1 R R R MetroTILE MetroSHAKE MetroROMAN Issued June 22, 2013 Revised September 1, 2013 INSTALLATION WARNING! These install details are provided to demonstrate a recommended installation method for Metro Roof panels and accessories. The Details and information in this document reflect current roofing practices used in the United States. Installers of Metro Roof panels and accessories should have knowledge of roof structures, an understanding of how to work with stone-coated steel panels and accessories, and be experienced at working on sloped roofs. Metro recommends installers of Metro products use a Metro Cutter, and have completed a SMART-Start On Site installer Training Orientation Program (located at for each profile installed. Metro does not consider its products to be do-it-yourself (D.I.Y.) mainly due to specialized cutting & bending tools used during installation. Page 1

2 INTRODUCTION Installation Tools: Metro Installation Kit - 150lbs (68.1kg) -- CUTTER - 40lbs (18.16kg) -- FULL PANEL BENDER attachment - 62lbs (28.1kg) -- FOOT BENDER - 48lbs (21.8kg) Hand Tools -- Impact Driver -- Red & Green Snips -- 3 Hand Seamers Other Tools: Nail Gun Hammer Tape Measure Caulking Gun String-Line Metro Bender General: These install details are designed to be used in conjunction with Metro s SMART-Start On-Site Installer Training Program. A certificate of completion is given to installers that complete the Metro SMART-Start On-Site Training Program for each Metro profile. Metro Cutter Metro install methods ensure the simplest application. Starting with the panel battens and perimeter flashing metals, followed by the field panels. Panels are measured, cut & bent to fit areas of the roof at ridges, hips and valleys. Trim caps are then installed, followed by an overall review of the entire roof. In cold climate zones with Cathedral Ceilings a Counter-Batten and Batten grid system is suggested to help prevent ice-damming. Page 2

3 MetroInstallation Batten Details Stone-Coated ITEMS R R R MetroROMAN 50-1/2 X14-7/16 (1283 X 367mm) 5.5 lbs. (2.5 Kg) MetroTILE SMART Vent 79 X 2-3/4 (2006 X 69.85mm) 3.75 lbs. (1.7 Kg) R MetroROMAN SMART-Vent 50-1/2 X 14-7/16 X 3 (1283 X 367 X 76mm) 11 lbs (5 Kg) NFVA-82 Sq in. ( Sq mm) MetroSHAKE SMART-Vent 52 X 14-1/2 X 3 (1321 X 368 X 76mm) 11 lbs (5Kg) NFVA-82sq in. (52.906sq mm) Flat-Stock Sheets 52 X 18 (1321 X 457mm) 5.7 lbs (2.59 Kg) Z-Bar (Small) 79 X1-3/8 X 1/2 X 1-3/8 (2006 X 35 X 13 X 35mm) 2 lbs (.90Kg) Z-Bar (Large) 79 X 2-1/4 X 1 X 2-1/4 (2006 X 57 X 25 X 57mm) 2.5 lbs (1.14 Kg) Tie-In Metal 79 X 4 X 2-1/2 X 3/8 (2006 X 100 X 64 X 10mm) 4 lbs (1.81 Kg) Trim Cap Metal 79 X 2 X 1-3/4 X 3/8 (2006 X 50 X 45 X 10mm) 3.5 lbs (1.60 Kg) Valley Center Cover 79 X 4 (2006 X 100mm) 3.5 lbs (1.60 Kg) FL Drip Edge 79 X 2 X 3-1/4 (2006 X 50.8 X 82.55mm) 3.3lbs. (1.49 Kg) 2.5 Head-wall 79 x 2.5 (2006 X 63.5mm) 3.3 lbs. (1.49 Kg) Barrel Trim Cap 14-1/2 x 6 (368 X 150mm) 1-lbs (0.45 Kg) MetroTILE 52 x 16.5 ( X 419.1mm) 5.5 lbs. (2.49 Kg) R MetroSHAKE 52 x 14 (1321 X 368mm) 5.5-lbs (2.5 Kg) R Page 3

4 Stone-Coated ITEMS Barrel End Disc 6 x 4 (150 X 100mm) 0.15 lbs (0.06 Kg) Fascia Counter Flashing 79 X 3-1/2 X 3/4 (2006 X 89 X 19mm) 2.50 lbs (1.14 Kg) Valley Center Cover 79 X 4 (2006 X 100mm) 3.5 lbs (1.60 Kg) Roman Bird-Stop V-Bat Riser 76-3/16 x 2-3/4 (1930 X 68mm) 3.75 lbs (1.7 Kg) Roman Top-Course 6-3/16 x 4-1/2 (1930 X 114mm) 3.5 lbs (1.6 Kg) Tile- V -Bat Riser 79 X 2-3/4 (2006 X 68mm) 3.75 lbs (1.7 Kg) V-Trim 14.5 x 6 (368 X 150mm) 1-lbs (0.45 Kg) End Disc 6 x 4 (150 X 100mm) 0.15 lbs (0.06 Kg) Rake Channel Tile 79 X 2 X 1 (2006 X 50 X 25mm) 3-lbs (1.36 Kg) Page 4

5 Stone-Coated ITEMS SMART-jack (2-Pipe-sizes SMALL base) 3-N-1 for 3-Inch Pipes (75mm) 12 X 16 (300 X 407mm) 1 lbs (0.45Kg) 3-N-4 for 4-Inch Pipes (100mm) 12 X 16 (300 X 407mm) 1 lbs (0.45Kg) SMART-Jack (2-Pipe Sizes - LARGE Base 3-N-1 for 3-Inch Pipes (75mm) 18 X 18 (457 X 457mm) 1.4 lbs (0.64Kg) 3-N-4 for 4-Inch Pipes (100mm) 18 X 18 (457 X 457mm) 1.4 lbs (0.64Kg) SMART-Sleeve (Pipe Cover) 16 X 4 (407 X 100mm) 1.65 lbs (0.75 Kg) SMART-Box Vent (2-Sizes) Small 3-4-Inch (75-100mm) 2 lbs (0.95Kg) Large 8-10-Inch ( mm) 5 lbs (2.27Kg) PAINTED or BARE METAL ACCESSORIES DOUBLE V-VALLEY 120 X 20 (3048 X 508mm) 12.5 lbs (5.68 Kg) CHIMNEY SADDLE (Two Sizes) 120 or 60 X 18 X 4 (3048 or 1524 X 457 X 100mm) 13.5 or 6.75 lbs (6.13 or 3 Kg) SIDE-WALL UNDER-PAN 120 X 3-1/2 X 4 (3048 X 89 X 100mm) 5 lbs (2.27 Kg) DRIP EDGE 120 X 1-1/2 X 1-1/2 (3048 X 38 X 38mm) 1.6 lbs (0.72 Kg) SMART-Valley (2 Pcs Reqd.) 120 X 9-1/4 X 1-1/2 X 1-1/2 (3048 X 235 X 38 X 38mm) 7.35 lbs (3.3 Kg) * Requires Valley Center Cover & sealant tape. W Valley 120 X 7 (3048 X 178mm) 6.2lbs. (2.8Kg) Page 5

