1 Silicon Valley Rapid Transit Program VTA's BART Silicon Valley Berryessa Extension 1436 California Circle, 2 d Floor Milpitas, CA Transmittal No. C P0728 Contract No.: C730 Contract: Contractor: C730 (DB14062F) McCatihy Building Companies, Inc. Response to: RFI-0094 PDCC#: P0728-C730-RFI-0094 Date: 4/13/2016 To: Mr. Greg Ciuba Project Manager, LEED AP BD + C McCarthy Building Companies, Inc N011h First Street, Suite 102 From: Mat1in Nnam C730 Project Manager Santa Clara Valley Transpo11ation Authority 1436 California Circle Milpitas, CA Phone: (949) Phone: ( 408) >" -'i! L cc: (Const.SVBX.CRP.C730.RFis) Hassan Basma; Dave Fong; Scott Hensler; Daniel Hinojosa; Edward Lao; Roy Lou; Nam Nguyen; Martin Nnam; Mayank Patel; Raj Sehdev; Matt Shipman; Margaret Simmons-Cross; Craig Temple; Kiet Vu; John Vukasin; Agustino Bong; Robert Dona; John Donahue; Catherine Doyle Additional Distribution: We Are Sending: Submitted For: Action Taken: 0 Shop Drawings D Execution 0 Approved As Submitted 0 Letter D Your Use 0 Approved As Noted D Prints D As Requested 0 For Reference Only D Change Order!ZI RFI Response 0 Resubmit D Plans 0 Not Approved D Samples Sent Via: 0 No Exception Taken D Specifications 0 Attached 0 Returned for Corrections D Other: 0 Separate Cover Via: 0 Due Date: Item Copies Date Description Status l l 4/13/2016 Response to RFI No Installation of Additional Berryessa Irrigation Closed Sleeves Remarks: See attached mark-ups for additional clarifications: 1. Add location C. Make location D longer to the decorative concrete band. 2. There are three entrances at location A. Add Location B " and 1-4" PVC inigation sleeves per new installation. Install per detail I/ C OK 5. OK Attachments: RFI No. 94 Mark-ups Signed: Martin Nnam, P.E. C730 Project Manager Page 1of1

2 RECEIVED PDCC April 08, 2016 Request for Information with Comments Project RFI #: Date Created: 04/06/2016 Priority: Normal SVBX Parking Structures at Milpitas and Berryessa Stations Project# C730 (DB 14062F) Tel: (408) Fax: (408) North First Street, Answer Required By: 04/08/2016 Suite 102 Submitted To Santa Clara Valley Transportation Authority Margaret Simmons-Cross 1436 California Circle 2nd Floor Milpitas, CA Submitted By McCarthy Building Companies, Inc. Eric Rudolph 2665 North First Street, Suite 102 Subject: Installation of Additional Berryessa Irrigation Sleeves Discipline: Initiated By: McCarthy - Eric Rudolph Category: BERRYESSA STATION Ref RFI: Reason: Attachments Type Name Description Content File Question RFl_Sleeve_Location_ VTA Berryessa C730.pdf REF: Attached sheet U600 Please see attached sheet U600 and provide clarification on necessary sleeve locations. Please confirm the following, 1. Irrigation sleeves highlighted in green & blue are to be installed per plans. RFl_Sleeve_Location_-_VTA_Berryessa_C730.pdf 2. Irrigation sleeves highlighted in red have recently been requested by VTA and are to be installed by McCarthy. 3. All shown sleeve locations are to have (2) 4" PVC irrigation sleeves. 4. No irrigation sleeves other than those highlighted in green, blue, or red are to be installed by McCarthy. 5. Sleeves highlighted in pink will not be installed by McCarthy as they are outside of the C730 site I scope. Suggestion Answer Date Answered: Comments See cover sheet for response. 4/13/2016 ArchitecVEngineer Signature ~ By: -1.~A Consultant: Printed On: 4/7/16 Date: Page 1of1

3

4

5 50 West San Fernando Street, Suite 950 San Jose, CA Tel (408) Fax (408)

