1 HRD Programme for Exchange of ICT Researchers and Engineers PROJECT COMPLETION REPORT Project Title: Emergency Broadband Access Network using Low Altitude Platform Station for Disaster Relief in Indonesia Chief Researcher Hariyo Sanso Bandung, July 31, 2009

2 HRD Programme for Exchange of ICT Researchers and Engineers PROJECT COMPLETION REPORT Project Title Emergency Broadband Access Network using Low Altitude Platform Station for Disaster Relief in Indonesia Executive Summary This project is aimed develop and do trial of low altitude platform station (LAPS) as part of emergency broadband access network (EBAN) for disaster relief in Indonesia. This project has been selected by the Ministry of Internal Affairs and Communications of Japan and APT as HRD Programme for Exchange of ICT Researchers and Engineers. The commenced of the project is on December 3, 2008 and should be completed by the end of July The tal budget approved for the project is USD 55, In general, the project achievement has fulfilled the initial project plan, both in the project results and time/budget consideration. The main activities for this HRD programme for exchange researchers are developing a protype of the EBAN system using LAPS, as well as performing a field trial of the system. The actual cost of the project is USD 55, or 99.60% of the budget approved by APT. The exchange program between Japanese and Indonesian researchers has also met the project objectives, especially in enhancing their ICT competencies and adding their project experiences. Several input and lessons learned have also been considered for further development and implementation of this EBAN system. In the field trial, team has made some measurements regarding the EBAN system. The measurements include time deploy the platform, attitude characteristic of the platform, strength of the signal, coverage area and also duty cycle of the system. 1. Project Information 1.1 Introduction This project has been selected by the Ministry of Internal Affairs and Communications (MIC) of Japan and Asia-Pacific Telecommunity as an APT Collaborative HRD Programme for Exchange of ICT Researchers and Engineers. This project commenced on December 3, 2008 and should be completed at the end of July The tal budget approved for the project is USD 55,

3 The main activities for this HRD programme for exchange researchers are develop and do trial of low altitude platform station (LAPS) as part of emergency broadband access network (EBAN) for disaster relief in Indonesia. This research project is conducted by, Research & Development Center (RDC) of PT. Telekomunikasi Indonesia Tbk. (TELKOM), and fully supported by researchers from: a. Institut Teknologi Telkom (IT Telkom Telkom Institute of Technology) Indonesia b. Asosiasi Satelit Indonesia (ASI Indonesian Sattelite Association) Indonesia c. University of Electro-Communications (UEC) Japan d. National Institute of Communications and Informations Technology (NICT) Japan The researchers involved in this project are 6 (six) Indonesian researchers and 5 (five) Japanese researchers. 1.2 Objectives The objectives aim in this project are: - Design a low altitude wireless broadband station for emergency situation considering the ease--use platform (hot air balloon) and BWA technology (wimax/wifi) deliver video, voice and internet services. - Study the performance & coverage characteristics of the chosen BWA technology due platform mobility and atmospheric disturbance in Indonesia - Analyze the applicability of the proposed model as a deployable platform station for emergency response. - Improve the application required for emergency relief. - Improve the user experience (ie. emergency team) in using communication system for emergency response. With those, output of the project is expected as follows: - The EBAN system is expected help Indonesian emergency team get initial image/video report from the sky about the affected area and provide scheduled communication solution connecting the field team and the EBAN communication center. - Indonesia emergency team is able explore various communication services and applications vary from video, image, data internet and voice services provided by EBAN system. - A comprehensive study report of LAPS-based WiMAX (1-5 km) covers the coverage characteristics, performance, application and deployment scenarios. 1.3 Project Team This research project is conducted by TELKOM-RDC, a Research & Development Center of PT. Telekomunikasi Indonesia Tbk., and fully supported by researchers from: a. Institut Teknologi Telkom (IT Telkom Telkom Institute of Technology) Indonesia b. Asosiasi Satelit Indonesia (ASI Indonesian Sattelite Association) Indonesia c. University of Electro-Communications (UEC) Japan d. National Institute of Communications and Informations Technology (NICT) Japan

4 The researchers involved in this project are 6 (six) Indonesian researchers and 5 (five) Japanese researchers, as follows: No. Name Institution Position in EBAN Project 1. Hariyo Sanso TELKOM Project Manager/Chief Researcher 2. Daduk Merdika TELKOM Researcher 3. Hadi Hariyan TELKOM Secretary/Researcher 4. Sony Ari Yuniar TELKOM Accounting Coordinar/Researcher 5. Anggoro K Widiawan ASI Researcher 6. Heroe Wijan BPPT Researcher 7. Prof. Toshizumi OHTA UEC Researcher 8. DR. Hirohiko Suwa UEC Researcher 9. Andri Qianri UEC Researcher 10. Agung Budi S UEC Researcher 11. DR. Ken UMENO NICT Researcher 2. Summary of the Financial Statement Summary of the financial statement is described in the following table: Item Budget Approved (USD) Cost Spent(USD) Variance (USD) Travel Expenses 13, , (3,318.02) Daily Allowances 18, , , Correspondence Expenses Shipping Fees Misc Equipment Purchase 22, , (7,587.81) Expenses Total 55, , Fund transferred by APT (phase-1) = USD 33, Cost spent until July 2009 = USD 55, Total Current Balance = USD 21, The detailed information of this financial statement is described in the Final Accounting Report. 3. Brief Overview of EBAN System To create the system as a solution for emergency broadband access network, team considers some ideas, which are: - Team has think the technology or system that is available and popular in Indonesia. With this, team won't have any difficulty in buying the equipment build the solution. - Identify the potential problem in early stage, minimize the possibility that the solution can't fulfill the objectives. - In the trial, team agrees do data collection using measurement device. These data will be analyzed get the result regarding the test of the system. - In the end, team will come up with trial report.

5 With the considerations, team compares all technologies that is available be implemented as part of the solution. For the platform station, we choose low altitude using balloon because of this analysis: For the platform communication, we have some alternatives be choosen: - Access Solution: providing broadband communication services for emergency/relief team from the air o Alternative I: WiMAX Point--Multipoint based on d Standard o Alternative II: Outdoor WiFi providing Point--Multipoint connectivity for WiFi terminal or group of WiFi ad-hoc Access Points in the ground - Backhaul and Ground Station Solution, providing broadband communication link from Ground Station the over-the-air EBAN system. o It is a point--point wireless link with the range vary from km (depend on the target mission and scenario) o The ground station is a deployable vehicle providing: The wireless link the air platform Platform and communication network management system VSAT IP from GS the Internet backbone via satellite comm Some comparison between Wifi and Wimax as our reference: For access communication, this table shows us the comparison between those two technologies:

6 For backhaul communication, this is the table: a. Network Configuration System configuration developed in this project is illustrated as follow:

7 Platform station: - Theatered blimp (non-aunomous system) Communication Solution: - On Board Platform: WiFi dual band 2.4 GHz / 5.8 GHz - On Ground: WiFi CPE or Access Point, WiFi adhoc Network may be used in the edge of the cell extend the coverage (optional) - Backhaul: WiFI 5.8 GHz And WiMAX 3.3 GHz - Deployable ground station: VSAT IP, Application Server, Network & Platform Moniring b. Applications/services For the applications that will be deployed on p of the communication network, we have selected 3 applications, which are: - Video streaming app is intended for use in single or multi-camera video. It supports capture, recording, and moniring of video data coming from one or more video attached at balloon platform. Ease of use (web based app GUI) and support motion picture standard MPEG-4. - Voice communication app: support max flexibility, interoperable with many telephony procol and support standards based telephony equipment. Can be implemented using relatively inexpensive hardware (for server or client). For optional client ol using softphone. - Emergency Medical Care Information System (EMCIS). Utilize early captured data as an input for the EMCIS provide medical advice. This application use graphical view on client UI.

