1 FILED ELECTRONICALLY May 3, 2017 Ms. Lori Hight, AICP Senior Planner City Development 9500 Civic Center Drive Thornton, CO Re: Response to Comments on the Second Review of the Land Development Approvals Application Submittal for the Thornton Electric Substation Project and Carlson Land, Inc. Retail Development Sites Dear Ms. Hight: Public Service Company of Colorado (PSCo), a Colorado corporation doing business as Xcel Energy, and Carlson Land, Inc. (Carlson) are proposing to develop approximately 11.6 acres of land located at the southeastern corner of East 120 th Avenue and Holly Street in the (City). Details regarding the proposed development were provided in the permit application for a Conceptual Site Plan (CSP) that PSCo and Carlson submitted jointly in October 2016 as well as other submitted documents as outlined in Table 1: Table 1: Summary of Submittals to the Submittal Type (a) Original Submitting Entity Identifier Responding Entity Conceptual Site Plan (CSP) Joint applicants: Carlson and CSP AP 8232 PSCo and Carlson PSCo Snydal Annexation Agreement Carlson ZAX AP 8233 (b) Carlson under separate cover Amendment Application Zoning Amendment Carlson Z AP 8234 Carlson under separate cover Development Permit/Specific Use PSCo DP AP 8237 PSCo Permit (DP/SUP) Height Variance for Static Masts PSCo V AP 8240 (c) PSCo Comprehensive Plan Amendment (CPA) PSCo SPCD AP 8235 PSCo a The submitted documents and City referral comments are available online at this location: b A letter dated March 24, 2017, from PSCo and Carlson to the City requested that the height variance request for the static masts be included in the Annexation Agreement Amendment. c The previous variance request dated October 27, 2016, was withdrawn by letter from PSCo and Carlson on March 24, 2017.
2 Page 2 of 6 The City completed an initial review of the submitted materials and provided referral comments to PSCo and Carlson in a letter dated December 12, 2016, and through additional meetings and communication that occurred January through March PSCo and Carlson submitted responses to the initial review comments along with revised drawings and studies to the City on March 24, 2017 (Submittal Number 2). The City provided comments on Submittal Number 2 in a letter from Lori Hight, Senior Planner, dated April 17, PSCo and Carlson met with the City on April 19, 2017 to review the comments and discuss the planned responses. Comments from Development Engineering were received on April 21, 2017, and on April 26, 2017, and additional questions regarding Electric and Magnetic Fields (EMF) analysis were received on April 27, The remaining sections of this letter address each referral comment provided on Submittal Number 2. Each comment has been duplicated and a response has been provided to each along with references to exhibits provided in support of this submittal. Exhibits that have been included as attachments to this letter and referenced in the responses to comments below are listed in Table 2. Table 2: Summary of Exhibits Attached to Letter Exhibit No. Exhibit Title Description 1 Responses to Comments on CPA Red-lined Drawings Red-lined drawings from the CPA (plans) with responses provided in blue boxes with blue text 2 Responses to Comments on DP/SUP Red-lined Drawings Red-lined drawings (plans) with responses provided in blue boxes with blue text 3 Responses to Comments on Drainage Report Red-lined Drainage Report with responses provided in blue boxes with blue text 4 Revised CPA Drawings Revised drawings (plans) 5 Revised DP/SUP Drawings Revised drawings (plans) 6 Revised Drainage Report Revised drainage report, including revised drawings 7 EMF Analysis Graphic showing magnetic field contours 8 Neighborhood Meeting Summary Summary of the neighborhood meeting held on April 27, 2017 Referral Comments Letter dated April 17, 2017 Current Planning Senior Planner, Lori Hight Planning Comment 1: See the attached red-lined drawings for comments from Current Planning. Response: Exhibit 1 provides responses to comments on the CPA drawings and Exhibit 2 provides responses to comments on the DP/SUP drawings. Please reference the following files to review the comments and responses specific to Current Planning: Exhibit1_2_Planning_comment_2_Comp_Plan_Amend.pdf Exhibit2_2_Planning_comments_2_DP.pdf
3 Page 3 of 6 The CPA and DP/SUP drawing sets have also been updated as a result of the cumulative comments from the City. Exhibit 4 contains the updated CPA drawing set and Exhibit 5 contains the updated DP/SUP drawing set. Planning Comment 2: Please be aware that a Subdivision Plat is required prior to the issuance of any building permits for this property. A subdivision plat and developer s agreement (DA) as well as civil construction drawings must be approved and the plat and DA recorded prior to the issuance of building permits. This process often takes a long time. Response: Comment noted. Development Engineering Civil Engineer, Nate Hatleback Development Engineering Comment 1: Comments from Civil Engineer will be forthcoming as soon as possible. Response: Development Engineering comments were provided on April 17, 2017, and April 21, Exhibit 2 provides responses to comments on the DP/SUP drawings and Exhibit 3 provides responses to comments on the Drainage Report. Please reference the following files to review the comments and responses specific to Development Engineering: Exhibit2_DE_Redlines-2_Revised_DP-SUP_Drawings.pdf Exhibit3_DE_Redlines-2_Final_Drainage_Report.pdf Exhibit 5 contains the updated DP/SUP drawing set and Exhibit 6 contains the updated Drainage Report (including drawings) that has been revised per the comments received. Development Engineering Comment 2: See the attached red-lined drawings for comments from the Traffic Engineer. Response: Traffic Engineering did not provide comments on either the CPA or DP/SUP. Responses to comments provided by Traffic Engineering on the CSP, Annexation Amendment, and Traffic Impact Study will be submitted directly to the City on May 3, 2017, under separate cover by Kimley-Horn on behalf of Carlson. Landscape Architect Senior Landscape Architect, Heidi Feigal Landscape Architect Comment 1: See the attached red-lined drawings for comments from the Landscape Architect. Response: Exhibit 2 provides responses to comments on the DP/SUP drawings. Please reference the following file to review the comments and responses specific to the Landscape Architect: Exhibit2_2_LA_comments_2_DP.pdf Exhibit 5 contains the updated DP/SUP drawing set that has been revised per the cumulative comments received.
4 Page 4 of 6 Infrastructure Engineering Senior Surveyor, Bryan Zimmerman Infrastructure Engineering Comment 1: See the attached red-lined drawings for comments from the City Surveyor. Response: Infrastructure Engineering did not provide comments on either the CPA or DP/SUP. Responses to comments provided by Infrastructure Engineering on the Zoning Amendment will be submitted directly to the City on May 3, 2017, under separate cover by Kimley-Horn on behalf of Carlson. Additional Comments from Lori Hight, April 27, 2017 Comment Regarding EMF We would like to repeat and clarify our request for an EMF study. With respect to your response of March 27, 2017, concerning the request for a site specific EMF study to assist staff in our recommendation for the Specific Use Permit, staff understands that the CPUC has determined that expected magnetic field values for the overhead and underground transmission lines and the substation meet the conditions of the Commission Rules. We note, however, that the only information presented in PSCo s application for the CPCN with regard to magnetic fields was the two exhibits illustrating the analysis results for expected magnetic field values associated with the overhead and underground transmission lines (Attachments BDC-4 Final OH Transmission EMF and BDC-5 Final UG Transmission EMF). Staff requests that PSCo provide similar information showing the modeling and analysis performed to determine the magnetic field strength of less than one (1) milligauss (mg) at a location one meter above ground at the substation boundary, as described in the Development Permit and Specific Use Permit Application on page 43 (excerpt follows): Electric and Magnetic Fields The PUC has deemed the EMF levels for the proposed project are reasonable by rule. PSCo has modeled EMF characteristics of the Thornton Electric Substation at full build-out (three 50MVA transformers). The EMF characteristics associated with the electrical current passing through the equipment in the substation and in the underground transmission lines that provide power to the substation will decrease rapidly with distance and are expected to be less than 1milliGauss (mg) along the eastern property line. The modeling shows that the substation will produce no measurable magnetic fields on private properties adjacent to the proposed facility. These modeling results are consistent with actual field measurements taken at existing substations with similar design characteristics. Any EMF detected inside residences at the adjacent private properties will be derived solely from electrical systems and equipment that use electricity located inside the residences. On the southern property line along the northern side of East 119th Avenue, the fields will be elevated within the right-of-way of the underground electric transmission line beneath East 119th Avenue and where the underground transmission line turns and crosses under the sidewalk to enter the substation. In addition to providing the results of this modeling and its conclusions to the public, PSCo provided additional educational information regarding EMF on the project website. This information can be found at Response: An analysis of the potential impact of magnetic fields from the new transformers and buss conductors was completed at a location one meter above ground at the substation boundary. A 3D magnetic field modeling analysis was conducted for the ultimate three-transformer buildout configuration of the substation to estimate the levels of magnetic fields at the substation boundary.
