76'-0" 10'-5 7/8" 10'-2" 3 7/8 15'-10 1/8" 5'-0" 42'-1 7/8" DINING. IS x83 KITCHEN. 36x80 CLAYTON WAKARUSA

Size: px
Start display at page:

Download "76'-0" 10'-5 7/8" 10'-2" 3 7/8 15'-10 1/8" 5'-0" 42'-1 7/8" DINING. IS x83 KITCHEN. 36x80 CLAYTON WAKARUSA"

Transcription

1 SHEAR WALL "B" SHEAR WALL "A" '-0" 70'- /" '- /" '- /" 7'-0" '- 7/" '-0 /" '-0" 0'- 7/" 0'-" MASTER BATH / MASTER BEDROOM / DINING 0 WS FURN x0 ES / LAUN. SHELF D W / W/H 9 / WS '-" WS / WS WALK IN / 0E / LIVING ROOM x0 IS-.0 x KITCHEN SHELF PAN F / BEDROOM # E / BATH # / BEDROOM # E '- /" 70'- /" '- /" '- /" 0'- /" 7'-0 /" '-9" '-0" '-0 /" 0'- 7/" 0'-" SHEAR WALL "C" FLOOR PLAN

2 MASTER BATH MASTER BEDROOM " x " x '-0" DINING '-" 0'-9" RAG LAUN. SHELF D W RAG RAG 7'-" WALK IN 9'-9" 9'-0" '-0" x HIGH x LOW LIVING ROOM KITCHEN PAN BEDROOM # BATH # 0 7'-" BEDROOM # NOTES:. ALUMINUM HEAT DUCTS. X0 REGISTERS. INLINE REGISTERS STANDARD. " BRANCH DUCTS '-0" '-0" '-" '-" HVAC LAYOUT

3 SHIP LOOSE QUANTITY DESCRIPTION " XLTL " SANTEE " COUPLING 0 " C/O W/PLUG ' " PIPE SANTEE DBL SANTEE LTTY XLTL ELL WYE " P-TRAP 7 DBL LTTY CO DBL ELL " 9 x CLST. ELL AUTO VENT K/S /" P-TRAP WASHER /" STAND PIPE CO " /" " /" " 0" " " /" " 9 /" " " " " " VTR " " P-TRAP " 7" " VTR CO " '- /" " " /" " P-TRAP " 7 7/" " " " " P-TRAP CO " " " 0" /" " 0" " " " " " 0'-" " " MAIN DRAIN NOTE:. ALL PIPE AND FITTINGS ARE PVC SCHEDULE 0.. ASSEMBLY OF PIPE AND FITTINGS PER CONTAINER OF GLUE AND SOLVENT.. MATERIAL, PIPE, AND FITTINGS BY MANUFACTURE.. PIPING TO BE SUPPORTED AT '-0" AND /" PER FOOT SLOPE MAINTAINED.. CUT PIPE TO LENGTH, COUPLERS ARE PROVIDED.. DASHED LINES INDICATE FIELD INSTALLED PIPE. 7. A COPY OF THIS LAYOUT TO ACCOMPANY UNIT AS PART OF THE INSTALLATION INSTRUCTIONS. PLUMBING DWV LAYOUT

4 WASHER COLD HOT SHUT-OFF VALVE KITCHEN SINK /" INLET /" /" /" /" W/H /" /" /" /" /" D/W /" ICE FAUCET NOTES:. ALL PIPING IS TUFF-PEX. ALL FITTINGS ARE LISTED FOR USE WITH TUFF-PEX. ALL LINES /" UNLESS OTHERWISE SPECIFIED. MAIN SHUT-OFF INSTALLED AT INLET. ALL OTHER SHUT-OFFS ARE IONAL.. WATER HEATER TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS INSTALLATION INSTRUCTIONS. PLUMBING SUPPLY LAYOUT

5 DRYER 0000 BTUH W/H 000 BTUH FURNACE 000 BTUH /" INLET /" /" RANGE 000 BTUH PLUMBING GAS LINE LAYOUT

6 WP HTR MASTER BATH WALK IN MASTER BEDROOM 9 SD 9 SD LIVING ROOM DINING 9 KITCHEN PV PAN T BEDROOM # F 0 SD 9 ES LAUN. SHELF D W BATH # W SD 9 BEDROOM # WP WP P ELECTRICAL LAYOUT

