Structural Calculations

Similar documents
2.3 SPECIFIC DESIGN DHS PURLINS

GLOSSARY OF TERMS SECTION 8

TEST SERIES TO EVALUATE THE STRUCTURAL BEHAVIOUR OF ISOBOARD OVER RAFTER SYSTEM

Steeline X-SPAN purlins

Design Guide Pryda Connectors for Steel Framing

3.1 General Provisions

LVL8 H1.2 GENERAL FRAMING. Eco Friendly Revolutionary H1.2 Treatment Azotek by Zelam

DUTCH GABLE FREESTANDING CARPORT

SHED PACK Step 1: Choose your shed type.

BRACING BRACING SECTION 7 SECTION 7

SHED PACK. Sheds are commonly constructed using portal frames.

WHY YOU SHOULD USE TUFFLOOR. components

Timber to Timber - Timber to Concrete - Timber to Steel

3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?

Garage Design Guide. October 2018

Strong, lightweight composite structural I -Beam.

ROOF-CEILING CONSTRUCTION

The Roofing Store TRS 9 35MM 78MM 150MM 78MM PRODUCT TECHNICAL DATA

Gable HomeshedsTM INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE LARGE SPAN. Council Approval. Before Starting

POST FRAME CONSTRUCTION MANUAL

APPENDIX 1 : Post and Beam Model

Metroll. Purlins & Girts. C Section Purlins. C Section Purlins are manufactured from Galvaspan steel and are roll formed into C Section.

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL

General Layout. Eng. Maha Moddather

Pryda Timber Connectors

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

When you need a clearspan of up to 6 metres of longrun steel you need...

A Shell construction

ROOF-CEILING CONSTRUCTION

How-To-build guide carport

Z and C - sections ZED PURLIN SYSTEMS. Design tables according to Eurocodes. For secondary steel structures. Large range of. Z and C - sections

F I X I N G B R O C H U R E

Practical Information Sheet. awnings. Public Information Sheet N 6

Introducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA

Sections & Details VOCABULARY

HILAND TRAY FORM AND FUNCTION MATERIAL SPECIFICATIONS DESIGN GUIDE ROOFING I WALLING

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

DIY SHED GUIDE Planning your Project I Simple Illustrations I Hints

Sturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models

ICC-ES Evaluation Report Reissued March 1, 2011 This report is subject to renewal in two years.

VERSA-LAM BCI INSTALLATION GUIDE LIMIT STATES DESIGN CANADA

INSTALLATION GUIDE. Outback. Flat Attached BEFORE YOU START ADDITIONAL MATERIALS TOOLS REQUIRED. VERAnDAHS PATIOS CARPORTS

T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY

FORTRESS BOTTOM PLATE ANCHORS. Product. Scope. Building Regulations. Appraisal No. 687 [2017]

KS SERIES - VERTICAL INSTALLATION

ESR-2024* Reissued September 1, 2011 This report is subject to renewal September 1, 2013.

EzyBrace Systems. Specification and installation manual CBI 5113

Shearwall System Installation Guide

Acceptable Standards of Domestic Construction

hyjoist Options Range Installation Guide

VERSA-LAM. An Introduction to VERSA-LAM Products

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

CCFSS Technical Bulletin

ICC-ES Evaluation Report

ROOF-CEILING CONSTRUCTION

STRUCTURAL BRACKETS CATALOGUE

Glulam Connection Details

Expressed Hardwood Structures

OUTBACK FLAT ATTACHED VERANDAH PATIO CARPORT - INSTALLATION GUIDE BEFORE YOU START TOOLS REQUIRED ADDITIONAL MATERIALS

Designed for Building Designed for Living

Attach Trusses and Rafters Faster

DIY Shed Guide Planning your Project Easy Step by Step Guide Simple Illustrations Maintenance

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: WOOD, PLASTIC, AND COMPOSITE FASTENINGS REPORT HOLDER:

Lightweight purlins. Technical Manual.

nam4t/m6 ubracreboaardl

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

Lateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later

EzyBrace For Light Steel Frame Systems

Structural Strength of Lapped Cold-Formed Steel Z-Shaped Purlin Connections with Vertical Slotted Holes

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side

ROOF-CEILING CONSTRUCTION

Meva Guided Screens MGS Technical Instruction Manual

Hugger Installation. Roof Hugger, LLC P: P.O. Box 1027 F: Odessa, FL

TOPSPAN 22 / 40 LYSAGHT TOPSPAN 22 / 40. Steel roof and ceiling battens for non cyclonic applications

hy JOIST futurebuild structural lvl design & Installation Guide: 2.1 december 2013

