Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.

Answer: Qualification statement should be provided with the bid.

ADDENDUM No. 1. RFP No Gallup Park Custom Playground Equipment Design. Due: Tuesday, August 4, 2015 by 10:00 a.m.

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

SECTION - II BID DATA SHEET

ADDENDUM NO. 02 July 31, 2012

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre

Construction Phase Project Management and Documentation

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

Merrick Pet Care New Distribution Center Hereford, Texas

(Full legal name of business submitting the offer)

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

SECTION VI SCOPE OF WORK

Renewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM IV - CONTRACT REVISIONS.

SECTION VI SCOPE OF WORK

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

SECTION PANELBOARDS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

ADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

TELEPHONE: (215) Addendum No. 1

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

SECTION PROJECT MANAGEMENT AND COORDINATION

ADDENDUM #1. April 29, 2009

Innovation Wireless KRONOsync GPS or NTP Wireless Clock System

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

Bid #3990DB - Two Way Motorola Radio System District Wide Upgrade

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015

CONVEYANCE PIPELINE AND PUMP STATION

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

9. Pay for the power consumed until the project has been accepted as substantially complete.

Section Meetings Section Material and Equipment. None Required

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

Answer: Only to ChurchWoods, LLC.

STATE OF TEXAS Agreement of Sale COUNTY OF TARRANT

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

FAST TRACK WORKSHOP OBJECTIVES

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

BUILDING PLANS. BUILDING DEPARTMENT

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

TG Glazing Design-Build

COMMONWEALTH OF KENTUCKY DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

Addendum #1 - Bid Package #

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT. Emergency Responder Radio Enhancement Coverage System (RES)

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

Commercial Infill Project Guide

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

Specifications: Other: sign in sheet

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

January, 2014 Page 1 of 5

East Central College

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

SECTION OPERATION AND MAINTENANCE DATA

State College of Florida, Manatee-Sarasota

Bid No. B14-02 Building 100 HVAC Improvements

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

Transcription:

ADDENDUM NO. 1 October 21, 2016 PROJECT: CWU CAMPUS GENERATOR PROJECT #: CWU Project No. 12238-02 The additions, clarifications and corrections contained herein shall be made to the Project Manual, Drawings and Schedules for the above referenced project, and shall be included in the scope of work and proposals to be submitted. (Note: References made below to the Project Manual and Drawings shall be used as a general guide only. Bidder shall determine the total extent of the work affected by Addendum items.) Pre-Bid Meeting Questions: 1. What is the full-scale sheet size for the drawings? a. 30 x 42. 2. Does the basic bid include Sales Tax? a. No. 3. Are existing Asbestos products known to be present within the area of work? a. No. The Owner has good faith inspections on file for the campus that can be made available to bidders upon request. 4. Do the General Conditions hold precedence on Insurance requirements? a. Yes. See Division 00. 5. What are the control wiring requirements from the Paralleling Switchgear to the Generators & Control Panel? a. Contractor shall be responsible for a complete system of control wiring as indicated in Specification Section 26 32 13, Part 3.1. Contact Western States for specific control wiring requirements: i. Product Representative Contacts: 1. Rick Armstrong, RickArmstrong@wseco.com, 509-535-2287 2. Brant Briody, BrantBriody@wseco.com, 509-532-3924 6. Is additional product information available for the planned OFCI switch bay section to be installed at existing Substation 3? a. Contact S&C Metal Enclosed Switchgear parts group to obtain parts information for switch bay installation: i. Product Representative Contact: 1. parts@sandc.com, 1-888-762-1100 a. Reference S&C file #CDA-761372 for similar equipment. 12238-02_ADDENDUM 01.docx Page 1of 3

7. Is the Contractor responsible for moving existing generator Big George from its temporary storage location to the project site? a. Yes. Big George is temporarily stored in the Jongeward Facilities Building service yard approximately 400 yards from the project site. Project Manual: ADE1.1 Reference Section 01 33 00, Submittal Procedures, Part 1.6.A; REPLACE Paragraph A with the following: Make submittals promptly in accordance with approved schedule, allowing a period of (14) days for A/E review, and in such a manner as to cause no delay in the Work. ADE1.2 Reference Section 26 01 01, Basic Electrical Requirements, Part 1.6.A; REPLACE Paragraph A with the following: The Electrical Drawings shall serve as the working drawings for the electrical work. ADE1.3 Reference Section 26 01 01, Basic Electrical Requirements, Part 1.6.E; DELETE Item 3. ADE1.4 Reference Section 26 32 13, Medium Voltage Switchgear and Engine Generator System, Part 1.6.D; REPLACE Paragraph D.2 with the following: 2. Concrete bases shall be designed by a licensed Structural Engineer. Installing contractor shall be responsible for the final design and approval of structural supports and submit design for approval with shop drawings. ADE1.5 Reference Section 26 32 13, Medium Voltage Switchgear and Engine Generator System, Part 2.3.C; ADD the following: 4. Replace existing batteries and battery charging system. Battery charger shall be equal to SENS charger, Model #NRG24-20-R-C. ADE1.6 Reference Section 26 32 13, Medium Voltage Switchgear and Engine Generator System, Part 1.6.G; REPLACE second sentence of Paragraph G with the following: Equipment shall be functionally tested at the factory through simulated tests. Owner/Project Engineer witness of factory testing is not required. Drawings: ADE1.7 - Sheet E1.101, Keynote 1. ADD: Maximum of (2) cabling splices is permitted between termination at Switch LSX and termination at Switch LSA9. Splice locations to be field coordinated with Owner prior to installation. Splices shall be bolted type per specifications. 12238-02_ADDENDUM 01.docx Page 2of 3

ADE1.8 - Sheet E1.402, Keynote 2. ADD: Provide new concrete housekeeping pad for switch bay section. Pad to match existing housekeeping pad at Substation 3. Attachments: Pre-Bid Meeting Sign-in Sheet 12238-02_ADDENDUM 01.docx Page 3of 3