8 4. Summary of the project activities 4.1 General Project Activities All researchers involved in this project, both researchers from Indonesia and Japan, actively supported all project activities. Some activities were virtually held via , via telephone line and other activities required a physical attendance of the researchers (exchange of researchers). In general, all main activities of the project complied with the initial planning. Although some activities required a slight time adjustment, the project closing itself was exactly similar the proposed plan, which is July 31, The detailed description about project activities is summarized in the following table. No Activity 1. Kick off Project 2. System 10/2/2008 Specification Analysis 10/11/ H/W, S/W & Network Procurement Plan Actual Schedule Place Schedule Place Description 10/1/2008 Bandung 12/5/2008 Bandung This meeting was held in RDC-TELKOM, Bandung and attended by 6 Indonesian researchers. Japanese researcher gave their comments and discussion via and yahoo messenger. Bandung 12/6/2008 Bandung 12/15/ /28/ /17/2008 Bandung 4/2/2009 5/20/2009 Bandung The output of this activity is the system specification document (described in Annex-1). This document is used as reference in making the system design document. Defining and assessing some ol/equipment will be used for development and trial. The procurement has been done in Bandung, and some of the ols have been used for the development of the system. List of ols/ equipment procured / rented from this project are: - Balloon platform - Hydrogen - Wifi system - Server - Balloon accessories 4. Survey location 5. Network Design/ System Planning & Design 6. Software Dev. 10/12/ /27/ /18/ /8/2008 Bandung 1/20/2009 2/2/2009 Bandung 2/3/2009 3/13/2009 Bandung Bandung/ Tokyo To help the implementation, we ve been coordinating with Sulaeman airport authority, who runs day day operational in the area. Location implementation has already been visiting also, as a preliminary survey activity, see the possibilities launch the platform. The output of this activity is system requirement document. All team members of this project finalized this draft in Tokyo on March 4-13, (Described in Annex-2) Design 12/9/ /19/2008 Bandung 3/14/2009 3/24/2009 Bandung The activity for designing the applications be deployed in EBAN system. Japanese expert also gave

9 inputs complete the system's design. Coding 12/20/2008 1/31/2009 Testing 2/1/2009 2/21/2009 SW Integration 2/22/2009 3/9/2009 SW 3/10/2009 Document ation 3/25/ Hardware Integrating 8. Installation/ System Testing 3/26/2009 5/1/2009 6/3/2009 6/18/2009 Bandung 3/25/2009 4/10/2009 Bandung 4/11/2009 4/13/2009 Bandung 4/14/2009 4/15/2009 Bandung 4/15/2009 5/15/2009 Bandung 5/1/2009 5/11/2009 Bandung 5/12/2009 5/15/2009 Bandung Bandung Bandung Bandung Bandung Bandung This activity intended write the software based on the design document developed previously. This activity covered functional test of the modules, especially investigating the flow of the software. Integrating all software modules before they are deployed on the platform. Creating technical documentations for EBAN system by using related software engineering standard. Installed all the components (wifi for access, wifi for backbone and balloon platform) before they are used in the field. Installed the system in the field and also doing some testing make sure that the system is running properly. 9. Field Trial 6/19/2009 7/19/2009 Bandung 5/15/2009 6/30/2009 Bandung All Indonesian researchers present in the opening of EBAN system field trial and also doing some test try the capability. They agree that the system is stable and ready for trial. All team performed the trial for about 2 weeks in 2 phases. 10. Closing 8/6/2009 Bandung 7/31/2009 Bandung This activity was also viewed as the formal project closing of this research project. 4.2 Exchange Activities Exchange Activities in Tokyo - Japan From March 4, 2009 until March 13, 2009, 6 (six) Indonesian researchers have visited Tokyo do exchange activity for this APT project. This activity was hosted by The University of Electro-Communications (UEC) and by National Institute of Communication Technology (NICT). The summary of this exchange activities are as follow: - In the UEC Japan o Discuss about system design with Prof. Toshizumi Ohta. He gave input the implementation of system, specific for applications deployed in the network, that those should have great impact especially for the disaster's victim. o Met with president of UEC, Prof. Mako Kajitani, report the project activity. o Finalizing the document design of the system. - Study visit/consultation During exchange activities in Japan, the team member had visited some institutions for gathering information and discussion regarding similar implementation of the system, be implemented in disaster area. Those institutions are: o Keio University, on March 10, In this meeting team discussed the concept of the system regarding implementation similar system in Japan.

10 Team from Keio University presented their projects about School on Internet (SOI) Asia project, Widely Integrated Distributed Environment (WIDE) project and LifeLine Station project. The last one is similar project with EBAN but it differed in the communication and platform technology. o Japan Aerospace Exploration Agency (JAXA), on March 11, In this meeting team discussed the concept of the system spesific for satelite communication. Mr. Higuchi from JAXA presented his projects about Wideband InterNetworking engineering test and Demonstration Satellite (WINDS) project and Sentinel Asia project. The team got a lot of information regarding the satellite communication system in Japan and planned use the knowledge as reference develop EBAN system using LAPS Exchange Activity in Indonesia Exchange activity for this APT project was held in Indonesia and hosted by TELKOM-RDC on June 21 25, Some activities that is done during the visit: a. Installation and Field Trial On May, team installed all system at Sulaeman Airport and after that continues with the trial. In phase 2 of the trial, Japanese researchers (Prof. Ohta, DR. Suwa, Mr. Andri and Mr. Agung) were involved in this activity. They collaborated with Indonesian researchers do the measurement and arranged the point of interest. b. Meeting and Presentation Prof. Ohta gave a general presentation about next generation of socio informatics in front of project team member and also management in TELKOM-RDC. In the presentation he mentioned that the project will contribute a lot in the development of next generation socio informatics, especially in disaster area. 4.3 Project Member Substitution To comply with time arrangement for implementing the system and also considering the environment needed do the trial, team agreed change the location of the implementation small airport near Bandung city. Because the system need be lifted up the air up 500m height, team needs find the environment that is wide open and also the permission from local authority launch something theair. Other adjustment is for team member. Team change 2 members of the project and add 1 new member. We change from DR. Iskandar Mr. Heroe Wijan because DR. Iskandar is not available joint with the project. For Mr. Mikio Suzuki, team substitute him with DR. Ken Umeno, because Mr. Mikio Suzuki is no longer in NICT. And for additional team member, team add DR. Hirohiko Suwa assist in spesific social IT matter. This is the change resume: Name of Researchers Name of Organizations/Institutions