Load-carrying capacity of timber frame diaphragms with unidirectional support

MULTISPAN GABLE WITH HIP END ATTACHED PATIO

ROOF-CEILING CONSTRUCTION

Safe and secure Dero

Featuring TJ Rim Board and TimberStrand LSL


VP Command Warnings, Unpriced Items, Asterisks, and Other

CLEARSPAN GABLE STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. WITH GAZEBO END ATTACHED PATIO

Design & Install Guide. The New Standard for Commercial Roof Laps. End-Lap Solution for Insulated Panel Roofing AS WEATHER RESISTANCE

Pryda Timber Connectors

Clopay Models 835/837 Sliding Door System Installation Guide

Flanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND

Section Member. H (in.) WT. lb./ft. Pull Out Strength Slip Resistance Torque Size / Thread All Series

How-To-build guide Garden shed

RIDGE-JOIST CONNECTION 12/12 maximum slope

Rigid Connections. Between Wood posts and concrete

KOLO SHELTER Installation Instructions Parts List

Figure 1: Single-span Symmetrical Portal Frame (Salter, 2004)

LYSAGHT FIRMLOK. Identification The format of the number code is: Material specifications

Beam & Header Technical Guide. LP SolidStart LVL. 2900F b -2.0E. U.S. Technical Guide U.S. TECHNICAL GUIDE

Use the Design Properties (100% Load Duration) Table from Page 3 for questions 1-7

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Transcription:

Structural Calculations Project Project Number 14 266 Napier Girls High School Performing Arts Building (Arthur Building) Document Control Date Version Extent of Revision Status 21 September 2015 A Original Review 26 September 2015 B Skectches Incorporated Building Consent Calculations prepared by Tim Pike Sigma Consulting Engineers Ltd CPEng 161118

Designer JDTA and MPA Page No 01 Table of Contents Introduction... 2 Scope of Assessment... 2 Design Criteria... 3 Wind Forces... 3 Seismic Design Actions Superstructure... 3 Plan... 4 Transverse Portal Frame Grid 1... 8 Portal Frame Grids 2, 3, 4, 5... 9 Purlins... 10 Studs... 10 Longitudinal Portals... 11 East Wall Window Framing (Grid 5)... 12 South Wall Window Framing (Grids H and I)... 13 Eaves Beams to Support Wall Posts... 14 North Wall Door Framing... 15 Secondary Purlin Support Steel Grid 2... 16 Secondary Purlin Support Steel Grid 3... 17 Secondary Purlin Support Steel Grids 4 and 5... 18 Column and Post Arrangement... 19 Suspended Parapet Wall... 21 Classroom 2 Eaves Structure... 23 Roof Bracing... 26 Retaining Wall to South Face... 27 Portal Column Foundations... 28 Foundations to Columns at Grids E1, E2, I1, I2, H4, H5, G2, G3, C4, F4... 29 Foundations to Columns at Grids C5, F5... 29 Base Fixing to 125x125x5.0 SHS Posts... 29 Plan... 30 Durability Statement... 31 Appendices... 32

Designer JDTA and MPA Page No 02 Introduction Part of existing building superstructure is to be demolished and a replacement superstructure built with similar footprint. RDCL have completed geotechnical investigations and report R150602065_01 dated 29 May 2015 applies. NCC considers the site to be in an Extra High wind zone to NZS 3604:2011. BRANZ consider the site to be in a Medium wind zone and Corrosion Zone D. Earthquake zone 3. RDCL consider the soil class to be B (rock). Investigations have confirmed that the foundation wall to the south face of the building, which retains hardfill and the concrete floor slab to the building, does not incorporate significant foundations and is considered to not be in compliance with the current building code. Scope of Assessment Portal frames Gable wall structure Longitudinal roof bracing Longitudinal wall bracing Eaves beams Purlins Retaining Wall Foundations

Designer JDTA and MPA Page No 03 Design Criteria From AS/NZS 1170: 50 year design life for building Importance level 2 APE = 1/500 ULS and 1/25 SLS Wind Forces Region A7 V 500 = 45 m/s; V 25 = 37 m/s Terrain category 3 M z = 0.83 M s = 1.0 M t = 1.0 V d = 37.4 m/s Q u = 0.85 kpa and Q s = 0.57 kpa C pe walls = +0.7 and 0.5 Roof pitch = 2 degrees; h/d = 0.4; C pe roof = 0.5 say If Tc = 2.5 then Mz = 0.87 and v = 39.2 m/s and qu = 0.92 kpa Med wind speed = 37 m/s and High wind speed = 44 m/s Design for wind speed of 44 m/s and Q u = 1.2 kpa and Q s = 0.8 kpa Seismic Design Actions Superstructure Subsoil class B Use 0.4 kpa dead load for roof + ceiling + services Use 0.4 kpa dead load for walls Roof area = 350m 2 so G = 140 kn Wall area = 400m 2 so G = 80 kn (half of wall area) Transverse loads resisted by portals on grids 1, 2/3, 4 and 5. 10 metre supported width, so some conservatism and inherent allowance for eccentricity. Longitudinal loads resisted by portals E1 E2; A1 A2; G4 G5; D4 D5; and B4 B5. Ceiling/roof diaphragm to all spaces. Use NZS 3404:Part 1:1997 for steel design. Category 3 structure, µ = 1.25, S p = 0.9. But can use S p = 0.7 for category 3 members as the material, section geometry, member restraint and connection requirements of section 12 are complied with.