7 7'-0" '-0" 7'-0" (SEE CLAYTON INSTALLTION MANUAL FOR PIER / FOOTER LAYOUT & DESIGN INFORMATION) '-" GAS '-0" '- " '-0" ELECTRIC WATER 0'-" 9 9 '-0 " 0 9'-0" DWV 9 7 9'-" DWV 99 '-". DESIGNED FOR PSF ALLOWABLE SOIL IN ACCORDANCE WITH (PAGE 7 & ) [.0] 7'- ". FROST DEPTH IS INCHES PER (FIGURE A) OR FROM LAHJ.. FROST PROTECTION WILL BE PROVIDED BY (Check one) : NA ; PLACING FOOTERS BELOW GRADE ; FROST PROTECTED DESIGN PAGE ; FROST FREE DESIGN PAGE [.(b)]. SPACE FRAME PIERS AT ' FROM EACH END AND FT.- INCHES ON CENTER BETWEEN.. LOAD AT EACH FRAME PIER WILL BE LBS. PER (TABLE ) without perimeter blocking OR (TABLE 7 ) with perimeter blocking AT SPACING ABOVE.. SINGLE or DOUBLE (circle one) DRY or MORTARED(circle one) STACK CONCRETE BLOCKS WILL BE USED FOR ALL FRAME PIERS WHICH HAS CAPACITY OF LBS PER MAX. & PIER HEIGHT IS INCHES OR LESS (TABLE 9) (PAGE ) [.0] 7. FRAME PIER FOOTING AREA WILL BE SQ. INCHES WHICH WILL BE INCHES (SQUARE OR DIAMETER) (circle one) (TABLE 0). FOOTERS WILL BE POURED/ PRECAST/ OTHER: (circle one or fill in) WITH MINIMUM DEPTH OF INCHES (TABLE 0A) 9. LOAD AT SIDEWALL OPENINGS IS LBS. (TABLE d). FOOTING AREA WILL BE SQ. INCHES WHICH WILL BE INCHES (SQUARE OR DIAMETER) (circle one) (TABLE 0) 0. MATING WALL COLUMN PIERS: SPAN: FT.; LOAD: LBS.; FOOTER SIZE: INCHES (SQUARE OR DIAMETER) (circle one); PIER CONF: STACKED; (PER TABLE ; TABLE 0;TABLE 9) (Reference to Clayton Homes DAPIA approved Installation manual) [Reference to Federal Statutes CFR Part 0, or ]. THIS PRINT IS PROVIDED TO SHOW THE REQUIRED PIER LOCATION THAT ARE NOT MODIFIED BY THE SITE SOIL CLASSIFICATIONS. REFERENCE THE CLAYTON HOMES HUD INSTALLATION MANUAL FOR ALL LAYOUT AND DESIGN INFORMATION. THIS STRUCTURE HAS NOT BEEN DESIGNED TO BE LOCATED WITHIN FLOOD HAZARD LOCATIONS, WHEN SITE IS LOCATED, AUTHORITY HAVING JURISDICTION OR FLOOD HAZARD MAPS, THE UNIT SHALL HAVE LOWEST FLOOR ELEVATED ABOVE THE DESIGNED FLOOD ELEVATION. THE DESIGN WIDTH IS NOMINAL AND DOES NOT TAKE INTO ACCOUNT THE OSB, SIDING, OR GAPS IN THE MATELINE AREA. A SITE INSTALLER SHOULD CONFIRM ALL MEASUREMENTS WITH THE FINISHED STRUCTURE.. PERMITER BLOCKING SHOWN MAY BE OMITTED DUE TO ADDITIONAL FLOOR JOISTS PER THE SET UP MANUAL ADDENDUM SU-ADD Wind Speed: Wind Zone. Maximum Roof Load: 0psf. Seismic Design Category: C. Max Sidewall Overhang: " Perimeter blocking not Required FOUNDATION LAYOUT 0#, 0# DRAWN BY: BH 7

CLASSIC PRODUCT FLOOR PLAN

CLASSIC PRODUCT FLOOR PLAN SHEAR ALL "B" SHEAR ALL "A" 2'-0" 30E '-0" 22'-0" '-0" 0 0 3 0'- 30 BEROOM 3 LIVING ROOM KITCHEN INING ROOM 3'-" 30 27'-0" 7'-0" CLEARSPAN SHELF OOR OOR 3'-" BEROOM 2 #2 ALK IN BEROOM FURN BL OOR OR x7

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information

INDEX PAGE RELEASE SECTION NUMBER DATE

INDEX PAGE RELEASE SECTION NUMBER DATE INSTALLATION INSTRUCTIONS For Wind Zone 1 (other Wind Zones available on request) Version 11/20/2002 INDEX PAGE RELEASE SECTION NUMBER DATE Approval INTRODUCTION 2 2/26/2001 GENERAL INSTALLATION 3 2/26/2001