11 DR. Iskandar (Researcher) Heroe Wijan (Researcher) Lecturer Lecturer Change Institut Teknologi Bandung (ITB), Indonesia Institut Teknologi Telkom (ITT), Indonesia Name of Researchers Mikio Suzuki (Researcher) DR. Ken Umeno (Researcher) Senior researcher Change Senior researcher Name of Organizations/Institutions National Institute of Communications and Informations Technology (NICT), Japan National Institute of Communications and Informations Technology (NICT), Japan And additional team member: Name of Researchers DR. Hirohiko Suwa Research Associate (Researcher) Name of Organizations/Institutions University of Electro- Communication 5. Project Deliverable/Outputs 5.1 EBAN System There are 2 main sub systems that are needed build complete EBAN solution. First is communication platform. This platform consists of two parts, backhaul communication part and access communication part. For both parts, team used wifi technology as the solution, but works in different frequency. For backhaul, the frequency is 5.8 GHz and for access is 2.4 GHz. Second sub system is the balloon platform, which is used as low altitude platform station. To maintain the stability and height of the platform, team used two balloons connected with 2 meters hub and tethered using ropes. Each balloon has diameter about 6 meters, thus both can lift payload up 40 kg 500 m height. This solution is ideal considering the coverage up 24 km diameter, which is large enough covers the communication system with broadband capability. 5.2 Enhancement of HRM Competency All researchers involved in this project have obtained some advantages improve their technical capabilities and project experiences, especially in scope of low altitude platform station. And also the team got the experience on how deal with people, especially whom are not related IT in their daily activities. 6. Field Trial

12 In order examine the EBAN system and get some data from the measurement, team performed the field trial of the system. The project trial is done in Sulaeman Airport, which is one non-operational airport in Bandung, operates by Indonesian air force. After completion the project, all team members consider continue the research of the system, enhance the capability and stability. 6.1 Objectives The main objectives of the project trial are: Examining the performance of EBAN system. Performing system testing, including functional tests, response time and stability of the EBAN system. Doing measurement get the data of stability, performance, duty cycle and other related facrs. 6.2 Schedule of the EBAN Trial The EBAN system project trial was held on May 15 June 30, The trial is divide in two phases, 1 week on May and other on June. During the trial all team members performed functional and stability test make sure that EBAN system is ready act as a communication platform. To get some data, team using measurement device capture the traffic that flow from user device access point in balloon platform. In second phase of the trial, Japanese team jointed do measurement and also gave the suggestions get more accurate data. 6.3 Place of Trial Place of trial is mainly in Bandung, in Sulaeman Airport. Sulaeman airport is one of airports in Bandung, operates by Indonesian air force. This airport is not use as a commercial airport, because the location is near the public s house. Regularly, the airport is used as a landing area for parachute trainee. 6.4 System Configuration of the Trial Based on the original system configuration, we modified a little bit, so the connection from satellite goes direct the internet, where the measurement was done by accessing the content from internet.

13 Internet 6.5 Trial Analysis Summary Based on the trial, the summary analysis of the system is as follow: Assumptions: - Antenna model: ITU envelope model for Patch Antenna with max gain of 6 dbi. - Transmit level of 26 dbm. Using those assumptions, team summarize the result as follows PDF of EBAN attitude

14 Plot of received signal level prediction

15 PDF of received signal level prediction CDF of received signal level prediction

16 Coverage of EBAN System The detail analysis can be read in the separate document, attach in Annex-2 Document Analysis of EBAN. 7. Impacts of the EBAN Project Some advantages of the EBAN system are: For team member: Some advantages for the team are: a. Having a simple, easy, fast deployment, and in-expensive communication system for emergency/disaster area with broadband capability, provides video, voice and data communications. b. Using general CPE with wifi capability connect the system. But there is a repeater needed strengthen the signal. c. New experience for the team research new communication platform that can be implemented in the air using low altitude platform station. d. With the system, there is wide-open possibility for others create service and content, specific for disaster area.

17 For Non-Government Organization Some advantages for NGO are: a. The system will be part of the bigger system as a solution for disaster area, especially for broadband implementation. b. To show the government of Indonesia, that there is new platform, which is low altitude platform station, that can carry communication system in the air serve for restricted area. c. The system is stable enough as a data carrier, thus many application can be served include video and real time communication. 8. Project Sustainability In order ensure the continuity of the project, all team members have considered continuing the research of EBAN system. Some efforts ensure the sustainability of the implementation of EBAN system are: Improvement of the EBAN system based on the trial measurement; such as enhance the stability of the platform, improvement of the antenna and securing the communication part avoid fraud. Implement application that is needed most for disaster victims, for example victim management, video streaming application and voice over IP. These applications should be light and very easy use. In addition, the EBAN system is very needed as a completion part of disaster management system ensure that communication part can be implemented very easy and fast. So the sustainability of the implementation of the system based on the market need is very promising. 9. Lesson Learned Some lessons learned from this project are as follow: a. The implementation of IT is very important for human being, not only for people live in the city, but also in the disaster area. And we realized that the distribution of IT knowledge is not equal in every area. Because of that, IT related project should be developed gradually in more areas. b. Collaboration among researchers from some different locations can be effectively accomplished electronically via both Internet and telecommunication facilities. c. Intensive coordination between team members, non-government organization and also people is very needed make sure that the implementation of the system is running well. d. The problems/limitations of this limited EBAN trial may be in the area of: o Stability of the balloon platform for a specific height, where there is strong wind can happen anytime.

18 o Client CPE for wifi. Because for long-range distance, regular CPE can not be used, because of signal strength can not reach the station. o Security of the system during internal communication, where there can be fraud during the connection. o Lack of team s knowledge about low altitude platform station technology, especially this is the first trial for that. 10. Future Plan a. All team members consider do further research regarding low altitude platform station and communication system, that can give more stable solution from interruption of wind, whether and flying living (bug, bird). b. In future implementation team agree collaborate with non-government organization that has task as a disaster work force. In this collaboration, EBAN system will be used as a main solution solve communication problem between center of coordination and team in the field. c. This model of low altitude platform station is the first research in this area, thus team consider publish the result in the national and international forum, get the input enhance the system and also get opportunity for wide implementation. 11. Annexes a. Annex-1: Document Requirement of EBAN b. Annex-2: Document Analysis of EBAN c. Annex-3: Pho Documentations

19 Final Report EBAN Project Annex-1 Document Requirement of EBAN TELKOM-RDC 19

20 Final Report EBAN Project Annex-2 Document Analysis of EBAN TELKOM-RDC 35

21 Final Report EBAN Project Annex-3 Pho Documentations TELKOM-RDC 70

第 XVII 部 災害時における情報通信基盤の開発

第 XVII 部 災害時における情報通信基盤の開発 XVII W I D E P R O J E C T 17 1 LifeLine Station (LLS) WG LifeLine Station (LLS) WG was launched in 2008 aiming for designing and developing an architecture of an information package for post-disaster

More information

Riza Muhida. Presented at he 22nd Session of the Asia Pacific Regional Space Agency Forum (APRSAF 22), Bali, Indonesia, December 1 4, 2015

Riza Muhida. Presented at he 22nd Session of the Asia Pacific Regional Space Agency Forum (APRSAF 22), Bali, Indonesia, December 1 4, 2015 Riza Muhida Presented at he 22nd Session of the Asia Pacific Regional Space Agency Forum (APRSAF 22), Bali, Indonesia, December 1 4, 2015 1 Presentation Outline Abstract Background Objective Project Scope

More information

Result Report on MDRU Joint Project. March, 2016

Result Report on MDRU Joint Project. March, 2016 Result Report on MDRU Joint Project March, 2016 Contents 1 1.MDRU Overview 2 2.Joint Project Background 3 3.Joint Project Overview 4 4.Feasibility Study Activities 6 5.Conclusion 15 1. MDRU Overview 2