Designer JDTA and MPA Page No 04 Plan

Designer JDTA and MPA Page No 05

Designer JDTA and MPA Page No 06

Designer JDTA and MPA Page No 07

Designer JDTA and MPA Page No 08 Transverse Portal Frame Grid 1 Supported width = 5 metres but use 10 metres Adopt roof area = (10m x 12m) = 120m 2 so G = 48 kn per frame = 4.8 kn/m Q = 0.25 kpa = 2.5 kn/m but zero in combination with seismic forces Wall supported = 50m 2 so G = 20 kn, apply as 1.2 kn/m to rafter So total load to rafter = 6.0 kn/m Total mass = 60 kn Portal Period: initial guess = 0.60 seconds 310UB40 trial section Z = 0.38 N = 1.0 R = 1.0 ULS and 0.25 SLS C h (T) = 1.40 Therefore C(T) = 0.53 ULS and 0.13 SLS µ = 1.25 S p = 0.7 k µ = 1.214 C d (T) = C(T)*S p /k µ = (0.53*0.7/1.214) = 0.31 (ULS) and 0.075 SLS W = 60kN F = 18.6kN ULS and 4.5 kn SLS d = 29mm (ULS) T = 2π ((60,000*0.029 2 )/(9.81*18,600*0.029)) 0.5 = 0.61 seconds OK Use T = 0.6 seconds Wind: Windward wall P = (0.85*2.0*10.0*0.7) = 11.9 kn ULS and 8.0 kn SLS Leeward wall P = (0.85*2.0*10.0*0.5) = 8.5 kn ULS 5.7 kn SLS Roof uplift = (10.0*0.85*0.5) = 4.25 kn/m ULS and 2.85 kn/m SLS Wind wall loads applied as point loads to eave since wall studs will be used, connected to an eaves beam Refer to SpaceGass12.21 analysis. Pinned bases. Displacement Results Vertical midspan deflection (G only) = 17mm = span/600 Lateral displacement in SLS earthquake = 5mm = height/800 In SLS wind the horizontal displacement = 22mm and the vertical deflection = 9mm Accept. Strength Results M max = 75 knm at eave (G+Q), check unrestrained columns using MemDes: ΦM bx = 111 knm so OK Rafters will be OK as they are restrained by the purlins M max = 78 knm at eave (G+E), unrestrained columns OK (see above) M rafters = 40 knm, bottom flange in tension so OK; bottom flange in compression for short length only so OK In wind case the column moment is less than for gravity or earthquake so is OK Rafters moment = 55 knm for half span say; ΦM bx = 97 knm so OK Concluded that 310UB40 portal is OK, with no lateral restraints to columns or rafters

Designer JDTA and MPA Page No 09 Portal Frame Grids 2, 3, 4, 5 Supported width = 6.5 metres on grids 2, 3, 5; but 9.5 metres on grid 4 Heights are similar to the portal frame on grid 1, but with a reduced rafter span Supported area is less for seismic forces but similar for gravity and wind forces So use same forces and loads as for portal frame on grid 1 loaded width 10 metres Displacement Results Vertical midspan deflection (G only) = 1.7mm Lateral displacement in SLS earthquake = 5mm = height/800 In SLS wind the horizontal displacement = 17mm and the vertical deflection = 9mm Accept. Strength Results M max = 75 knm at eave (G+Q), check unrestrained columns using MemDes: ΦM bx = 111 knm so OK Rafters will be OK as they are restrained by the purlins M max = 49 knm at eave (G+E), unrestrained columns OK (see above) M rafters = 49 knm, bottom flange in tension so OK; bottom flange in compression for short length only so OK In wind case the column moment is similar as for earthquake so is OK Rafters moment = 55 knm for half span say; ΦM bx = 97 knm so OK Concluded that 310UB40 portal is OK, with no lateral restraints to columns or rafters

