CUSTOM DESIGNED CUSTOMER AREA

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

From Off-The-Shelf to Market-Ready New Age Enclosures is your Single Source Solution. Let us quote modifiying our Stock Enclosures to meet your

* TURNING SPACE ROLLED CURB SIDEWALK RAMP TYPE R (ROLLED SIDES) * TURNING SPACE ** RAMP

DESIGN DRAWING INDEX PROJECT INFO. WEATHERBY / PIPER MCKEE GROUP x 136

GENERAL NOTES: G1. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO INSTALLATION. G2. DUCT SIZES SHOWN ARE ACTUAL INSIDE DIMENSIONS.

Junction Box. Digitrace C910 Electronic Controller. Thermal Pipe. Ambient Control Rtd. Insulation. Rayclic-E End Seal. XL-Trace Heating Cable

POWER PANEL INSULATION TEST

From Off-The-Shelf to Market-Ready New Age Enclosures is your Single Source Solution. Let us quote modifiying our Stock Enclosures to meet your

S.R. 32 AT GRADE CROSSING

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2017 REVISIONS

PURCHASING DEPARTMENT

A NEW GYMNASIUM AT ARITON SCHOOL FOR THE DALE COUNTY BOARD OF EDUCATION OZARK, ALABAMA

5/4/2010 DATUM 644 GREAT ALASKAN RENTAL PACKAGE DRAINAGE SYSTEM/HEAT-PREWIRE DRAINAGE SYSTEM-HEATED CODES/STANDARDS USA 265 CODES/STANDARDS-CSA/CMVSS

The Cottage Beach Design

VAC.LINE TO HEATER-A/C CONTROLS (BLUE) HOSE (1200) FROM VAC.RESERVOIR TO ENGINE VAC. SOURCE (BLACK) VAC. RESERVOIR ADAPTER

LIST OF ARCHITECTURE PLANS

Requ est fo r sea led bids for an addition to Be ave r Lake Bathhouse

NORTH STAR 2-PANEL PATIO DOOR ASSEMBLY INSTRUCTIONS

Multi-Point Astragal Prehanger Installation Instructions

BUILDING OVERHANG (6'-0") STREET TREES IN 5X5 PLANTER BEDS ALONG E GRAND PLANTER BEDS

5'-7 3/4" AFI 1'-11" BEDROOM 2 AFI AFI CLOSURE PANEL ABOVE *NOTE: ELEVATOR PIT MUST BE A FULL 8" DEEP GAME ROOM CARPET T-2 2'-0"

A '-4" 10'-10" 16'-6" 7'-0" 23'-0" 10 3/4" 9'-6" 5 1/4" 2'-11 1/2" 2'-6" 3'-2 3/4" 3'-1" 4'-8 3/4" 2'-5 3/4" 2'-6" 7'-2" R.O. HD 7'-3" R.O.

EDUCATION GRADE 12 JUNE EXAMINATION 2013 UMLAZI / ILEMBE / UGU ENGINEERING GRAPHICS AND DESIGN PAPER 1 MANUFACTURING ENGINEERING & TECHNOLOGY

IIHS LATCH Measurement Tool Set Drawings REV1. iihs.org

WYOMING CLEAN WATER PLANT

Ultimate Trilennium Astragal Prehanger Installation Instructions

Multi-Institutional Academic Health Science and Research Center. PS701 from the conformed documents folder. These are obsolete drawings

Pro-Master Ridge Vent Enabling Attic Air to Exit. Moist, Hot Attic Air. Cool, Fresh Air Enters Through Soffit Vents

THE CHANDLERY. image area: a PISANI + ASSOCIATES ARCHITECTS. 270 Dorchester Avenue South Boston, Massachusetts

DRAWING TABLE SYSTEM

HALL 1 & HALL 4 RESTROOM FINISH UPGRADE 100 SOUTH WEST TEMPLE, SLC, UT QUOTE # SLP42848 AUGUST 29, 2017 CONSTRUCTION DOCUMENTS ABBREVIATIONS

PLEASANT VALLEY ROAD REHABILITATION 37 AVENUE TO 41 AVENUE FOR CONSTRUCTION ENG

120.28' PLANTER AC PAVING ' COMMERCIAL BUILDING 4,100 SF / R-1 SPD 3333 I STREET APN: LANDSCAPE ' 4' WIDE CITY SIDEWALK

Remove (E) carpet, underlying flooring material, and all remaining glue residues. E Consultant 29'-2" VIF