5 Page 5 of 6 All electric utility wires and devices that carry electrical current generate magnetic fields. The earth itself generates steady-state magnetic fields. Magnetic fields are produced by the electrical load, or the amount of current flow, through the conductors measured in terms of amperage. The magnetic field strength is directly proportional to the amperage; that is, increased power flow results in increased amperage that produces a stronger magnetic field. The magnetic field is inversely proportional to the distance from the conductors and the strength declines as the distance from the conductor increases. Magnetic fields are expressed in units of milligauss (mg). However, unlike voltage, the amperage, and therefore the magnetic field around electric utility wires and devices, fluctuates hourly and daily as the amount of current flow varies. In a complex facility such as an electrical substation, the strength of the magnetic field at any point depends on the current flowing in nearby conductors, the geometry of the construction of the substation, the degree of reinforcement or cancelation from other conductors of similar or different electrical phases, and the distance from the conductors or cables. Analysis The magnetic field analysis was conducted using the 3D-FIELDS program. The 3D-FIELDS program, written by the Southern California Edison Company, is designed to calculate and plot in three dimensions the magnetic fields produced by any wiring configuration such as those used in substations and other similar electrical facilities. The magnetic fields that will be generated by the proposed substation were calculated using the Grid mode in 3D-FIELDS at an elevation of 3 feet above ground. The accuracy of the modeling is dependent on the accuracy of the input data (i.e., if the average phase current is higher than what was modeled, so will the resulting magnetic fields). The resulting field plots are within a small percentage of the true value for the conditions modeled. The 3D magnetic field analysis was conducted with the following assumptions. The underground transmission line bringing power to the substation was assumed to carry 250 megavolt amperes (MVA) of power. This line connects to a riser structure where the current is conducted up and onto the overhead buss. The power flows in the circular buss to the transformers where 50MVA is pulled off at each of the three transformers. The remaining 100MVA of power flows back out of the substation on the second underground transmission line back to the overhead transmission line. The currents in the buss conductors within the substation were calculated to depict the magnetic fields that would be produced by the substation operating in its ultimate buildout configuration and at maximum current flows. The transformers, circuit breakers, and other items of discrete electrical equipment within the substation were not modeled since they comprise point sources of magnetic fields that will have a very rapid cube of the distance decay of their magnetic fields. For example, if a magnetic field of 100mG is predicted at 5 feet from a transformer the field level becomes approximately one-eighth of this or 12.5mG at twice the distance (10 feet) and 1.6mG at 20 feet. Therefore at the distance to the substation wall, the field levels will have dropped to background levels. The gridded magnetic field values from the buss conductors computed by 3D-FIELDS were then plotted using the 3D graphing program Surfer, which is available from Golden Software. Surfer creates a threedimensional surface view of the magnetic field levels across the substation.
