1 STRATFORD MINING COMPLEX Prepared for: Stratford Coal Pty Ltd PO Box 168 Gloucester NSW 2422 SLR Ref: R10 Version No: v1.0

2 PREPARED BY SLR Consulting Australia Pty Ltd ABN Kings Road New Lambton NSW 2305 Australia (PO Box 447 New Lambton NSW 2305 Australia) T: F: E: newcastleau@slrconsulting.com BASIS OF REPORT This report has been prepared by SLR Consulting Australia Pty Ltd with all reasonable skill, care and diligence, and taking account of the timescale and resources allocated to it by agreement with Stratford Coal Pty Ltd (the Client). Information reported herein is based on the interpretation of data collected, which has been accepted in good faith as being accurate and valid. This report is for the exclusive use of the Client. No warranties or guarantees are expressed or should be inferred by any third parties. This report may not be relied upon by other parties without written consent from SLR SLR disclaims any responsibility to the Client and others in respect of any matters outside the agreed scope of the work. DOCUMENT CONTROL Reference Date Prepared Checked Authorised R09-v November2018 Martin Davenport Robert Hall Martin Davenport Page 2

3 CONTENTS 1 INTRODUCTION SMC NOISE CRITERIA Project Approval Schedule 3 Environmental Performance Conditions EPL Noise Limits - SMC Operations Noise Limits at the Nominated Attended Noise Monitoring Locations Assessment of Low-frequency Emissions Rail Noise Goals OPERATIONAL NOISE MONITORING METHODOLOGY General Requirements Operator-attended Noise Monitoring Locations RESULTS Operator-attended Noise Monitoring - SMC Operational Activity Operator-attended Noise Survey Results - Atkins Operator-attended Noise Survey Results - Clarke Operator-attended Noise Survey Results - Hall Operator-attended Noise Survey Results - Lowrey Operator-attended Noise Survey Results - Pryce-Jones Operator-attended Noise Survey Results - Van der Drift Operator-attended Noise Survey Results - RTNM Rail Noise Monitoring PERFORMANCE ASSESSMENT Operations Sleep Disturbance Rail Noise CONCLUSION DOCUMENT REFERENCES TABLES Table 1 Noise Limits for the Nominated Noise Monitoring Locations... 9 Page 3

4 CONTENTS Table 2 ARTC EPL 3142 Noise Objectives Table 3 SMC Operational Noise Monitoring Locations Table 4 SMC RTNM Verification Noise Monitoring Locations Table 5 Rail Noise Monitoring Locations Table 6 Operator-attended Noise Survey Results - Atkins Table 7 Operator-attended Noise Survey Results - Clarke Table 8 Operator-attended Noise Survey Results - Hall Table 9 Attended Noise Survey Results - Lowrey Table 10 Lowrey Night - NPfI Low Frequency Analysis Table 11 Attended Noise Survey Results Pryce Jones Table 12 Attended Noise Survey Results Van der Drift Table 13 Van der Drift Night - NPfI Low Frequency Analysis Table 14 Attended Noise Survey Results RTNM Table 15 Operator-attended Rail Noise Monitoring Results Table 16 Performance Assessment - Operations Table 17 Performance Assessment - Sleep Disturbance FIGURES Figure 1 Attended Noise Monitoring Locations APPENDICES Appendix A Acoustic Terminology Appendix B Operator Attended Noise Survey Charts Page 4

5 1 Introduction Stratford Coal Pty Limited (DCPL), a wholly owned subsidiary of Yancoal Australia Limited (Yancoal), has commissioned SLR Consulting Australia Pty Ltd (SLR) to conduct monthly noise monitoring for the Stratford Mining Complex (SMC) operations guided by the requirements of the (Stratford Extension Project) Noise Management Plan (NMP), Document No. NMP-R01-A, dated March This report presents the results and findings from the operator-attended noise surveys conducted between Monday 24 and Tuesday 25. It is understood that the SMC collectively comprises the Stratford Coal Mine (SCM), the Bowens Road North Open Cut (BRNOC) and the associated coal processing and handling facilities. Run-of-mine (ROM) coal from the Duralie Coal Mine (DCM) is transported by rail to the SMC, where it is processed along with ROM coal from the SCM and BRNOC. SMC coal is then loaded and railed on the North Coast Railway to the port of Newcastle. The objectives of the noise monitoring programme for this operating period were as follows: Conduct three rounds of external operator-attended noise measurements at the six nominated locations, representative of receivers in the area surrounding the SMC. The six nominated external operator-attended noise measurement locations are: Atkins Off Wenhams Cox Road, Stratford Clarke Off Wenhams Cox Road, Stratford Hall Upper Avon Road Lowrey Off Crowthers Road, Stratford Pryce Jones The Bucketts Way, Craven Van der Drift Wood Street. Stratford Noise monitoring will occur for a day, evening and night period. The day, evening and night periods being those defined in the NSW Industrial Noise Policy (EPA 2000). The operator will quantify and characterise the maximum (LAmax) and the intrusive (LAeq and LCeq) noise level contributions from SMC operations over a 15 minute measurement period. In addition, the operator will quantify and characterise the overall levels of ambient noise (i.e. LAmax, LA1, LA10, LA50, LA90, and LAeq) over the 15 minute measurement interval. Assess the noise emissions of SMC and determine compliance with respect to the limits contained in the NMP. In addition to monthly noise monitoring at the nominated residential receivers, the NMP requires quarterly noise monitoring of rail activity and verification monitoring of the Real Time Noise Monitor (RTNM) network. RTNM verification and rail noise monitoring was conducted throughout the quarter ending. The following report uses specialist acoustic terminology. An explanation of common terms is provided in Appendix A. Page 5

6 2 SMC Noise Criteria The figures presented in this Section are extracts from the Stratford Extension Project (SSD-4966) Development Consent dated 29 May Project Approval Schedule 3 Environmental Performance Conditions Page 6

7 Page 7

8 Page 8

9 2.2 EPL Noise Limits - SMC Operations The noise limits specified in EPL 5161 are consistent with the noise criteria specified in SSD Noise Limits at the Nominated Attended Noise Monitoring Locations The site specific noise limits for the six nominated attended noise monitoring locations are summarised in Table 1. Table 1 Noise Limits for the Nominated Noise Monitoring Locations Locality Intrusiveness Criteria LAeq(15minute) Night LA1(1minute) Criterion Day Evening Night Night Atkins Clarke 1, Hall Lowrey Pryce Jones Van der Drift Note 1: Note 2: Owned by Stratford Coal Pty Ltd Criteria adopted from Bagnall as a guide only and are not definitive at this location. Note 3: Land subject to acquisition upon request. 2.4 Assessment of Low-frequency Emissions To address the low-frequency noise assessment issues raised in the 2014 Independent Environmental Audit, as outlined in the VIPAC letter (29N TNT , dated 26 February 2015), the following analysis of the operator-attended monitoring data was proposed: a full L Ceq minus L Aeq spectrum low frequency analysis will be conducted on all noise compliance measurements where the mine noise contribution is deemed to be the dominant noise source. This will be conducted in accordance with the guidance set out in the INP in accordance with the requirements of Development Consent 23-98/99 Schedule 3 Condition 7(a) and Development Consent Schedule 2 Condition 6.4C(a)(i). The low-frequency analysis proposed above shall also serve to meet the Compliance Monitoring requirement of Section 5(d) of Appendix 6 Noise Compliance Assessment of the Stratford Extension Project Development Consent (SSD-4966, dated 29 May 2015), that states: the use of an appropriate modifying factor for low frequency noise to be applied during compliance testing at any individual residence if low frequency noise is present (in accordance with the INP) and before comparison with the specified noise levels in the consent. Low frequency noise is assessed under the NSW Noise Policy for Industry (NPfI) methodology following its introduction in 2017, and replaces the INP methodology. A full LCeq minus LAeq and low frequency 1/3 octave analysis of SMC noise contributions was conducted at the following locations: Lowrey - Night Page 9