1 OF / Jan-2018

Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products

MONROE COUNTY BOARD OF EDUCATION ABC PROJECT NO ADDENDUM NUMBER 4. Thursday, May 8, 2014

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

CSP-CALHAN SITE MODIFICATION REQUEST SMR-2WAY S. VAUGHN WAY, SUITE 550 AURORA, CO SITE VICINITY MAP SCALE: NTS

Particular Specification for Furniture (Total of 11 pages, not including this page)

ADDENDUM NUMBER: 002 COUNTY OF MOORE NEW RECREATION CENTER CARTHAGE, NC OWNER PROJECT NUMBER IFB PROJECT NUMBER

BLDG. OG-8 PLUMBING 1ST FLOOR PLAN

A0.0 TENANT IMPROVEMENTS FOR FACILICARE AND RENOVATIONS AND LUCKY SAVANNAH

GENERAL INFORMATION WITH SPECIFICATIONS GENERAL PRODUCT INFORMATION

WETROOM WALK-IN AWL1500 AWL1200 AWL900 AWC850

Power rating at 80 C watts R0005 ohms R0006 to R01. R001 to R01 Power. to R015. (mω) 1 0.2, 0.25, 0.3, 0.

1, 1.5, 2, 2.5, , 0.75, 1, 1.5, , 3, , 4.5, 5, 5.5, , 4.5, 0.5, 5, , , 6.

RENOVATION OF THE FARMERS MARKET Reference Number:

0-50 (with Circulated Air) EHDF G C2 -Y -30 Direction Valve Rated Flow Series Number Type of Mounting. L/min.

NOTE: UNLESS OTHERWISE SPECIFIED. 1. SEE SHIPPING INSTRUCTIONS FOR FINAL PACKAGING

Sample Plan RETAINING WALL DETAILS NARRATIVE. Sample Plan RETAINING WALL DETAILS CHECKLIST

ASSEMBLY INSTRUCTIONS

NORTH STAR 4-PANEL PATIO DOOR ASSEMBLY INSTRUCTIONS

No screws, no glue just add your Raspberry Pi filling!

CRAFTSMAN EXAMINATION, JUNE 2008 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

Ultimate Flip Lever Astragal Prehanger Installation Instructions

Safety Relay Unit. Main contacts Auxiliary contact Number of input channels Rated voltage Model Category. possible 24 VAC/VDC G9SA-501.

ADDENDUM ADDENDUM NO.: 01 PROJECT NO.: CONTRACT NO.: DATE OF ISSUE: January 12, 2018

REQUEST FOR INFORMATION

The BEST Plumbing Specialties. One Source. A 15

Aquauno Select MINUTES. (duration) FREQUENCY LED. OFF 8h AQUAUNO SELECT 5 MIN FREQUENCY. the timer is being programmed;

1 OF / Jan-2018

Tubing Spacers. Backing Plate. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a a. a a. a a

T6-200 THERMAL IMAGING SYSTEM

Reversible and Proportional Electric Actuators

SMARTdesks with flipit S P E C I F I C A T I O N S

CONSTRUCTION PLANS COLLIER BOULEVARD & GOLDEN GATE CANAL 36" WATER MAIN DIRECTIONAL DRILL

Options. Exposed Ends (EXP) Flush Ends (FL) Flush Unexposed Ends (FUE) Cabinet Systems Winter

Job Sheet 2. Variable Speed Drive Operation OBJECTIVE PROCEDURE. To install and operate a Variable Speed Drive.

SECTION PLUMBING FIXTURES

ADDENDUM NO: 1 IFB/RFP No: NKU Commodity: Kentucky Hall Renovation Date: 12/7/2017 Due Date: 12/18/2017

Ultimate Push Button Astragal Prehanger Installation Instructions

1st FLOOR FURNITURE PLAN

Geberit Duofix. Installation Manual Montageanleitung Instructions de montage Istruzioni per il montaggio

670 Freestyle/Style Door with In-Line Panel

SECTION 4 - REINFORCED CONCRETE MASONRY UNITS (CMU)

NOTES 3D VIEW OF RAILING WITH TYPE 1 - PICKET INFILL PANEL. (42" Height shown, 54" Height Similar) TABLE 1 - RAILING MEMBERS ALTERNATIVE BOTTOM &