Designer JDTA and MPA Page No 10 Purlins Span = 11.5 metres Spacing = 1000mm G = 0.4 kn/m Q = 0.25 kn/m W u = 0.85 kn/m W s = 0.57 kn/m 1.2G+1.5Q = 0.85 kn/m 0.9G W u = 0.5 kn/m Use DHS 300/15 purlins at 1000mm centres 2 rows of bracing to each span Alternatively use 450x63 hyspan purlins at 600mm centres Studs Non load bearing external walls Height = 4.4 metres See also NZS 3604:2011 table 8.4 Q u = 0.85 kpa and Q s = 0.57 kpa Assume 400mm centres W u = 0.34 kn/m and W s = 0.23 kn/m M* = 0.82 knm 140x45 SG8: ΦM b = 1.65 knm so OK Def = 13.6mm = span/323

Designer JDTA and MPA Page No 11 Longitudinal Portals Span = 11.4 metres (grids 1 3), height = 4.4 metres Supported width = 5 metres Each portal is to resist one quarter of the total building seismic load (conservative as there are 5 portals) G = 2.0 kn/m Q = 1.25 kn/m Wind: Windward wall P = (0.85*2.2*6.0*0.7) = 7.9 kn ULS and 5.3 kn SLS Leeward wall P = (0.85*2.2*6.0*0.5) = 5.6 kn ULS 3.8 kn SLS Roof uplift = (6.0*0.85*0.5) = 2.6 kn/m ULS and 1.7 kn/m SLS Wind wall loads applied as point loads to eave since wall studs will be used, connected to an eaves beam Refer to SpaceGass12.21 analysis. Pinned bases. Use C(T) = = 0.31 (ULS) and 0.075 (SLS) Seismic mass = (0.4*90 roof) + (0.4*50 wall) = 56 kn So W u = 17.4 kn and W s =4.4 kn Try 310UB40 Displacement Results Vertical midspan deflection (G only) = 9.3mm Lateral displacement in SLS earthquake = 8mm In SLS wind the horizontal displacement = 18mm and the vertical deflection = 3mm Accept. Strength Results M max = 37 knm at eave (G+Q), check unrestrained columns using MemDes: ΦM bx = 111 knm so OK Rafters will be OK as they are restrained by the purlins M max = 56 knm at eave (G+E), unrestrained columns OK (see above) M rafters = 49 knm, bottom flange in tension so OK; bottom flange in compression for short length only so OK In wind case the column moment is less than for earthquake so is OK Rafters moment = 55 knm for half span say; ΦM bx = 97 knm so OK Concluded that 310UB40 portal is OK, with no lateral restraints to columns or rafters

Designer JDTA and MPA Page No 12 East Wall Window Framing (Grid 5) Windows span almost the full width of the portal span so require a wind beam to the top and bottom of the windows. Width = 8.3 metres Supported vertical width = 1.5 metres Q u = 1.2 kpa and Q s = 0.8 kpa i.e. W uls = 1.8 kn/m and W sls = 1.2 kn/m Beam depth limited by 140mm timber stud framing Include an intermediate post Span = 4.1 metres, M* = 3.8 knm 125x125x5.0 SHS: Deflection = 4.9mm = span/839 OK Check vertical deflection for top beam: 1.5 metres of timber wall framing say 0.5 kpa = 0.75 kn/m 125x125x5.0 SHS: Deflection = 3.0mm OK Check new central post: Height = 3.7 metres say central point load P sls = (2*4.1*1.2) = 9.8 kn P uls = (2*4.1*1.8) = 14.8 kn, M* = 13.7 knm, OK 125x125x5.0 SHS: Deflection = 11.4mm = height/323 Use 125x125x5.0 SHS Window Framing as shown below Purlin location must coincide with the vertical 140SHS post

Designer JDTA and MPA Page No 13 South Wall Window Framing (Grids H and I) Windows span almost the full width of the portal span so require a wind beam to the top and bottom of the windows, supported by vertical posts. Similar to east wall. Grids 1 3: Span = 4.4 metres Supported vertical width = 1.8 metres Q u = 1.2 kpa and Q s = 0.8 kpa i.e. W uls = 2.2 kn/m and W sls = 1.5 kn/m Beam depth limited by 140mm timber stud framing 125x125x5.0 SHS: Deflection = 6.7mm OK Check vertical deflection for top beam: 2.5 metres of timber wall framing say 0.5 kpa = 1.25 kn/m 125x125x5.0 SHS: Deflection = 5.6mm OK Check new central post: Height = 4.4 metres say central point load (4.4*2.2*0.8) = 7.7 kn 125x125x5.0 SHS: Deflection = 10.9mm = height/384 OK Use 125x125x5.0 SHS Window Framing as shown below Grids 3 4 and 4 5: Span = 5.4 metres Supported vertical width = 1.2 metres Q u = 1.2 kpa and Q s = 0.8 kpa i.e. W uls = 1.5 kn/m and W sls = 1.0 kn/m Beam depth limited by 140mm timber stud framing 125x125x5.0 SHS: Deflection = 10.2mm OK Check vertical deflection for top beam: 2.5 metres of timber wall framing say 0.5 kpa = 1.25 kn/m 125x125x5.0 SHS: Deflection = 12.7mm OK Check new central post: Height = 3.4 metres say central point load (1.7*5.4*0.8) = 7.4 kn 125x125x5.0 SHS: Deflection = 5.5mm OK Use 125x125x5.0 SHS Window Framing as shown below Secure 125SHS posts to concrete slab with 250x150x10 plate and 2 M12 Grade 5.8 anchor studs set in to 14mm diameter x 100mm length hole with Epcon C6.