10 Van der Drift - Night At all other locations SMC was not audible and/or significantly below the relevant noise criteria and is therefore not addressed further. The results of the operator attended noise measurements presented in Section Rail Noise Goals The NMP has adopted ARTC s EPL 3142 noise goals as criteria for the assessment of SMC rail transport noise. The noise objectives specified in ARTC s EPL 3142 apply at 1 m from the façade of affected residential properties and are provided in Table 2. Table 2 ARTC EPL 3142 Noise Objectives Descriptor Rail Traffic Goal dba Daytime/Evening LAeq(15hour) 65 Night-time LAeq(9hour) 60 Maximum Pass-by LAmax 85 3 Operational Noise Monitoring Methodology 3.1 General Requirements All acoustic instrumentation employed throughout the monitoring programme has been designed to comply with the requirements of AS IEC Electroacoustics Sound level meters Specifications, AS IEC , AS IEC and carried current NATA or manufacturer calibration certificates. Instrument calibration was checked before and after each measurement survey, with the variation in calibrated levels not exceeding ±0.5 dba. All operator-attended noise measurements were conducted using a one-third octave integrating Brüel & Kjær Type 2270 (s/n ) and Svantek SVAN957 (s/n 23815) sound level meters together with a Svantek SV30A acoustical calibrator (s/n 24713). 3.2 Operator-attended Noise Monitoring Locations Noise monitoring was conducted in accordance with the requirements of the NMP. Operator-attended noise measurements were conducted during the day, evening and night-time period for a minimum of 15 minutes per period at each of the six nominated residential noise monitoring locations. The details of the operator-attended SMC operational noise monitoring locations are contained within Table 3 and shown generally in Figure 1. During the operator-attended noise measurements, the character and relative contribution of ambient noise sources and SMC contributions were determined by observations on site. Page 10

11 Table 3 SMC Operational Noise Monitoring Locations Monitoring Location Receiver Type Resident / Owner Monitoring Location - MGA Zone 56 Easting (m) Northing (m) Atkins Residence Atkins Clarke Residence Clarke Hall Residence Hall Lowrey Residence Lowrey Pryce Jones Residence Pryce Jones Van der Drift Residence Van der Drift The objective of the SMC operational operator-attended noise monitoring was to measure the maximum (LAmax) and the LAeq(15minute) noise level contributions at the nearest potentially affected receptors to determine the noise contribution of mining activities associated with SMC operations over a 15 minute measurement period. During the measurement, the operator also quantifies and characterises the overall levels of ambient noise in the area (i.e. LAmax, LA1, LA10, LA90, and LAeq) over the 15 minute measurement interval. Verification noise monitoring as part of the NMP is conducted at RTNM1 and RTNM2. The details of the operator-attended SMC operational noise monitoring locations are contained within Table 4 and shown generally in Figure 1. Table 4 SMC RTNM Verification Noise Monitoring Locations Monitoring Location Receiver Type Representative Receiver Locality Monitoring Location - MGA Zone 56 Easting (m) Northing (m) RTNM1 Real Time Noise Monitoring Location Stratford RTNM2 Real Time Noise Monitoring Location Craven The objective of the RTNM verification monitoring is to inform the continual calibration and validation of the RTNM system. The details of the rail noise monitoring locations are contained within Table 5 and shown generally in Figure 1. Table 5 Rail Noise Monitoring Locations Monitoring Location Receiver Type Representative Receiver Locality Monitoring Location - MGA Zone 56 Easting (m) Northing (m) TN1 Rail Noise Monitoring Location Craven TN2 Rail Noise Monitoring Location Wards River The objective of the rail noise monitoring is to determine rail pass-by noise levels from the Stratford coal export trains. Page 11

12 Figure 1 Attended Noise Monitoring Locations Source: NMP Page 12

13 4 Results 4.1 Operator-attended Noise Monitoring - SMC Operational Activity Operator-attended noise measurements were conducted during a day, evening and night period between Monday 24 and Tuesday 25. Results of the operator-attended noise surveys at residential locations are provided in Sections to A summary of the results for the attended noise monitoring are displayed graphically in Appendix B showing LAmax, LAeq, and LAeq(<1.25kHz) in 1-second intervals throughout the monitoring survey. Ambient noise levels presented include all noise sources such as transport (roads, rail and aircraft), fauna (insects, frogs, birds, and bats), farm animals (cows, bulls), the natural environment (wind, wind in trees), domestic noises, other industrial operations as well as SMC noise emissions. Weather data during the monitoring period has been obtained from the weather station located on the SMC site. The tables provide the following information: Date and start time, operator and equipment details. Monitoring location. Wind velocity (m/s) and temperature (ºC) at the measurement location. Typical maximum (LAmax) and contributed LAeq(15minute) noise levels. Page 13

14 4.1.1 Operator-attended Noise Survey Results - Atkins Results of the operator-attended noise surveys at Atkins are provided in Table 6. Monitoring location Atkins represents residential receptors located to the north of the site. Table 6 Operator-attended Noise Survey Results - Atkins Period Date/Start Time/ Weather Primary Noise Descriptor dba (15 minute) LAmax LA1 LA10 LA90 LAeq LAeq ( 1.25kHz) Description of Noise Emissions and Typical Maximum Noise Levels (dba) Day 25/9/18 08:58: 14 C 2 m/s WSW Evening 24/9/18 20:14 12 C Calm Night 24/9/18 23:39 11 C Calm Site related noise events: SMC: Audible Engine noise LAeq(15minute) contribution 30 dba Aeroplane 50 Local traffic Birdsong 47 Train Site related noise events: SMC: Inaudible Distant traffic Birdsong Dog Site related noise events: SMC: Inaudible Livestock 39 Rod traffic Exhaust cooling click 45 SMC operations were audible only during the day measurement at this location generating an LAeq(15minute) noise contribution of 30 dba. Page 14

15 4.1.2 Operator-attended Noise Survey Results - Clarke Results of the operator-attended noise surveys at Clarke are provided in Table 7. Monitoring location Clarke represents residential receptors located to the east of the site, and is a SMC owned property. The monitoring results at Clarke are used to determine SMC contributions at the Bagnall residence located further to the east. Table 7 Operator-attended Noise Survey Results - Clarke Period Date/Start Time/ Weather Primary Noise Descriptor dba (15 minute) LAmax LA1 LA10 LA90 LAeq LAeq ( 1.25kHz) Description of Noise Emissions and Typical Maximum Noise Levels (dba) Day 24/9/18 12:49 14 C 2 m/s S Evening 1 24/9/18 19:52 12 C 1 m/s S Night 1 25/9/18 00:02 11 C Calm Site related noise events: SMC: Audible Excavator LAeq(15minute) contribution 44 dba Aeroplane 49 Birdsong Site related noise events: SMC: Audible Mechanical plant (intermittently operational) LAeq(15minute) contribution 23 dba Livestock Aeroplane 38 Distant traffic 22 Exhaust cooling Site related noise events: SMC: Audible Dozer Mechanical plant LAeq(15minute) contribution 34 dba LAmax contribution 47 dba Birdsong (plover) 33 Livestock Due to limited access to the Clarke monitoring location after hours, noise monitoring was conducted at the western entrance to the Bowens Road realignment construction site. Page 15

16 Mining operations in the Avon North open cut were the dominant noise source during the day, evening and night-time monitoring periods. SMC operations generated an LAeq(15minute) noise contribution of 44 dba, 23 dba and 34 dba during the day, evening and night-time, respectively. During the night time monitoring period the operation of a dozer generated LAmax noise levels of up to 47 dba at the monitoring location. Taking into account the distance between the observed SMC operations and the nearest privately owned residence Bagnall, LAeq(15minute) noise levels of 36 dba during the daytime and less than <25 during the evening and night are predicted at the Bagnall location. LAmax noise levels are predicted to be 35 dba. It should be noted that this figure is considered conservative as it takes into account corrections for propagation distance only (i.e. no shielding due to topography or atmospheric absorption). As such SMC operations are considered to be compliant at the Bagnall location. Page 16