GENERAL NOTES 1600 SYSTEM NOTES STRUCTURAL SEAL NOTES 1 - HANDLING, STORING AND PROTECTING ALUMINUM MATERIAL. 2 - GENERAL RULES

STANDARD CONSTRUCTION DETAILS PAVING REVISED -MAY 2017 DEPARTMENT OF ENGINEERING

Floor Area Ratio. Note: Handicap parking is provided in accordance with ADA standards. SITE DATA FIRE LANE STRIPING FIRE HYDRANT PARKING COUNT

Radiant systems 0801EN March 2016 Radiant plasterboard ceiling and/or floor system ISO /7

ARK CHEVRON INSTALLATION GUIDE

REAR FRONT 93' 20' 12' 48' 120' 30' 52' 75' Sample Shopping Center. Unit # 5 +/- 10,920 GLA GROUND FLOOR. Width +/- 105' Depth +/- 120' Site Map

A. This Section includes plumbing fixtures and related components.

INSTALLATION INSTRUCTIONS FREE STANDING TUB FILLERS

METHOD OF LOCATION USING SIGNALS OF UNKNOWN ORIGIN. Inventor: Brian L. Baskin

NOTE THAT THE HANDLE IS BELOW THE LOCK BASE

TECHNICAL DRAWING SPECIFICATIONS

Whole House Fan. WHF 1500, GF 1500, WHF 3000 Installation Instructions. Parts List * Required Tools:

Harmer Roof Drainage The Modulock Raised Deck Support Ranges

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

Extremely small "footprint" and the highest circuit density available AK550. Front Wire Entry

WINDY HILL PROPERTY VENTURES

SECTION CUSTOM MILLWORK

GXR-GPS GXR-GPS-485 User Manual

J. Colville

Transcription:

McKee and ssociates rchitecture and Interior Design ddendum No. ONE Date: 1-30-18 Project: NEW NCESSIONS/ TOILET BUILDINGS FOR FLOMTON HIGH SCHOOL FOR THE ESCMBI UNTY BORD OF EDUCTION BREWTON, LBM 1.1 GENERL PROJECT NO. 17-164 BC# 2017278. The following changes and/or substitutions to the plans and specifications are hereby made a part of same and are incorporated in full force as part of the contract. B. Bidders shall acknowledge receipt of this ddendum in writing on his Proposal Form. C. Clarification: ll work in Base Bid and lternate if accepted is to be completed on or before ugust 1, 2018 1.2 SPECIFICTIONS- No Changes 1.3 DRWINGS. The following sheets are to be substituted (dated 1-25-18) into the drawings: Sheet C-1 Sheet C-2 Sheet C-3 Sheet Sheet B. The following sheets are to be substituted (dated 1-30-18) into the drawings: Sheet 1.1 Sheet 1.2 Sheet 3.1 END OF DDENDUM ONE 631 South Hull Street Montgomery, labama 36104 334-834-9933