6 Painted or bare metal accessories Metro Batten SMART-Gutter -Riser Metal 120 X 3/4 X2-1/2 (3048X19X63mm) 1.9lbs. Painted Black SMART-XP-Foam Tape Roll 1 X 1-1/4 Exp X ft (25X32X6000mm) 1.0lb 24-Rolls / Box SMART-Batten 120 X 1 X 2-3/8 (3048 X 25.4 X 60mm) 3.55 lbs (1.6 Kg) * Requires 2-pcs per 10-ft of Hip & Ridge * Requires panels to be cut as tight as possible (Mitered on hips) and Metro SMART-XP-Foam Tape installed on each flat leg of SMART-Batten prior to SMART-Batten installation. Page 6

7 Walking on your Metro roof Correct General Information These install details are provided to demonstrate a recommended installation method for Metro Roof panels and accessories.the Details and information in this document reflect current roofing practices used in the United States. Installers of Metro Roof panels and accessories should have knowledge of roof structures, an understanding of how to work with stone-coated steel panels and accessories, and be experienced at working on sloped roofs. Metro recommends installers of Metro Roof products use a Metro Cutter, and have completed a SMART-Start On Site installer Training Orientation Program for each profile installed. Metro does not consider its products to be do-ityourself (D.I.Y.) mainly due to specialized cutting & bending tools used during installation. Incorrect Page 7

8 general - preperation Metro panels are installed on new or existing roofs pitched a minimum of 2-1/2:12 ( 12 degrees). An underlayment is to be installed as per local code and manufacturers instructions. Ice and Water Shield should be installed per product application instructions in areas where icing may occur. Panel battens Panel battens are installed parallel to the ridge/fascia spaced 14 1/2 o/c. Position the first batten flush with the fascia or batten Buildup. The second batten is positioned 14 to allow adequate overhang at the fascia for gutter/water shed from the roof. Valley battens are spaced to accommodate the valley metal Use 2 x2 ridge battens or double stack 1 x4. to provide 1-1/2 fold-up height for hip and ridge. Hip battens install directly on top of each intersecting panel batten, so panel hip cuts can be fitted against hip battens. Space 5 apart. Panel batten spacing is critical because panel must fit snuggly against the batten. Panel battens may be either 1X4, 2X2 wood (Douglas-Fir / Larch #2 or better) or 1X2 plastic battens. Steel hat sections with a minimum height of 3/4-inch, and inch thick (0.43mm) galvanized steel. Page 8

9 HIP & RIDGE BATTENS Space 5 (127mm )apart. 5 RIDGE Support Battens Install 1X4 (25X100mm) support battens to the required height as shown. The 1X4 creates a ledge beneath the 2X2 (50X50mm) Ridge batten for the Ridge panel to be bent up against. HIP Support Battens Install 1X2 (25X50mm) support battens to the required height as shown. The 1X2 is installed flush with the 2X2 (50X50mm) Hip battens to provide height for the Hip cut panels to be bent up against. ridge RIDGE (127mm) 5 hip (127mm) 5 2x2 battens 1x4 batten Underlay - Panel battens only Random 5 Wood panel battens can be 2 x2, 1 x3 or 1 x4. Consult Metro regarding approved steel purlin sections. Panel batten spacing is critical 14 1/2 o/c to allow panels to fit properly on each course. 1 x4 or 1 x3 panel battens are recommended at the roof edge. Fasten into supporting framing members as per code an Metro High Wind instructions. Page 9

10 SMART Accessory Batten Metro SMART-Battens require 2-pieces per each 10- foot length of Hip or Ridge. Miter cut and install Metro panels at the center-line of the Hip or Ridge as shown.. 4-inches in from the cut edge, flatten the panel as shown. Apply a (min. 4-in wide) strip of Peel-N-Stick material along the entire length of the hip or ridge butted panels. The sealing strip is placed beginning from the bottom and laps a min. 4-inches (100mm). The seal stropping is pressed against the panels forming a weather seal. The edges of the seal striping can be slightly snipped at each course to better confirm to the panels. Metro SMART-Acc-Battens are installed 6-inches (150mm) apart on each side of the hip or ridge using #10 X 2-in long (50mm) 1/4-in (6mm) HWH screws. The screws are spaced a minimum of 12-inches (300mm) at the ridge, or on each course of panels at the hips as shown. Indicates fastener Trim Cap SMART-Accessory Batten Peel-N-Stick Panel Continuous Ridge Venting cannot be used with the Metro SMART-Acc-Battens. Metro SMART-Vents on one side of the ridge may be used as an alternative. Page 10

11 HIP & RIDGE SMART-Batten (OPTIONAL ALTERNATIVE) Metro Batten Metro SMART-Battens require 2-pieces per each 10- foot length of Hip or Ridge. Miter cut and install Metro panels at the center-line of the Hip or Ridge as shown.. SMART Batten SMART-XP-Foam-Tape After Mitering & installing panels to Hip center-line, apply Metro SMART-XP-Foam Tape onto flat section of the Metro SMART-Batten and position SMART-Batten using the Metro Trim cap as a guide (6-inches apart) so center of trim cap is aligned with center of hip. Screw SMART-Batten on one side of hip through flat section, XP-Foam Tape, Metro panel and into the roof deck. The XP-Foam expands to 1-1/4 thick and will fill the saw tooth void created by the Metro courses. Use the Metro trim cap to correctly position the other SMART- Batten and then install the trim caps up the hip. Use of SMART-Battens with Metro ROMAN(R) may require additional sealant/tape due to the deep Roman profile beneath the SMART-Batten at the Hip or Indicates fastener Trim Cap SMART-Accessory Batten SMART-XP-Foam-Tape Panel Continuos Ridge Venting is possible with Metro SMART-Battens, refer to Metro website for details. Page 11

12 counter battens Counter battens (1 x4 ) are used when roofing over uneven surfaces or where a cold roof installation is desired. Fascia buildup for roofing over existing roofs when reroofing over wood shingles or shakes, the existing roof is cut back around the perimeter to allow a buildup of 1 x4, 2 x2 or a combination of both, to provide a solid fastening foundation. The wood buildup conforms to the underside of the 1 x4 counter battens on top of the existing roof. Consult local codes for the other specific requirements. Position 1 x4 counter battens approximately 24 o/c directly over the rafter. Fasteners must penetrate 1 into or through the roof framing members and be placed 12 o/c. Fascia Metal - drip edge metal Fascia metal is available in either 3 1/2 or 5 face widths to cover the build-up of the new lumber at the fascia and to act as a metal drip edge. Fascia Metal Fascia 1st row support battens vary by region, alternative 1st row 3/4-inch riser options can be; 1X4 wood or plastic battens, Metro Gutter Riser, or Cobra mesh material. Page 12