17 4.1.3 Operator-attended Noise Survey Results - Hall Results of the operator-attended noise surveys at Hall are provided in Table 8. Monitoring location Hall represents residential receptors located to the southwest of the site. Table 8 Operator-attended Noise Survey Results - Hall Period Date/Start Time/ Weather Primary Noise Descriptor dba (15 minute) LAmax LA1 LA10 LA90 LAeq LAeq ( 1.25kHz) Description of Noise Emissions and Typical Maximum Noise Levels (dba) Day 25/9/18 09:43 15 C 1.5 m/s SE Evening 24/9/18 21:26 12 C Calm Night 24/9/18 22:27 12 C Calm Site related noise events: SMC: Audible Fixed plant and dozer LAeq(15minute) contribution 25 dba Birdsong Road traffic 36 Aeroplane Resident truck Dog barking Site related noise events: SMC: Audible Fixed plant Dozer 24 LAeq(15minute) contribution 19 dba Insects/frogs Birdsong 27 Exhaust cooling Site related noise events: SMC: Audible Fixed plant and dozer LAeq(15minute) contribution 24 dba LAmax contribution 28 dba Animal 57 Exhaust cooling Road traffic SMC operations were audible during the all operator attended noise surveys at this location. SMC operations generated an LAeq(15minute) noise contribution of 25 dba, 19 dba and 24 dba during the day, evening and nighttime, respectively. During the night time period the operation of a dozer generated LAmax noise levels of up to 28 dba at the monitoring location. Page 17

18 4.1.4 Operator-attended Noise Survey Results - Lowrey Results of the operator-attended noise surveys at Lowrey are provided in Table 9. Monitoring location Lowrey represents residential receptors located to the west of the site and west of Bucketts Way. Table 9 Attended Noise Survey Results - Lowrey Period Date/Start Time/ Weather Primary Noise Descriptor dba (15 minute) LAmax LA1 LA10 LA90 LAeq LAeq ( 1.25kHz) Description of Noise Emissions and Typical Maximum Noise Levels (dba) Day 8:25 25/9/18 14 C 0.5 m/s NE Evening 24/9/18 20:39: 12 C Calm Night 24/9/18 23:13 12 C Calm Site related noise events: SMC: Barely Audible Engine noise <25 LAeq(15minute) contribution<25 dba Road traffic Birdsong Livestock 45 Aeroplane Site related noise events: SMC: Audible CHPP LAeq(15minute) contribution 22 dba Road traffic Dog barking Insects Birdsong 34 Aeroplane Site related noise events: SMC: Audible Fixed plant and dozer LAeq(15minute) contribution 31 dba LAmax contribution 37 dba Road traffic Insects 25 Livestock 35 Birdsong 49 SMC operations were audible during the all operator attended noise surveys at this location. SMC operations generated an LAeq(15minute) noise contribution of <25 dba, 22 dba and 30 dba during the day, evening and night-time, respectively. During the night time period the operation of a dozer generated LAmax noise levels of up to 37 dba at the monitoring location. During the night-time measurement the difference between LCeq - LAeq noise levels from SMC exceeded 15 db which triggers a more detailed assessment of low frequency noise. Table 10 details the 1/3 octave SMC contribution assessed against the NPfI low frequency threshold. Page 18

19 Table 10 Frequency (Hz) Lowrey Night - NPfI Low Frequency Analysis LZeq(15minute) threshold Level dbz SMC LZeq(15minute) noise level Exceedance SMC noise levels were below the NPfI threshold levels in all 1/3 octave bands. As such no positive adjustment to the measured noise level is to be applied Operator-attended Noise Survey Results - Pryce-Jones Results of the operator-attended noise surveys at Pryce Jones are provided in Table 11. Monitoring location Pryce Jones represents residential receptors located in Craven to the south of the site. Table 11 Attended Noise Survey Results Pryce Jones Period Date/Start Time/ Weather Primary Noise Descriptor dba (15 minute) LAmax LA1 LA10 LA90 LAeq LAeq ( 1.25kHz) Description of Noise Emissions and Typical Maximum Noise Levels (dba) Day 24/9/18 11:48: 13 C 2 m/s S Evening 24/9/18 21:48 12 C Calm Night 24/9/18 22:05 12 C Calm Site related noise events: SMC: Inaudible Road traffic Birdsong Wind in trees Site related noise events: SMC: Barely Audible Site noise <25 LAeq(15minute) contribution <25 dba Insects/frogs Road traffic Site related noise events: SMC: Barely Audible Site noise <25 LAeq(15minute) contribution <25 dba LAmax contribution <25 dba Insects/frogs Road traffic Page 19

20 SMC operations were barely audible during the evening and night-time operator attended noise surveys at this location generating LAeq(15minute) and LAmax noise levels of less than 25 dba Operator-attended Noise Survey Results - Van der Drift Results of the operator-attended noise surveys at Van der Drift are provided in Table 12. Table 12 Attended Noise Survey Results Van der Drift Period Date/Start Time/ Weather Primary Noise Descriptor dba (15 minute) LAmax LA1 LA10 LA90 LAeq LAeq ( 1.25kHz) Description of Noise Emissions and Typical Maximum Noise Levels (dba) Day 25/9/18 09:19: 15 C 2 m/s S Evening 24/9/18 21:02: 12 C Calm Night 24/9/18 22:50 12 C Calm Site related noise events: SMC: Inaudible Road traffic Aeroplane 39 Birdsong Site related noise events: SMC: Audible Fixed plant LAeq(15minute) contribution 27 dba Road traffic 41 Insects/frogs Site related noise events: SMC: Audible Fixed plant and dozer LAeq(15minute) contribution 35 dba LAmax contribution 42 dba Exhaust cooling Insects SMC operations were audible during the evening and night-time operator attended noise surveys at this location generating an LAeq(15minute) noise contribution of 27 dba and 35 dba respectively. LAmax noise levels of 42 dba were generated by dozer activity. During the night-time measurement the difference between LCeq - LAeq noise levels from SMC exceeded 15 db which triggers a more detailed assessment of low frequency noise. Table 13 details the 1/3 octave SMC contribution assessed against the NPfI low frequency threshold. Page 20

21 Table 13 Frequency (Hz) Van der Drift Night - NPfI Low Frequency Analysis LZeq(15minute) threshold Level dbz SMC LZeq(15minute) noise level Exceedance SMC noise levels were below the NPfI threshold levels in all 1/3 octave bands. As such no positive adjustment to the measured noise level is to be applied Operator-attended Noise Survey Results - RTNM2 Results of the operator-attended noise surveys at RTNM2 are provided in Table 14. Table 14 Attended Noise Survey Results RTNM2 Period Date/Start Time/ Weather Primary Noise Descriptor dba (15 minute) LAmax LA1 LA10 LA90 LAeq LAeq ( 1.25kHz) Description of Noise Emissions and Typical Maximum Noise Levels (dba) Day 24/9/18 11:24 13 C 2 m/s S Site related noise events: SMC: Inaudible Road traffic Birdsong 57 Wind in trees SMC operations were not audible at this location. Page 21

