tech_project_template

Similar documents
AESA TECHNOLOGY OF LAN CABLE

Project No: Date: 02 September To: The Des Plaines Public Library Issued by: Lisa Schmidt

Technical Service Note

Data, Video, BAS and Beyond

Communications Integrators, Inc. June S. Wilson Street, Suite 105 Tempe, Arizona Toll Free (800) Web Site

HandPunch Installation Guide

Design Appendix: Throughout this document various supporting appendixes are referenced. These appendixes can be found at

CTS-D Job Task Analysis

B. Division-16 Basic Materials and Methods section apply to work specified in this section.

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK

Workstation Outlets GigaFlex PS6+ Modules Category 6

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

Cisco Certification Exam

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

English. Français. AV Surround Receiver SR7009. Quick Start Guide Guide de démarrage rapide Guía de inicio rápido

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

B. Related Sections include the following: 1. Division 16 Sections for basic electrical and telecom design requirements

NZQA unit standard version 1 Page 1 of 6. Demonstrate knowledge of the installation of electrotechnology systems on customer premises

Model NV-EC1701 EoC Ethernet over Coax Transceiver with PoE, PoE+, or High Power PoE

Qt 600. Sound Masking - Paging - Music Installation Guide. Purchase date: Install date: MAC Address

SIP Trunking Service Configuration Guide for XO

Effective this date, this addendum forms part of the contract documents and modifies the original RFP.

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

SCRIPPS RANCH. COMMERCE PARK BusinessPark Ave Scripps Ranch Ct Carroll Canyon Rd. San Diego, CA 92131

1. This Section specifies the ethernet Category 5E data cabling system for buildings and structures.

ADDENDUM 1 and 2 September 29, 2017 Request for Proposals: Wi-Fi and Wireless Backhaul Replacement

Quick Start Guide Read Me First...

WIREMOLD AL7450 Series Isoduct Aluminum Raceway

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER

Exhibit Display Rules and Regulations

TSB-67. Transmission Performance Specifications for Field Testing of UTP Cabling Systems

Scan Sat Network S.L.

NAMES 2018 Exhibition Fair Guidelines

Tilting Wall Mount Fits 37" to 70" Flat Panel TVs Model No: DCD13020

ZEBRA RETAIL SOLUTIONS

Welcome to TradeMark Construction. How To Contact Us

NV-EC1701U. Ethernet over Coax Transceiver (+1) (+44) (0) Model NV-EC1701

Exhibit Display Rules and Regulations

T A B L E O F C O N T E N T S

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

T A B L E O F C O N T E N T S

FREQUENTLY ASKED QUESTIONS ABOUT ALLOWABLE USES OF 911 FEES Updated January, 2018

SHARED TENANT SERVICE (STS) ARRANGEMENTS

SC Railing Process. What To Expect

Voice/Data Identification. onlinecomponents.com THE LEADER IN COMMUNICATIONS LABELING 2004/2005

B. The designated coverage areas shall include both indoor and outdoor coverage.

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

INVENTORY MANUAL FOR J. CREW PIECE COUNT PASSWORD: ZEBRA RETAIL SOLUTIONS

Quick Start Guide Read Me First...

ADDENDUM #2 September 12, 2018

School City of Hobart

ADDENDUM #1. April 29, 2009

AW5802xTR. User s Manual. 5.8 GHz Outdoor Wireless Ethernet Radio. AvaLAN. Industrial-grade, long-range wireless Ethernet systems

Check our AVR setup tips online Usa.denon.com/SetupTips Ca.Denon.com/SetupTips

THE BEST SOLUTION FOR TELECOMMUNICATIONS DISTRIBUTION

Amendment to Bid #1 Minor Office Renovations B /30/2018 No

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

Bid #3990DB - Two Way Motorola Radio System District Wide Upgrade

Symphony II Adaptable Table System

Transmission Media. Two main groups:

P r e d a t o r. Wi- F i / 3 G V i d e o I n t e r c o m. Predator WIFI

September 29 October 1, 2013 Indiana Convention Center 100 South Capitol, Indianapolis, Indiana 46225

AW5800-SPEC USER S MANUAL

FEATURED PRODUCTS SECTION 1COMMSCOPE

Saving You Time and Money on Your Next A/V or CCTV Project

Welcome Thank you for choosing a Denon AV receiver. This guide provides step-by-step instructions for setting up your AV receiver. Before You Begin Re

b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 26 Jun 2012 ( ENCLOSURE 1)

Kevin O'Connor Design Kevin O'Connor CKD, CBD, CID

AW900-SPEC USER S MANUAL

PLAN SUBMITTAL REQUIREMENTS

Oberon Professional Wireless LAN Installation Solutions for Cisco Access Points

P700WLS IoProx Receiver

ON-SITE BRANDING OPPORTUNITIES

AW5802xTP. User s Manual. 5.8 GHz Outdoor Wireless Ethernet Panel. AvaLAN. Industrial-grade, long-range wireless Ethernet systems

RM600 Carrier Grade E1 Radios

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.

DAS Solutions. Delivering coverage and capacity in today s challenging environments

NV-EC1701U. Ethernet over Coax Transceiver (+1) (+44) (0) Model NV-EC1701

Installation Instructions

ZEBRA RETAIL SOLUTIONS

Decorating Prep

NEW BOOTH PACKAGE SPECS + DECOR RULES

DESIGN PRACTICE NOTE GENERAL OCS SPECIFICATION UPDATE

P700-WLS ioprox Receiver

TG Glazing Design-Build

Assembly InstructIons

Welcome Thank you for choosing a Marantz AV receiver. This guide provides step-bystep instructions for setting up your AV receiver. Before You Begin R

K.D. LOCKER ASSEMBLY INSTRUCTIONS

100 BaseT transmission; Network speeds up to 93 Mbps*; Up to 8,000ft (2,500m)*

Hi5 s Expert Guide to Specify afix Lecture Hall Tables

INVENTORY LEAD S INSTRUCTION MANUAL FOR

BOOTH REGULATION VISUALS

ZEBRA RETAIL SOLUTIONS

McKenzie County Healthcare Systems

RETAIL SOLUTIONS VERSION 09 STORE MANAGER S INSTRUCTION MANUAL FOR INVENTORY

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

Instructions for Robust Fiber Appendix 5 Documentation. Ver 1.2

MAX Dispatch - Standard

Transcription:

tech_project_template Velstar TPM - Project Template 2016 TASK Responsible Party Start Date End Date Complete Status Comments Column6 1 Project start 07/04/16 09/30/16 2 Office Visit To Be Determined 3 Velstar TPM Retainer To Be Determined 4 TPM Signed document date To Be Determined 5 Retainer Fee Deposit ($5,000) to get project started. To Be Determined 6 Planning Phase To Be Determined 7 IT/Electrical floor CAD drawings To Be Determined 8 Electrical Floor Plan To Be Determined 9 Telecommunications Floor Plan To Be Determined 10 Furniture Floor Plan To Be Determined 11 Reflected Ceiling Plan To Be Determined 12 Lease Status To Be Determined 13 What is lease Sign Date? To Be Determined 14 What is scheduled Move in Date To Be Determined 15 Building labor status (Union or Non Union)? To Be Determined 16 Tenant service Authorization (Login credentials) To Be Determined 17 What is lease Sign Date? To Be Determined 18 What is scheduled Move in Date To Be Determined 19 Building Welcome Package To Be Determined 20 Building labor status (Union or Non Union)? To Be Determined 21 Identify Stakeholders John Gentile 22 Create contact list John Gentile 23 Establish Comunications plan John Gentile 24 create contact list John Gentile 25 plan and publish meeting Schedule John Gentile 26 update project plan John Gentile 27 maintain issues tracking John Gentile 28 maintain escalation list John Gentile 29 Office Construction Plan To Be Determined 30 Complete office demo and construct (floor to ceiling) To Be Determined 31 Determine drop ceiling or exposed ceiling To Be Determined 32 Date Carpet to be completed: To Be Determined 33 Determine date Paint to be completed: To Be Determined 34 Determine Wall and Ceiling paint color: To Be Determined 35 agree on Date HVAC complete? To Be Determined Page 1 of 7