13 valley metal Position the valley metal between the battens and scribe the valley profile onto the fascia metal. Cut the fascia to allow the valley metal to exit past the fascia a minimum of 1-inch. With either the 7-inch or 20-inch wide valley metal an Open or Closed valley detail may be used. (300mm) (25mm) RAKE DETAIL - rake channel Tile Rake Channel Fastener Batten Fascia Keep 1X4 panel battens back 2-3/4-inches from rake edge as shown. install Drip Edge down rake then Rake Channel on top of Drip Edge. Panels are cut to fit inside Rake Channel. Page 13

14 Trim cap rake metal Install Trim Cap Rake metal along the rake edges as shown. This metal edging aids in positioning Metro Trim cap neatly. Adjust the position of the tile Rake metal so it rests on the wood buildup. The Metro trim Caps should cover the buildup. The Metro trim Caps should cover the buildup and the folded down Metro panel as shown. Barrel Trim (stone-coated) 2X2 Rake Batten 1x4 Support Batten Bird-stop (stone-coated) 15/16 Solid Sheathing FL Drip-edge (stone-coated) Tile Rake Metal ALTERNATIVE RAKE EDGE DETAIL: The Metro panels may be cut and folded down over the rake edge then covered over woith Trim caps as shown or left trimmed to the Trim Cap Rake Metal. Page 14

15 Panel layout Lay full panels form the top (1st full course from the ridge) down to the fascia. Tie panels may be laid either left to right or right to left. Interlock each panel using the pre-set 2 side-lap Always stager Metro Tile panels 1-2 pan modules to eliminate the negative visual effect of continuous sidelaps. fastening Each Metro panels is fastened with a minimum of 4 fasteners as shown. They are positioned along the nose of the panel, 1 away from the water groove and angled to gain good penetration into the panel batten. 1st row fastening Fasten the First panel course up from the fascia through the top as shown. Top panel fastening is also acceptable behind Metro SMART-vents and chimney/ skylight details as nessesary. Use the Metro Touchup kit to cover each top fastener. This picture shows the use of the Metro V-Bat Riser part instead of 1X4 & 2X2 batten build-up. Page 15

16 valley panels After full panels ate laid out, remaining areas are filled in by measure, cutting, and bending panels to conform with roof geometry. Metro panels can be shaped to create either an open or closed valley detail. Cut off corner to prevent valley overflow record the top and bottom measurement of each valley panel as shown, and sequentially record the measurements for each course of panels. Apply these dimensions to full or cut panel sections and scribe a line to form the diagonal ct and bend lines as shown alls for an approximate 2 bend down as shown. Metro Panels are cut and bent as shown to finish valley detail. Tile valley Cut & Bend section HIp panels Measure, cut and fold up panels 2 (50mm) at the hip line. Install hip section panels similar to other panels placing additional fasteners through the up turned flanges as shown into hip board. At hips, use either a full panel or a cut section long enough to obtain the hip cut. Always deduct 1/2 (12mm) from your measurements for Hip & Ridge cuts to ensure they fit easily. Page 16

17 MetroInstallation Batten Details smartvents Metro SMART-vents are used in place of regular panels on the first full course down from the ridge where ventilation is required. The vents are installed similar to panels after cutting ventilation hole in decking (approximately 8 x 30 ). A Metro SMART-vent provides approximately 82 sq. inches of Net Free Vent Area (NFVA). care should be taken to adequately ventilate the building. Building codes require a minimum NFVA of 1/300 the area of the space to be ventilated (attic). Seal Back up-turn Prior to overlaying panel. To prevent rodents and other vermin from entering attic space, the roof deck ventilation hole should be covered with 1/4 wire mesh. Always check local codes and ensure you have adequate intake ventilation for the quantity of exhaust SMART-vents you are installing. Use Metro SMART-XP-Foam tape or sealant directly beneath area where fasteners penetrate panel. Top panel fastening is acceptable behind Metro SMART-Vents, Chimney s & Skylights as shown. Use fasteners with self-sealing rubber washers covered by a dome cap or seal fasteners then cover with Metro touch-up kit. Page 17

18 ROMAN smartvents Metro Roman-Tile SMARTvents are used in place of regular panels where ventilation is required. The vents are installed similar to panels after cutting ventilation hole in decking (approximately 8 x 30 ). A Metro RomanTile SMARTvent provides approximately 82sq inches of Net Free Vent Area (NFVA). care should be taken to adequately ventilate the building. Building codes require a minimum NFVA of 1/300 the area of the space to be ventilated (attic) Seal Back up-turn Prior to overlaying panel. Secure SMARTvent with screws (#10x2 HH)(50mm) ROMAN VAlley Exit Bird stop metal extends into valleys as shown. Locator Lip Bird-stop Drip-edge The Bird-stop riser metal creates a ¾ off-set from the fascia. The use of this Bird-Stop requires standard Drip-Edge metal to be installed on a (1X4 or 2X2) support batten. Page 18

19 ROMAN PANEL LAYOUT Fastening Location Full panels are laid from the top (1st full course from the ridge) down to the fascia. Roman Tile panels are laid from right to left. Overlap each panel over the 2 side-lap (see ill). Each Roman-tile panel is fastened to battens with a minimum or four (4).131 dia x 2-3/8 long corrosion resistant ring shank nails through the front down turn of the panels as shown. #10 x 2 long 1/4 hex head corrosion resistant screws may be used in place of nails Always stagger MetroTile panels 1-2 pan modules to eliminate negative visual effects of continuous side-laps. Metro panels are fastened on the right side of each Overlapped pan as shown. Page 19

20 MetroInstallation Batten Details chimney / side-wall / headwall NO BATTEN 45 Cut and flatten 45 2 At front of chimney, measure, cut, and fold up panel up 2. Cut panels on a 45 degree angle as shown and fold tabs around chimney. On sides of chimney, cut and fold up panels 2 as shown. At back of chimney, seal each top corner section.keep panel battens away of saddle as shown. Roman Foam Closure Fold flap down to fit tight against saddle bend Saddle Panel Batten 1 Hem 2 At back of chimney, install chimney saddle as shown. Extend Saddle a minimum of 6 past each side of chimney. Hem ends 1 to keep water on saddle flashing. Apply a bead of sealand across Foam Closure and Seat back cut-section panel onto Foam Closure. Panels fastend through front downturn flashing, Foam Closure and Saddle into decking. Install a section of Metro Roman Foam Closure across the chimney saddle as shown (aligh with Roman profile). Always start from the bottom of the item being flashed to ensure correct weather protection. Counter Flashing metal or Z-bar covers bent up edges of panels. Page 20