22 4.2 Rail Noise Monitoring SMC rail pass-by noise levels are presented in Table 15. Table 15 Operator-attended Rail Noise Monitoring Results Monitoring Location Date and Time LAmax (dba) Horn Included Horn Excluded TN1 24/9/ :13 - to Stratford TN2 24/9/ :33 - from Stratford /9/ :41 - to Stratford Maximum SMC rail pass-by noise levels (excluding the sounding of horns on approach to level crossings) did not exceed 85 dba at the monitoring locations. 5 Performance Assessment 5.1 Operations Results of the operator-attended noise measurements compared with the relevant noise criteria contained in the SMC Development Consent are given in Table 16. Table 16 Performance Assessment - Operations Estimated SMC LAeq(15minute) Noise Level dba 1 Noise Criteria LAeq(15minute) dba Compliance Day Eve Night Day Eve Night Day Eve Night Atkins 30 I/A I/A Yes Yes Yes Clarke No 4 Yes Yes Bagnall 3 34 <25 < Yes Yes Yes Hall Yes Yes Yes Lowrey < Yes Yes Yes Pryce Jones I/A <25 < Yes Yes Yes Van der Drift I/A Yes Yes Yes Note 1: Note 2: Note 3: Note 4: I/A = Inaudible. Owned by Stratford Coal Pty Ltd. Criteria adopted from Bagnall Calculated result from monitoring location Clarke Criteria adopted as a guide only Results presented in Table 16 indicate that SMC operations during the operator-attended noise monitoring at all privately owned locations were compliant with the relevant Development Consent conditions. Noise levels at Clarke were above the adopted noise criteria, however the Clarke property is owned by Stratford Coal Pty Ltd. Page 22

23 5.2 Sleep Disturbance Results of the night period sleep disturbance measurements compared with the relevant noise criteria contained in the Development Consent are given in Table 17. Table 17 Performance Assessment - Sleep Disturbance Location SMC LA1(1minute) Contribution Noise Criteria LA1(1minute) Compliance Atkins I/A 1 45 Yes Clarke No 4 Bagnall Yes Hall I/A 45 Yes Lowrey I/A 45 Yes Pryce Jones I/A 49 Yes Van der Drift I/A 45 Yes Note 1: Note 2: Note 3: Note 4: I/A = Inaudible. Owned by Stratford Coal Pty Ltd. Criteria adopted from Bagnall Calculated result from monitoring location Clarke Criteria adopted as a guide only Table 17 indicate that SMC operations during the night-time operator-attended noise monitoring at all privately owned locations were compliant with the relevant Development Consent conditions. Noise levels at Clarke were above the adopted noise criteria, however the Clarke property is owned by Stratford Coal Pty Ltd. 5.3 Rail Noise Maximum SMC rail pass-by noise levels complied with the noise goal of 85 dba at all monitoring locations, excluding the sounding of horns on approach to level crossings. 6 Conclusion SLR was engaged by Stratford Coal Pty Limited to conduct monthly noise monitoring for the Stratford Mining Complex (SMC) operations guided by the requirements of the Noise Management Plan (NMP), Document No. NMP-R01-A, dated March Operator-attended noise monitoring was conducted at six residential receiver locations between Monday 24 and Tuesday 25 in order to determine the noise performance of the SMC operations against the Development Consent conditions. Based on the measured SMC noise contribution, compliance with the relevant operational noise criteria was achieved at all noise monitoring locations during the day, evening and night monitoring periods, with the exception of Clarke during the day period. Noise levels at Clarke were above the adopted noise criteria, however the Clarke property is owned by Stratford Coal Pty Ltd. Page 23

24 APPENDIX A Acoustic Terminology R10-v1.0.docx Page 1 of 1

25 APPENDIX B Operator Attended Noise Survey Charts R10-v1.0.docx Page 1 of 10

26 Figure B1 Day Period Atkins Operator Attended Noise Survey Results Figure B2 Evening Period Atkins Operator Attended Noise Survey Results R10-v1.0.docx Page 2 of 10

27 Figure B3 Night Period Atkins Operator Attended Noise Survey Results Figure B4 Day Period Clarke Operator Attended Noise Survey Results R10-v1.0.docx Page 3 of 10

28 Figure B5 Evening Period Clarke Operator Attended Noise Survey Results Figure B6 Night Period Clarke Operator Attended Noise Survey Results R10-v1.0.docx Page 4 of 10

29 Figure B7 Day Period Hall Operator Attended Noise Survey Results Figure B8 Evening Period Hall Operator Attended Noise Survey Results R10-v1.0.docx Page 5 of 10

30 Figure B9 Night Period Hall Operator Attended Noise Survey Results Figure B10 Day Period Lowrey Operator Attended Noise Survey Results R10-v1.0.docx Page 6 of 10

31 Figure B11 Evening Period Lowrey Operator Attended Noise Survey Results Figure B12 Night Period Lowrey Operator Attended Noise Survey Results R10-v1.0.docx Page 7 of 10

32 Figure B13 Day Period Pryce Jones Operator Attended Noise Survey Results Figure B14 Evening Period Pryce Jones Operator Attended Noise Survey Results R10-v1.0.docx Page 8 of 10

33 Figure B15 Night Period Pryce Jones Operator Attended Noise Survey Results Figure B16 Day Period Van der Drift Operator Attended Noise Survey Results R10-v1.0.docx Page 9 of 10

34 Figure B17 Evening Period Van der Drift Operator Attended Noise Survey Results Figure B18 Night Period Van der Drift Operator Attended Noise Survey Results R10-v1.0.docx Page 10 of 10

35 ASIA PACIFIC OFFICES BRISBANE CANBERRA DARWIN MACKAY Level 2, 15 Astor Terrace Spring Hill QLD 4000 Australia T: GPO 410 Canberra ACT 2600 Australia T: Foelsche Street Darwin NT 0800 Australia T: River Street Mackay QLD 4740 Australia T: F: F: F: MELBOURNE Suite 2, 2 Domville Avenue Hawthorn VIC 3122 Australia T: F: NEWCASTLE 10 Kings Road New Lambton NSW 2305 Australia T: F: PERTH Ground Floor, 503 Murray Street Perth WA 6000 Australia T: F: ROCKHAMPTON rockhampton@slrconsulting.com M: SYDNEY TAMWORTH TOWNSVILLE 2 Lincoln Street Lane Cove NSW 2066 Australia T: F: PO Box Tamworth NSW 2340 Australia M: F: Level 1, 514 Sturt Street Townsville QLD 4810 Australia T: F: AUCKLAND 68 Beach Road NELSON 5 Duncan Street NEW PLYMOUTH Level 2, 10 Devon Street East Auckland 1010 New Zealand T: Port Nelson 7010 New Zealand T: New Plymouth 4310 New Zealand T:

STRATFORD MINING COMPLEX

STRATFORD MINING COMPLEX STRATFORD MINING COMPLEX Prepared for: Stratford Coal Pty Ltd PO Box 168 Gloucester NSW 2422 SLR Ref: 630.11771-R06 Version No: v0.1 PREPARED BY SLR Consulting Australia Pty Ltd ABN 29 001 584 612 10 Kings

More information

Duralie Coal Mine. Quarterly Compliance Noise Monitoring. November Report Number R December 2016.

Duralie Coal Mine. Quarterly Compliance Noise Monitoring. November Report Number R December 2016. Duralie Coal Ltd PO Box 168, GLOUCESTER NSW 2422 www.duraliecoal.com.au Version: v1.1 Page 2 PREPARED BY: ABN 29 001 584 612 10 Kings Road New Lambton NSW 2305 Australia (PO Box 447 New Lambton NSW 2305

More information

Attended Noise Monitoring - Quarter Ending September 2013

Attended Noise Monitoring - Quarter Ending September 2013 Unity Mining Level 10, 350 Collins St Melbourne VIC 3000 Version: Page 2 PREPARED BY: ABN 29 001 584 612 Units 7-8, 26-28 Napier Close Deakin ACT 2600 Australia (PO Box 9344 Deakin ACT 2600 Australia)

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring February 2018 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring February 2018 Reference:

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring May 2018 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring May 2018 Reference: Report date:

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company Environmental ise Monitoring May 2015 Prepared for Muswellbrook Coal Page i Muswellbrook Coal Company Environmental ise Monitoring May 2015 Reference: Report date: 18 June 2015

More information

Bloomfield Colliery. Quarterly Noise Monitoring. and Compliance Assessment September Report Number Q R2.

