Norbert Meyners, DESY. LCTW 09 Orsay, Nov. 2009

Similar documents
ITk silicon strips detector test beam at DESY

EUDET Pixel Telescope Copies

R&D for ILC detectors

Pixel sensors with different pitch layouts for ATLAS Phase-II upgrade

Test Beam Measurements for the Upgrade of the CMS Phase I Pixel Detector

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously

`First ep events in the Zeus micro vertex detector in 2002`

AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators. Deliverable Report. CERN pixel beam telescope for the PS

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

Resolution studies on silicon strip sensors with fine pitch

Monolithic Pixel Sensors in SOI technology R&D activities at LBNL

Tracking Detectors for Belle II. Tomoko Iwashita(Kavli IPMU (WPI)) Beauty 2014

Phase 1 upgrade of the CMS pixel detector

CALICE AHCAL overview

HPS Upgrade Proposal

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration

Large TPC Prototype of LCTPC

The High-Voltage Monolithic Active Pixel Sensor for the Mu3e Experiment

LYCORIS - A Large Area Strip Telescope

SIMBOL-X. Peter Lechner MPI-HLL Project Review Schloss Ringberg, science background. mission. telescope.

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

PoS(VERTEX2015)008. The LHCb VELO upgrade. Sophie Elizabeth Richards. University of Bristol

Belle II Silicon Vertex Detector (SVD)

Current Status of ATLAS Endcap Muon Trigger System

Plan for Accelerator Beam Study Towards J-PARC Muon Project. Koji YOSHIMURA (KEK) for KEK Muon Working Group at NuFACT08 July 2nd, 2008

Nikhef jamboree - Groningen 12 December Atlas upgrade. Hella Snoek for the Atlas group

Totem Experiment Status Report

Towards a 10 μs, thin high resolution pixelated CMOS sensor system for future vertex detectors

optimal hermeticity to reduce backgrounds in missing energy channels, especially to veto two-photon induced events.

3.1 Introduction, design of HERA B

The LHCb VELO Upgrade. Stefano de Capua on behalf of the LHCb VELO group

CMOS Detectors Ingeniously Simple!

Development of large readout area, high time resolution RPCs for LEPS2 at SPring-8

CEBAF Overview June 4, 2010

A tracking detector to study O(1 GeV) ν μ CC interactions

The LHCb VELO Upgrade

arxiv: v1 [physics.ins-det] 26 Nov 2015

R & D for Aerogel RICH

Track Triggers for ATLAS

The Commissioning of the ATLAS Pixel Detector

Seminar. BELLE II Particle Identification Detector and readout system. Andrej Seljak advisor: Prof. Samo Korpar October 2010

A new strips tracker for the upgraded ATLAS ITk detector

Status of the PRad Experiment (E )

The CMS Outer HCAL SiPM Upgrade.

What do the experiments want?

RP220 Trigger update & issues after the new baseline

Trigger Rate Dependence and Gas Mixture of MRPC for the LEPS2 Experiment at SPring-8

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

A Characterisation of the ATLAS ITk High Rapidity Modules in AllPix and EUTelescope

Electronic Readout System for Belle II Imaging Time of Propagation Detector

SiD and CLIC CDR preparations

VErtex LOcator (VELO)

CMS Tracker studies. Daniel Pitzl, DESY

The LHCb Vertex Locator : Marina Artuso, Syracuse University for the VELO Group

Status of ATLAS & CMS Experiments

3 General layout of the XFEL Facility

PoS(EPS-HEP2017)476. The CMS Tracker upgrade for HL-LHC. Sudha Ahuja on behalf of the CMS Collaboration

The VELO Upgrade. Eddy Jans, a (on behalf of the LHCb VELO Upgrade group) a

PoS(VERTEX 2008)034. EUDET-Pixel Telescope. Ingrid-Maria Gregor DESY.