21 ridge panels The following steps should be followed to ensure a weather tight installation along the ridge. The top course of panels requires a cut and bent panel to complete the ridge line. Bend all ridge panels using Metro s top bender. Cut Line Bend Line Always bend the ridge panels before cutting as they deform slightly in the and are difficult to install. Deduct ½ from mea surements. Mark both bend, and cut lines for each panel prior to cutting or bending. After bending and cutting, rehsape panels to match existing panel courses Fasten first at bottom right corner. Then fasten at bottom far left corner. Panels are then pushed down to fit coursing properly. Push back of panel into position against ridge batten before fastening Additional fasteners are applied as necessary. Page 21

22 MetroInstallation Batten Details PIPE FLASHING - SMART-Jack & SMART-Sleeve Method Install subsequent course above the SMART-jack flashing. Cut a pipe sized hole in the covering panel. Install covering panel and apply a bead of sealant on each side and around the hole of the pipe as shown. Slide the SMART-Jack flashing over the pipe and seat it into the sealant. Conform the SMART-Jack Flashing to the panel contours. Fasten the back No Fasten Zone For added protection and appearance, SMARTsleeves are cut to conform to the panels and installed over pipes. SMART-sleeves are fastened with a screw through the back of the SMART-sleeve into the pipe. Dissimilar Metals To avoid adverse corrosion effects caused by dissimilar metals, COPPER and LEAD flashings should not be used with Metro roof products and accessories Page 22

23 Roman Pipe Jack Cut panel battens a min of 6 from the protruding pipe. Flatten the panel directly below the vent to avoid a hump. Cut and hem a lip around the perimeter of the SMARTjack on the section placed above the panel batten. Install a batten behind the protrusion to support the back of the SMARTjack. Slide the SMARTjack into place. Mold base of SMARTjack to conform with panel. Cut Mark, measure and cut roman panels to cover back section of SMARTjacks. Seal around flashing. For added protection and appearance, SMARTsleeves are cut to conform to the panels and are installed over pipes. SMARTsleeves are fastened with a screw through the back of the smart sleeve into the SMARTjack. Page 23

24 MetroInstallation Batten Details Pipe flashing - underpan sandwich method - smart-jack Cut Under-Pan flashing around Vent Pipe as shown. Bend front edge of Under-Pan over rear of under lapping panel. Install pipe flashing over Under-Pan. Seal Vent Pipe around bottom of cone and around pipe flashing as shown. Pipe SMARTjack Cut a hole in the covering panel to fit the cone of the Pipe Flashing. To avoid adverse corrosion effects caused by dissimilar metals, COPPER and LEAD flashings should not be used with Metro roof products and accessories Underpan Underlayment Dissimilar Metals Panel Decking Page 24

25 short course When a step or jog in the fascia is encountered, usual a short course of panels is required. Install short course panels following a similar process to ridge cuts. Measure from the fascia to the short course batten and apply to a full panel. Bend up panel creating the std. 1 upturn. Install as regular panel. Install the remaining panels of the full course. Seal the seams. Page 25

26 ROman short course Top Course Metal Roman Top Course metal may be used to avoid bending and cutting full panels at the ridge. Roman Top Course metal can also be used at the front of chimneys and skylights. 1-1/2 5-1/2 1-1/2 Top Course Metal is used when the Top course is 5½ or smaller Sealant Apply a bead of sealant between two overlapping top course pieces. Short Course This detail is caused by the fascia/eave stepping out from the main roof course line. Cut out Where panels intersect with stepped fascia, stop panel battens approximately 6 from new fascia line. If necessary notch, cut, and flatten panel at this intersection as shown. The 1st full panel Short Course piece is notched and fitted as shown. Roman Foam Closure Strip Place Metro Roman FOAM closure strip in line with main coursing row. Use sealant to secure. Install full panels aligned with main courses. Fasten with screws, through top panel nose through the FOAM closure strip, and into bottom panel as shown. Page 26

27 trim caps HIP/RIDGE INTERSECTION Install hip caps from the bottom using 2 fas teners per trim cap. Overlap trimcaps at hip/ridge in ter section. Cut and fit the ridge cap over both in ter secting hip caps as shown. RIDGE CEN TER CAP At the center of a ridge line, a small/short ridge cap as shown can be made where cap pieces arrive from different directions. Attach end disc with stitch screws. HIP CORNER Notch & fold the end disc as shown to form a closed 3-di men sional end cap. Fit end disc to bottom hip corner with stitch screws and install balance of trim caps up the hip. To maintain a straight line of trim caps, fasten only 1-side of the ridge or hip and then fasten the other side. RIDGE/GABLE END Where the ridge intersects with a gable end (rake), cut and fold the end disc as shown to follow the Rake Channel sections previously installed. After installing trimcaps at intersections, seal cut edges and apply Metro basecoat and stone chip to provide a complete stone coat finish. Page 27

MetroCOTTAGE Shingle

MetroCOTTAGE Shingle Batten-less Installation Sept. 14, 2017 INSTALLATION WARNING! These install details are provided to demonstrate a recommended installation method for Metro Roof panels and accessories. used in the United

More information

INSTALLATION DETAILS

INSTALLATION DETAILS INSTALLATION DETAILS Front Issued January 23rd, 2005 These install details are provided to demonstrate the recommended installation method for Metro Roof products and accessories. The details and information

More information

METRO PANELS (EXPOSED

METRO PANELS (EXPOSED METRO PANELS 001EX-METRO-PANELS.VSD STARTER EAVE Detail Metro V-Bat RISER METAL (1) PANELS (2) FASTENERS (5) BOTTOM ROW fastening 0.75in. (4) METRO RISER Metal, With Integral Batten Riser & Locator-Lip.

More information

INSTALLATION WARNING! These install details are provided to demonstrate a recommended installation method for Metro Roof panels and accessories.

INSTALLATION WARNING! These install details are provided to demonstrate a recommended installation method for Metro Roof panels and accessories. Issued December 29, 2005 evised July 5, 2013 INSTALLATION WANING! These install details are provided to demonstrate a recommended installation method for Metro oof panels and accessories. practices used

More information

BARRELL VAULT BATTENLESS

BARRELL VAULT BATTENLESS i BARRELL VAULT BATTENLESS INSTALLATION GUIDE INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation of the Gerard Barrel Vault battenless

More information

Barrel Vault Counter Batten and Batten

Barrel Vault Counter Batten and Batten Barrel Vault Counter Batten and Batten INSTALLATION GUIDE www.gerardusa.com INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation

More information

installation guide Villa

installation guide Villa installation guide Villa Table of Contents Introduction............................. 2 Safety................................... 2 Tools.................................... 2 Codes & Requirements....................

More information

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1 Table of Contents DECRA Tile & Shake Roof Overview... 2 Introduction... 3 Safety... 3 Tools.... 3 Estimating Sheets... 4 Codes & Requirements... 4 Roof Slope... 4 Underlayment... 4 Deck Preparation....

More information

Table of Contents. Roof to Head Wall w/ Side Flashing DECRA Shake XD Roof Overview Roof Penetration - Pipes & Vents...