36 client signoff John Gentile 37 Furniture Plan To Be Determined 38 finalize Furniture Floor Plan Design: To Be Determined 39 identify furniture contractor To Be Determined 40 identify furniture requirements To Be Determined 41 indentify lead time for furniture delivery To Be Determined 42 execute P.O To Be Determined 43 Determine location and peripherals(power?) To Be Determined 44 client signoff John Gentile 45 Electrical Work Plan To Be Determined 46 identify contractor To Be Determined 47 Confirm Trench locations To Be Determined 48 determine # of duplex for TV To Be Determined 49 identify and spec Additional requirements To Be Determined 50 Confirm power requirements To Be Determined 51 Confirm Whip Locations To Be Determined 52 Confirm power requirements To Be Determined 53 Workstation power and IT outlet requirements To Be Determined 54 What is bid/estimate for Scope of Work? To Be Determined 55 IT Closet power requirements (draw) for hardware and UPS systems To Be Determined 56 mount height To Be Determined 57 payment terms To Be Determined 58 client signoff To Be Determined 59 Tel/Data/IT Closet Plan To Be Determined 60 Office visit with tel/data Contractor, lease agent, and construction PM from To Be Determined 61 Identify Design Engineer To Be Determined 62 Power Whip Cable Locations: To Be Determined 63 Additional Electrical Requirements To Be Determined 64 # of duplex for TV mount/height/vertical)? To Be Determined 65 Velstar provided Inventory: To Be Determined 66 Total Drops (CAT6?) To Be Determined 67 # of locations in office To Be Determined 68 VOIP The network connection will run to the phone, then from the phone to the To Be Determined 69 COLOR preference white To Be Determined 70 PATCH cords Black or gray To Be Determined 71 Labeling schema per cubicle/station jack (1A/1B, 2A/2B etc) To Be Determined 72 Recommend Conference Rooms To Be Determined 73 # of Runs from table to IT Closet To Be Determined 74 # of Runs from table to HDTV To Be Determined Page 2 of 7

75 # of Runs from HDTV to IT Closet To Be Determined 76 HDTV (remove HDMI/COAX) To Be Determined 77 confirm size and brand To Be Determined 78 WAP ( Wireless Access Point system design) To Be Determined 79 Replace with CAT6/CLASS E To Be Determined 80 CAT6 HDMI Converters/Extenders (IT Closet) To Be Determined 81 CAT6/CLASS E - COAX converter (IT Closet) To Be Determined 82 MD/HDMI converters (BNP Media to supply) for MAC To Be Determined 83 Trench Locations (if any): To Be Determined 84 IT Closet build out To Be Determined 85 2 Post or 4 Post Rack To Be Determined 86 Is Supplemental Cooling Required : To Be Determined 87 UPS System(confirm size and brand) To Be Determined 88 Shelving(confirm size and brand) To Be Determined 89 Power supply(identify location and size) To Be Determined 90 What is Scope of Work? To Be Determined 91 Confirm CAT6/CLASS E drop locations To Be Determined 92 Confirm HDTV locations - (3) conference rooms and NOT the glass conference room To Be Determined 93 Confirm HDTV size and brand To Be Determined 94 Mounting Kit (swivel) To Be Determined 95 Confirm WAP locations To Be Determined 96 Client Accepted: To Be Determined 97 Payment terms? To Be Determined 98 client signoff John Gentile 99 Access Security Plan To Be Determined 100 identify security contractor To Be Determined 101 Receptionist(front door location) To Be Determined 102 Mail/Copy Room Location To Be Determined 103 IT/Closet location To Be Determined 104 Confirm Access Type: To Be Determined 105 Card Reader/Biometric Scanner To Be Determined 106 Door Buzzer To Be Determined 107 # of employees To Be Determined 108 Type of door lock from GC To Be Determined 109 Determine when toprogram doors to be opened (M-F 8AM to 5PM) and then auto To Be Determined 110 Door type (Wood/Metal) To Be Determined 111 Who to provide security cabling To Be Determined 112 Confirm electrical requirements To Be Determined 113 What is bid/estimate for Scope of Work? To Be Determined Page 3 of 7