PLUMBING FIXTURE SCHEDULE NO. ** FIXTURE WTER CLOSET D WTER CLOSET D URINL URINL LVTORY D LVTORY ** ** WSTE C.W. H.W. REMRKS 1 1/ 3/ 3/ 1/ 1 1/ 1/ PROVIDE WTER TEMPERTURE LIMITING DEVICE EQUL TO SYMMONS #5-210-CK (SSE STD. 1070) WITH 1/ TEMPERED WTER LINE TO FUCET. N O T E S 1/ 1/ FL. MTD. - REG. FL. MTD. - D WLL HUNG - D WLL HUNG - REG. WLL HUNG - REG. WLL HUNG - D SINK 1 1/ 1/ 1/ 2-MP. MTD. IN UNTER SPLIT LEVEL EWC 1 1/ 1/ - D - HI / LOW P9 FUTURE ICE MKER WLL BOX -- 1/ - D - HI / LOW 1. ROUGH WTER CLOSET ND URINL FLUSH VLVE SO THT THE FLUSH TUBE IS VERTICLLY STRIGHT. 2. PROVIDE DEEP SEL P-TRP ND TRP SEL FOR ECH FLOOR DRIN ND HUB DRIN. 3. PROVIDE VCUUM BREKER FOR ECH WLL HYDRNT ND HOSE BIBB. 4. RUN LL WTER PIPING WITHIN BUILDING INSULTION ENVELOPE. 5. ORDINTE LL PIPING RUNS WITH THE ELECTRICL NTRCTOR. DO NOT RUN PIPING OVER ELECTRICL TRNSFORMERS, PNELS ND EQUIPMENT. MINTIN CLERNCE S REQUIRED BY THE NTIONL ELECTRICL DE. (GENERLLY MIN. 3 FEET). 6. LL WSTE ND VENT PIPING INSIDE RETURN IR PLENUM SPCES SHLL BE CST IRON PIPE ND FITTINGS S SPECIFIED. VSTR 7. MINTIN MIN. OF 10 LINER FEET FROM PLUMBING VENTS TO HVC FRESH IR (OUTSIDE IR) INTKES. 8. H/C - HNDICP - FIXTURES ND INSTLLTION SHLL MEET MERICNS WITH DISBILITIES CT (.D..) REQUIREMENTS. 9. FLUSH VLVE HNDLE FOR HNDICP WTER CLOSET SHLL BE LOCTED ON WIDE SIDE OF TOILET STLL RE TO MEET.D.. REQUIREMENTS. 10. ROUGH HNDICP WTER CLOSET 18" FROM FINISHED WLL TO CENTERLINE OF WTER CLOSET. MESURE FROM FCE OF SHORT SIDE OF STLL TO FINISHED WLL. 11. PROVIDE REDILY CCESSIBLE CLENOUT T OR NER THE BSE OF ECH WSTE ND VENT STCK PER PLUMBING DE ND SPECS.. 12. WTER SUPPLY SYSTEM IS DESIGNED FOR STTIC PRESSURE OF 50 TO 75 PSI. GUGE CITY WTER SUPPLY TO VERIFY THT THE PRESSURE IS WITHIN THOSE LIMITS. PROVIDE WTER PRESSURE REDUCING VLVE, IF REQUIRED TO MEET DESIGNED WTER PRESSURE. VS VS VS L E G E N D G R H/C F H.D. F.D. C.O. W.H. G.V. B.V. F.S. S R WSTE PIPE VENT PIPE LD WTER PIPE HOT WTR. PIPE (125 ) HOT WTR. RECIRC. PIPE GS PIPE STORM WTER PIPE CID RESIST. WSTE PIPE CID RESIST. VENT PIPE UNION GTE VLVE CHECK VLVE BLL VLVE HNDICPPED FLOOR CLENOUT HUB DRIN FLOOR DRIN CLENOUT WLL HYDRNT GTE VLVE BLL VLVE FLOOR SINK INDICTES POINT OF NNECTION TO EXISTING INDICTES POINT OF NNECTION TO OUTSIDE