More information

APT RECOMMENDATION USE OF THE BAND MHZ FOR PUBLIC PROTECTION AND DISASTER RELIEF (PPDR) APPLICATIONS

APT RECOMMENDATION USE OF THE BAND MHZ FOR PUBLIC PROTECTION AND DISASTER RELIEF (PPDR) APPLICATIONS APT RECOMMENDATION on USE OF THE BAND 4940-4990 MHZ FOR PUBLIC PROTECTION AND DISASTER RELIEF (PPDR) APPLICATIONS No. APT/AWF/REC-01(Rev.1) Edition: September 2006 Approved By The 31 st Session of the

More information

R&D PROGRAMME FOR EXCHANGE OF ICT RESEARCHERS & ENGINEERS

R&D PROGRAMME FOR EXCHANGE OF ICT RESEARCHERS & ENGINEERS R&D PROGRAMME FOR EXCHANGE OF ICT RESEARCHERS & ENGINEERS FINAL PROJECT REPORT Research on IGOS Linux Voice Command in Bahasa Indonesia to Aid People with Different Abilities and Illiteracy REPORTED BY

More information

HIGH ALTITUDE PLATFORM STATIONS FOR AUSTRALIA

HIGH ALTITUDE PLATFORM STATIONS FOR AUSTRALIA WIRELESS BROADBAND HIGH ALTITUDE PLATFORM STATIONS FOR AUSTRALIA Les Davey, Sky Station, Australia Richard (Dick) Butler, Sky Station, Australia Richard Buchanan, Vice President Systems Integration, StratoComm

More information

1. Detect and locate potentially illegal fishing ship using satellite image, AIS data, and external sources.

1. Detect and locate potentially illegal fishing ship using satellite image, AIS data, and external sources. Title: Development of Microsatellite to Detect Illegal Fishing MS-SAT Primary Point of Contact (POC) & email: Dr. Ridanto Eko Poetro; ridanto@ae.itb.ac.id Co-authors: Ernest Sebastian C., Bintang A.S.W.A.M.

More information

IPSTAR Disaster Recovery and Emergency Communications

IPSTAR Disaster Recovery and Emergency Communications IPSTAR Disaster Recovery and Emergency Communications March 2009 COPYRIGHT THAICOM PLC 2009 PROPRIETARY Content Introduction 3 Advantages 4 Applications 5 Equipment 6-7 IPSTAR Enterprise Series IPSTAR

More information

Evaluating IEEE Broadband Wireless as a Communications. Activities. Award #2006-IJ-CX-K035

Evaluating IEEE Broadband Wireless as a Communications. Activities. Award #2006-IJ-CX-K035 This project was supported by Grant No. 2006-IJ-CX-K035 awarded d by the National Institute t of Justice, Office of Justice Programs, US Department of Justice. Points of view in this document are those

More information

Sharing scenarios of 5G (IMT-2020) networks with the incumbent and future satellite communication systems

Sharing scenarios of 5G (IMT-2020) networks with the incumbent and future satellite communication systems Sharing scenarios of 5G (IMT-2020) networks with the incumbent and future satellite communication systems AGENDA Past and Present: IMT VS. FSST AGENDA 5GT Satellite Communications Future: IMT AND FSST

More information

High Altitude Communications Platforms

High Altitude Communications Platforms High Altitude Communications Platforms - new Opportunities in Air Space Management Alan C Smith ATN2004 - The ATC Data Link Conference at the Institution of Electrical Engineers, London 15th September,

More information

GVF Response to the public Consultation Process Published by ICASA:

GVF Response to the public Consultation Process Published by ICASA: GVF Response to the public Consultation Process Published by ICASA: Draft Frequency Migration Regulation And Frequency Migration Plan GG 35598 (vol 566) 17 August 2012 (ICASA notice 606) Introduction The

More information

BRI R&D Initiative on Housing Safety to Mitigate Earthquake Disasters in Collaboration with Research Institutes

BRI R&D Initiative on Housing Safety to Mitigate Earthquake Disasters in Collaboration with Research Institutes BRI R&D Initiative on Housing Safety to Mitigate Earthquake Disasters in Collaboration with Research Institutes Expert meeting for the Anti-seismic Building Code Dissemination Project (ABCD) for the Housing

More information

IEEE PROPOSED AMENDMENTS TO WORKING DOCUMENT TOWARDS PRELIMINARY DRAFT NEW RECOMMENDATION ITU-R F.[9B/BWA]

IEEE PROPOSED AMENDMENTS TO WORKING DOCUMENT TOWARDS PRELIMINARY DRAFT NEW RECOMMENDATION ITU-R F.[9B/BWA] Approved by the IEEE 802.16 WG (2004-07-15) and the IEEE 802 Executive Committee (2004-07-16). 2004-07-15 IEEE L802.16-04/25 INTERNATIONAL TELECOMMUNICATION UNION RADIOCOMMUNICATION STUDY GROUPS Document

More information

Asia Disaster Reduction Science and Technology Forum on December 4, 2006 BPPT Building II, Jakarta, Indonesia. Tatsuo Narafu

Asia Disaster Reduction Science and Technology Forum on December 4, 2006 BPPT Building II, Jakarta, Indonesia. Tatsuo Narafu Outline of Collaborative R&D Project on Network of Research Institutes in Earthquake Prone Areas in Asia supported by Ministry of Education, Culture, Sports, Science and Technology (MEXT) Asia Disaster

More information

In this unit we are going to speak about satellite communications. Satellites are useful for connecting to remote areas, or when you want to

In this unit we are going to speak about satellite communications. Satellites are useful for connecting to remote areas, or when you want to In this unit we are going to speak about satellite communications. Satellites are useful for connecting to remote areas, or when you want to broadcast video or data with minimal infrastructure. A communications

More information

Space Japan Club. Mr. Masaaki Shimada Senior Engineer, Aerospace Research and Development Directorate Japan Aerospace Exploration Agency

Space Japan Club. Mr. Masaaki Shimada Senior Engineer, Aerospace Research and Development Directorate Japan Aerospace Exploration Agency Space Japan Club -Record of the man who sweated for satellite communications- Mr. Masaaki Shimada Senior Engineer, Aerospace Research and Development Directorate Japan Aerospace Exploration Agency Mr.

More information

Flying Internet for the Unwired:

Flying Internet for the Unwired: Flying Internet for the Unwired: How to implement sky-streaming internet in the developing world Seongcheol Kim (Korea University) Jieun Park (Seoul Digital Foundation) Introduction Connectivity is now

More information

Overview of Utilization of WINDS

Overview of Utilization of WINDS Overview of Utilization of WINDS 2nd Joint Project Team Meeting for Sentinel Asia STEP3 Yangon, Myanmar Sachiko Hozawa Space Application and Promotion Center (SAPC) Japan Aerospace Exploration Agency (JAXA)

More information

SOLUTIONS Paper Wi4 Fixed: Point-to-Point Wireless Broadband Solutions. Point-to-Point Connectivity in the 4.9 GHz Public Safety Band

SOLUTIONS Paper Wi4 Fixed: Point-to-Point Wireless Broadband Solutions. Point-to-Point Connectivity in the 4.9 GHz Public Safety Band SOLUTIONS Paper Wi4 Fixed: Point-to-Point Wireless Broadband Solutions Point-to-Point Connectivity in the 4.9 GHz Public Safety Band Contents pg Section 3 FCC and the Public Safety RF Band 3 Qualified

More information

Institute of Electrical and Electronics Engineers (IEEE) PROPOSED AMENDMENTS TO ANNEX 15 TO DOCUMENT 8A/202