MuCool Test Area Experimental Program Summary

SiD Workshop RAL Apr Nigel Watson Birmingham University. Overview Testing Summary

Beam Infrared Detection with Resolution in Time

Status of the LHCb Experiment

Silicon W Calorimeters for the PHENIX Forward Upgrade

arxiv: v1 [physics.ins-det] 25 Oct 2012

Hall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012

The Silicon TPC System

A new single channel readout for a hadronic calorimeter for ILC

X-Ray Detection Using SOI Monolithic Sensors at a Compact High-Brightness X-Ray Source Based on Inverse Compton Scattering

CMOS pixel sensors developments in Strasbourg

1. PUBLISHABLE SUMMARY

Polarimetry Concept Based on Heavy Crystal Hadron Calorimeter

RESULTS ON FIELD MEASUREMENTS IN A FLAT POLE MAGNET WITH THE CURRENT CARING SHEETS

Laser Alignment System for LumiCal

THE CRYOGENIC SYSTEM OF TESLA

Magnetic measurement system for superconducting final focus quadrupoles for SuperKEKB

A New GEM Module for the LPTPC. By Stefano Caiazza

BTeV Pixel Detector and Silicon Forward Tracker

Lattice Design for PRISM-FFAG. A. Sato Osaka University for the PRISM working group

CALICE Software. Data handling, prototype reconstruction, and physics analysis. Niels Meyer, DESY DESY DV Seminar June 29, 2009

CMOS Pixel Sensor for CEPC Vertex Detector

The BaBar Silicon Vertex Tracker (SVT) Claudio Campagnari University of California Santa Barbara

Lecture 11. Complex Detector Systems

A DAQ readout for the digital HCAL

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

Strip Detectors. Principal: Silicon strip detector. Ingrid--MariaGregor,SemiconductorsasParticleDetectors. metallization (Al) p +--strips

Instrumentation for the Belle II experiment

Development of Pixel Detectors for the Inner Tracker Upgrade of the ATLAS Experiment

Resistive Micromegas for sampling calorimetry

ATLAS Pixel Detector Upgrade: IBL Insertable B-Layer

PoS(Vertex 2016)071. The LHCb VELO for Phase 1 Upgrade. Cameron Dean, on behalf of the LHCb Collaboration

arxiv: v2 [physics.ins-det] 20 Oct 2008

A Novel Design of a High-Resolution Hodoscope for the Hall D Tagger Based on Scintillating Fibers

FLASH II. FLASH II: a second undulator line and future test bed for FEL development.

Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs

Mitigating high energy anomalous signals in the CMS barrel Electromagnetic Calorimeter

GEM chambers for SoLID Nilanga Liyanage. University of Virginia

Overview over CERN SPS test beams

A 130nm CMOS Evaluation Digitizer Chip for Silicon Strips readout at the ILC

EMC review for Belle II (Grounding & shielding plans) PXD DEPFET system

Transcription:

DESY Test Beam Facilities - Status and Plan Norbert Meyners, DESY LCTW 09 Orsay, 3.-5. Nov. 2009

DESY Test Beam DESY provides three test beam lines with 1-5 (-6) GeV/c electrons Very simple system, no beam optics, only momentum selection via magnet. Bremsstrahlung beam generated by a carbon fibre in the circulating beam of the electron/positron synchrotron DESYII. Photons are converted to electron/positron pairs with a metal plate. Beam is spread out into a horizontal fan with a dipole magnet. Collimator cuts out final beam. 2

DESY II Mainly injector for DORIS and PETRA (synchrotron light sources). Long Up Times (10-11 month/a) Demand: High Reliability Not much room for improvements for the test beams The revolution frequency is 1 MHz, the RF frequency 500MHz, and the bunch length around 30 ps. The average radius is 46.6m For DORIS: DESYII delivers every second cycle (160ms) single bunch with about 3*10 9 positrons at 4.5GeV For PETRA: DESYII delivers every fourth cycle (320ms) single bunch with 1*10 10 positrons (3*10 10 electrons) at 6GeV Test beam runs in old PETRA mode at 7GeV possible 3