Bloomfield Colliery. Quarterly Noise Monitoring. and Compliance Assessment September Report Number Q R2. Bloomfield Colliery Quarterly Noise Monitoring and Compliance Assessment September 2015 Report Number Q59 630.01053-R2 15 October 2015 Bloomfield Collieries Four Mile Creek Road Ashtonfield NSW 2323 Version:

More information

Attended Noise Monitoring Program

Attended Noise Monitoring Program 16 May 2018 Ref: 171356/7853 Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 RE: MAY 2018 NOISE MONITORING RESULTS MUSWELLBROOK COAL MINE This letter report presents the results of noise compliance

More information

Boggabri Coal Mine. Environmental Noise Monitoring October Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring October Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring October 2017 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring October 2017 Reference: Report date:

More information

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 REPORT 30-1664R1R0 Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 PREPARED FOR P.O Box 806 Cessnock NSW 2325 14 MAY 2007 Quarterly Noise Monitoring Report Austar

More information

Ashton Coal. Environmental Noise Monitoring May Prepared for Ashton Coal Operations Pty Ltd

Ashton Coal. Environmental Noise Monitoring May Prepared for Ashton Coal Operations Pty Ltd Ashton Coal Environmental Noise Monitoring May 2018 Prepared for Ashton Coal Operations Pty Ltd Page i Ashton Coal Environmental Noise Monitoring May 2018 Reference: Report date: 5 June 2018 Prepared for

More information

Boggabri Coal Mine. Environmental Noise Monitoring August Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring August Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring August 2018 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring August 2018 Reference: Report date:

More information

Attended Noise Monitoring Program

Attended Noise Monitoring Program 1 November 2018 Ref: 171356/8121 Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 RE: OCTOBER 2018 NOISE MONITORING RESULTS MUSWELLBROOK COAL MINE This letter report presents the results of noise

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring April 2016 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring April 2016 Reference: Report

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company Environmental Noise Monitoring November 2015 Prepared for Muswellbrook Coal Page i Muswellbrook Coal Company Environmental Noise Monitoring November 2015 Reference: Report date:

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring August 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring August 2017 Reference: Report

More information

Bloomfield Colliery. Quarterly Noise Monitoring and Compliance Assessment. September Report Number

Bloomfield Colliery. Quarterly Noise Monitoring and Compliance Assessment. September Report Number Report Number 630.01053 20 December 2016 Bloomfield Collieries Four Mile Creek Road Ashtonfield NSW 2323 Version: v1.0 Report Number 630.01053 20 December 2016 v1.0 Page 2 PREPARED BY: ABN 29 001 584 612

More information

Boggabri Coal Mine. Environmental Noise Monitoring June Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring June Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring June 2017 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring June 2017 Reference: Report date: 5 July

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring November 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring November 2017 Reference:

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring September 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring September 2017 Reference:

More information

Cullen Valley Mine. Environmental Noise Monitoring Quarter 2, Prepared for Castlereagh Coal

Cullen Valley Mine. Environmental Noise Monitoring Quarter 2, Prepared for Castlereagh Coal Cullen Valley Mine Environmental Noise Monitoring Quarter 2, 2018 Prepared for Castlereagh Coal Page i Cullen Valley Mine Environmental Noise Monitoring Quarter 2, 2018 Reference: Report date: 28 June

More information

OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017

OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017 OneSteel Recycling Pty Ltd 14-Jul-2017 60493017 OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017 NATA ACCREDITATION No. 2778 (14391) Accredited for compliance with ISO/IEC 17025 Testing

More information

REPORT PERIOD: JANUARY 01 MARCH

REPORT PERIOD: JANUARY 01 MARCH QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT PERIOD: JANUARY 01 MARCH 31 2018 IE LICENCE REF. NO. W0178-02 APRIL 2018 QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT

More information

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Prepared by Umwelt (Australia) Pty Limited on behalf of Mackas Sand Pty Ltd

More information

ENVIRONMENTAL NOISE MONITORING QUARTER 1, Northparkes Mines PO Box 995 Parkes NSW 2870

ENVIRONMENTAL NOISE MONITORING QUARTER 1, Northparkes Mines PO Box 995 Parkes NSW 2870 ENVIRONMENTAL NOISE MONITORING QUARTER 1, 2018 s PO Box 995 Parkes NSW 2870 Job No: J38252 Report issued: 25 June 2018 ESP ENVIRONMENTAL & SAFETY PROFESSIONALS A division of Enviro-Net Australia Pty. Ltd.

More information

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK.

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. TECHNICAL REPORT 16 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. FOR Gabriel Kelly Group Environmental Manager Dairygold Food ingredients Castlefarm Mitchelstown

More information

CALGA SAND QUARRY ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO E VERSION A APRIL 2017 PREPARED FOR

CALGA SAND QUARRY ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO E VERSION A APRIL 2017 PREPARED FOR ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO. 01127-E VERSION A APRIL 2017 PREPARED FOR HANSON CONSTRUCTION MATERIALS PTY LTD LOT 151 PEATS RIDGE ROAD CALGA NSW 2250 DOCUMENT CONTROL Version

More information

BASELINE NOISE MONITORING SURVEY

BASELINE NOISE MONITORING SURVEY t m s environment ltd TMS Environment Ltd 53 Broomhill Drive Tallaght Dublin 24 Phone: +353-1-4626710 Fax: +353-1-4626714 Web: www.tmsenv.ie BASELINE NOISE MONITORING SURVEY UNIVERSITY COLLEGE DUBLIN Report

More information

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000; 15 December 2017 Suite 6, Level 1, 146 Hunter Street Newcastle NSW 2300 PO Box 506 Pere Riini Quarry Manager Hanson Construction Materials Pty Ltd Level 5, 75 George Street Parramatta, NSW 2150 Newcastle,

More information

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 September 2013 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 September 2013 Prepared by on behalf of Mackas Sand Pty Ltd Project

More information

Compliance Noise Survey & Assessment

Compliance Noise Survey & Assessment John Trotter Compliance Noise Survey & Assessment Duralie Coal October 2009 Issued October 2009 Vipac Engineers & Scientists Ltd Hunter Valley / Newcastle, NSW REPORT NO: 29N-09-0002-TRP-470219-0 PREPARED

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Quarter 1, 2013 Environmental Noise Monitoring Prepared for Wambo Coal Pty Limited Wambo Coal Mine and Rail Spur Quarter 1, 2013 Environmental Noise Monitoring Reference:

More information

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Appendix G Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Environmental Management Plan G May 2014 Colton Coal Mine Aldershot, Queensland Review of Baseline Noise Monitoring

More information

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000; 10 October 2017 Suite 6, Level 1,, 146 Hunter Street Newcastle NSW 2300 PO Box 506 Pere Riini Quarry Manager Hanson Construction Materials Pty Ltd Level 5, 75 George Street Parramatta, NSW 2150 Newcastle,

More information

NOISE IMPACT ASSESSMENT 2016

NOISE IMPACT ASSESSMENT 2016 Panther Environmental Solutions Ltd, Unit 4, Innovation Centre, Institute of Technology, Green Road, Carlow, Ireland. Mobile: 087-8519284 Telephone /Fax: 059-9134222 Email: info@pantherwms.com Website:

More information

CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017.

CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017. CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017. Prepared for: CLARE COUNTY COUNCIL ÁRAS CONTAE AN CHLÁIR NEW ROAD ENNIS CO. CLARE 3156 May 16 th, 2017 EPA

More information

Noise Monitoring Program

Noise Monitoring Program for Document Table of Contents for... 1 1 Purpose... 3 1.1 Purpose... 3 2 Noise Impact Assessment Criteria... 3 2.1 Noise Criteria... 3 3 Measurement and Evaluation... 6 3.1 Monitoring Locations... 6 3.2

More information

Roche Ireland Limited

Roche Ireland Limited Limited Clarecastle, Co. Clare Monitoring Report Industrial Emissions Licence Number P0012-05 Report Date: 1 st February 17 Fitz Scientific Unit 35A, Boyne Business Park, Drogheda, Co. Louth Report No.

More information

Rev2-18.Feb Safety Reliability Integrity Training Asset Support Design Support Troubleshooting

Rev2-18.Feb Safety Reliability Integrity Training Asset Support Design Support Troubleshooting KEYSBROOK ENVIRONMENTAL NOISE COMPLIANCE REPORTING Q1 2016 MZI RESOURCES LTD 1370900-5-100-Rev2-18.Feb.2016 www.svt.com.au Perth Brisbane Kuala Lumpur Bangkok Noise Vibration Corrosion Safety Reliability

More information

Rix's Creek Coal Mine

Rix's Creek Coal Mine Rix's Creek Coal Mine Environmental Noise Monitoring September 2018 Prepared for Rix's Creek Pty Ltd Page i Rix's Creek Coal Mine Environmental Noise Monitoring September 2018 Reference: Report date: 5

More information

Annexure C-L.02 Report Page 2 of 6

Annexure C-L.02 Report Page 2 of 6 Annexure C-L.02 Page 2 of 6 L.02 Ambient Noise Monitoring Results (610.16185 Annexure C L.02) SLR Consulting Australia Pty Ltd Annexure C-L.02 Page 3 of 6 L.02 Ambient Noise Monitoring Results (610.16185

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company June, 12 Environmental Noise Monitoring Prepared for Muswellbrook Coal Muswellbrook Coal Company June, 12 Environmental Noise Monitoring Reference: Report date: 9 August 12 Prepared

More information

Pipeline Blowdown Noise Levels

Pipeline Blowdown Noise Levels Pipeline Blowdown Noise Levels James Boland 1, Henrik Malker 2, Benjamin Hinze 3 1 SLR Consulting, Acoustics and Vibration, Brisbane, Australia 2 Atkins Global, Acoustics, London, United Kingdom 3 SLR

More information

Roche Ireland Limited

Roche Ireland Limited Roche Ireland Limited Clarecastle, Co. Clare Environmental Noise Monitoring Report Industrial Emissions Licence Number P0012-05 Report Date: 6 th October 17 Fitz Scientific Unit 35A, Boyne Business Park,

More information

Offaly County Council

Offaly County Council Derryclure Landfill Facility, Derryclure, Co. Offaly Annual Monitoring Report Waste Licence Reg. No. W0029-04 Report Date: th October 15 Fitz Scientific Unit 35A, Boyne Business Park, Drogheda, Co. Louth

More information

ORICA AUSTRALIA PTY LTD. ENVIRONMENTAL NOISE AUDIT OVERVIEW

ORICA AUSTRALIA PTY LTD. ENVIRONMENTAL NOISE AUDIT OVERVIEW Postal Address P.O. Box 432 Gladesville N.S.W. 1675 AUSTRALIA A.C.N. 068 727 195 A.B.N. 19 068 727 195 Telephone: 02 9879 4544 Fax: 02 9879 4810 Email: AtkinsAcoustics@bigpond.com.au Atkins Acoustics and

More information

McGill Environmental Ltd.

McGill Environmental Ltd. McGill Environmental Ltd. Coom, Glenville, Co. Cork Environmental Noise Survey Report Date: 7 th October 2016 For inspection purposes only. KD Environmental Ltd. 1 Swiftbrook Glen, Virginia, Co. Cavan

More information

R e p o r t th A u g u s t

R e p o r t th A u g u s t N o ise Mon it o r ing R e p o r t L e g a c y W a y T u n n e l M o n i t o r i n g P o s t C o m m is s i o n ing T es ts V e n ti la t ion S t a c ks Jun e 20 1 6 R e p o r t 3557 4 th A u g u s t 2

More information

University of York Heslington East Campus Details of Noise Modelling and Noise Survey. Report ref AAc/ /R01

University of York Heslington East Campus Details of Noise Modelling and Noise Survey. Report ref AAc/ /R01 Heslington East Campus Details of Noise Modelling and Noise Survey Report ref Heslington East Campus Details of Noise Modelling and Noise Survey January 2008 Arup Acoustics Admiral House, Rose Wharf, 78

More information

Pfizer Ireland Pharmaceuticals

Pfizer Ireland Pharmaceuticals Allegro Acoustics Limited, Unit 2A Riverside, Tallaght Business Park, Tallaght, Dublin 24 Tel/Fax: +33 () 1 4148 Pfizer Ireland Pharmaceuticals Pfizer Grange Castle, Grange Castle Business Park, Clondalkin,

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 20 June 2017 Doc no. 102-QM-RP-4-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

W For inspection purposes only. This report shall not be reproduced except in full, without the approval of BnM Environmental.

W For inspection purposes only. This report shall not be reproduced except in full, without the approval of BnM Environmental. ANNUAL MONITORING OF ENVIRONMENTAL NOISE AT THE BORD NA MóNA KILBERRY COMPOST FACILITY IN COMPLIANCE WITH IED LICENCE, NO. W0198-01 For the Attention of: Site Work & Report Prepared by: Anua File Ref:

More information

79 First Avenue Mob: FIVE DOCK NSW 2046 VENTILATED ACOUSTIC ENCLOSURE NOISE EMISSION ASSESSMENT ACOUSTIC SERVICES & ADVICE

79 First Avenue Mob: FIVE DOCK NSW 2046 VENTILATED ACOUSTIC ENCLOSURE NOISE EMISSION ASSESSMENT ACOUSTIC SERVICES & ADVICE Head Office Postal Address T 02 9908 1270 Suite 9 PO Box 270 F 02 9908 1271 38-46 Albany St Neutral Bay 2089 E info@acousticdynamics.com.au St Leonards 2065 ABN: 36 105 797 715 W www.acousticdynamics.com.au

More information

Appendix 8. Draft Post Construction Noise Monitoring Protocol

Appendix 8. Draft Post Construction Noise Monitoring Protocol Appendix 8 Draft Post Construction Noise Monitoring Protocol DRAFT CPV Valley Energy Center Prepared for: CPV Valley, LLC 50 Braintree Hill Office Park, Suite 300 Braintree, Massachusetts 02184 Prepared

More information

Orora Compliance Monitoring

Orora Compliance Monitoring Orora Compliance Monitoring ORORA LIMITED April 2016 Noise Monitoring 038900_20160506 A 6 May 2016 Orora Compliance Monitoring Project no: Document title: IA038900 April 2016 Noise Monitoring Document

More information

Environmental Noise Assessment Cambourne to Cambridge options

Environmental Noise Assessment Cambourne to Cambridge options Environmental Noise Assessment Cambourne to Cambridge options CLIENT: Cambridgeshire County Council Major Infrastructure Delivery Box No SH1311 Shire Hall Cambridge CB3 0AP CONTACT: Tim Watkins REPORTED

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 11 August 16 Doc no. 102-QM-RP-1-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Report ref. PJ3159/13181 Date August 13 Issued to Cuadrilla Resources Limited Issued by Peter Jackson MSc MIOA

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring Quarter 4 2009 Prepared for Wambo Coal Pty Limited Wambo Coal Mine and Rail Spur Quarter 4, 2009 Environmental Noise Monitoring Reference: 09244_R01.doc