114 Security Bid: (install) To Be Determined 115 Monitoring Security MRC: per month To Be Determined 116 Requires static IP Address To Be Determined 117 Payment terms? To Be Determined 118 Client Acceptedf signoff John Gentile 119 Internet Access and Phone Services Plan To Be Determined 120 Velstar Quotes To Be Determined 121 Inexpensive COAX or FiOS (FIBER) To Be Determined 122 asymmetric pricing To Be Determined 123 Ethernet of Copper To Be Determined 124 Ethernet over Fiber To Be Determined 125 Bandwidth Requirements (5/10/20/50/100MB.1GigE) To Be Determined 126 Multicarrier Quotes To Be Determined 127 Include up to (8) Useable IP s To Be Determined 128 Optional Managed QoS Router To Be Determined 129 Velstar to provide Phone System Options To Be Determined 130 Premise PBX To Be Determined 131 Hosted PBX To Be Determined 132 # of users To Be Determined 133 Feature Requirements To Be Determined 134 New Phone numbers or PORT existing numbers To Be Determined 135 Toll Free numbers To Be Determined 136 efax requirements To Be Determined 137 Trunking To Be Determined 138 PRI To Be Determined 139 POTS To Be Determined 140 SIP/Call Paths To Be Determined 141 Execution Phase To Be Determined 142 Office Construction To Be Determined 143 Complete office demo and construct (floor to ceiling) To Be Determined 144 Drop ceiling or exposed ceiling To Be Determined 145 Date Carpet to be completed: To Be Determined 146 Date Paint to be completed: To Be Determined 147 Wall and Ceiling paint color: To Be Determined 148 Furniture To Be Determined 149 receive and inventory furniture To Be Determined 150 location and peripherals(power?) To Be Determined 151 assembly of furniture To Be Determined 152 inventory and install To Be Determined Page 4 of 7

153 Electrical Work To Be Determined 154 Confirm Trench locations completed to spec To Be Determined 155 # of duplex for TV To Be Determined 156 Additional requirements To Be Determined 157 Confirm power requirements completed to spec To Be Determined 158 Confirm Whip Locations completed to spec To Be Determined 159 Confirm power requirements completed to spec To Be Determined 160 Workstation power and IT outlet requirements completed to spec To Be Determined 161 IT Closet power requirements (draw) for hardware and UPS systems To Be Determined 162 mount height completed to spec To Be Determined 163 Tel/Data/IT Closet To Be Determined 164 Power Whip Cable Locations: completed to spec To Be Determined 165 Additional Electrical Requirements completed to spec To Be Determined 166 # of duplex for TV mount/height/vertical) completed to spec To Be Determined 167 Velstar provided Inventory: To Be Determined 168 Total Drops (CAT6?) completed to spec To Be Determined 169 VOIP The network connection will run to the phone, then from the phone to the To Be Determined 170 COLOR preference white completed to spec To Be Determined 171 PATCH cords Black or gray completed to spec To Be Determined 172 Labeling schema per cubicle/station jack (1A/1B, 2A/2B etc) To Be Determined 173 Recommend Conference Rooms To Be Determined 174 # of Runs from table to IT Closet To Be Determined 175 # of Runs from table to HDTV To Be Determined 176 # of Runs from HDTV to IT Closet To Be Determined 177 HDTV (remove HDMI/COAX) To Be Determined 178 confirm size and brand To Be Determined 179 WAP ( Wireless Access Point system design) To Be Determined 180 Replace with CAT6/CLASS E To Be Determined 181 CAT6 HDMI Converters/Extenders (IT Closet) To Be Determined 182 CAT6/CLASS E - COAX converter (IT Closet) To Be Determined 183 MD/HDMI converters (BNP Media to supply) for MAC To Be Determined 184 Trench Locations (if any): To Be Determined 185 IT Closet build out To Be Determined 186 2 Post or 4 Post Rack completed to spec To Be Determined 187 Supplemental Cooling Required : completed to spec To Be Determined 188 UPS System completed to spec To Be Determined 189 Shelving completed to spec To Be Determined 190 Power supply completed to spec To Be Determined 191 Confirm CAT6/CLASS E drop locations To Be Determined Page 5 of 7