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation June 3, 2010 Pella asks what is needed for submittals. See Attachment #1. June 7, 2010 Pella (Matt Tison) confirms the receipt of

More information

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete Mix Design - 3500 psi - Review Form Reviewed By: Laura Landon, Comma-Q Architecture Date: May 10, 2012 Project: BPS Belgrade Elementary

More information

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN SUBMITTAL REVIEW Submittal: No. 008 Spec Section: 14 2010 Passenger Elevators Reviewed By: Tripp Lewton, Comma-Q Architecture Date: May 17, 2012 Project: BPS Belgrade Elementary School Location: Belgrade,

More information

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM: OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: FLOOR BOXES BUILDING REFERENCE: DATE RECIEVED: Oct 09, 2014 DISCIPLINE: Electrical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 26 05 38 REVIEWER DUE

More information

AMES INDUSTRIAL PARK AND OFFICE PLAZA

AMES INDUSTRIAL PARK AND OFFICE PLAZA SILICON VALLEY LEASED INVESTMENT OR OWNER/USER OPPORTUNITY FOR SALE ±177,820 SF MULTI-TENANT INDUSTRIAL PARK & OFFICE PLAZA MILPITAS, CALIFORNIA $18,200,000.00 OR $102.35 PSF BACK ON THE MARKET! BUILDING

More information

SILICON VALLEY RAPID TRANSIT CORRIDOR BART EXTENSION TO MILPITAS, SAN JOSE AND SANTA CLARA POLICY ADVISORY BOARD MEETING MINUTES

SILICON VALLEY RAPID TRANSIT CORRIDOR BART EXTENSION TO MILPITAS, SAN JOSE AND SANTA CLARA POLICY ADVISORY BOARD MEETING MINUTES SILICON VALLEY RAPID TRANSIT CORRIDOR BART EXTENSION TO MILPITAS, SAN JOSE AND SANTA CLARA POLICY ADVISORY BOARD MEETING Thursday, October 18, 2007 MINUTES 1. The Regular Meeting of the Silicon Valley

More information

SUBMITTAL REVIEW COVERSHEET

SUBMITTAL REVIEW COVERSHEET SUBMITTAL REVIEW COVERSHEET Project Name: Alley 111 1725 Westlake Avenue N. Date: 2015-02-12 Suite 300 Submittal No & Description Rev 0: Submittal #220500-0205-0 Plumbing Shop Drawings L7-L8 Seattle, WA

More information

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal. SUBMITTAL REVIEW Submittal: No. 010.00 Spec Section: 03 3000 2.3 Steel Reinforcement Shop Drawings - Slab and Masonry Reviewed By: Laura Landon, Comma-Q Architecture Date: June 13, 2012 Project: BPS Belgrade

More information

TASMAN TECH MILPITAS, CA. ±10,721 to ±225,000 SF available MARRIOTT/ ELEMENT HOTEL STOP TO BART MCCARTHY BLVD COYOTE CREEK SYCAMORE DRIVE

TASMAN TECH MILPITAS, CA. ±10,721 to ±225,000 SF available MARRIOTT/ ELEMENT HOTEL STOP TO BART MCCARTHY BLVD COYOTE CREEK SYCAMORE DRIVE MILPITAS, CA MARRIOTT/ ELEMENT HOTEL LIGHT RAIL SOON STOP TO BART DRIVE DRIVE COYOTE CREEK MCCARTHY BLVD SYCAMORE DRIVE ±10,721 to ±225,000 SF available 10,000 SF 252,000 SF Available Free Standing High

More information

TASMAN TECH MILPITAS, CA. ±10,721 to ±225,000 SF available TASMAN MCCARTHY ALDER MARRIOTT/ ELEMENT HOTEL STOP TO BART

TASMAN TECH MILPITAS, CA. ±10,721 to ±225,000 SF available TASMAN MCCARTHY ALDER MARRIOTT/ ELEMENT HOTEL STOP TO BART MILPITAS, CA -890 1371- MCCARTHY 500- DRIVE MARRIOTT/ ELEMENT HOTEL LIGHT RAIL SOON STOP TO BART DRIVE COYOTE CREEK MCCARTHY BLVD SYCAMORE DRIVE ±10,721 to ±225,000 SF available 10,000 SF 252,000 SF Available