UTILITY. SEE CIVIL DWGS.. VSTR VS VS VS WSTE RISER R-2 REVISED VS SECURE PIPE CLMP TO ROOF JOISTS PROVIDE PLSTIC SLEEVE PIPE CLMP SIZE TO FIT OVER PIPE INSULTION DEEP SEL P-TRP REQUIRED PIPING NO SCLE BTT INSULTION PROTECTIVE SHIELD. SEE SPECS.. FROM TRP PRIMER T WTER CLOSET FLUSH VLVE SUPPLY OR LVTORY TILPIECE 1/ C.W. LINE FLOOR DRIN TRP PRIMER DETIL VS VS NO SCLE HUB DRIN FLOOR WTER PIPING INSULTION CST IRON OR PVC PIPE. SEE SPECS.. FOR /C UNITS FLOOR SINK FOR FUTURE VS HUB DRIN FOR WTER HETER VS ICE MCHINE - PROVIDE SLOTTED VER PLTE H.W. LINE T.&P. RELIEF VLVE W/PPER OVERFLOW LINE TO UX. DRIN PN. 3/ THERMOMETER WTR. HTR. SCHED. 20.0 GL. STOR. 4.5 KW HTG. ELEM. 208V,1PH,60HZ. xx THICK NEOPRENE PD. (4) REQ'D.. UNION WTER HETER WTER HETER DETIL NO SCLE EXTERIOR CLENOUT VER & FRME. PROVIDE TWO-WY CLENOUT WHERE REQUIRED. TERMINTE W/ CLENOUT PLUG T END OF RUN. VCUUM BREKER 6"THICK NC. PD OR EXTERIOR SLB. 3/ CBINET BSE 3/ 3 GL. THERML EXPNSION TNK PROVIDE SUPPORT UX. DRIN PN W/ PPER DR. LINE TO HUB DRIN SEE PLNS NO SCLE CIRC. PUMP CHECK VLVE WLL MTD. PROGRM CLOCK STRP-ON QUSTT CLENOUT PLUG BLL VLVE FINISHED GRDE EXTERIOR CLENOUT H.W. RECIRC. WSTE PIPING C.W. LINE NEW NCESSIONS / TOILET BUILDINGS FOR FLOMTON HIGH SCHOOL FOR THE F O ESCMBI UNTY SCHOOLS L T E B M T BREWTON, LBM S T WLTER T. McKEE, JR. No. 1082 MONTGOMERY, L. M c K E E a n d S S O C I T E S R C H I T E C T U R E a n d I N T E R I O R D E S I G N 631 SOUTH HULL STREET MONTGOMERY, LBM 36104 (334) 834-9933 TEC RE I RCH D ERE GI ST VS VS VS VS - Z:\Mckee\17-352 Flomaton Concessions & Toilet Building\HVC & PLBG-B.dwg - Thursday, January 25, 2018 11:43:49 M VS WSTE RISER R-1 VS HUB DRIN FOR WTER HETER VS HUB DRIN FOR /C UNITS VS FLOOR SINK FOR FUTURE ICE MCHINE - PROVIDE SLOTTED VER PLTE ZGOUVS, EIRING & SSOCITES NSULTING ENGINEERS 800 S McDONOUGH STREET MONTGOMERY, L. 36104 334.263.4406 ZE PROJECT NUMBER 17-352 THE INFORMTION NTINED IN THIS DRWING IS PYRIGHTED MTERIL ND SHLL NOT BE REPRODUCED, DIGITIZED, OR REVISED, IN WHOLE OR IN PRT, WITHOUT THE WRITTEN NSENT OF ZGOUVS, EIRING ND SSOCITES SHEET TITLE : MCKEE JOB # : DRWN BY : CHECKED BY : DTE: REVISED DTE: REVISED DTE: REVISED DTE: SHEET NO. : 17-164 C. WRD 01-09-18 01-09-18 PLBG. SCHED. DETILS ND RISERS T. ZGOUVS