192 Confirm HDTV locations - (3) conference rooms and NOT the glass conference room To Be Determined 193 Confirm HDTV size and brand completed to spec To Be Determined 194 Mounting Kit (swivel) completed to spec To Be Determined 195 Confirm WAP locations completed to spec To Be Determined 196 Client Accepted: To Be Determined 197 Payment terms? To Be Determined 198 client signoff To Be Determined 199 Access Security To Be Determined 200 Receptionist(front door location) To Be Determined 201 Mail/Copy Room Location To Be Determined 202 IT/Closet location To Be Determined 203 Confirm Access Type: completed to spec To Be Determined 204 Card Reader/Biometric Scanner To Be Determined 205 Door Buzzer To Be Determined 206 # of employees To Be Determined 207 Type of door lock from GC To Be Determined 208 Program doors to be opened (M-F 8AM to 5PM) and then auto lock all other hours. To Be Determined 209 Door type (Wood/Metal) To Be Determined 210 Who to provide security cabling To Be Determined 211 Confirm electrical requirements To Be Determined 212 What is bid/estimate for Scope of Work? To Be Determined 213 Security Bid: (install) To Be Determined 214 Monitoring Security MRC: per month To Be Determined 215 Requires static IP Address To Be Determined 216 Payment terms? To Be Determined 217 Client Acceptedf signoff To Be Determined 218 Internet Access and Phone Services To Be Determined 219 Verify selected services built to spec To Be Determined 220 Inexpensive COAX or FiOS (FIBER) To Be Determined 221 Ethernet of Copper To Be Determined 222 Ethernet over Fiber To Be Determined 223 Bandwidth Requirements (5/10/20/50/100MB.1GigE) To Be Determined 224 Multicarrier Quotes To Be Determined 225 Include up to (8) Useable IP s To Be Determined 226 Optional Managed QoS Router To Be Determined 227 Premise PBX To Be Determined 228 Hosted PBX To Be Determined 229 # of users To Be Determined 230 Feature Requirements To Be Determined Page 6 of 7

231 New Phone numbers or PORT existing numbers To Be Determined 232 Toll Free numbers To Be Determined 233 efax requirements To Be Determined 234 Trunking To Be Determined 235 PRI To Be Determined 236 POTS To Be Determined 237 SIP/Call Paths To Be Determined 238 Warm site testing To Be Determined 239 phones To Be Determined 240 internet To Be Determined 241 electrical outlets To Be Determined 242 Installed perihperals To Be Determined 243 Lan and all cabling. To Be Determined 244 Security systems To Be Determined 245 remediate and escalate as required To Be Determined 246 Client signoff To Be Determined 247 Client open office To Be Determined 248 create punch list as required To Be Determined 249 250 251 252 Page 7 of 7