Institute of Electrical and Electronics Engineers (IEEE) PROPOSED AMENDMENTS TO ANNEX 15 TO DOCUMENT 8A/202 2005-07-20 IEEE L802.16-05/043r1 INTERNATIONAL TELECOMMUNICATION UNION RADIOCOMMUNICATION STUDY GROUPS *** DRAFT *** Document 12 July 2005 English only Source: Annex 15 to Document 8A/202 Question: 212/8

More information

Future IMT Bands: WRC-15 & C-band Satellite Solutions for the Caribbean. David Hartshorn Secretary General GVF

Future IMT Bands: WRC-15 & C-band Satellite Solutions for the Caribbean. David Hartshorn Secretary General GVF Future IMT Bands: WRC-15 & C-band Satellite Solutions for the Caribbean David Hartshorn Secretary General GVF C-Band Satellites in Service Global Distribution of 36 MHz Transponder-Equivalents (TPE) per

More information

Satisfying growth demands for maritime communications. Michael Carter, Sales Director Network & Data Services

Satisfying growth demands for maritime communications. Michael Carter, Sales Director Network & Data Services Satisfying growth demands for maritime communications Michael Carter, Sales Director Network & Data Services Overview 1. 2. Key drivers for maritime growth 3. Why Ka band? 4. satellite & coverage Planned

More information

W-Band Satellite Transmission in the WAVE Mission

W-Band Satellite Transmission in the WAVE Mission W-Band Satellite Transmission in the WAVE Mission A. Jebril, M. Lucente, M. Ruggieri, T. Rossi University of Rome-Tor Vergata, Dept. of Electronic Engineering, Via del Politecnico 1, 00133 Rome - Italy

More information

IEEE Broadband Wireless Access Working Group <

IEEE Broadband Wireless Access Working Group < Project Title Date Submitted IEEE 802.16 Broadband Wireless Access Working Group Proposed IEEE Contribution to ITU-R on Detailed specifications of the radio interfaces for fixed

More information

Applications Scenario and Evolution

Applications Scenario and Evolution Applications Scenario and Evolution Michele Morganti Siemens ITU Workshop Tomorrow s Network Today Saint-Vincent 7-8 October 2005 Exceeding Nomadic Customers expectations W-LAN like access: + Anywhere

More information

Awarded the special prize of broadcasting technology of the 40th Hoso Bunka Foundation Award

Awarded the special prize of broadcasting technology of the 40th Hoso Bunka Foundation Award October 2014 Awarded the special prize of broadcasting technology of the 40th Hoso Bunka Foundation Award Presentation ceremony of the 40th Hoso Bunka Foundation (HBF* ) Award was held in Tokyo on 25 June

More information

Presented at The 1st Space Exploration and Kibo Utilization for Asia Workshop Thursday, 28 May 2015, LAPAN Headquarters, Jakarta, Indonesia 1

Presented at The 1st Space Exploration and Kibo Utilization for Asia Workshop Thursday, 28 May 2015, LAPAN Headquarters, Jakarta, Indonesia 1 Riza Muhida Presented at The 1st Space Exploration and Kibo Utilization for Asia Workshop Thursday, 28 May 2015, LAPAN Headquarters, Jakarta, Indonesia 1 Presentation Outline Abstract Background Objective

More information

CEPT has conducted a number of studies and has produced a number of deliverables related to the use of MFCN in the 1400 MHz band, as listed below.

CEPT has conducted a number of studies and has produced a number of deliverables related to the use of MFCN in the 1400 MHz band, as listed below. ESOA response to the OFCOM consultation document: Invitation to tender for frequency blocks for the national provision of mobile telecommunications services in Switzerland 6 April 2018 1. Introduction

More information

EARS February 10, 2011 Rick Miller - AI1V Loudoun Amateur Radio Group

EARS February 10, 2011 Rick Miller - AI1V Loudoun Amateur Radio Group EARS February 10, 2011 Rick Miller - AI1V Loudoun Amateur Radio Group Introduction about LARG Why do balloon operations? Elements of a successful mission Flight Package Components Launch Planning and Operations

More information

Introduction to Wireless Networking CS 490WN/ECE 401WN Winter 2007

Introduction to Wireless Networking CS 490WN/ECE 401WN Winter 2007 Introduction to Wireless Networking CS 490WN/ECE 401WN Winter 2007 Lecture 9: WiMax and IEEE 802.16 Chapter 11 Cordless Systems and Wireless Local Loop I. Cordless Systems (Section 11.1) This section of

More information

Annex 1. Interim Report By Study Group for Wireless Broadband Promotion. <Outline> April Study Group for Wireless Broadband Promotion

Annex 1. Interim Report By Study Group for Wireless Broadband Promotion. <Outline> April Study Group for Wireless Broadband Promotion Annex 1 Interim Report By Study Group Wireless Broadb Promotion April 2005 Study Group Wireless Broadb Promotion Milestones Milestones radio radio spectrum spectrum reallocation reallocation

More information

Public Education and Outreach for Supporting Nuclear Program in Indonesia

Public Education and Outreach for Supporting Nuclear Program in Indonesia Public Education and Outreach for Supporting Nuclear Program in Indonesia S. Ariyanto 1, D. Irawan 2, T.E. Wijayanti 2 1) Center for Education and Training, National Nuclear Energy Agency of Indonesia

More information

Development of Microsatellite to Detect Illegal Fishing MS-SAT

Development of Microsatellite to Detect Illegal Fishing MS-SAT Development of Microsatellite to Detect Illegal Fishing MS-SAT Ernest S. C. P. Bintang A.S.W.A.M. Department of Aerospace Engineering Faculty of Mechanical and Aerospace Engineering Institut Teknologi

More information

Mario Maniewicz Deputy-Director, Radiocommunication Bureau Commonwealth Spectrum Management Forum London, October 2017

Mario Maniewicz Deputy-Director, Radiocommunication Bureau Commonwealth Spectrum Management Forum London, October 2017 ITU-R studies in support of the Internet of Things Mario Maniewicz Deputy-Director, Radiocommunication Bureau Commonwealth Spectrum Management Forum London, October 2017 1 Internet of Things (IoT, MTC,

More information

Wireless Networking: Trends and Issues

Wireless Networking: Trends and Issues Wireless Networking: Trends and Issues Raj Jain Washington University in Saint Louis Saint Louis, MO 63130 Jain@cse.wustl.edu A talk given in CS 131: Computer Science I Class October 10, 2008 These slides

More information

Modelling and Performances Analysis of WiMAX/IEEE Wireless MAN OFDM Physical Downlink

Modelling and Performances Analysis of WiMAX/IEEE Wireless MAN OFDM Physical Downlink Modelling and Performances Analysis of WiMAX/IEEE 802.16 Wireless MAN OFDM Physical Downlink Fareda Ali Elmaryami M. Sc Student, Zawia University, Faculty of Engineering/ EE Department, Zawia, Libya, Faredaali905@yahoo.com

More information

AGENDA ITEMS UNDER PREPARATION BY SOUTH AFRICA FOR THE WORLD RADIOCOMMUNICATION CONFERENCE 2012 June 2009

AGENDA ITEMS UNDER PREPARATION BY SOUTH AFRICA FOR THE WORLD RADIOCOMMUNICATION CONFERENCE 2012 June 2009 AGENDA ITEMS UNDER PREPARATION BY SOUTH AFRICA FOR THE WORLD RADIOCOMMUNICATION CONFERENCE 2012 June 2009 Agenda Item 1.2 (Enhancing the international regulatory framework) CPM CHAPTER 6 FUTURE WORK PROGRAMME