Table of Contents. Roof to Head Wall w/ Side Flashing DECRA Shake XD Roof Overview Roof Penetration - Pipes & Vents... Table of Contents DECRA Shake XD Roof Overview.... 2 DECRA Shingle XD Roof Overview.... 3 Introduction... 4 Safety... 4 Tools.... 4 Estimating Sheet... 4 Codes & Requirements... 4 Roof Slope... 4 Underlayment...

More information

INSTALLATION GUIDE LEARN MORE AT DECRA.COM

INSTALLATION GUIDE LEARN MORE AT DECRA.COM Villa Tile INSTALLATION GUIDE LEARN MORE AT DECRA.COM Table of Contents DECRA Villa Tile Roof Overview... 2 Introduction... 3 Safety... 3 Tools.... 3 Estimating Sheet... 3 Codes & Requirements... 3 Roof

More information

Stone coated steel roof tile INSTALLATION GUIDE

Stone coated steel roof tile INSTALLATION GUIDE Stone coated steel roof tile INSTALLATION GUIDE Ⅰ. Introduction These installation details are provided to demonstrate recommended installation methods for KD One roof products and accessories. Consult

More information

Installation Manual. Future Roof Shingle / Slate Products

Installation Manual. Future Roof Shingle / Slate Products Installation Manual Future Roof Shingle / Slate Products REVISED 14/09/2010 Future Roof Shingle Installation Manual is a component of Future Roof, Inc. and as such is intended to be used with Future Roof

More information

Installation Manual. For Gerard Shingle Products

Installation Manual. For Gerard Shingle Products Installation Manual For Gerard Shingle Products Gerard Shingle Installation Manual is a component of Gerard roofing products and as such is intended to be used with Gerard products only. All information

More information

Granite Ridge Shingle Guardian Shingle

Granite Ridge Shingle Guardian Shingle Allmet Installation Manual Shingle Profiles Granite Ridge Shingle Guardian Shingle March 2017 This Installation Manual is designed as an instructional tool to clearly depict to the contractor, installer,

More information

Terrabella Shake & Shingle Znap Ver. 2.0

Terrabella Shake & Shingle Znap Ver. 2.0 Terrabella Shake Znap Actual length = 52.6 Actual Width = 16.33 Coverage length = 49.7 Coverage width = 14 Terrabella Shingle Znap Actual Length = 52.375 Actual Width = 15.25 Coverage Length = 49.375 Coverage

More information

Gerard Installation Manual Shingle Profiles

Gerard Installation Manual Shingle Profiles Gerard Installation Manual Shingle Profiles Granite Ridge Shingle Guardian Shingle March 2017 This Installation Manual is designed as an instructional tool to clearly depict to the contractor, installer,

More information

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

Installation Guide.   Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation Step 7. Transition s and Accessories Step 3. Valley Step 6. Hip and Ridge Installation Step 2. Rake Trim Step 5. Installing the Shingles Step 1. Eave Starter Installation Step 4. Endwall s Installation

More information

Installation Manual. Future Shingle Products

Installation Manual. Future Shingle Products Installation Manual Future Shingle Products TITLE REVISED 7/4/2011 Future Shingle Installation Manual is a component of Future Roof, Inc. and as such is intended to be used with Future Roof products only.

More information

Guardian Shingle Granite Ridge Shingle

Guardian Shingle Granite Ridge Shingle Installation Manual Shingle Profiles Guardian Shingle Granite Ridge Shingle Shingle Installation Manual This Installation Manual is designed as an instructional tool to clearly depict to the contractor,

More information

REGAL. Installation Manual

REGAL. Installation Manual REGAL Installation Manual General Information The details shown on the following pages are suggestions or guidelines for installing the Regal system. The installation details shown here are proven methods

More information

INSTALLATION GIUDE.

INSTALLATION GIUDE. INSTALLATION GIUDE INTRODUCTION The instructions and drawings included here are intended only as a guide for the installation of ECO Roofing Systems Spanish and Modern profiles. The materials and methods

More information

IRONSTONE SLATE & FLASHING SPECIFICATIONS IRONSTONE SLATE

IRONSTONE SLATE & FLASHING SPECIFICATIONS IRONSTONE SLATE 8 5/8" A) 1 5/8" 5/8" 1 10" 10 1 5 50" 9 7/8" IRONSTONE SLATE & FLASHING SPECIFICATIONS IRONSTONE SLATE 1/8" 1 B) 3/8" 2 7/8" 1 3/8" 3/8" 3/8" 3/8" 1" 1 5/8" 1 5/8" 1 2 1 8.3" 3/4" Overall Length 52 Length

More information

CertainTeed. Shake / Slate Installation Guide

CertainTeed. Shake / Slate Installation Guide CertainTeed Shake / Slate Installation Guide Table of Contents System Components... 2 General Conditions, Safety and Roof Preparations... 3... 4 Eave/Drip Edge... 5 Inner Gable... 6 Outer Gable... 7 Open

More information

IRONWOOD SHAKE & FLASHING SPECIFICATIONS

IRONWOOD SHAKE & FLASHING SPECIFICATIONS 3 1-51 3-3/4 1 IRONWOOD SHAKE & FLASHING SPECIFICATIONS 6 1-13- 1-1-1/4 2-1.5 Drip Edge 2.5 Drip Edge 2-7/8 1-1-1/4 3/4 1 2-1 IRONWOOD SHAKE Overall Length 51 Length of Coverage 48 Width of Coverage 1

More information

DECRA Shingle Installation Guidelines

DECRA Shingle Installation Guidelines Installation Guide DECRA Shingle Installation Guidelines General Instructions Failure to use these guidelines may void the product warranty. Local building codes may require additional application techniques

More information

SmartVent Eave Edge Installation Instructions

SmartVent Eave Edge Installation Instructions SmartVent Eave Edge Installation Instructions STEP 1: Cut a slit 1 wide (or a series of 1 ¾ holes at 3 on center) into the roof decking 6 to 7 up from the drip edge. SmartVent is rated 9NFA. Ensure drip

More information

Tuff-Rib Install Guide

Tuff-Rib Install Guide Install Guide bestbuymetalroof.com Page 2 of 27 Page 3 of 27 1. Page 4 2. a. Installation Guide b. Panel Squaring Pages 5, 6 Pages 7, 8 3. Pages 9, 10 4. a. Fascia (optional) b. Eave / 1.5x3.5 Angle c.