Designer JDTA and MPA Page No 14 Eaves Beams to Support Wall Posts Grids I1 I3 (critical) Eaves span beam = 11.3 metres Two posts supported, reaction to eaves beam = 6.0 kn ULS and 4.0 kn SLS But part of lateral load will be resisted by the parapet beam M* = (6*3.8) = 23 knm Check 310UB40 for y axis bending: ΦM by = 40 knm so OK Deflection = 134mm No good so need some roof plane support to top of post utilise the 19mm plywood forming the roof Grids E1 E3, and H4 H5 similar Grids D3 D4 Eaves span beam = 10.7 metres Supported wall height = 1.8 metres Q u = 1.2 kpa and Q s = 0.8 kpa i.e. W uls = 2.2 kn/m and W sls = 1.5 kn/m M* = 31 knm 250PFC: ΦM s = 114 knm so OK Deflection Horiz = 29mm = span/370 OK Use 250PFC Eaves Beam (horizontally placed) between grids D3 and D4 Include a mid span vertical 125x125x5.0 SHS post to reduce vertical deflection Grids H3 H4 Eaves span beam = 10.7 metres Supports post at mid span P sls = 3.7 kn and P uls = 5.6 kn M* = 15 knm 250PFC: ΦM s = 114 knm so OK Deflection Horiz = 10.4mm Use 250PFC Eaves Beams (horizontally placed) between grids H3 and H4

Designer JDTA and MPA Page No 15 North Wall Door Framing Door opening measures 5.4 metres width x 3.3 metres height Lintel supports a face load width of 2.0 metres Q u = 1.2 kpa and Q s = 0.8 kpa i.e. W uls = 2.4 kn/m and W sls = 1.6 kn/m M* = 8.8 knm OK 125x125x5.0 SHS: Deflection = 16.3mm = span/331 Check posts: Height = 4.2 metres say central point load = 4.5 kn 125x125x5.0 SHS: Deflection = 6.5mm = height/657 OK Use 125x125x5.0 SHS Door Framing as shown below

Designer JDTA and MPA Page No 16 Secondary Purlin Support Steel Grid 2 Need a rafter to span between grids G and E and then cantilevered out for the roof eave Span = 5.2 metres Supported width = 1.2 metres (roof between grids 2 and 3) G = 0.4 kpa = 0.24 kn/m Q = 0.25 kpa = 0.15 kn/m W s = (0.8*0.5) = 0.4 kpa = 0.24 kn/m W Q = (1.2*0.5) = 0.6 kpa = 0.36 kn/m 1.2G+1.5Q = 0.5 kn/m 0.9G W Q = 0.14 kn/m M* = 1.7 knm 150PFC: ΦM b = 14 knm unrestrained so OK (MemDes) Deflection = 1.4mm for G only Use 150PFC beam

Designer JDTA and MPA Page No 17 Secondary Purlin Support Steel Grid 3 Rafter to span from post to grids G, and G E D, and then cantilever out for the roof eave Simply supported beams and posts Span = 4.6 metres Supported width = 6.3 metres (roof between grids 2 and 4) G = 0.4 kpa = 2.5 kn/m Q = 0.25 kpa = 1.6 kn/m W s = (0.8*0.5) = 0.4 kpa = 2.5 kn/m W Q = (1.2*0.5) = 0.6 kpa = 3.8 kn/m 1.2G+1.5Q = 5.4 kn/m 0.9G W Q = 1.6 kn/m M* = 14.3 knm 150PFC: ΦM b = 16 knm unrestrained so OK (MemDes) Deflection = 6mm for G only Use 150PFC beams and 89x89x3.5 SHS posts

Designer JDTA and MPA Page No 18 Secondary Purlin Support Steel Grids 4 and 5 Rafter to span from grid H to grid F, and then out to grid C (grid 4 only) Use 150PFC as for previous Hang from 310UB40 rafter above using 150PFC sections on grid 4 Simply supported beams and posts Use 150PFC beams support on 310UB40 columns