More information

Japan s Radio Policies Towards 5G

Japan s Radio Policies Towards 5G Japan s Radio Policies Towards 5G November 9, 2016 New-Generation Mobile Communications Office Land Mobile Communications Division Radio Department, Telecommunications Bureau Ministry of Internal Affairs

More information

Maksat Coral Wireless Broadband Solutions

Maksat Coral Wireless Broadband Solutions Maksat Coral Wireless Broadband Solutions Company Profile A Broadband Wireless Equipment company with robust, cost effective and scalable solutions for carrier class networks. Over 7 yrs of intensive research

More information

Derivation of Power Flux Density Spectrum Usage Rights

Derivation of Power Flux Density Spectrum Usage Rights DDR PFD SURs 1 DIGITAL DIVIDEND REVIEW Derivation of Power Flux Density Spectrum Usage Rights Transfinite Systems Ltd May 2008 DDR PFD SURs 2 Document History Produced by: John Pahl Transfinite Systems

More information

Asia Broadband Program (Unofficial Translation)

Asia Broadband Program (Unofficial Translation) Asia Broadband Program (Unofficial Translation) March 28, 2003 Ministry of Public Management, Home Affairs, Posts and Telecommunications Fair Trade Commission Ministry of Justice Ministry of Foreign Affairs

More information

Second APEC Ministers' Conference on Regional Science & Technology Cooperation (Seoul, Korea, Nov 13-14, 1996) JOINT COMMUNIQUÉ

Second APEC Ministers' Conference on Regional Science & Technology Cooperation (Seoul, Korea, Nov 13-14, 1996) JOINT COMMUNIQUÉ Second APEC Ministers' Conference on Regional Science & Technology Cooperation (Seoul, Korea, Nov 13-14, 1996) JOINT COMMUNIQUÉ 1. Ministers responsible for science and technology from Australia, Brunei

More information

General Assembly. United Nations A/AC.105/C.1/L.335/Add.4. Draft report

General Assembly. United Nations A/AC.105/C.1/L.335/Add.4. Draft report United Nations General Assembly Distr.: Limited 20 February 2014 Original: English Committee on the Peaceful Uses of Outer Space Scientific and Technical Subcommittee Fifty-first session Vienna, 10-21

More information

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Group RSPG Secretariat Brussels, 24 February

More information

National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology

National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology QuikSCAT Mission Status QuikSCAT Follow-on Mission 2 QuikSCAT instrument and spacecraft are healthy, but aging June 19, 2009 will be the 10 year launch anniversary We ve had two significant anomalies during

More information

ECC Report 276. Thresholds for the coordination of CDMA and LTE broadband systems in the 400 MHz band

ECC Report 276. Thresholds for the coordination of CDMA and LTE broadband systems in the 400 MHz band ECC Report 276 Thresholds for the coordination of CDMA and LTE broadband systems in the 400 MHz band 27 April 2018 ECC REPORT 276 - Page 2 0 EXECUTIVE SUMMARY This Report provides technical background

More information

Spectrum License Selection of 2.5-GHz Wireless Broadband Access in Japan

Spectrum License Selection of 2.5-GHz Wireless Broadband Access in Japan Spectrum License Selection of 2.5-GHz Wireless Broadband Access in Japan Yoshihisa Matsumoto Ph.D. Candidate, Ph.D. Program in Informatics School of Multidisciplinary Sciences The Graduate University for

More information

We're on your wavelength. emgw Solutions. Enabling Operators to Provide Cost Effective Voice Services to Sparsely Populated Rural Areas.

We're on your wavelength. emgw Solutions. Enabling Operators to Provide Cost Effective Voice Services to Sparsely Populated Rural Areas. emgw Solutions Enabling Operators to Provide Cost Effective Voice Services to Sparsely Populated Rural Areas White paper Introduction A growing number of operators, mainly those focusing on service provision

More information

Helikite Presentation. March 2018 Copyright 2018 BAL Consulting. All rights reserved.

Helikite Presentation. March 2018 Copyright 2018 BAL Consulting. All rights reserved. Helikite Presentation March 2018 Copyright 2018 BAL Consulting. All rights reserved. Helikite as an ultra low cost coverage solution Height meters Line of Sight Radius km Coverage km 2 Comment total cost

More information

Ground Systems for Small Sats: Simple, Fast, Inexpensive

Ground Systems for Small Sats: Simple, Fast, Inexpensive Ground Systems for Small Sats: Simple, Fast, Inexpensive but Effective 15 th Ground Systems Architecture Workshop March 1, 2011 Mr Andrew Kwas, Mr Greg Shreve, Northrop Grumman Corp, Mr Adam Yozwiak, Cornell

More information

Contents of Presentation

Contents of Presentation Outline of Collaborative R&D Project on Network of Research Institutes in Earthquake Prone Areas in Asia supported by Ministry of Education, Culture, Sports, Science and Technology (MEXT) Tokyo International

More information

MEO Satellite Applications to Support Mobility

MEO Satellite Applications to Support Mobility MEO Satellite Applications to Support Mobility Colloquium on Satellite Services for Global Mobility 14 October, 2013 David Burr, Director, Product Development O3b A revolutionary solution O3b Networks

More information

Satisfying growth demands for offshore communications

Satisfying growth demands for offshore communications Satisfying growth demands for offshore communications Michael Carter, Sales Director Network and Data Services GVF Oil & Gas Communications Europe 2014, Aberdeen Overview 1. Who we are 2. Key drivers for

More information

Japanese concept of microwave-type SSPS

Japanese concept of microwave-type SSPS Japanese concept of microwave-type SSPS S. Sasaki *1,2, K.Tanaka *1, and JAXA Advanced Mission Research Group *2 The Institute of Space and Astronautical Science(ISAS) *1 Aerospace Research and Development

More information

4G system for internet access in coastal areas

4G system for internet access in coastal areas 4G system for internet access in coastal areas System Presentation The purpose of NeptuLink by MVG is to satisfy the broadband IP communication needs of users on board ships and various vessels in coastal

More information

Results of Public Comments on Final Report from Study Group for Wireless Broadband Promotion and Release of Final Report

Results of Public Comments on Final Report from Study Group for Wireless Broadband Promotion and Release of Final Report 8 Please feel free to use the articles in this publication, with proper credits. Results of Public Comments on Final Report from Study Group for Wireless Broadband Promotion and Release of Final Report

More information

Review of Path Loss models in different environments

Review of Path Loss models in different environments Review of Path Loss models in different environments Mandeep Kaur 1, Deepak Sharma 2 1 Computer Scinece, Kurukshetra Institute of Technology and Management, Kurukshetra 2 H.O.D. of CSE Deptt. Abstract

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) COMMENTS OF REDLINE COMMUNICATIONS INC.