6 Page 6 of 6 The magnetic fields that will be generated by the proposed substation were plotted as shown in Exhibit 7. The higher magnetic fields shown in the purple and pink colors are the locations where the magnetic field is the highest. The lowest levels down to 50mG are shown in dark green and levels below 50mG are shown as grey. Conclusion The exhibit shows that the magnetic field strength decreases to background levels at the new substation walls on all sides. In other words, all magnetic fields from the substation busses and conductors will decay to zero inside the wall. Outside the wall, the magnetic fields from the substation will be zero as well. The substation fields will also be zero at the nearest houses to the east of the substation. This magnetic field analysis was managed and report prepared by Robert Pearson, Ph.D., PE. He is a senior project manager at Tetra Tech in their downtown Denver office and is a registered professional engineer in Colorado. Dr. Pearson has 45 years of experience with EMF and has authored many articles and reports on the subject. In addition, Dr. Pearson has qualified to testify as an EMF expert both in court proceedings and in numerous administrative and rulemaking proceedings. This concludes PSCo s response to comments on the second review of the land development approvals application submittal for the Thornton Electric Substation Project and Carlson Land, Inc. retail development sites. In addition to the comment responses and revised materials being provided as a part of this submittal, a summary of the Neighborhood Meeting held on April 27, 2017, has also been provided as Exhibit 8. We look forward to working with you during the ongoing permit review process. Please do not hesitate to contact us if we can assist with any information or questions. Susan Innis (PSCo) can be reached at and Cory Thornton (Carlson) can be reached at Sincerely, Susan Innis PSCo Manager, Siting and Land Rights susan.a.innis@xcelenergy.com Sincerely, Cory Thornton Carlson Land, Inc. Broker cory@carlsonland.net
1st Review of Submittal Materials for Willow Bend Development; CSP (Hansen #1734) Comment Responses
City of Thornton 9500 Civic Center Drive Thornton, CO 80229 Attn: Jay Ruchti, Senior Planner Re: 1st Review of Submittal Materials for Willow Bend Development; CSP 2014 008 (Hansen #1734) Comment Responses
More informationCity Development Department 9500 Civic Center Drive Thornton, Colorado FAX
City Hall City Development Department 9500 Civic Center Drive 303-538-7295 Thornton, Colorado 80229-4326 FAX 303-538-7373 www.cityofthornton.net Zach Lauterbach Evergreen Devco, Incorporated 2390 East
More informationBestall Collaborative Limited Planning Environment Construction Management Development
November 18, 2017 Bestall Collaborative Limited Lori Hight, AICP, Senior Planner City Development Department City of Thornton City Hall 9500 Civic Center Drive Thornton, Colorado 80229-4326 RE: River Valley
More informationCITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS
DEVELOPMENT APPLICATION PROCESS Development Applications are reviewed by the El Mirage Technical Advisory Committee (TAC) to ensure Building, Engineering and Zoning compliance before scheduling public
More informationCITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS
DEVELOPMENT APPLICATION PROCESS I. Technical Advisory Committee (TAC) 1. Submit TAC Review Application (See Page 3 for TAC Review Application Requirements) 2. Review of TAC Review Application by Technical
More informationApplying for a Site Development Review (Sign CVCBD only)
Guide Applying for a Site Development Review (Sign CVCBD only) What is it? Site Development Review ensures that new buildings or land uses are compatible with their sites and with the surrounding environment,
More informationSITE PLAN Application Packet (Required For All Non-Residential Development Projects)
SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,
More informationOperating Standards Attachment to Development Application
Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org SITE DEVELOPMENT
More informationConceptual, Preliminary and Final Site Plan Review in Holladay City
Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made
More informationCommunity & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS
Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project
More informationApplying for a Site Development Review
Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.
More informationCHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS
CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05
More informationMINOR DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS
9500 Civic Center Drive Thornton, CO 80229 CITY DEVELOPMENT DEPARTMENT 303-538-7295 developmentsubmittals@cityofthornton.net MINOR DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS Applications must contain the
More informationAppendix 6-F: Electric and Magnetic Field Study Report
Draft Environmental Impact Statement Cricket Valley Energy Project Dover, NY Appendix 6-F: Electric and Magnetic Field Study Report ELECTRIC & MAGNETIC FIELDS (EMFs) STUDY REPORT For the CRICKET VALLEY
More informationTOWN OF MANCHESTER PLANNING AND ZONING COMMISSION. 7:00 P.M. 494 Main Street AGENDA
TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION September 18, 2017 Lincoln Center Hearing Room 7:00 P.M. 494 Main Street AGENDA PUBLIC HEARING: 1. TOWN OF MANCHESTER PLANNING & ZONING COMMISSION To revise
More informationDOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)
DOCUMENT 01105 FOR PRELIMINARY REVIEW/APPROVAL PART I: SUBMITTAL 1.1 CITY OF FRIENDSWOOD (COF) A. Submit four (4) copies of drawings. B. Submit by 5:00 PM a minimum of fourteen calendar days (14 cd) prior
More information12 May CURRENT PLANNING Senior Planner (Jay Ruchti) 1. Put the case number, PLDP , in the upper right hand corner of the document.
12 May 2017 City of Thornton Attn: Jay Ruchti 9500 Civic Center Drive Thornton, CO 80229 Re: Initial Review Response to 04/19/17 Letter Dear Mr. Ruchti: This letter is in response to initial review comments
More informationPLANNING AND DEVELOPMENT
OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing
More informationSite Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)
1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone
More informationHillside & Foothills Development Application
Hillside & Foothills Development Application This box for office use only File #: Cross Referenced File(s): Fee: Zone(s): Are Pre-Application materials attached? Yes No This application is a request to
More informationAPPLICATION FOR ZONING AND LAND DEVELOPMENT
APPLICATION FOR ZONING AND LAND DEVELOPMENT To be completed by Town staff: Application date: Application/Fee Received: Fee Paid: TYPE OF APPLICATION (CHECK ALL THAT APPLY) ZONING DEVELOPMENT PLANS Zoning
More informationAPPLICATION DESIGN REVIEW Please Print or Type
www.srcity.org ZONING ADMINISTRATOR (ZA) APPLICATION DESIGN REVIEW Please Print or Type DESIGN REVIEW BOARD File # Related Files: LOCATION OF PROJECT (ADDRESS) ASSESSOR S PARCEL NUMBER(S) EXISTING ZONING
More informationExample Plans: Business Signs (Not For Construction)
Plans: Business s Site Plan 220 10 utility easement 120 40 50 Proposed Awning Proposed Freestanding 40 79 20 Street Name Proposed Wall C L N 123 Historic Way Indianapolis, IN 46000 Basic Elements of a
More informationSTATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES
STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES : IN THE MATTER OF THE PETITION OF : PUBLIC SERVICE ELECTRIC AND GAS : COMPANY FOR A DETERMINATION : PURSUANT TO THE PROVISIONS OF : N.J.S.A. 0:D-1 : BPU DOCKET
More informationWILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305
WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal
More informationCHAPTER ELECTRIC AND MAGNETIC FIELDS
CHAPTER 62-814 ELECTRIC AND MAGNETIC FIELDS 62-814.100 Intent, Findings, Basis of Standards, and Research Needs 62-814.200 Electric and Magnetic Fields; Definitions 62-814.300 General Technical Requirements
More informationSite Plan/Building Permit Review
Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required
More informationSECTION 3 IMPROVEMENT PLAN REQUIREMENTS
SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,
More informationColorado PUC E-Filings System
Page of BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * * Colorado PUC E-Filings System IN THE MATTER OF THE APPLICATION OF PUBLIC SERVICE COMPANY OF COLORADO FOR APPROVAL OF THE
More informationSITE PLAN APPLICATION
SITE PLAN APPLICATION SECTION 1. APPLICANT/OWNER INFORMATION Please Print or Type Applicant/Developer: City: State: Zip: Telephone: Fax: E-mail: Applicant s Status: (Check One) Owner Tenant Prospective
More informationPLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material
PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS Per the provisions
More informationCONCEPT REVIEW GUIDELINES
Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES
More informationMemorandum. Dear Ms. Allen,
RhoadesPlanningGroup Memorandum To: Shannon Allen, AICP, Principal Planner From: Rhoades Planning Group Date: June 10, 2015 Re: Response to Incomplete Letter, 1900 Fourth Street Dear Ms. Allen, This letter
More informationPLANNING Development Services Department
PLANNING Development Services Department Date Stamp APPLICATION SUBMITTAL CHECKLIST for Design Review Case Number: I acknowledge that the City of Glendale requires the following items be submitted before
More informationDESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN
209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN *** IMPORTANT INFORMATION Please
More informationBulk Electric System Definition Reference Document
Bulk Electric System Definition Reference Document January, 2014 This draft reference document is posted for stakeholder comments prior to being finalized to support implementation of the Phase 2 Bulk
More informationCity of Santa Paula Planning Department
City of Santa Paula Planning Department INSTRUCTIONS FOR SUBMITTING APPLICATIONS DESIGN REVIEW, PLANNED DEVELOPMENT PERMITS, CONDITIONAL USE PERMITS AND VARIANCES A. ITEMS / DOCUMENTS REQUIRED FOR SUBMITTAL:
More informationSITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS
INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with
More informationSmall Cell Infrastructure in Denver
September 2017 Small Cell Infrastructure in Denver The City and County of Denver is receiving growing numbers of requests from wireless providers and wireless infrastructure companies to construct small
More informationTown of Skowhegan Application For Development Review
Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:
More informationAC Magnetic Field Survey Report
AC Magnetic Field Survey Report of Literature Building - 3 University of California San Diego for University of California San Diego La Jolla, California Report Date: February 15, 21 FMS Ref: 21-182 FIELD
More informationList of Figures. List of Forms
City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan
More informationAPPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT
209 South Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT *** IMPORTANT
More informationSUBDIVISION PLAT APPLICATION
SUBDIVISION PLAT APPLICATION ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fee (Nonrefundable)$ (772)871-5212 FAX: (772)871-5124 Receipt #.......................................
More informationChecklist for Tentative Subdivision Map
Checklist for Tentative Subdivision Map All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,
More informationCITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:
CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA 50311 Phone: 515-283-4200 Minor Site Plan list This checklist should be used as a guide in the preparation of
More informationA. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT
400. 402.A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT SECTION 400 PURPOSE The purpose of the Sketch Plan is to provide an opportunity for the applicant to consult early
More informationMailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:
/ Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax
More information2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town.
Subject: Antenna Systems Policy Number: Date Developed: 2008/09 Date Approved: April 8, 2009 Lead Department: Planning and Development Date Modified: (if applicable) November 26, 2014 A. PROTOCOL STATEMENT:
More informationBulk Electric System Definition Reference Document
Bulk Electric System Definition Reference Document JanuaryVersion 2 April 2014 This technical reference was created by the Definition of Bulk Electric System drafting team to assist entities in applying
More informationPLANNED SIGN PROGRAM SUBMITTAL REQUIREMENTS
PLANNED SIGN PROGRAM SUBMITTAL REQUIREMENTS City of Greenwood Village Community Development Department 6060 S. Quebec Street Greenwood Village, CO 80111-4591 (303) 486-5783; FAX (303) 773-1238 SUBMITTAL
More informationOakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)
Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248)-858-1447 Fax (248)-858-7466 Requirements Needed for Final Condominium Approval General Requirements. 1
More informationDEP 2008 ELECTRIC AND MAGNETIC FIELDS CHAPTER ELECTRIC AND MAGNETIC FIELDS
CHAPTER 62-814 ELECTRIC AND MAGNETIC FIELDS TABLE OF CONTENTS PAGE 62-814.100 Intent, Findings, Basis of Standards, and Research Needs. 2 62-814.200 Electric and Magnetic Fields; Definitions. 3 62-814.300
More informationCHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN
N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional
More informationCITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET
CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES
More informationSANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS
SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications
More informationPorter County Plan Commission
Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer
More informationDEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3
DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3 Unified Development Code (UDC) Article 2, Applications, Procedures and Criteria provides the steps for applying the Unified Development Code standards to
More informationTown of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014
Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014 This form is to be completed by either applicant or their representative and submitted with Preliminary Review plans.