Designer JDTA and MPA Page No 19 Column and Post Arrangement

Designer JDTA and MPA Page No 20

Designer JDTA and MPA Page No 21 Suspended Parapet Wall Present to grid I1 I3 and E1 E2. Maximum span = 11.3 metres Height of panel = 1700mm Face load from wind = 1.2 kpa Vertical load say 0.5 kpa for framing plus 0.1 kpa for cladding = 0.6 kpa = 1.0 kn/m SLS and 1.4 kn/m ULS Total vertical mass = 7.9 kn ULS Horizontal Wind Force W sls = (0.8*1.7) = 1.4 kn/m W uls = (1.2*1.7) = 2.0 kn/m M* h = (2.0*11.3 2 /8) = 32 knm Chords comprise 1700mm depth box beam using 19mm ply and 140x45 framing I xx = 456.6 x10 6 mm 4 Deflection = (5*1.4*11300 4 )/(384*10500*456.6 x10 6 mm 4 ) = 62mm ΦM b = (0.8*456.6x10 6 /79*18) = 83 knm OK If mid span restraint added then L = 5.7 metres and deflection = 6mm Accept Horiz reaction midspan = 11.4 kn ULS V* = 11.3 kn Shear Flow max = (11300*5103/456.6x10 6 ) = 0.12 N/mm 2.5mm nails at 10mm crs are OK Vertical Gravity Force W sls = 1.0 kn/m W uls = 1.4 kn/m M* h = (1.4*11.3 2 /8) = 22 knm Chords comprise 2/140x45 SG8 with 19mm ply I xx = 16.2 x10 9 mm 4 Deflection = (5*1.0*11300 4 )/(384*8000*16.2 x10 9 mm 4 ) = 2mm ΦM b = (0.8*16.2 x10 9 /850*18) = 470 knm OK V* = 7.9 kn Shear Flow max = (7900*10.1x10 6 /16.2 x10 9 ) = 4.9 N/mm 2.5mm nails at 100mm crs are OK Use 1700mm depth box beam as shown below.

Designer JDTA and MPA Page No 22

Designer JDTA and MPA Page No 23 Classroom 2 Eaves Structure Parapet wall to span up to 11.3 metres and overhang from portal eave up to 800mm Wall height = 1.6 metres so use mass = 0.8 kn/metre Wind force (ULS) reactions (horiz) = 11.3kN Portal is designed for seismic force exceeding this so OK Vertical reactions = 7.9 kn

Designer JDTA and MPA Page No 24

Designer JDTA and MPA Page No 25

Designer JDTA and MPA Page No 26 Roof Bracing Portal frames are present in both directions and so nominal roof plane bracing is required only, to prevent racking action in earthquake or wind. Use RB12 reidbrace as shown two crossed bays to each end of the building.

Designer JDTA and MPA Page No 27 Retaining Wall to South Face Existing foundation wall is not designed to support lateral forces as a retaining wall, and so a new retaining wall is to be added in front of it, to provide lateral support to the building. The existing wall will be called upon to resist vertical forces only. The new wall will resist lateral forces from the backfill and seismic forces. There will be no surcharge loads from the building to the new wall, as the building is supported on the existing wall. The building floor level is approximately 1200mm maximum above the adjacent ground level. Design parameters were provided in the RDCL report. Survey information has been presented by Cardno. The wall height is 1.4 metres maximum about foundation level. Information is extracted from MBIE and Build it Right Canterbury supplementary guidance dated July 2014 Guidance on the seismic design of retaining structures for residential sites in Greater Christchurch. Case 3 is adopted i.e. the retaining wall supports the building foundation. SESOC_SOILS software utilised for design. Have carried out short term and long term analyses. Seismic force included in short term analysis only. For seismic design: Z = 0.38 C h (T) = 1.0 (Class A and B (rock) sites) Adopt IL 2 so R = 1.0 A topo = 1.0 say N = 1.0 C(T) = 1.0*(0.38*1.0*1.0) = 0.38 C(T, A topo ) = 0.38 W d = 0.5 Therefore k n = 0.2

Designer JDTA and MPA Page No 28 Portal Column Foundations Critical Cases: G+Q: H = 17 kn and V = 55 kn G+W: H = 12 kn and V = 21 KN G+E: H = 20 kn and V = 38 KN Use SESOC_SOILS Software. Adopt parameters for shallow soils provided by RDCL 75 kpa allowable bearing All cases work for a 900mm x 900mm x 400mm concrete foundation pad 15mm baseplate and M16 hold down bolts typically