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) COMMENTS OF REDLINE COMMUNICATIONS INC. Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the Matter of Amendment of the Commission's Rules with Regard to Commercial Operations in the 3550-3650 MHz Band GN Docket No. 12-354

More information

Policing in the 21 st Century. Response from the Royal Academy of Engineering to the Home Affairs Select Committee

Policing in the 21 st Century. Response from the Royal Academy of Engineering to the Home Affairs Select Committee Policing in the 21 st Century Response from the Royal Academy of Engineering to the Home Affairs Select Committee February 2008 Introduction The Royal Academy of Engineering is pleased to contribute to

More information

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) Page 1 Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) ECC RECOMMENDATION (06)04 USE OF THE BAND 5 725-5 875 MHz FOR BROADBAND

More information

TDD and FDD Wireless Access Systems

TDD and FDD Wireless Access Systems WHITE PAPER WHITE PAPER Coexistence of TDD and FDD Wireless Access Systems In the 3.5GHz Band We Make WiMAX Easy TDD and FDD Wireless Access Systems Coexistence of TDD and FDD Wireless Access Systems In

More information

Philippines Typhoon Haiyan ETC Situation Report #22 Reporting period 11/12/13 to 17/12/13

Philippines Typhoon Haiyan ETC Situation Report #22 Reporting period 11/12/13 to 17/12/13 Philippines Typhoon Haiyan ETC Situation Report #22 Reporting period 11/12/13 to 17/12/13 Author: Adam Ashcroft, WFP Highlights Over 3,700 humanitarian workers have registered to use ETC internet services

More information

SOME ASPECT AND PERSPECTIVES OF IMPLEMENTATION OF THE NATIONAL POLICY IN THE FIELD OF EXPLORATION AND PEACEFUL USES OF OUTER SPACE

SOME ASPECT AND PERSPECTIVES OF IMPLEMENTATION OF THE NATIONAL POLICY IN THE FIELD OF EXPLORATION AND PEACEFUL USES OF OUTER SPACE SOME ASPECT AND PERSPECTIVES OF IMPLEMENTATION OF THE NATIONAL POLICY IN THE FIELD OF EXPLORATION AND PEACEFUL USES OF OUTER SPACE 1 Folie 1 NKS Raumfahrt, Dr. Adrian klein Background National Academy

More information

IEEE Broadband Wireless Access Working Group < Working Group Review of Working Document IEEE 802.

IEEE Broadband Wireless Access Working Group <  Working Group Review of Working Document IEEE 802. Project Title Date Submitted IEEE 802.16 Broadband Wireless Access Working Group Specification of operational environments for non-exclusively assigned and licensed bands 2006-09-25

More information

Volume 2 - Telesat's Solution Ka-band Application APPENDIX 4. Corporate Profiles of COM DEV and EMS Technologies

Volume 2 - Telesat's Solution Ka-band Application APPENDIX 4. Corporate Profiles of COM DEV and EMS Technologies Volume 2 - Telesat's Solution Ka-band Application APPENDIX 4 Corporate Profiles of COM DEV and EMS Technologies The Deployment of DVB-RCS in Canada In Support of Ka-band based Internet Access Introduction

More information

ATDI Software Use for Space Services Yerevan, 15 December 2017

ATDI Software Use for Space Services Yerevan, 15 December 2017 ATDI Software Use for Space Services Yerevan, 15 December 2017 AGENDA ABOUT US AGENDA ICS TELECOM EV - GENERALT USE OF ICS TELECOM EV FOR SPACE SERVICEST USE CASE: IMT AND FSST Company Overview ATDI is

More information

Millimetre-wave wireless backhaul in 5G networks. Mike Geen Head of Engineering Filtronic Broadband

Millimetre-wave wireless backhaul in 5G networks. Mike Geen Head of Engineering Filtronic Broadband Millimetre-wave wireless backhaul in 5G networks Mike Geen Head of Engineering Filtronic Broadband About Filtronic Filtronic was established 1977 currently ~120 employees across multiple sites in UK, US,

More information

Huawei WLAN Indoor/Rail Transportation APs Antenna Datasheet

Huawei WLAN Indoor/Rail Transportation APs Antenna Datasheet Huawei WLAN Indoor/Rail Transportation APs Antenna Datasheet Antenna Datasheet 01 Contents 1 Antenna Description...04 2 Selection Policy...04 3 Antennas for Indoor Distributed APs...07 3.1 2.4 GHz Single-Polarized

More information

RF exposure impact on 5G rollout A technical overview

RF exposure impact on 5G rollout A technical overview RF exposure impact on 5G rollout A technical overview ITU Workshop on 5G, EMF & Health Warsaw, Poland, 5 December 2017 Presentation: Kamil BECHTA, Nokia Mobile Networks 5G RAN Editor: Christophe GRANGEAT,

More information

Country Experience On Satellite Service Regulatory Framework

Country Experience On Satellite Service Regulatory Framework Country Experience On Satellite Service Regulatory Framework MD. GOLAM RAZZAQUE Project Director Bangabandhu Satellite Launching Project Bangladesh Telecommunication Regulatory Commission ITU Satellite

More information

ACHIEVING SPECTRUM HARMONISATION TO DELIVER CONNECTIVITY TO NEXT 1 BILLION Joaquin Restrepo, Chief of Outreach and Publication Services Division, BR/

ACHIEVING SPECTRUM HARMONISATION TO DELIVER CONNECTIVITY TO NEXT 1 BILLION Joaquin Restrepo, Chief of Outreach and Publication Services Division, BR/ ACHIEVING SPECTRUM HARMONISATION TO DELIVER CONNECTIVITY TO NEXT 1 BILLION Joaquin Restrepo, Chief of Outreach and Publication Services Division, BR/ ITU 1 ITU-T Telecommunication standardization - network

More information

Evolving International Regulation on Satellite Services

Evolving International Regulation on Satellite Services Evolving International Regulation on Satellite Services Inter-Agency Meeting on Outer Space Activities 2017 Mitsuhiro Sakamoto Radiocommunication Bureau International Telecommunication Union IMPORTANCE

More information

Chapter 1 INTRODUCTION

Chapter 1 INTRODUCTION Chapter 1 INTRODUCTION 1 The History of Mobile Radio Communication (1/3) 1880: Hertz Initial demonstration of practical radio communication 1897: Marconi Radio transmission to a tugboat over an 18 mi path

More information

Deriving meteorological observations from intercepted Mode-S EHS messages.

Deriving meteorological observations from intercepted Mode-S EHS messages. Deriving meteorological observations from intercepted Mode-S EHS messages. Edmund Keith Stone and Malcolm Kitchen July 28, 2016 Abstract The Met Office has deployed a network of five receivers in the UK

More information

Ad-hoc Mobile Broadband

Ad-hoc Mobile Broadband Ad-hoc Mobile Broadband Application in Emergency Situations EU FP7 Project Report Agenda Deployment of ad-hoc Mobile broadband, in tunnels, mines, destroyed buildings and other crisis-related environments,

More information

Motorola s Wireless Broadband Point-to-Point Solutions. The PTP 100, 400 & 600 Series Part of Motorola s MOTOwi4 portfolio

Motorola s Wireless Broadband Point-to-Point Solutions. The PTP 100, 400 & 600 Series Part of Motorola s MOTOwi4 portfolio Motorola s Wireless Broadband Point-to-Point Solutions The PTP 100, 400 & 600 Series Part of Motorola s MOTOwi4 portfolio High-Speed Point-to-Point Solutions Engineered for Simple-to-Complex Applications

More information

Update of BeiDou Navigation Satellite System

Update of BeiDou Navigation Satellite System Update of BeiDou Navigation Satellite System 01 03 Development Plan 02 Latest Progress Recent Plans 01 03 Development Plan 02 Development Objectives Basic Principles Development Steps Latest Progress System

More information

Motorola Deployable Solutions

Motorola Deployable Solutions Motorola Deployable Solutions Fully integrated site solution on wheels for rapid response to additional capacity, additional coverage, or disaster recovery. Rapid Response Advanced planning, preparation,

More information

GENERAL NOTICES ALGEMENE KENNISGEWINGS

GENERAL NOTICES ALGEMENE KENNISGEWINGS STAATSKOERANT, 23 MAART 2018 No. 41512 1893 GENERAL NOTICES ALGEMENE KENNISGEWINGS INDEPENDENT COMMUNICATIONS AUTHORITY OF SOUTH AFRICA NOTICE 145 OF 2018 IC PURSUANT TO SECTION 4 (1) OF THE ELECTRONIC