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS

SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS SEAC/ RMSCA Steel Liaison Committee May 17, 2006 Disclaimer SEAC, RMSCA, nor its committees, writers, editors and individuals who have

More information

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY 08625-0350 CHRIS CHRISTIE GOVERNOR KIM GUADAGNO Lt. Governor March 24, 2011 LEE A. SOLOMON

More information

Submittal Packages Detailed with Items and Reviewers

Submittal Packages Detailed with Items and Reviewers Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 2351 San Diego State University 5500 Campanile Drive San Diego, CA 92182 Tel: 619-594-3740 Fax: 0054-096813-1 Tile Carpeting

More information

TASMAN TECH NOW AVAILABLE. 10,000 SF 220,000 SF (appx.) MILPITAS, CA

TASMAN TECH NOW AVAILABLE. 10,000 SF 220,000 SF (appx.) MILPITAS, CA TECH MILPITAS, CA NOW AVAILABLE 10,000 SF 220,000 SF (appx.) WWW.TECH.NET FEATURES 10,000 SF 220,000 SF Available Free Standing High Image Buildings 2 VTA stops to BART-Milpitas Station 1 VTA stop to Great

More information

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM: OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: BUILDING REFERENCE: SUBJECT: ATHLETIC EQUIPMENT - CALCS - RESUBMITTED 2 TIME(S) DATE RECIEVED: Feb 02, 2015 DISCIPLINE: Structural PRIORITY STATUS: 2-STANDARD SPECIFICATION

More information

Submittal Transmittal

Submittal Transmittal Submittal Transmittal DLR Group PROJECT: SUBJECT: Windsor High School 37-17223-00 Flush Wood Doors - Flush Wood Door, Veneer-Faced Doors Product Data and Shop Drawings DATE SENT: 6/21/2017 SUBMITTAL ID:

More information

VTA Board of Directors: This is for your information only.

VTA Board of Directors: This is for your information only. From: Board.Secretary Sent: Tuesday, March 24, 2015 11:26 AM To: VTA Board of Directors Cc: Alaniz, Bernice Subject: VTA/Santa Clara County Human Trafficking press conference - March 24, 2015 2 p.m. Importance:

More information

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED HVAC WATER TREATMENT CHILLED WATER PIPING TR SUBMITTAL NUMBER: SUBMITTAL DETAILS:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED HVAC WATER TREATMENT CHILLED WATER PIPING TR SUBMITTAL NUMBER: SUBMITTAL DETAILS: OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: BUILDING REFERENCE: DATE RECIEVED: Jun 01, 2015 DISCIPLINE: Mechanical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 23 25 00 REVIEWER DUE DATE: 6/11/2015

More information

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0. SUBMITTAL REVIEW SENT VIA: REGULAR MAIL OVERNIGHT FAX HAND DELIVERY DIGITAL DELIVERY OTHER: TO: Rodrigo Gorgazzi / CannonDesign Steve Benesh / CannonDesign Tim Donlon / FROM: Steven Cooper CC: David Barnett

More information

Why BIM? VASQUEZ MARSHALL ARCHITECTS

Why BIM? VASQUEZ MARSHALL ARCHITECTS Why BIM? VASQUEZ MARSHALL ARCHITECTS Agenda Introductions Using BIM Software For Drawing Production Using BIM Software For Constructability Review Benefits Of BIM Getting Started BIM Experts Michael Smith

More information

Fremont Business Center FREMONT, CALIFORNIA

Fremont Business Center FREMONT, CALIFORNIA CRAIG FORDYCE, sior, ccim +1 408 282 3911 craig.fordyce@colliers.com CA License No. 00872812 MIKE ROSENDIN, sior, ccim +1 408 282 3900 michael.rosendin@colliers.com CA License No. 00826095 SHANE MINNIS,

More information

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016. SUBMITTAL REVIEW Submittal: No. 016.00 Spec Section: 3 113 Underground Natural Gas Piping Reviewed By: Laura Landon, Comma-Q Architecture Date: June 1, 01 Project: BPS Belgrade Elementary School Location:

More information

January 10, Public Utilities Commission of the State of California 505 Van Ness Avenue San Francisco, CA Advice Letter No.