More information

Orora Compliance Monitoring

Orora Compliance Monitoring Orora Compliance Monitoring ORORA LIMITED April Noise Monitoring 389_14 A 29 April 1 Orora Compliance Monitoring Project no: IA389 Document title: April Noise Monitoring Document no: 389_1429 Revision:

More information

APPENDIX K NAPIER PORT WHARF NO. 6 FUTURE PORT NOISE MAPS

APPENDIX K NAPIER PORT WHARF NO. 6 FUTURE PORT NOISE MAPS APPENDIX K NAPIER PORT WHARF NO. 6 FUTURE PORT NOISE MAPS PORT OF NAPIER WHARF 6 FUTURE PORT NOISE MAPS (2026) Rp 004 r02 2015784A 20 September 2016 84 Symonds Street PO Box 5811 Wellesley Street Auckland

More information

Bickerdike Allen Partners

Bickerdike Allen Partners 25 CHURCH ROAD, SE19 ENTERTAINMENT NOISE ASSESSMENT Report to Kayode Falebita Kingsway International Christian Centre 3 Hancock Road Bromley-By-Bow London E3 3DA A9540/R01-A-HT 26/07/2012 CONTENTS Page

More information

SYDNEY INTERNATIONAL CONTAINER TERMINALS Noise Compliance Assessment July 2015 Rp002 r SY. 23 October 2015

SYDNEY INTERNATIONAL CONTAINER TERMINALS Noise Compliance Assessment July 2015 Rp002 r SY. 23 October 2015 SYDNEY INTERNATIONAL CONTAINER TERMINALS Noise Compliance Assessment July 2015 Rp002 r02 2014432SY 23 October 2015 4/46 Balfour St Chippendale NSW 2008 T: +612 9282 9422 Fax: +612 9281 3611 www.marshallday.com

More information

Sydney Metro City and Southwest North Corridor Works Technical Report - Noise Monitoring OOHW P1-6: 25 to 26 August 2018

Sydney Metro City and Southwest North Corridor Works Technical Report - Noise Monitoring OOHW P1-6: 25 to 26 August 2018 1/8 Project Title Client Document Reference No. Laing O Rourke Project No. Noise Monitoring Sydney Metro City and Southwest LOR-NCW-Noise Monitoring WE08_ OOHW P1-6 - 250818_260818.docx K38 Document Date

More information

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2014

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2014 Project: Mt Piper Power Station Ash Placement Lamberts North Operational Noise Assessment March 2014 Reference: 233710 Prepared for: EnergyAustralia NSW Revision: 2 25 March 2014 Mt Piper Power Station

More information

ACOUSTIC SIGNATURE OF OPEN CUT COAL MINES

ACOUSTIC SIGNATURE OF OPEN CUT COAL MINES ACOUSTIC SIGNATURE OF OPEN CUT COAL MINES Jeffrey Parnell NSW Department of Planning and Environment Sydney NSW, Australia Email: jeff.parnell@planning.nsw.gov.au Abstract The NSW Department of Planning

More information

Rehab Glassco. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only.

Rehab Glassco. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only. Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre, Ennis Road, Limerick Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare Environmental

More information

Assured Monitoring Group

Assured Monitoring Group Assured Monitoring Group YARRANLEA SOLAR FARM NOISE & VIBRATION IMPACT ASSESSMENT JANUARY 2017 I3 CONSULTING PTY LTD Project ID. 10734 R_1 DATE OF RELEASE: 15/02/2017 Table 1: Document approval Name Position

More information

Glassco Recycling. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only.

Glassco Recycling. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only. Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre, Ennis Road, Limerick. info@axisenv.ie 00353 61 324587 Unit 4, Osberstown Industrial Park, Caragh

More information

Assessing the accuracy of directional real-time noise monitoring systems

Assessing the accuracy of directional real-time noise monitoring systems Proceedings of ACOUSTICS 2016 9-11 November 2016, Brisbane, Australia Assessing the accuracy of directional real-time noise monitoring systems Jesse Tribby 1 1 Global Acoustics Pty Ltd, Thornton, NSW,

More information

ITV CORONATION STREET PRODUCTION FACILITY, TRAFFORD WHARF ROAD ASSESSMENT OF POTENTIAL NOISE & VIBRATION IMPACT OF PROPOSED METROLINK LINE

ITV CORONATION STREET PRODUCTION FACILITY, TRAFFORD WHARF ROAD ASSESSMENT OF POTENTIAL NOISE & VIBRATION IMPACT OF PROPOSED METROLINK LINE ITV CORONATION STREET PRODUCTION FACILITY, TRAFFORD WHARF ROAD ASSESSMENT OF POTENTIAL NOISE & VIBRATION IMPACT OF PROPOSED METROLINK LINE On behalf of: ITV plc Report No. 22396.01v1 October 2014 ITV CORONATION

More information

ACOUSTIC BARRIER FOR TRANSFORMER NOISE. Ruisen Ming. SVT Engineering Consultants, Leederville, WA 6007, Australia

ACOUSTIC BARRIER FOR TRANSFORMER NOISE. Ruisen Ming. SVT Engineering Consultants, Leederville, WA 6007, Australia ICSV14 Cairns Australia 9-12 July, 2007 ACOUSTIC BARRIER FOR TRANSFORMER NOISE Ruisen Ming SVT Engineering Consultants, Leederville, WA 6007, Australia Roy.Ming@svt.com.au Abstract In this paper, an acoustic

More information

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices ABERDEEN HARBOUR EXPANSION PROJECT November 2015 Volume 3: Technical Appendices Appendix 20-B BASELINE NOISE SURVEY 20-B BASELINE NOISE SURVEY Noise Sensitive Receptors A desk-based study and site walkover

More information

Assessment of rail noise based on generic shape of the pass-by time history

Assessment of rail noise based on generic shape of the pass-by time history Proceedings of Acoustics 23 Victor Harbor 7-2 November 23, Victor Harbor, Australia Assessment of rail noise based on generic shape of the pass-by time history Valeri V. enchine, Jonathan Song Science

More information

Xtratherm Limited Kells Road, Navan, Co Meath

Xtratherm Limited Kells Road, Navan, Co Meath Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre Ennis Road Limerick Kells Road, Navan, Co Meath Annual Environmental Noise Survey 2017 IPPC Licence

More information

Soltec (Ireland) Limited Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report

Soltec (Ireland) Limited Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report 2013 Licence Number: W0115-01 Report Date: 09 th July 2013 Report Number: 3220-13-03 Version 0 AXIS environmental services 40 Coolraine

More information

Cymbaluk Noise Complaints

Cymbaluk Noise Complaints Decision 20259-D01-2015 Cymbaluk Noise Complaints December 22, 2015 Alberta Utilities Commission Decision 20259-D01-2015 Cymbaluk Noise Complaints Proceeding 20259 Application 20259-A001 December 22, 2015

More information

Engineering a Sustainable Future for Our Environment

Engineering a Sustainable Future for Our Environment NOISE COMPLIANCE REPORT FOR MULTIQUIP AGGREGATES 5152 OALLEN FORD ROAD, BUNGONIA Prepared for: Alexander Cox, Environmental Officer Multiquip Aggregates Prepared by: Peter Gangemi, Acoustic Engineer R

More information

Noise Monitoring Report For. Schloetter (Ireland) Ltd. Naas Enterprise Park, Naas, Co. Kildare

Noise Monitoring Report For. Schloetter (Ireland) Ltd. Naas Enterprise Park, Naas, Co. Kildare Bray (Co. Wicklow) 01 276 1428 Lisburn (Co. Antrim) 028 9262 6733 Birmingham (U.K.) 0121 673 1804 Blackrock (Co.Cork) 021 4536155 Noise Monitoring Report 2017 For Schloetter (Ireland) Ltd. Naas Enterprise