1/ TRP PRIMER LINE BELOW FROM TRP PRIMER T LV. TILPIECE TO FLOOR DRIN NNECTION PROVIDE ELEC. HET TRCE FOR P-TRP ND SUPPLY MEN'S 201 1/ TRP PRIMER LINE BELOW FROM TRP PRIMER T LV. TILPIECE TO FLOOR DRIN NNECTION VERIFY LOCTION OF EXISTING WSTE PIPING ON SITE ND MKE REQUIRED NN. TO FCILITTE NEW BLDG. WSTE PIPING TWO WY C.O. IN NC. PD FLUSH W/ FIN. GRDE. MEN'S 101 PROVIDE ELEC. HET TRCE FOR P-TRP ND SUPPLY TWO WY C.O. IN NC. PD FLUSH W/ FIN. GRDE. WOMEN'S 102 HUB DRIN EXTEND 6" BOVE NC. SIDEWLK WSTE RISER R-2 REVISED WOMEN'S 202 VERIFY LOCTION OF EXISTING WSTE PIPING ND MKE REQUIRED NN. TO FCILITTE NEW BLDG. WSTE PIPING 1/ TRP PRIMER LINE BELOW FROM TRP PRIMER T LV. TILPIECE TO FLOOR DRIN NNECTION BEFORE ORDERING WTER HETER VERIFY WTER HETER WILL FIT UNDER CBINET-WTER HETER TO HVE SIDE INLET ND OUTLET NNECTIONS HUB DRIN FOR /C UNIT NCESSIONS 203 STORGE 204 WSTE RISER R-1 TICKETS 205 FLOOR SINK FOR FUTURE ICE MCHINE - PROVIDE SLOTTED VER PLTE SEE SPECS. HUB DRIN EXTEND 6" BOVE NC. SIDEWLK BEFORE ORDERING WTER HETER VERIFY WTER HETER WILL FIT UNDER CBINET-WTER HETER TO HVE SIDE INLET ND OUTLET NNECTIONS PLBG. FLOOR PLN SHOWING WSTE PIPING - HOME SCLE: 1/4 = 1'-0" 3/ MEN'S 201 1/ 3/ 3/ NCESSIONS 103 STORGE 104 HUB DRIN FOR /C UNIT FLOOR SINK FOR FUTURE ICE MCHINE - PROVIDE SLOTTED VER PLTE SEE SPECS. 1/ PROVIDE ELEC. HET TRCE FOR P-TRP ND SUPPLY 1/ 3/ WTER SERVICE RISE IN CHSE INTO TTIC VERIFY LOCTION OF EXISTING WTER SERVICE ON SITE ND MKE REQUIRED NN. TO FCILITTE NEW BLDG. WTER PIPING TICKETS 105 WOMEN'S 202 3/ HB HB 1/ 1-1/ 3/ 3/ RE-CUIRCULTION LINE DN. IN WLL SEE DETIL FOR NN. BEFORE ORDERING WTER HETER VERIFY WTER HETER WILL FIT UNDER CBINET 3/ H.W. PIPING RISE IN WLL INTO TTIC 1/ 3/ C.W. DN. IN WLL EXTEND ND NN. TO WTER HETER WH-1 UNDER UNTER GTE VLVE IN BOX W/ LID FLUSH W/ FIN. GRDE REVISED NCESSIONS 203 STORGE 204 P9 1/ WTER ROUGH-IN FOR FUTURE ICE MCHINE TICKETS 205 NEW NCESSIONS / TOILET BUILDINGS FOR FLOMTON HIGH SCHOOL FOR THE ESCMBI UNTY SCHOOLS BREWTON, LBM M c K E E a n d S S O C I T E S R C H I T E C T U R E a n d I N T E R I O R D E S I G N 631 SOUTH HULL STREET MONTGOMERY, LBM 36104 (334) 834-9933 PLBG. FLOOR PLN SHOWING WSTE PIPING - VISITORS SCLE: 1/4 = 1'-0" PLBG. FLOOR PLN SHOWING WTER PIPING - VISITORS SCLE: 1/4 = 1'-0" F O L T E B M T S T WLTER T. McKEE, JR. No. 1082 MONTGOMERY, L. TEC RE I RCH D ERE GI ST HB PROVIDE ELEC. HET TRCE FOR P-TRP ND SUPPLY 3/ 1/ 1/ 1/ 1/ 3/ - Z:\Mckee\17-352 Flomaton Concessions & Toilet Building\HVC & PLBG-B.dwg - Thursday, January 25, 2018 11:43:50 M MEN'S 101 3/ WTER SERVICE RISE IN CHSE INTO TTIC GTE VLVE IN BOX W/ LID FLUSH W/ FIN. GRDE 1/ 3/ 3/ WOMEN'S 3/ 102 VERIFY LOCTION OF EXISTING WTER SERVICE ON SITE ND MKE REQUIRED NN. TO FCILITTE NEW BLDG. WTER PIPING 3/ RE-CUIRCULTION LINE DN. IN WLL SEE DETIL FOR NN. PLBG. FLOOR PLN SHOWING WTER PIPING - HOME SCLE: 1/4 = 1'-0" HB 3/ 1/ 3/ C.W. DN. IN WLL EXTEND ND NN. TO WTER HETER WH-1 UNDER UNTER 3/ H.W. PIPING RISE IN WLL INTO TTIC BEFORE ORDERING WTER HETER VERIFY WTER HETER WILL FIT UNDER CBINET NCESSIONS 103 1/ WTER ROUGH-IN FOR FUTURE ICE MCHINE P9 STORGE 104 TICKETS 105 ZGOUVS, EIRING & SSOCITES NSULTING ENGINEERS 800 S McDONOUGH STREET MONTGOMERY, L. 36104 334.263.4406 ZE PROJECT NUMBER 17-352 THE INFORMTION NTINED IN THIS DRWING IS PYRIGHTED MTERIL ND SHLL NOT BE REPRODUCED, DIGITIZED, OR REVISED, IN WHOLE OR IN PRT, WITHOUT THE WRITTEN NSENT OF ZGOUVS, EIRING ND SSOCITES SHEET TITLE : MCKEE JOB # : DRWN BY : CHECKED BY : DTE: REVISED DTE: REVISED DTE: REVISED DTE: SHEET NO. : 17-164 C. WRD 01-09-18 01-09-18 PLBG. FLOOR PLNS T. ZGOUVS