More information

RIDGEMASTER PLUS CAUTION INSTALLATION INSTRUCTIONS ALWAYS WEAR SAFETY GLASSES TOOLS NEEDED GENERAL GUIDELINES FOR RIDGEMASTER PLUS AND HIPMASTER

RIDGEMASTER PLUS CAUTION INSTALLATION INSTRUCTIONS ALWAYS WEAR SAFETY GLASSES TOOLS NEEDED GENERAL GUIDELINES FOR RIDGEMASTER PLUS AND HIPMASTER INSTALLATION INSTRUCTIONS RIDGEMASTER PLUS CAUTION Before beginning installation read all general guidelines, special notes and installation steps thoroughly and be sure to check and follow all your local

More information

Ekoroof LiteTile Dimensions

Ekoroof LiteTile Dimensions Ekoroof LiteTile Dimensions 7 3 3.5 Height 40 Width 20 Length Weight per Panel: 3 kg / 6.61 lbs 2 2 Area per panel 800 in / 5.55 ft 2 Panels per Square: 20 (including overlap, for a 100 ft covered area)

More information

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION ROOF FRAMING INFORMATION It is the responsibility or roofers, building

More information

ONDUVILLA. The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S

ONDUVILLA. The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S ONDUVILLA The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S 1 INSTALLATION INSTRUCTIONS Even though ONDUVILLA is easy to install, it is important to read through these

More information

DIRECTIONS FOR APPLICATION

DIRECTIONS FOR APPLICATION Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS

More information

Inspire Aledora Slate Application Guidelines

Inspire Aledora Slate Application Guidelines July 2014 Inspire Aledora Slate Application Guidelines Only Basic Roofing Tools Required Hand fastened or fastened with a pneumatic nail gun Utility knife or a standard circular saw Tape measure, pry bar,

More information

Installation Instructions

Installation Instructions Installation Instructions ROLL VENT STANDARD / METRIC Page Installation Considerations 3 Roll Vent Standard General Installation 4 Roll Vent Metric General Installation 5 Steep Pitch Guidelines 6 Asphalt

More information

DIRECTIONS FOR APPLICATION

DIRECTIONS FOR APPLICATION Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS

More information

Steel Roofing & Siding INSTALLATION GUIDE

Steel Roofing & Siding INSTALLATION GUIDE Steel Roofing & Siding INSTALLATION GUIDE Your Authorized Dealer is: WASHINGTON Auburn (800) 700-7228 WASHINGTON Spokane (866) 321-5954 www.nuraymetals.com CALIFORNIA Redlands (800) 806-8729 CONTENTS BEFORE

More information

SLATE & SHINGLE INSTALLATION

SLATE & SHINGLE INSTALLATION EAVE EDGE Apply a small strip of roofing paper to the bottom of eave. Eave flashing is attached to substrate with roofing nails every 9". Install underlayment over entire roof. (See Fig. 1) PAGE 1 Bend

More information

DIRECTIONS FOR APPLICATION

DIRECTIONS FOR APPLICATION Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS

More information

TABLE OF CONTENTS A-1

TABLE OF CONTENTS A-1 TABLE OF CONTENTS PAGE NUMBER: DETAIL DESCRIPTION A-1...TABLE OF CONTENTS A-2...GENERAL NOTES B-1...GENERAL INFORMATION C-1...EAVE DRIP DETAIL C-2...EAVE DRIP with GUTTER DETAIL C-3 & C-4...FIXED RIDGE

More information

Installation Instructions

Installation Instructions Installation Instructions RAPID RIDGE STANDARD / 7 / METRIC Page Installation Considerations 3 Rapid Ridge Standard General Installation 4 Rapid Ridge Metric General Installation 5 Rapid Ridge 7 General

More information

eco-shake INSTALLATION INSTRUCTION

eco-shake INSTALLATION INSTRUCTION 1 eco-shake INSTALLATION INSTRUCTION NOTE: Shuffling the eco-shakes during installation may be necessary to obtain a uniform color throughout the roof. Due to the natural wood content in the ecoshakes,

More information

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

Inspire Slate Starter Piece Hip and Ridge. 13 1/2 Height: 13 ½ Width: 12 Squares/ Pallet. Bundles/ Square December 2017 Classic Slate Application Guidelines Only Basic Roofing Tools Required Hand fastened or fastened with a pneumatic nail gun Utility knife or a standard circular saw Tape measure, pry bar,

More information

Shingle Installation Guide

Shingle Installation Guide Installation Guide Roof Framing Information Installation Installation Accessory Installation Estimating Data General Information Roof Framing Information It is the responsibility or roofers, building contractors

More information

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application 1 2 3 General Instructions NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE

More information

Brava Old World Slate Installation Guide

Brava Old World Slate Installation Guide Brava Old World Slate Installation Guide Brava Roof Tile Phone: 844-290-4196 www.bravarooftile.com This document includes the recommended and suggested installation procedures for Brava Old World Slate

More information

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive

More information

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive

More information

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016 Best Barns USA Assembly Book revised March 23, 2016 the Brookhaven 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

TremLock T-138 INSTALLATION MANUAL T-138 www.tremcoroofing.com 3735 Green Road Beachwood, Ohio 44122 1.800.852.6013 50 Beth Nealson Drive Toronto, Ontario M4H 1M6 1.800.668.9879 7241 6/8/18 TABLE OF CONTENTS

More information

Installation Guide. Cedar Shake. Distributed by: BEST MATERIALS LLC, Phoenx AZ

Installation Guide. Cedar Shake. Distributed by: BEST MATERIALS LLC, Phoenx AZ RPM ROOFING Installation Guide Cedar Shake Distributed by: BEST MATERIALS LLC, Phoenx AZ 602-272-8128 800-474-7570 www.bestmaterials.com Table of Contents OVERVIEW... 1 CAUTION... 1 DISCLAIMER... 1 PRODUCT

More information

Table of Contents. Important Notices 3. Residential Roofing Application 4. Trims & Accessories 5. Trim & Accessory Glossary 6, 7, 8

Table of Contents. Important Notices 3. Residential Roofing Application 4. Trims & Accessories 5. Trim & Accessory Glossary 6, 7, 8 Table of Contents Page(s) Important Notices 3 Residential Roofing Application 4 Trims & Accessories 5 Trim & Accessory Glossary 6, 7, 8 Estimating Material 9 Roof Preparation: 5 Steps 10, 11 Shingle Installation

More information

Turada Hardwood Shingles and Shakes Installation instructions

Turada Hardwood Shingles and Shakes Installation instructions 1. General 1.1 Maximum Exposure: Maximum exposure for wood shingles and shakes shall comply with Table 1 herein, unless specifically specified in the roof assemblies Product Approval. 1.2 Solid and Spaced

More information

COMPOSITE TILE INSTALLATION MANUAL

COMPOSITE TILE INSTALLATION MANUAL COMPOSITE TILE INSTALLATION MANUAL Product Description Quarrix Composite Tile is a lightweight molded composite of a mixture of polyethylene polymer and inorganic proprietary additive materials that gives

More information

Tuff-Rib. Installation Manual. Nationwide supplier of quality metal roofing. Toll-Free (800) S. Lee Hwy. Cleveland, TN 37311