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

CRAFTSMAN EXAMINATION, JUNE 2008 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

CRAFTSMAN EXAMINATION, JUNE 2008 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9195 CRAFTSMAN EXAMINATION, JUNE 2008 PLUMBING INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed THREE

More information

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped

More information

Pre Drywall Inspection Report

Pre Drywall Inspection Report Pre Drywall Inspection Report Pratik Property Address: Seneca Lot 36 Cumming GA 10/28/2016 Dana Home Inspections, Inc. Scott Dana 1050 Lakemont Trace Roswell, GA 30075 404-849-8293 www.danahi.com General

More information

Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products

Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products Plumbing Plans Introduction Classifications of piping: Industrial Carries liquids and gases used in the manufacture of products Residential (i.e., plumbing) Carries fresh water, gas, liquid, solid waste

More information

SUBSTATION SECURITY WALL INSTALLATION MANUAL

SUBSTATION SECURITY WALL INSTALLATION MANUAL SUBSTATION SECURITY WALL INSTALLATION MANUAL JULY 26, 2016 OLDCASTLE PRECAST, INC. 3000 New McEver Rd, Acworth, Ga 30101 Substation Security Wall Installation Manual This Installation Manual is intended

More information

SECTION: 15 ZONING RULE LOT AREA 6134 S.F S.F. BUILDING AREA (FOOTPRINT) LOT COVERAGE 20.2% 24.86' FRONT YARD SIDE YARD 8.

SECTION: 15 ZONING RULE LOT AREA 6134 S.F S.F. BUILDING AREA (FOOTPRINT) LOT COVERAGE 20.2% 24.86' FRONT YARD SIDE YARD 8. PROPOSED 1ST FLOOR PROPOSED 2ND FLOOR Anthony Hatziioannou Architect, P.C. EXISTING 1ST FLOOR ZONING CALCULATION JURISDICTION: TOWN OF OYSTER BAY SECTION: 15 BLOCK: 71 LOT: ZONE: RESIDENCE R1-7 PERMITTED

More information

3 Basic Code Enforcement, Part 3

3 Basic Code Enforcement, Part 3 Study Session 3 Basic Code Enforcement, Part 3 Technical Aspects of Code Enforcement OBJECTIVE: To become familiar with the technical aspects of code enforcement: first, by learning to recognize the basic

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

SCALE 1/4" = 1'-0" SCALE 1/4" = 1'-0" SCALE 1/4" = 1'-0"

SCALE 1/4 = 1'-0 SCALE 1/4 = 1'-0 SCALE 1/4 = 1'-0 0 1' 2' ' 4' 5' ' 7' 8' ' 10' GRAPHIC BRICK ELEVATIONS 1525 1 OF 5 0 1' 2' ' 4' 5' ' 7' 8' ' 10' GRAPHIC " OVERHANG " OVERHANG " OVERHANG ELEVATIONS 1525 2 OF 5 0 1' 2' ' 4' 5' ' 7' 8' ' 10' GRAPHIC 58'-

More information

3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?

3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)? Mobile County Public Works Residential Plan Reviewers Checklist For Structural Requirements of Wood Framed Residences Recommendation: Permit as Noted Revise Plans and Resubmit MCPW Ref. No. Design Criteria:

More information

1. Name the horizontal member that rests on the foundation wall to support other wood members.

1. Name the horizontal member that rests on the foundation wall to support other wood members. Student Name: Teacher: Date: District: Rowan Assessment: 9_12 T and I IC62 - Drafting - Architr II Test 1 Description: Unit C - Floorplans - Test 3 (ALL) Form: 501 1. Name the horizontal member that rests

More information

PLAN CEILING FRAMING PLAN CEILING JOIST SCHEDULE. Tenant Improvements. UNLV Police Station Maryland Parkway.