More information

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2016

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2016 Project: Mt Piper Power Station Ash Placement Lamberts North Operational Noise Assessment March 2016 Reference: 246493-002 Prepared for: EnergyAustralia NSW Revision: 3 26 April 2016 Document Control Record

More information

Noise and Ground-Borne Vibration Monitoring

Noise and Ground-Borne Vibration Monitoring 69 Noise and Vibration Study Noise and Ground-Borne Vibration Monitoring Labrador City, Newfoundland Nov, 07 Iron Ore Company of Canada TABLE OF CONTENTS 1.0 INTRODUCTION... 2 1.1 Study Objectives... 2

More information

Black Butte Copper Project Mine Operating Permit Application (Revision 3)

Black Butte Copper Project Mine Operating Permit Application (Revision 3) Mine Operating Permit Application (Revision 3) APPENDIX J: Tintina Montana, Inc. July 17 MEMORANDUM DATE: October 7, 13 TO: FROM: RE: Allan Kirk / Geomin Resources Bob Jacko / Tintina Resources Sean Connolly

More information

Southwood Fibre southern exports environmental noise assessment

Southwood Fibre southern exports environmental noise assessment Van Diemen Consulting Southwood Fibre southern exports environmental noise assessment Report No. 5012_AC_R TARKARRI ENGINEERING PTY LTD PO Box 506 Kings Meadows TAS 7249 September 2017 DOCUMENT CONTROL

More information

Keystone Pipeline Phases 1 & 2 Acoustic Monitoring Report for Canadian Pump Stations

Keystone Pipeline Phases 1 & 2 Acoustic Monitoring Report for Canadian Pump Stations Revision 0 Keystone Project Document # RE-03 [2-4-22-2] ATCO Project # 763000 TransCanada Pipeline Ltd. Keystone Pipeline Project Keystone Pipeline Phases 1 & 2 Acoustic Monitoring Report for Canadian

More information

MALONE O REGAN. Annual Noise Survey Powerstown Landfill Industrial Emission Licence No. W March 2016

MALONE O REGAN. Annual Noise Survey Powerstown Landfill Industrial Emission Licence No. W March 2016 MALONE O REGAN March 2016 Powerstown Landfill Industrial Emission Licence No. W0025-04 Annual Noise Survey 2015 2B Richview Office Park, Clonskeagh, Dublin 14. Tel: +353 01 2602655 Fax: +353 01 2602660

More information

NETWORK RAIL BORDERS RAILWAY OPERATIONAL NOISE AND VIBRATION (YEAR 1, ROUND 2) REP-003. September 2016

NETWORK RAIL BORDERS RAILWAY OPERATIONAL NOISE AND VIBRATION (YEAR 1, ROUND 2) REP-003. September 2016 Ref:15375 OPERATIONAL NOISE AND VIBRATION (YEAR 1, ROUND 2) 15375-REP-003 September 2016 Registered Office Park House 39 Bo ness Road Grangemouth Stirlingshire FK3 8AN Tel: +44 (0)1324 878822 Fax: +44

More information

Further Investigations of Low-frequency Noise Problem Generated by Freight Trains

Further Investigations of Low-frequency Noise Problem Generated by Freight Trains Proceedings of Acoustics 2012 - Fremantle Further Investigations of Low-frequency Noise Problem Generated by Freight Trains Jingnan Guo, John Macpherson and Peter Popoff-Asotoff Noise Regulation Branch,

More information

Black. LWECS Site Permit. Stearns County. Permit Section:

Black. LWECS Site Permit. Stearns County. Permit Section: PERMIT COMPLIANCE FILING Permittee: Permit Type: Project Location: Docket No: Permit Section: Date of Submission : Black Oak Wind,, LLC LWECS Site Permit Stearns County IP6853/WS-10-1240 and IP6866/WS-11-831

More information

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times 765 kv Substation Acoustic Noise Impact Study by Predictive Software and

More information

The following is the summary of Keane Acoustics community mechanical noise study for the City of St. Petersburg.

The following is the summary of Keane Acoustics community mechanical noise study for the City of St. Petersburg. August 11, 2017 David Goodwin Director Planning & Economic Development Department City of St. Petersburg Re: City of St. Petersburg Dear Mr. Goodwin, The following is the summary of Keane Acoustics community

More information

Environmental Management System

Environmental Management System Printed Date: PORT KEMBLA COAL TERMINAL HSEC Noise Management Plan Printed By: Management Plan MP.HS.387 Status:Approved Version:7.0 Doc ID:387 Page 1 of 38 Environmental Management System Noise Management

More information

Sheringham Shoal Cawston, Norfolk. Substation Noise Assessment Summary

Sheringham Shoal Cawston, Norfolk. Substation Noise Assessment Summary Sheringham Shoal Cawston, Norfolk Substation Noise Assessment Summary Document title: Substation Noise Assessment Summary Status: Final Date: 13 March 2015 Project name: Sheringham Shoal, Cawston, Norfolk

More information

Automated detection and analysis of amplitude modulation at a residence and wind turbine

Automated detection and analysis of amplitude modulation at a residence and wind turbine Proceedings of Acoustics 213 Victor Harbor 17-2 November 213, Victor Harbor, Australia Automated detection and analysis of amplitude at a residence and wind turbine Jonathan Cooper (1) and Tom Evans (1)

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 1996-2 Second edition 2007-03-15 Acoustics Description, measurement and assessment of environmental noise Part 2: Determination of environmental noise levels Acoustique Description,

More information

Status: Rev: Comments Date: Author: Reviewer:

Status: Rev: Comments Date: Author: Reviewer: PAKENHAM EAST PRECINCT STRUCTURE PLAN CITY GATE NOISE ASSESSMENT Rp 002 R03 20171135 28 May 2018 Marshall Day Acoustics Pty Ltd ABN: 53 470 077 191 6 Gipps Street Collingwood VIC 3066 Australia T: +613

More information

Statement of Evidence of N I Hegley

Statement of Evidence of N I Hegley IN THE MATTER AND IN THE MATTER of the Resource Management Act 1991 of Notices of Requirement to enable the construction, operation and maintenance of the City Rail Link. Statement of Evidence of N I Hegley

More information

Appendix D: Preliminary Noise Evaluation

Appendix D: Preliminary Noise Evaluation Appendix D: Preliminary Noise Evaluation Acoustics The study of sound and its properties is known as acoustics. By considering basic physical properties of sound and the acoustic environment, the potential

More information

REVISED NOISE IMPACT STUDY

REVISED NOISE IMPACT STUDY REVISED NOISE IMPACT STUDY Benton Boarding and Daycare 5673 Fourth Line Road Ottawa, Ontario City of Ottawa File No. D07-12-13-0024 Integral DX Engineering Ltd. Page 2 of 24 TABLE OF CONTENTS 1.0 INTRODUCTION

More information

THE CASE FOR SPECTRAL BASELINE NOISE MONITORING FOR ENVIRONMENTAL NOISE ASSESSMENT.

THE CASE FOR SPECTRAL BASELINE NOISE MONITORING FOR ENVIRONMENTAL NOISE ASSESSMENT. ICSV14 Cairns Australia 9-12 July, 2007 THE CASE FOR SPECTRAL BASELINE NOISE MONITORING FOR ENVIRONMENTAL NOISE ASSESSMENT Michael Caley 1 and John Savery 2 1 Senior Consultant, Savery & Associates Pty

More information

November 12, Mr. Bryan Tripp Canadian Hydro Developers, Inc. 34 Harvard Road Guelph, ON N1G 4V8

November 12, Mr. Bryan Tripp Canadian Hydro Developers, Inc. 34 Harvard Road Guelph, ON N1G 4V8 November 12, 2009 Mr. Bryan Tripp Canadian Hydro Developers, Inc. 34 Harvard Road Guelph, ON N1G 4V8 Re: Summer 2009 Acoustic Audit and Intermediate Verification Measurements Amaranth Transformer Station,

More information