DESY Test Beam Ideal DESY II Cycle (no extraction) Rates Energy Target 3mm Cu 1mm Cu 1 GeV ~2.2 khz ~ 0.5 khz 2 GeV ~4.6 khz ~1.1 khz 3 GeV ~5.2 khz ~1.3 khz 4 GeV ~4.4 khz ~1.1 khz 5 GeV ~2.8 khz ~0.5 khz 6 GeV ~1.5 khz ~0.2 khz In practice is the maximal event rate around 2 khz. (3 GeV, 3mm Cu convert, Collimator ca. 5mm x 5mm) The rates are influenced by many parameters. Ideally, the maximum rate around 1kHz (3GeV, 3mmCu convert, Collimator ca. 5mmx5mm, 5mm, DESYII maximum energy at 7GeV, no beam extraction, no DESY III ramp). Few hundred Hertz are realistic 4

Test Beam Layout T21 T22 T24 T24/1 5

Facilities for Test Beam User All three test beam lines have Interlock systems Magnet control Patch panels with preinstalled cables Gas warning systems Fast internet connection (DHCP) The user can ask for: Translation stages Premixed gases Superconducting Magnet (1T) Big Dipole Magnet (1T) Beam Telescopes: MVD Telescope EUDET Telescope The users typically bring: Data Acquisition incl. computers Trigger scintillators 6

Test Beam Area 21 Recently refurbished -> New home of EUDET telescope Pixel beam telescope: 6 layers of Monolithic Active Pixel Sensor (MAPS) detectors DEPFET and ISIS pixel detectors for validation DAQ system Demonstrator telescope in use since summer 2007 More information WWW.EUDET.ORG 7

Test Beam 22: ZEUS Telescope Location of ZEUS MVD telescope (build in 1998) Telescope parameters: 300 µm m thick single-sided sided Si strip sensors Each plane with 2 sensors perpendicular to each other Strip pitch: 25µm Readout pitch: 50µm Active area: 32x32 mm 2 Trigger window: 8x8 mm 2 DAQ was upgraded to EUDET like system Plans for next years: keep telescope running improve software 8

Test Beam 24: EUDET Large bore magnet: 1Tesla, Ø 85 cm, stand- alone He cooling, supplied by KEK infrastructure (control, field mapping, etc.) through EUDET Magnet fully instrumented at DESY and ready for use 9

Test Beam Layout MD Magnet EUDET Telescope T21 T22 MVD Telescope T24 T24/1 PCMAG 10

Review 2008/2009 2008 8 Month Shutdown A lot of work on the accelerator sub-systems (Complete new water cooling etc.) to increase the reliability of the injector for PETRAIII Test beam vacuum system renewed! 3 User Groups + LCTPC collaboration 2009 7 User Groups + LCTPC collaboration Several 1-1½ week breaks due to work on new power supplies! This task could not be finish in the long shutdown! Should be finished in the shutdown January-February 2010 Mainly the LCTPC collaboration was effected New wave guide to spare RF-system (ready March 2010) 11

Outlook 2010 Extend shutdown: Restart 22. February 2010 (tbc.) Machine study weeks every 6 weeks possible (DORIS/PETRA Service Weeks) No (stable) beam mo-fr 8-12!!! Under discussion: break (2 weeks) in summer The EUDET telescope should be operational from March on PETRA will NOT start top-up-mode Chance to run DESY II at 7GeV By the way: Ingrid/EUDET wants to build a demonstrator* telescope by re-using the demonstrator analog pixel chips. Should be ready by end 2010! 12

Availability and Summary DESY test beam is running from 22. Feb on throughout 2010 Machine study weeks every 6 weeks possible (DORIS/PETRA Service Weeks) Users can apply for beam time through DESY test beam coordinators -> up to three weeks possible, longer terms negotiable You can apply for test beam time at DESY testbeam.desy.de Or contact: testbeam-coor@desy.de DESY provides three test beam lines with 1-6GeV/c electrons Very simple system, no beam optics, only momentum selection via magnet Perfect facility for proof of principle studies, efficiency studies and also resolution studies Infrastructure simple and flexible 13

Back Up Slides 14

Schedule 2010 1.Half 15

Schedule 2010 2.Half 16

Schedule 2009 1.Half 17

Schedule 2009 2.Half 18