PLAN CEILING FRAMING PLAN CEILING JOIST SCHEDULE. Tenant Improvements. UNLV Police Station Maryland Parkway. TYPICAL HEADER, SEE DETAIL 3/ 4 1 6 2 CEILING FRAMING PLAN SCALE: 3/16" = 1'-0" 2 2 4 600S162-43 FLAT BRACE, 4 CEILING JOIST, SEE SCHEDULE, BOXED BEAM: (2) 600S162-54 + (2)14GA TRACKS 2 CEILING JOIST SCHEDULE

More information

Shearwall System Installation Guide

Shearwall System Installation Guide Shearwall System Installation Guide Complete HFX product listing with dimensions, weights, connectors, typical installations and accessories. Also includes Hardy Frame Moment Frame information. Easy as

More information

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

5/16 Flange nut. Bolt Keeper Plate (8 Sq. SYS.) (3) 1/2 x 3 Hex head connector zinc plated bolt w/ washers and nut. Anchor 3 sq. 7 Ga. 2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc

More information

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped

More information

3.1 General Provisions

3.1 General Provisions WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope

More information

DECK PERMIT APPLICATION PACKET

DECK PERMIT APPLICATION PACKET Building Division 865 SE Barrington Dr Oak Harbor, WA 98277 Ph 360.279.4510 Fax 360.279.4519 DECK PERMIT APPLICATION PACKET SUBMITTAL FORMS INDEX Basic Deck Submittal Checklist Residential Deck Submittal

More information

Richland Ranch Homes. Homes Worth Looking Into!

Richland Ranch Homes. Homes Worth Looking Into! 2015 1 Richland Ranch Homes Homes Worth Looking Into! www.commodore-pennsylvania.com Table of Contents Pg Model Size Sq. Ft. 4 GF729A 2848 1280 4 GF706A 2848 1198 5 GF726A 2848 1280 5 GF774A 2840/60 1309

More information

SINGLE SECTION HOMES NORTHWOOD SERIES

SINGLE SECTION HOMES NORTHWOOD SERIES 1 SINGLE SECTION HOMES NORTHWOOD SERIES ABOUT US Redman Homes is one of the oldest and most respected homebuilders in America. Founded in 1937, Redman pioneered factory home construction and continues

More information

Architectural Design

Architectural Design Punch! Pro Dream House Project After completing the tutorial and scale drawing exercises the students will design their dream home using Professional Home Design program, Punch! Home Design. Using Professional

More information

TO WHOM IT MAY CONCERN:

TO WHOM IT MAY CONCERN: TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit

More information

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................

More information

ERRATA AND REVISIONS to the CANADIAN PLUMBING CODE

ERRATA AND REVISIONS to the CANADIAN PLUMBING CODE NATONAL RESEARCH COUNCL OF CANADA ASSOCATE COMMTTEE ON THE NATONAL BULDNG CODE ERRATA AND REVSONS to the CANADAN PLUMBNG CODE 1970 (ncorporating changes from Change Series No.2 to the National Building

More information

Load Tables, Technical Data and Installation Instructions

Load Tables, Technical Data and Installation Instructions W22. W22. W22. W22. W22 W22.. Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections Including Ledgers Designed to provide an easy-to-install, high-strength alternative to through-bolting

More information

When is a Building Permit Required? Deck Details: What Must be Submitted with a Building Permit Application?

When is a Building Permit Required? Deck Details: What Must be Submitted with a Building Permit Application? P.O. Box 1190, Fort Collins, Colorado 80522-1190, Planning (970) 498-7683, Building (970) 498-7700, Larimer.org When is a Building Permit Required? A permit is required if ANY of the following is true:

More information

SECOND FLOOR 960 sq. ft.

SECOND FLOOR 960 sq. ft. Great Room 13'3" x 12'3" Flex Room 8'6" x 7'10" Bedroom 2 10'4" x 11'5" Nook 10'2" x 9'6" Bedroom 3 10'4" x 10'11" W D Laundry Mudroom DW 11'5" x 15'0" Half Ensuite Linen FRONT GARAGE DUPLEX BATHROOMS

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

Training Manual The Installation of Siphonic Pipework

Training Manual The Installation of Siphonic Pipework Training Manual The Installation of Siphonic Pipework The Engineered Rainwater Solution Training Manual: The Installation of Siphonic Pipework o Overview of Principals of Siphonic Drainage o Interpreting

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1 ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,

More information

1907 Grayson Street North Charleston, SC TMS: FRANKLIN DESIGN

1907 Grayson Street North Charleston, SC TMS: FRANKLIN DESIGN Metanoia Houses 1907 Grayson Street North Charleston, SC 29405 TMS: 469-12-00-090 DESIGN Chris Bonner, Architect 582 Rutledge Ave Charleston SC 29403 843.608.1858 www.bstudioarchitecture.com 1907 Grayson

More information

THE. Harbor Master ELEVATION 2

THE. Harbor Master ELEVATION 2 THE Harbor Master ELEVATION 2 Additional Elevations ELEVATION 1 ELEVATION 3 Lower Level Patio 28'10" x 12'0" Mechanicals on Raised Platform H Lower Entry HVAC Parking 20'4" x 48'0" Side Entry Garage Side