Tuff-Rib. Installation Manual. Nationwide supplier of quality metal roofing. Toll-Free (800) S. Lee Hwy. Cleveland, TN 37311 Installation Manual Nationwide supplier of quality metal roofing. 65 S. Lee Hwy. Cleveland, TN 7.. www.bestbuymetals.com Toll-Free (800) 78-00 IMPORTANT NOTICE This manual contains suggestions and guidelines

More information

Width = 18 Ridge Cap Width = 6 Verona Terrabella Verona Verona Verona Length = 8 Valley: Length

Width = 18 Ridge Cap Width = 6 Verona Terrabella Verona Verona Verona Length = 8 Valley: Length Terrabella Verona Actual length = 44.67 Actual Width = 18 Coverage length = 39.75 Coverage width = 15.74 Verona Ridge Cap Actual Length = 15.94 Actual Width = 15.25 Coverage Length = 49.375 Verona End

More information

A P P L I C A T I O N I N S T R U C T I O N S

A P P L I C A T I O N I N S T R U C T I O N S 1 2 3 General Instructions NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE

More information

Installation Guide. Titan Old World Slate REV Titan Manufacturing Phone: (407) Fax: (866)

Installation Guide. Titan Old World Slate REV Titan Manufacturing Phone: (407) Fax: (866) Installation Guide Titan Old World Slate REV70908 Titan Manufacturing Phone: (407) 587-5492 Fax: (866) 741-2147 www.titanroofsystems.com This document includes the recommended and suggested installation

More information

Installation Instructions

Installation Instructions Installation Instructions XTRACTOR VENT X18 / X18 XTRA / XLP Page Installation Considerations 3 X18 and X18 Xtra General Installation 4 XLP General Installation 5 Steep Pitch Guidelines 6 Asphalt Shingles

More information

HipMaster Installation Instructions

HipMaster Installation Instructions Mid-America, Plus and HipMaster Installation Instructions New applications for metal, slate and wood shingle roofs (see page 7) CAUTION: Before beginning installation read all general guidelines, special

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

Installation Instructions

Installation Instructions Installation Instructions XTRACTOR VENT X18 / X18 XTRA / XLP Page X18 and X18 Xtra General Installation 2 XLP General Installation 3 Asphalt Fiberglass Shingles Detail 4 Ridge Beam Detail 5 Hip Roof Detail

More information

Table of Contents. Installation Guide for Profile with Hidden Fasteners 3. Installation Steps 4, 5. Prestige Series Moldings 6, 7. Other Accessories 8

Table of Contents. Installation Guide for Profile with Hidden Fasteners 3. Installation Steps 4, 5. Prestige Series Moldings 6, 7. Other Accessories 8 1 Table of Contents Page(s) Installation Guide for Profile with Hidden Fasteners 3 Installation Steps 4, 5 Prestige Series Moldings 6, 7 Other Accessories 8 Trims & Accessories 9 Eave Starters 10 Gableboards

More information

Steel Shingle Installation Guide

Steel Shingle Installation Guide Page THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING DEFECTS RESULTING FROM

More information

Installation Instructions

Installation Instructions Installation Instructions SHARK VENT XLP / XTRA Page Installation Considerations 3 Shark Vent XLP & Xtra General Installation 4 Steep Pitch Guidelines 5 Asphalt Shingles Detail 6 Ridge Beam Detail 7 Hip

More information

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK StormMaster Slate General Instructions IMPORTANT: THE STATEMENTS EXPRESSED ON THIS PAGE ARE THE RECOMMENDATIONS FOR THE APPLICATION OF THE ROOFING PRODUCTS AS OUTLINED AND ILLUSTRATED. ANY DEVIATION FROM

More information

Installation guide for 20/20

Installation guide for 20/20 Introduction The following installation instructions are recommended minimum requirements for the 20/20. The designer and fixer should ensure that tiles are installed in accordance with BS 5534; The British

More information

ROOFING APPLICATION STANDARD (RAS) No. 130

ROOFING APPLICATION STANDARD (RAS) No. 130 ROOFING APPLICATION STANDARD (RAS) No. 130 1. Scope 1.1 This application Standard provides the minimum installation criteria for wood shingles and shakes. 2. Definitions 2.1 For definitions of terms used

More information

900 SERIES WALL PANELS

900 SERIES WALL PANELS CI-DS-01-900 CI-PP-01-900 CI-PJ-01-900 CI-PJ-02-900 CI-PJ-03-900 CI-BS-01-900 CI-BS-02-900 CI-BS-03-900 CI-BS-04-900 CI-BS-05-900 CI-OC-01-900 CI-OC-02-900 CI-IC-01-900 CI-FO-01-900 CI-FO-02-900 CI-FO-03-900

More information

Table of Contents Light Gauge Metal Roof & Wall Panels

Table of Contents Light Gauge Metal Roof & Wall Panels Table of Contents Light Gauge Metal Roof & Wall Panels Installation Guide for Delta Rib, Nor-Clad, Strata Rib & 2-1/2 Corrugated Introduction Important Notice Notes: April 2008 Minimum Recommended Tools

More information

Roofing Training - Basics. Sandy Wesch

Roofing Training - Basics. Sandy Wesch Roofing Training - Basics Sandy Wesch Tools Hammer Measuring Tape Chalk Line & Chalk Speed Square Framing Square Utility Knife Metal Snips Extension Ladder(s) 2 Safety Any tools or material up on the roof

More information

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD Application Instructions for FORMERLY 30 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR

More information

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25 3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25 1 Directions For Applying Malarkey 3-Tab Shingles GENERAL INSTRUCTIONS Install Malarkey 3-tab shingles according to building code and local amendments.

More information

Recommended Slating Tools

Recommended Slating Tools Recommended Slating Tools Product Size L Sketch of Article No. Description 60-070 Scriber 60-00 Slater s Hammer 60-00 Slater Ripper 60-080 Parallel Shears 60-0 Slate Cutter Kwiksnip Slate Guuillotine Slate

More information

Application Guidelines - Shake General Information

Application Guidelines - Shake General Information Application Guidelines - Shake General Information No Special Tools Required hand fastened or fastened with a pneumatic nail gun utility knife or a standard circular saw tape measure, pry bar, tin snips

More information

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE INTRODUCING THE CLICKFAST FASCIA AND GUTTER SYSTEM The Clickfast Fascia and Gutter System was originally designed by Stratco and has proven to be the most successful fascia and gutter system in Australia

More information

Gerard Battenless Profiles

Gerard Battenless Profiles Manual Gerard Battenless Profiles Canyon Shake Barrel Vault NB Tile January 2015 This Manual is designed as an instructional tool to clearly depict to the contractor, installer, distributor and architect,

More information

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions REDLAND DRY VALLEY Installation Instructions for Redland Dry Valley Version: 6 Date: May 2013 Author: Department: Redland Technical Solutions Redland Technical Solutions 1 Introduction 1.1 TECHNICAL DATA