Designer JDTA and MPA Page No 29 Foundations to Columns at Grids E1, E2, I1, I2, H4, H5, G2, G3, C4, F4 New 900x900x400 RC pads with columns centrally located 6 HD16 150 each way top and bottom and 75mm cover Existing concrete slab and footing broken out as required and existing rebar tied to existing footing rebar M16 hold down bolts to be cast into concrete foundation and baseplate fixed to these Pads at G2, G3F4 to be reviewed at time of concrete slab removal to confirm that hardfill beneath the slab is acceptable Foundations to Columns at Grids C5, F5 Columns are located on edge of existing concrete slab/foundation wall Existing concrete needs to be removed and new foundations poured At F5 this will involve a reasonable amount of disruption as the slab is approx 1200mm above ground level so the underlying hardfill will lose support. Over excavation is likely with replacement of hardfill. Base Fixing to 125x125x5.0 SHS Posts Plates to be on edge of existing slab so hold down bolts will be 62.5 mm from edge Weld SHS posts to 250x125x10 baseplates Drill two 14mm dia holes on longitudinal centreline with 30mm end distance Secure 125SHS posts to concrete slab with 250x115x10 plate and 2 M12 Grade 5.8 anchor studs set in to 14mm diameter x 100mm length hole with Epcon C6.

Designer JDTA and MPA Page No 30 Plan

Designer JDTA and MPA Page No 31 Durability Statement A Producer Statement Design has been provided for this project, covering clause B1 of the Building Code Structure. B2 Durability has not been included as part of the Producer Statement Design because there is no effective verification method for B2 contained within the Building Code. The structural elements included in my documentation should however comply with the following: Timber treatment should be selected in accordance with Table 1A of B2/AS1, which is utilised in NZS 3604:2011. Concrete covers should be selected in accordance with NZS 3101 Part 1 section 3. Typically 75mm cover is required to all rebar within concrete that is poured in contact with the ground. The structural steel that is to be enclosed can be considered to be interior. An Alkyd Primer such as system ALK4 will provide 10 25 years to first maintenance on the basis of a low atmospheric category. Exterior steel such as that supporting the parapet walls is in a very high atmospheric category, and an inorganic zinc silicate coating IZS2 would provide 10 15 years to first maintenance. These recommendations are based on AS/NZS 2312 Guide to the Protection of Structural Steel against Atmospheric Corrosion by the Use of Protective Coatings. Concrete masonry should comply with NZS 4210:2001.

Designer JDTA and MPA Page No 32 Appendices SpaceGass12 Output for Portal Frames Sketches

Purlin Installation Guide 2.3.15 DHS COMPONENTS 2.3.15.1 FASTBRACE Product Description Fastbrace is a lock-in bracing system which uses cleats with specially shaped lock-in tabs attached to each end of a 89 x 12 bracing channel, for use with DHS purlins up to and including DHS 300 series. Pairs of Fastbrace are fi tted from each side of the DHS purlin through prepunched 18mm diameter round bracing holes and are locked together, minimising erection time. When a line of Fastbrace has been installed, the system provides resistance to restrict lateral movement of the DHS purlin and also supports the purlin fl ange. Limitations for Use The end brace at the fi rst and last bracing points is secured using the standard bolted connection on the outermost cleat end. To ensure straight alignment of the bracing system, the bracing holes can be offset by 25mm over the last purlin spacing to accommodate a bolted cleat. If this is not achieved, an angle of less than 2 degrees from a straight alignment is created, which in most cases is negligible and acceptable. At the ridge, the lower bolt position is used to tie the bracing lines each side together using a sag rod. Where back to back DHS purlins are used, bolted end brace components are required each side. The durability of zinc coated products is dependent on the environment it will be used in, the grade of the zinc coating and the amount of maintenance that will be carried out over the life of the product. Refer Section 2.1.3 Environments for further guidelines. Maintenance Must be carried out in accordance with Section 2.1.6 Maintenance. Handling and Storage The Fastbrace system is delivered to site, usually strapped together, marked in bundles for installing in the same area of the roof structure. Refer to Section 2.6.2 Handling and Storage. Material Specification Base metal Steel Yield Standard thickness (BMT) grade strength zinc weight (mm) f y (MPa) Z (g/m 2 ) Bracing channel 1.15 G250 250 275 End cleats 2.00 G250 250 275 Tolerances: Length ± 2mm Depth ± 1mm Width ± 1mm Web/fl ange angle 89 to 93 degrees October 2006

Purlin Installation Guide 2.3.15.1 FASTBRACE continued General Arrangement of the Fastbrace System Standard Brace This is the standard Fastbrace component used almost everywhere in the system. It locks into other standard brace components, adjustable brace components, or end brace components. Adjustable Brace This is the adjustable component in the Fastbrace system and is used where some level of adjustment on the purlin line is required. The purlin is adjusted into line and the 12mm diameter hex fl ange bolts on the brace tightened. The adjustable brace offers up to 20mm of adjustment. End Brace End brace is used at the end of a purlin bracing line, i.e. eaves or ridge, each side of a roof step, or at top and bottom girts on a wall. The end brace locks into either standard or adjustable brace at one end and is twisted between the purlin lips and bolted into position at the other end. Adjustable End Brace Where the end purlin spacing is less than 800mm, an adjustable end brace with a bolted end cleat is available, as twisting of the end cleat is not practical.the adjustable cleat can be rotated up to 15 degrees from normal, to accommodate the change in angle from vertical portal to the roof slope of the rafter. October 2006