More information

Pergola Installation Guide

Pergola Installation Guide Pergola Installation Guide When only the best will do. 1 Tools Needed Installation Tools for assembly Drill(s) Miter or Circular Saw with carbide blade (cut slowly) ½" Drill Bit 5 /8" Drill Bit 5 /16"

More information

POST FRAME CONSTRUCTION MANUAL

POST FRAME CONSTRUCTION MANUAL POST FRAME CONSTRUCTION MANUAL www.pole-barn.info www.apbbuildings.com TABLE OF CONTENTS 3. Jobsite Preparation 4. Setting Foundation Posts 5. Setting Corner Posts 6. Sidewall & Endwall Posts 7. Grade

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

One Piece LSD/Vector Pads from TIE DOWN ENGINEERING Easier installation with 70% fewer parts Lower cost with competitive pricing

One Piece LSD/Vector Pads from TIE DOWN ENGINEERING Easier installation with 70% fewer parts Lower cost with competitive pricing NEW! One Piece SD/ector Pads from TIE DOWN ENGINEERING Easier installation with 70% fewer parts ower cost with competitive pricing Do the Math! Compare material and labor cost with the New SD and ector

More information

in Midtown EXCEL HOMES LOCKEPORT SECOND FLOOR 762 sq. ft. MAIN FLOOR 762 sq. ft. LANED DUPLEX TWO STOREY excelhomes.ca Nook 12'11" x 9'0"

in Midtown EXCEL HOMES LOCKEPORT SECOND FLOOR 762 sq. ft. MAIN FLOOR 762 sq. ft. LANED DUPLEX TWO STOREY excelhomes.ca Nook 12'11 x 9'0 Nook 12'11" x 9'0" Bedroom 2 9'4" x 9'10" Bedroom 3 9'4" x 9'8" Half DW 12'11" x 13'6" 12'0" x 13'0" Down Up Laundry W D Down BATHROOMS 2.5 BEDROOMS 3 LANED DUPLEX TWO STOREY FINISHED SQ. FT. 1524 DEVELOPED

More information

ONE AND TWO FAMILY DWELLINGS Uncovered Decks July, 2007

ONE AND TWO FAMILY DWELLINGS Uncovered Decks July, 2007 ONE AND TWO FAMILY DWELLINGS Uncovered Decks July, 2007 In the City of Lee s Summit, the construction of uncovered decks with a floor surface more than 30 inches above the adjacent grade level requires

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

Product Information & Installation Instructions

Product Information & Installation Instructions Product Information & Installation Instructions TUFF-STRAND TM OSB Sheathing OSB Structural Panels from MARTCO Installation Instructions: Site-Built and Modular Construction Important Notice to Buyers

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section

More information

Manholes Table of Contents

Manholes Table of Contents Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type

More information

2012 IMC Performing Commercial Mechanical Inspections

2012 IMC Performing Commercial Mechanical Inspections 2012 IMC Performing Commercial Mechanical Inspections Based Primarily on the 2012 International Mechanical Code (IMC ) and the 2012 International Fuel Gas Code (IFGC ) as applicable. ` Welcome I am You

More information

Questions. Paul Ross Wallach V7198. Published by Hearlihy P.O. Box 1747 Pittsburg, KS

Questions. Paul Ross Wallach V7198. Published by Hearlihy P.O. Box 1747 Pittsburg, KS Questions for Blueprint-Reading Exams Paul Ross Wallach Published by Hearlihy P.O. Box 1747 Pittsburg, KS 66762 866-622-1003 www.hearlihy.com 81861 V7198 Copyright 2007 by Hearlihy. Except for making transparencies

More information

Students will learn to correctly prepare, assemble, and solvent weld ABS piping.

Students will learn to correctly prepare, assemble, and solvent weld ABS piping. Description Students will learn to correctly prepare, assemble, and solvent weld ABS piping. Lesson Outcomes The student will be able to: Accurately cut plastic piping Prepare plastic piping for solvent

More information

CKBD Peakes Bath Scoresheet

CKBD Peakes Bath Scoresheet CKBD Peakes Bath Scoresheet Part I: Graphics & Presentation Standards Each question pertains to all four drawing documents: Floor Plan, Mechanical, Construction Plan, and Elevation Drawing unless specifically

More information

Non-Residential and Multi-Family Plan Check Submittal Requirements

Non-Residential and Multi-Family Plan Check Submittal Requirements Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail: www.comptoncity.org City of Compton Building & Safety Department Non-Residential and Multi-Family Plan Check Submittal Requirements The purpose of this

More information

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 WOOD SKID FLOOR FLOOR SYSTEM FOR 10x12 TRICO AND FLORA SHEDS RAW MATERIALS LIST: 2 (9) FLOOR FRAMING AND SHEATHING: 1) BAND BOARD 2 x 6 x 12 PRESSURE

More information

ICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013.

ICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013. ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-1790 Reissued September 1, 2012 This report is subject to renewal September 1, 2013. A Subsidiary of the International Code Council

More information

A/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY

A/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY A/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural,

More information

Featuring TJ Rim Board and TimberStrand LSL

Featuring TJ Rim Board and TimberStrand LSL #TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and TimberStrand LSL Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load

More information

PLAN A at Gulfstream Preserve Workforce Housing

PLAN A at Gulfstream Preserve Workforce Housing PLAN A 788 sq. ft. 1 Bedroom 1 Bathroom Lanai Plan A Gulfstream Preserve Plans and elevations are artist s renderings and may not accurately represent the actual condition of a home as constructed, and

More information

SUMMARY SHEETS OF BAR COUPLER CONNECTIONS

SUMMARY SHEETS OF BAR COUPLER CONNECTIONS APPENDIX A SUMMARY SHEETS OF BAR COUPLER CONNECTIONS NCHRP 12 88 Connection Evaluations Appendix A A 1 APPENDIX A SUMMARY SHEETS OF BAR COUPLER CONNECTIONS NCHRP 12 88 Connection Evaluations Appendix

More information

Lateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later

Lateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later Lateral Support Decks over 24 above grade require lateral support* *Exceptions to be discussed later Decking Types of Decking: -2x4s & 2x6s -five quarter span rated decking boards -Wood plastic composite

More information

What Plans Do I Need for a Building Permit?

What Plans Do I Need for a Building Permit? What Plans Do I Need for a Building Permit? 6 CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1900 SW 4th Avenue, Por tland, Oregon 97201 503-823-7300 www.portlandoregon.gov/bds This brochure

More information

Plan 1. Caselman Ranch PALOMA ELEVATION C. 3 Bed / 2 Bath / 1,776 Sq. Ft. PRELIMINARY

Plan 1. Caselman Ranch PALOMA ELEVATION C. 3 Bed / 2 Bath / 1,776 Sq. Ft. PRELIMINARY Plan 1 Caselman Ranch PALOMA 3 Bed / 2 Bath / 1,776 Sq. Ft. ELEVATION A ELEVATION B Offer void where prohibited or otherwise restricted by law. All information (including, but not limited to prices, availability,

More information

SEMI-PRIVACY PANEL AND GATE INSTALLATION INSTRUCTIONS

SEMI-PRIVACY PANEL AND GATE INSTALLATION INSTRUCTIONS SEMI-PRIVACY PANEL AND GATE INSTALLATION INSTRUCTIONS 1 BEFORE YOU START, IT S IMPORTANT TO CHECK: That fence or the fence post footings do not exceed your lot lines of your property. If you can locate

More information

LIFT. Please give your shopfitters not only this information sheet but also the floor plan showing the exact position of the unit.

LIFT. Please give your shopfitters not only this information sheet but also the floor plan showing the exact position of the unit. Installation instructions LIFT Backwash unit Important notes for the salon owner This technical information has been produced for your shopfitters. Remember to give them good advance warning so that your

More information

Tri-County Commercial Application Checklist

Tri-County Commercial Application Checklist TRI-COUNTY SERVICE CENTER TRI-COUNTY SERVICE CENTER State of Oregon Clackamas Multnomah Washington C O U N T I E S Tri-County Commercial Application Checklist Department of Consumer & Business Services

More information

SECOND FLOOR 1159 sq. ft.

SECOND FLOOR 1159 sq. ft. Nook 9'11" x 11'11" Great Room 12'11" x 11'11" Walk-in Closet Master 12'5" x 12'11" Half room Walk-in Closet Shelves Foyer Linen onus Room 13'5" x 12'11" D W FRONT GARAGE HOME TWO STOREY ATHROOMS 2.5 EDROOMS

More information

2250 S LOCUST APARTMENT IMPROVEMENTS EXPENSES

2250 S LOCUST APARTMENT IMPROVEMENTS EXPENSES APT #1 APT #1 11/12/2014 NEW GARAGE LOCKS $ 89.00 11/12/2014 NEW LOCKS $ 169.80 1/11/2015 GARAGE KEY COPIES $ 6.47 1/23/2015 PLUMBING REPAIRS REPLACED MAIN BATH SINK PIPES $ 299.76 2/2/2015 PAINTING $