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL SHINGLES SECTION: METAL ROOF TILES REPORT HOLDER:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL SHINGLES SECTION: METAL ROOF TILES REPORT HOLDER: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1754 Reissued 11/2017 This report is subject to renewal 11/2018. DIVISION: 07 00

More information

INSTALLATION PROCEDURE

INSTALLATION PROCEDURE Vinyl Siding INSTALLATION PROCEDURE Tools Needed and Preparation MOST ESSENTIAL TOOLS The proper tools, materials and equipment can make the installation of Durabuilt Vinyl Siding much easier. Here are

More information

1 Roof Substrate (Deck) OWENS CORNING BERKSHIRE SHINGLES INSTALLATION INSTRUCTIONS

1 Roof Substrate (Deck) OWENS CORNING BERKSHIRE SHINGLES INSTALLATION INSTRUCTIONS General This Installation Instruction document for Owens Corning Berkshire roofing shingles is to be read in conjunction with the Installation information printed on each packet of shingles along with

More information

Shapes Siding. Perfection Shingles. Chalk Line

Shapes Siding. Perfection Shingles. Chalk Line Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter

More information

6 STEP INSTALLATION GUIDE BY DCI

6 STEP INSTALLATION GUIDE BY DCI 6 STEP INSTALLATION GUIDE BY DCI STEP 1 (Ensure metal drip edge was previously installed.) Begin by cutting a slit 1 wide (or a series of 1 ¾ holes 3 on center) into the roof decking 6 to 7 up from the

More information

Pipe penetration refer CT15. Viking CertainTeed Shingles General Roof details

Pipe penetration refer CT15. Viking CertainTeed Shingles General Roof details Vented ridge refer CT02 Substrate Viking SuperStrand or F11 Roofing ply Pipe penetration refer CT15 Valley details refer CT07 and CT08 refer CT17 and CT18 for requirements Drip-edge refer CT01 Barge detail

More information

ICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013.

ICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013. ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-1790 Reissued September 1, 2012 This report is subject to renewal September 1, 2013. A Subsidiary of the International Code Council

More information

GIRTS ON BACK OF BUILDING

GIRTS ON BACK OF BUILDING GIRTS ON BACK OF BUILDING ALL GIRTS ARE 1 1/2 SQUARE TUBE. GIRT LENGTHS FOR 12, 20, 24, AND 30 WIDE BUILDINGS: ON 12 WIDE BUILDINGS GIRTS ARE 67 3/4 LONG ON 20 WIDE BUILDINGS GIRTS ARE 56 3/4 LONG ON 24

More information

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights 1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and s These 1 Exam Prep Tabs are based on the National Roofing Contractors Association (NRCA) manual listed below: Steep-Slope Roof Systems

More information

Straight Rib Series Metal Roofing Panel Installation Guide

Straight Rib Series Metal Roofing Panel Installation Guide D-Rib G-Rib C-Rib Straight Rib Series Metal Roofing Panel Installation Guide 7000 AIRPORT LINE R.R., BOX 7 HENSALL, ONTARIO N0M X0 EASY BUILDING PRODUCTS TEL. : 5-6-07 TOLL FREE : -888-76-777 FAX: 5-6-08

More information

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR

More information

INSTALLATION GUIDE SLATE NOTE TO INSTALLER

INSTALLATION GUIDE SLATE NOTE TO INSTALLER N INSTALLATION GUIDE SLATE Bellaforté Slate is a polymer roof covering carefully engineered to provide the authentic look and durability of its natural counterpart. Special care has been taken to make

More information

BARDOLINE INSTALLATION INSTRUCTIONS

BARDOLINE INSTALLATION INSTRUCTIONS BARDOLINE INSTALLATION INSTRUCTIONS www.onduline.com CONTENTS General conditions Material requirements Terms Estimating shingle requirements Roof preparation Shingle application 9 GENERAL CONDITIONS ONDULINE

More information

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION 1. 2. 3. Scope 1.1 This application standard provides the minimum installation criteria for wood

More information

Bitumen Roofshingles ARMOURVENT MULTI APPLICATION GUIDE VENTILATION

Bitumen Roofshingles ARMOURVENT MULTI APPLICATION GUIDE VENTILATION Bitumen Roofshingles ARMOURVENT MULTI APPLICATION GUIDE VENTILATION WHY VENTILATE A SHINGLE ROOF? Unventilated shingle roofs will cause high temperatures inside. This will age the shingles much quicker

More information

METAL ROOFING INSTALLATION GUIDE

METAL ROOFING INSTALLATION GUIDE METAL ROOFING INSTALLATION GUIDE STANDING SEAM ROOFING PANELS Horizon 16 and Climaguard 16 Regardless of whether your roofing project is a new installation or a re-roof, and whether your building is residential,

More information

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the PART 1 GENERAL 1) DESCRIPTION a) CertainTeed Symphony TM composite slate is an innovative roofing product that simulates the appearance, texture, and contours of traditional natural slate. It is a carefully

More information

TYPICAL FRAMING AND STITCH FASTENER PATTERNS FOR MAX-RIB PANELS

TYPICAL FRAMING AND STITCH FASTENER PATTERNS FOR MAX-RIB PANELS TYPICAL AND PATTERNS FOR MAX-RIB S MAX-RIB (PATTERN #1) @ 1'-8" O.C. (MAX.) ROLL TAPE SEALANT @ SEAMS MAX-RIB @ 1'-8" O.C. (MAX.) ROLL TAPE SEALANT @ SEAMS MAX-RIB TRIM (PATTERN #3) NOTE: TAPE SEALANT

More information

OWENS CORNING LAMINATE SHINGLES INSTALLATION INSTRUCTIONS

OWENS CORNING LAMINATE SHINGLES INSTALLATION INSTRUCTIONS General This Installation Instruction document for Owens Corning asphalt roofing shingles is to be read in conjunction with the Installation information printed on each packet of shingles along with the

More information

Best Buy Metals Toll Free / Phone / Fax

Best Buy Metals Toll Free / Phone / Fax DETAIL MANUAL for Vertical Seam Best Buy Metals Toll Free 1-800-728-4010 / Phone 423-479-6382 / Fax 423-728-3066 www.bestbuymetals.com Vertical Seam Roofing Panels Fig. 2 Vertical Seam Has 1-3/4" high

More information

INSTALLATION GUIDE SHAKE N OTE TO I NSTALLER

INSTALLATION GUIDE SHAKE N OTE TO I NSTALLER N INSTALLATION GUIDE SHAKE Bellaforté Shake is a polymer roof covering carefully engineered to provide the authentic look and durability of its natural counterpart. Special care has been taken to make

More information

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR

More information

TIOGA Table of Contents

TIOGA Table of Contents Table of Contents TABLE OF CONTENTS Product Data Sheet...2 Engineering Data...3 General Information...4 Handling...5 Roof Preparation...5 Fastening Recommendations...6 Field Cutting...7 Touch-up Paint...7

More information