More informationTown of Holly Springs Sign Installation Packet
Town of Holly Springs Sign Installation Packet Department of Planning & Zoning 128 S. Main Street P.O. Box 8 Holly Springs, NC 27540 (919) 557-3908 HSPlanning@hollyspringsnc.us GENERAL INFORMATION: If
More informationSUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV
COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS
More informationRecommended Changes to the Public Hearing Draft Zoning Ordinance
DATE: December 6, 2016 TO: Village of Oak Park FROM: Arista Strungys SUBJECT: Recommended Changes Recommended Changes to the Public Hearing Draft Zoning Ordinance ZONING MAP» Edit to remove right-of-way
More informationCITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES
SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES CITY OF RICHMOND 112 JACKSON STREET RICHMOND, TEXAS 77469 PHONE: 281-232-6871 FAX: 281-238-1215 CITY OF RICHMOND PUBLIC
More informationPlanning and Zoning Application & Checklist
City of Driggs, Idaho Planning & Zoning 60 S. Main Street PO Box 48 Driggs, ID 83422 Ph: (208) 354-2362 Fax: (208) 354-8522 www.driggs.govoffice.com Planning and Zoning Application & Checklist DESIGN REVIEW
More informationI. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted.
SITE PLAN BUILDING ELEVATION LANDSCAPE PLAN SIGNAGE PLAN APPLICATION FOR THE VILLAGE OF MATTESON I. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted.
More informationCHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.
14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic
More information1. Denver Water is not the provider. [C1 Cover] Baseline Response: Revised to show Thornton Water Department as the provider.
Nate Hatleback Project Manager City of Thornton 303 538 7694 Nate.Hatleback@cityofthornton.net Re: Topgolf Review The City of Thornton has provided comments regarding several submittals on June 14 th,
More informationCITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)
CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA 98040 (206) 275-7605 SUBMITTAL REQUIREMENTS FOR DESIGN COMMISSION APPROVAL & SIGNAGE APPROVAL PURPOSE: Design Commission
More informationDavid J. Gellner, AICP, Principal Planner
Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission David J. Gellner, AICP, Principal Planner - 801-535-6107 - david.gellner@slcgov.com Date: October
More informationSUBMITTAL REQUIREMENTS RCV D REJECT PENDING
1 of 5 SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1. General Information. 1.1 Applicant s name, address and contact numbers. 1.2 Project name, type, address and legal description of the property. 1.3
More informationVillage of Glenview Appearance Commission
Village of Glenview Appearance Commission STAFF REPORT June 13, 2018 TO: Chairman and Appearance Commissioners FROM: Community Development Department CASE #: A2018-062 LOCATION: PROJECT NAME: 1533 Waukegan
More informationADMINISTRATIVE PERMIT SUBMITTAL REQUIREMENTS
ADMINISTRATIVE PERMIT SUBMITTAL REQUIREMENTS DEVELOPMENT DESIGN REVIEW (DDR) Number of Copies Application Form 1 Supplemental Project Information Questionnaire 1 Assessor s Parcel Map (with property outlined)
More informationPRELIMINARY PLAT CHECK LIST
Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report
More informationAPPLICATION FOR SITE PREPARATION PERMIT
Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.
More informationMULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST
MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be
More informationChecklist for Minor Plan Modification
Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,
More informationSUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT
SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will
More informationACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS
ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS Detailed construction drawings for system extensions shall be prepared for approval with a submittal to the Authority. All construction
More informationCHAPTER 2 SUBMITTAL AND REVIEW PROCEDURES TABLE OF CONTENTS
CHAPTER 2 SUBMITTAL AND REVIEW PROCEDURES TABLE OF CONTENTS Section Title Page 2.1 General... 2-1 2.1.1 General Submittal Criteria and Procedures...2-1 2.1.2 Authorization/Certification...2-1 A. Designer
More information5.7 Plan Documentation and Supporting Information.
5.7 and Supporting Information. In any case where the and Supporting Information for a Development Plan requires the submission of a Site Plan, Overall Plan, Landscape Plan, Building Elevations, Sign Plan
More informationProcedure to Petition for Plat Review and Site Plan Review
Economic Development Department (734) 676-7104 or (734) 676-7109 Procedure to Petition for Plat Review and Site Plan Review All site plans shall be submitted to the Economic Development Department to be
More informationCITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:
CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?
More informationCITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION
CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION Christine S. Primiano, Principal Planner Room 14, City Hall, Jay Street SCHENECTADY, NY 12305-1938 518.382.5147 cprimiano@schenectadyny.gov www.cityofschenectady.com
More informationMinor Site Plan Application and Checklist Land Disturbing Activities
Minor Site Plan Application and Checklist Land Disturbing Activities INSTRUCTIONS: Please provide the requested information below. The Development Services Department reviews each site plan submittal based
More informationSPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS
Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized
More informationArticle 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW
Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Section 4.01 Purpose It is the intent of this Article to specify standards, application and data requirements, and the review process which shall
More informationDESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MARCH 16, 2016 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Robert Garcia, Senior
More informationCity of Palmetto Florida
Date Submitted: City of Palmetto Florida General Development/ Construction/ Final Site Plan Application For Planned Developments nly) PRJECT NAME: TYPE F APPRVAL DESIRED: See fee schedule below) Small
More informationLARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)
3966 Archer Pkwy Cheyenne, WY 82009 planning@laramiecounty.com Phone (307) 633-4303 Fax (307) 633-4616 SITE PLAN REVIEW PROCESS 1. Pre-Application Meeting: The applicant shall meet with a Laramie County
More informationMinor Site Plan Application
Section 496-11.3.6 of the City Code: Minor Site Plan Review allows for review of the site design of routine development applications that are eligible to be processed administratively. Procedure 1. If
More informationSummerland Planning Advisory Committee
Summerland Planning Advisory Committee SunPAC Meeting #32 May 10, 2011 1 SunPAC Meeting Agenda Call to Order Agenda Item: 1 Item 1: Pledge of allegiance and roll call Item 2: Public comment period Item
More informationDOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION
This application, including the Conceptual Review Presentation, must be completed and submitted to the Downtown Development Review Board (DDRB) Staff twenty (20) business days prior to the upcoming DDRB
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationTOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE
TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist
More informationREPLY OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) TO PROTESTS AND REQUESTS FOR HEARINGS
Julie A. Miller Senior Attorney Julie.Miller@SCE.com May 25, 2005 Docket Clerk California Public Utilities Commission 505 Van Ness Avenue San Francisco, California 94102 RE: A.05-04-015 Dear Docket Clerk:
More informationCHAPTER 26 SITE PLAN REVIEW
CHAPTER 26 SITE PLAN REVIEW Section 26.1. Committee. The Planning Commission shall appoint three members of the Planning Commission to the site plan review committee which shall be responsible for site
More informationPRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS
Development Services Department, 3363 West Park Place, Pensacola, Fl 32505 (850) 595-3475 PRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS All Preliminary Plat / Construction
More informationMINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS
Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS
More informationCustomer Requirements RF Antenna Installations
Application Terms Attachment requirements and clearances on the Pole for Radio Frequency (RF) antenna equipment installations. This standard is intended to allow electrical workers to perform their normal
More informationCITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES
CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES I. PURPOSE AND COMPLIANCE In implementing City Code, Chapter 8, Section 815, the City Council of the City of Pine City (the City ) finds that
More information