More information

APPLICATION FOR A BUILDING PERMIT

APPLICATION FOR A BUILDING PERMIT APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all

More information

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type: Community Development Department 10 N. Water Street Monday Friday 847 741 3894 8:30 a.m. 5:00 p.m. 847 741 3959 FAX www.southelgin.com BASEMENT REMODEL APPLICATION PROPERTY INFORMATION South Elgin, IL

More information

PANEL NOTATION (3) D4 D3 D2 D3X2 SHEATHING THICKNESS (IN.) D " NAILS/ SPACING " o.c. SILL BOLT SPACING 1 2 " 36" O.C. 1 2 " Ø

PANEL NOTATION (3) D4 D3 D2 D3X2 SHEATHING THICKNESS (IN.) D  NAILS/ SPACING  o.c. SILL BOLT SPACING 1 2  36 O.C. 1 2  Ø PANEL NOTATION (3) D2 X2 SHEATHING THICKNESS (IN.) 32 " NAILS/ SPACING 32 " 8d @3" o.c. SILL BOLT SPACING 2 " Ø @ 36" O.C. 2 " Ø @ 2" O.C. 2 " Ø @ O.C. 2 " Ø @ 6" O.C. 2 " Ø @ '-0" O.C. 980 PLF D2X2 32

More information

On-Line Windows/Doors Permit Plan Review Package Without 25% Protection Exemption

On-Line Windows/Doors Permit Plan Review Package Without 25% Protection Exemption On-Line Windows/Doors Permit Plan Review Package Without 25% Protection Exemption W A R N I N G ON-LINE PERMITTING IS OFFERED AS A CONVENIENCE TO THE CONTRACTING COMMUNITY. IN CERTAIN CASES WHERE PLANS,

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785) 141 E 1450 Rd. Lawrence, KS 66044 (75) 594-5696 Perma-Column Installation Instructions i Unlike any other concrete post-frame foundation system, Perma-Column Precast Concrete Piers use 10,000 psi concrete

More information

EXCEL HOMES GARNET MAIN FLOOR OPTIONS KITCHEN OPTION LOCATION OVERVIEW. excelhomes.ca

EXCEL HOMES GARNET MAIN FLOOR OPTIONS KITCHEN OPTION LOCATION OVERVIEW. excelhomes.ca Zero lot line home requires window to be removed. #10901 Half Mudroom Nook 12'11" x 9'11" 14'3" x 14'11" Foyer Zero lot line home requires window to be removed. #10901 Walk-in Closet Master edroom 15'11"

More information

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute

More information

BUILDING DEPARTMENT CURRENT

BUILDING DEPARTMENT CURRENT CITY OF LAPEER FEE SCHEDULE EFFECTIVE 7-1-2018 BUILDING DESCRIPTION BUILDING DEPARTMENT CURRENT FEE Administrative Plan Review Fees Plan Review $81.00 per hour; 1 hr minimum Commercial Plan Review Deposit

More information

SECOND FLOOR 832 sq. ft.

SECOND FLOOR 832 sq. ft. Mudroom 13'0" x 11'6" DW Bedroom 3 9'4" x 10'9" Bedroom 2 9'4" x 10'3" Laundry W D 10'3" x 15'10" Nook 10'3" x 11'3" Pocket Office Linen BATHROOMS 2.5 BEDROOMS 3 LANED DUPLEX TWO STOREY FINISHED SQ. FT.

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

Ranch Rail Vinyl Fence

Ranch Rail Vinyl Fence Ranch Rail Vinyl Fence INSTALLATION INSTRUCTIONS These instructions are to be used as general guidelines for the installation of your vinyl fence under normal installation conditions. Local conditions

More information

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal Complete sets of plans are required. Plans shall be stamped and wet signed by the architect or engineer. (signed and accompanied with letter from Homeowners

More information

SDWH TIMBER-HEX Screw

SDWH TIMBER-HEX Screw Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections, Including Ledgers Double-barrier coating provides corrosion resistance equivalent to hot-dip galvanization, making it suitable

More information

24" max from each end of the ledger. See detail 6A & 6B, typ. both ends IRC R Ledger R507.2

24 max from each end of the ledger. See detail 6A & 6B, typ. both ends IRC R Ledger R507.2 NOTE: All exposed lumber to be pressure treated (P.T.) or decay resistant. Fasteners for P.T. wood shall be hot-dipped galv. or stainless steel, typical. see pages 2 & 5 for footings 8'-0" -10'-0" Beam