Purlin Installation Guide 2.3.15.2 BOLTED CHANNEL BRACING Product Description The Dimond bolted channel bracing system uses cleats, clinched at each end of a 89 x 12 bracing channel, which are fastened through the DHS purlin with two bolts each end. Bolted channel bracing is used with the full DHS purlin range (DHS 150 to DHS 400 series). This system uses bolted channel bracing between all purlins in the bracing line. Refer Section 2.3.9.1 for design basis. At the ridge, the lower hole position is used to tie the bracing lines each side together using a sag rod. Limitations for Use The durability of zinc coated products is dependent on the environment it will be used in, the grade of the zinc coating and the amount of maintenance that will be carried out over the life of the product. Refer Section 2.1.3 Environments for further guidelines. Maintenance Must be carried out in accordance with Section 2.1.6 Maintenance. Handling and Storage The channel bracing system is delivered to site, usually strapped together, marked in bundles for installing in the same area of the roof structure. Refer to Section 2.6.2 Handling and Storage. For the material specifi cations of the bracing refer to Section 2.3.15.1. Components Bolted Channel Brace This is the standard component used in the bolted channel bracing system and is used almost everywhere. Adjustable Bolted Channel Brace This is the adjustable component in the bolted channel bracing system and is used where some level of adjustment on the purlin line is required. The purlin is adjusted into line and the 12mm diameter hex fl ange bolts on the brace tightened. The adjustable brace offers up to 20mm of adjustment. May 2004

Purlin Installation Guide 2.3.15.3 PORTAL CLEATS These are typically supplied by the fabricator or installer and welded on to the portal frame. Cleat thicknesses range from 6mm to 12mm thickness. The hole centres are laid out to suit hole punchings in the DHS purlin, refer to Section 2.3.16.3 Hole Locations for details. The cleat height may need to be increased where an expansion step in the roof is detailed. 2.3.15.4 SAG RODS Alternating sag rods and channel have been superseded by the use of Fastbrace and the bolted channel bracing as the preferred bracing method. However the rods are still used as a cranked sag rod at the ridge to join each side together. Usually supplied by the steel erectors and fabricators in 12mm diameter engineering round bar grade 250 MPa, galvanised or electroplated fi nishes, with double nuts and washers each end. Where loads require, 16mm diameter engineering round bar can be used. 2.3.15.5 TIMBER STRIP Timber strip battens are fi tted once the netting is in place to avoid roof insulation squashing down, over the purlin, as the roofi ng is screwed down. Usually supplied and fi xed on site by the fabricator. However Dimond recommend using an ex 50mm x 50mm timber batten or a depth of batten equal to the thickness of the insulation gauged two sides and treated to H3 timber preservation such as boric or LOSP (low, organic solvent preservative). The CCA treatment process should be avoided, due to chemical contact with galvanised surface. The batten is fi xed onto the top fl ange of the DHS Purlins, once the netting or safety mesh has been laid on the structure. Fixings to be 10g 16 x 75mm. Countersunk rib head wingtek. The coating fi nish is a zinc plated AS 3566 class 2 fi nish. Longer, other types of fi xings may need to be considered when the timber depth is greater than 65mm. Spacing of the wingteks is dependent on the DHS material thickness it is being fi xed into. Refer to the following table. DHS Purlin BMT Max. screw (mm) centres (mm) 1.15 250 1.25 to 2.0 300 At these centres, the maximum outward load on the nailing strip is 5.0 kn/m. August 2007

Purlin Installation Guide 2.3.16 DHS CAD DETAILS DHS CAD details are shown in this section. For the latest DHS CAD details, please download from the Dimond website www.dimond.co.nz. Follow the steps below: 1. Log in to the Architects/Specifi ers section. 2. Click on the green Structural Systems Manual button. 3. Click on the Download CAD details button. 4. Select from product list shown to view CAD details available for that product. Please note all of these details are to be used as a guide only and are not intended for construction. Specifi c design details are required to be provided by the design engineer. 2.3.16.1 DHS PROFILES Not to scale. Continued on next page August 2007

Purlin Installation Guide 2.3.16 DHS CAD DETAILS continued 2.3.16.2 RECOMMENDED DIMENSIONS OF PORTAL CLEATS FOR USE WITH DHS PURLINS & GIRTS Not to scale. Continued on next page August 2007

New Slabs

Plan Column Detail at Grid H5 (H4 and F5 similar)

New Slabs