More information

Broadband Wireless Access: A Brief Introduction to IEEE and WiMAX

Broadband Wireless Access: A Brief Introduction to IEEE and WiMAX Broadband Wireless Access: A Brief Introduction to IEEE 802.16 and WiMAX Prof. Dave Michelson davem@ece.ubc.ca UBC Radio Science Lab 26 April 2006 1 Introduction The IEEE 802.16/WiMAX standard promises

More information

Japanese Aerospace Industries Requests to the Government

Japanese Aerospace Industries Requests to the Government 航宇工第 20-387 Japanese Aerospace Industries Requests to the Government Yuji Hanawa Engineering Division (Space) The Society of Japanese Aerospace Companies (SJAC) October 6, 2008 2008.10.6 JAXA-MEWS 21 1

More information

Bluetooth BlueTooth - Allows users to make wireless connections between various communication devices such as mobile phones, desktop and notebook comp

Bluetooth BlueTooth - Allows users to make wireless connections between various communication devices such as mobile phones, desktop and notebook comp ECE 271 Week 8 Bluetooth BlueTooth - Allows users to make wireless connections between various communication devices such as mobile phones, desktop and notebook computers - Uses radio transmission - Point-to-multipoint

More information

ITRAINONLINE MMTK OUTDOOR RADIO SIMULATION HANDOUT

ITRAINONLINE MMTK OUTDOOR RADIO SIMULATION HANDOUT ITRAINONLINE MMTK OUTDOOR RADIO SIMULATION HANDOUT Developed by: Alberto Escudero Pascual, IT +46 (Getting started with Radio Mobile ) Table of Contents 1. About this document...1 1.1 Copyright information...1

More information

AIRBORNE IOT NETWORK (AIN) FOR SMART AGRICULTURE AND ENVIRONMENT PROTECTION

AIRBORNE IOT NETWORK (AIN) FOR SMART AGRICULTURE AND ENVIRONMENT PROTECTION AIRBORNE IOT NETWORK (AIN) FOR SMART AGRICULTURE AND ENVIRONMENT PROTECTION Nordin Ramli1, Kentaro Ishizu2, Rosdiadee Nordin3, Nestor Michael C. Tiglao4, Brian Yuliarto5, Fumihide Kojima2, and Hafizal

More information

The Wireless Roadshow. Sebastian Büttrich & Tomas Krag, wire.less.dk

The Wireless Roadshow. Sebastian Büttrich & Tomas Krag, wire.less.dk The Wireless Roadshow Sebastian Büttrich & Tomas Krag, wire.less.dk http://thewirelessroadshow.org thewirelessroadshow@wire.less.dk the wireless roadshow The Wireless Roadshow offers assistance in the

More information

Urban WiMAX response to Ofcom s Spectrum Commons Classes for licence exemption consultation

Urban WiMAX response to Ofcom s Spectrum Commons Classes for licence exemption consultation Urban WiMAX response to Ofcom s Spectrum Commons Classes for licence exemption consultation July 2008 Urban WiMAX welcomes the opportunity to respond to this consultation on Spectrum Commons Classes for

More information

SOLUTIONS Paper Wi4 Fixed: Point-to-Point Wireless Broadband Solutions. Point-to-Point Connectivity in the 4.9 GHz Public Safety Band

SOLUTIONS Paper Wi4 Fixed: Point-to-Point Wireless Broadband Solutions. Point-to-Point Connectivity in the 4.9 GHz Public Safety Band SOLUTIONS Paper Wi4 Fixed: Point-to-Point Wireless Broadband Solutions Point-to-Point Connectivity in the 4.9 GHz Public Safety Band Contents pg Section 3 FCC and the Public Safety RF Band 3 Qualified

More information

Wireless TDMA Mesh Networks

Wireless TDMA Mesh Networks Wireless TDMA Mesh Networks Vinay Ribeiro Department of Computer Science and Engineering IIT Delhi Outline What are mesh networks Applications of wireless mesh Quality-of-service Design and development

More information

The SCHNOOR DMR-System

The SCHNOOR DMR-System The SCHNOOR DMR-System SYSTEM DESCRIPTION SCHNOOR DMR DMR combines the advantages of professional mobile radio with the latest technology Wherever wireless communications with highest reliability and a

More information

2013 RockSat-C Preliminary Design Review

2013 RockSat-C Preliminary Design Review 2013 RockSat-C Preliminary Design Review TEC (The Electronics Club) Eastern Shore Community College Melfa, VA Larry Brantley, Andrew Carlton, Chase Riley, Nygel Meece, Robert Williams Date 10/26/2012 Mission

More information

An insight in the evolution of GEO satellite technologies for broadband services

An insight in the evolution of GEO satellite technologies for broadband services An insight in the evolution of GEO satellite technologies for broadband services EUROPEAN SATELLITE INDUSTRY ROADMAP MARCH 14 TH, BRUSSELS Future broadband technologies 1/2 2 The need for informing the

More information

Characteristics of and protection criteria for systems operating in the mobile service in the frequency range GHz

Characteristics of and protection criteria for systems operating in the mobile service in the frequency range GHz Recommendation ITU-R M.2068-0 (02/2015) Characteristics of and protection criteria for systems operating in the mobile service in the frequency range 14.5-15.35 GHz M Series Mobile, radiodetermination,

More information

Operation and Development of BeiDou Navigation Satellite System

Operation and Development of BeiDou Navigation Satellite System Operation and Development of BeiDou Navigation Satellite System Jing Li IAIN 2015, 20 23 October Prague, Czech Republic 2 01 03 Plan and Policy 02 Status and Near-term Goal International Cooperation 3

More information

Canopy Backhaul Portfolio. Motorola s flexible MOTOwi4 backhaul solutions

Canopy Backhaul Portfolio. Motorola s flexible MOTOwi4 backhaul solutions Canopy Backhaul Portfolio Motorola s flexible MOTOwi4 backhaul solutions MOTOwi4 Backhaul Solutions Engineered for Simple-to-Complex Applications in Challenging Environments With the introduction of its

More information

Cisco IPICS: Comprehensive Emergency Management & Communications Interoperability

Cisco IPICS: Comprehensive Emergency Management & Communications Interoperability Riyadh, Saudi Arabia Country February 5 th, 2013 Cisco IPICS: Comprehensive Emergency Management & Communications Interoperability Hani Khalaf Customer Solutions Manager Physical Safety and Security Solutions

More information

Spectrum Management in Indonesia

Spectrum Management in Indonesia MINISTRY OF COMMUNICATION AND INFORMATION TECHNOLOGY REPUBLIC OF INDONESIA Spectrum Management in Indonesia Fierza Pasaribu, Analyst of Spectrum Planning for Fixed Service Presented in Workshop on Spectrum

More information

Research on the Integration and Verification of Foundational Software and Hardware

Research on the Integration and Verification of Foundational Software and Hardware Research on the Integration and Verification of Foundational Software and Hardware Jing Guo, Lingda Wu, Yashuai Lv, Bo Li, and Ronghuan Yu Abstract Following the high-speed development of information technology,

More information

Enabling ICT for. development

Enabling ICT for. development Enabling ICT for development Interview with Dr M-H Carolyn Nguyen, who explains why governments need to start thinking seriously about how to leverage ICT for their development goals, and why an appropriate

More information