More information

Building Science. Design Issues. Design Issues. Advanced Framing. Stack Framing Concept. Advanced Framing. Use Less Stuff Better

Building Science. Design Issues. Design Issues. Advanced Framing. Stack Framing Concept. Advanced Framing. Use Less Stuff Better SUPPLY CENTRAL RETURN WALL 1 TW3046 TW3046 TW3046 TW3046 3068 UP SUPPLY TW3046 TW3046 16Õ-2Ó * 19Õ-2Ó * 16Ó 16Ó 16Ó 16Ó Joseph Lstiburek, Ph.D., P.Eng Building Science Advanced Framing Use Less Stuff Better

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

WHY YOU SHOULD USE TUFFLOOR. components

WHY YOU SHOULD USE TUFFLOOR. components Tuffloor DESIGN GUIDE WHY YOU SHOULD USE TUFFLOOR Strong and Easily Installed Tuffloor is a steel floor framing system designed for strength and ease of installation, and is an easy and economical alternative

More information

Fitting C.O. Adapter

Fitting C.O. Adapter ABS-DWV Fittings ABS/DWV Service Weight Pipe Schedule 30 Single step solvent cementing procedures no primer required. Excellent solvent cementing characteristics. Black. 84/Ctn. x h Hub Sanitary 0321612

More information

Use the Design Properties (100% Load Duration) Table from Page 3 for questions 1-7

Use the Design Properties (100% Load Duration) Table from Page 3 for questions 1-7 www.garyklinka.com page 1 of 16 Truss Joist I-Joist Quiz Instructions: www.garyklinka.com 1. Print these pages. 2. Print referencing manual from my site at http://garyklinka.com/manuals/tj-4000.pdf or

More information

Pergola Installation Guide. When only the best will do.

Pergola Installation Guide. When only the best will do. Pergola Installation Guide When only the best will do. Tools Needed Installation Tools for assembly Drill(s) Miter or Circular Saw with carbide blade (cut slowly) 5 /8" Drill Bit 5 /16" Magnetic Driver

More information

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do. MODERN PERGOLA INSTALLATION GUIDE When only the best will do. TOOLS LIST Drill(s) 3/8" Magnetic Driver (s) 12" Drill Extension #2 Square Drive bit for Drill or Driver Level Tape Measure Hammer Drill if

More information

Code Compliance Research Report CCRR-0155

Code Compliance Research Report CCRR-0155 Code Compliance Research Report CCRR-0155 Issue Date: 03-25-2011 Revision Date: 04-18-2018 Renewal Date: 03-26-2019 DIVISION: 06 00 00 WOOD, PLASTICS AND COMPOSITES Section: 06 63 00 Plastic Railings REPORT

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL March 2016 INSTALLATION INSTRUCTIONS FOR FURTHER QUESTIONS, PLEASE CALL 775 440 2025 JENSEN WATER RESOURCES 521 Dunn Circle, Sparks, NV 89431 JensenPumps.com Figure 1: This illustration shows a complete

More information

PROJECT INSTRUCTIONS Roofing

PROJECT INSTRUCTIONS Roofing PROJECT INSTRUCTIONS Roofing This handout outlines some basic regulations contained within the 2015 Minnesota State Building Code, as well as other good building practices. However, this handout is not

More information

CONSTRUCTION / HOUSING

CONSTRUCTION / HOUSING CONSTRUCTION / HOUSING - PRINCE EDWARD ISLAND APPLIED MATHEMATICS 80A Table of Contents Construction/ Housing Reading a Tape Measure (Imperial)... - Using a Carpenter s Square... -5 Checking for Squareness

More information

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard

More information

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION

More information

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and

More information

Side-of-Pole Mount for 4 Modules (SPM4) For Module Type B ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Side-of-Pole Mount for 4 Modules (SPM4) For Module Type B ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation Side-of-Pole Mount for 4 Modules (SPM4) For Module Type B ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A SP3358-2 PCN 060712-5 Side-of-Pole Mount for 4 Modules (SPM4) For

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Permit Application. General Information

Permit Application. General Information Town of Permit Application Application Date: / /20 Permit Type Requested: [ ] New Construction [ ] Expansion [ ] Accessory Building [ ] Reconstruction [ ] Earth Moving [ ] Dock/Deck [ ] Fence [ ] Foundation

More information

Unified School District of De Pere Tech. Ed. And Engineering Intro to Construction

Unified School District of De Pere Tech. Ed. And Engineering Intro to Construction Tech. Ed. And Engineering Intro to Construction A. Students will understand that technology is an extension of human capability. B. Students will recognize that systems are made up of individual components

More information