January 10, Public Utilities Commission of the State of California 505 Van Ness Avenue San Francisco, CA Advice Letter No. January 10, 2017 San Jose Water Company 110 West Taylor Street San Jose, CA 95110 Phone 408 279-7900 Fax 408 279-7934 Public Utilities Commission of the State of California 505 Van Ness Avenue San Francisco,

More information

REQUEST FOR INFORMATION (RFI)

REQUEST FOR INFORMATION (RFI) Planning, Development & Facilities 349 Magnolia Avenue Glendale, California 91204 Tel: 818.507.0201 Fax: 818.507.4911 Project Name: Jefferson ES-12 Classroom Bldg. DSA No: A#:03-114361, File#:19-41 District

More information

Submittal Review Form

Submittal Review Form Submittal Review Form Project Name: SMD1 Pump Station Project Contract No: 184030298 Submittal No: 8.1 Resubmittal Received Submittal Title: Standby Generator, Resubmittal 01 Spec. No: 16620 Routing Sequence

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

Fremont Business Center

Fremont Business Center CRAIG FORDYCE, sior, ccim +1 408 282 3911 craig.fordyce@colliers.com MIKE ROSENDIN, sior, ccim +1 408 282 3900 michael.rosendin@colliers.com SHANE MINNIS, leed ap +1 408 282 3901 shane.minnis@colliers.com

More information

Request or Schedule an Appointment Health Link

Request or Schedule an Appointment Health Link Request or Schedule an Appointment Health Link Process to schedule or request an appointment with a Heritage Valley Provider via Health Link Patient Portal Please read before proceeding: Request an Appointment

More information

Drawings or Data are Submitted: For Approval For Information B Training Plan Polymer Make Down Units 01820

Drawings or Data are Submitted: For Approval For Information B Training Plan Polymer Make Down Units 01820 Date: 2/1/18 P1-101 Submittal Transmittal Project Name: P1-101 Sludge Dewatering and Odor Control at Plant 1 To: Orange County Sanitation District 10844 Ellis Avenue Fountain Valley, CA 92708 Attn: Plant

More information

Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1

Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1 700 NEW YORK AVENUE N.W., WASHINGTON, D.C. 20006 Office: 202.842.200 Museum of the Bible Submittal Pkg. No.: 08443.0 Submittal Review Form Submittal Items thru SG Project No: 26865.000 Response Date: 3/2/206

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

GSFC CONFIGURATION MANAGEMENT MANUAL

GSFC CONFIGURATION MANAGEMENT MANUAL GSFC-CM-001 Effective Date: 05/03/2007 Expiration Date: 05/03/2008 National Aeronautics and Space Administration Goddard Space Flight Center Greenbelt, MD 20771 GSFC CONFIGURATION MANAGEMENT MANUAL Responsible

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SUBJECT^REPLACEMENT MEMORANDUM REGARDING CITY COUNCIL COMMITTfeES^BdARDS AND COMMISSIONS APPOINTMENTS

SUBJECT^REPLACEMENT MEMORANDUM REGARDING CITY COUNCIL COMMITTfeES^BdARDS AND COMMISSIONS APPOINTMENTS COUNCIL AGENDA 1/10/17 ITEM 2 14 CITY OF SANjOSE CAPITAL OF SILICON VALLEY Memorandum TO: CITY COUNCIL FROM: Mayor Sam SUBJECT: SEE BELOYY DATE: January 10, 2017 / - >o -> 9 SUBJECT^REPLACEMENT MEMORANDUM

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL 1730 VARSITY DRIVE, SUITE 500, RALEIGH, NC 27606 TEL (919) 233-8091 FAX (919) 233-8031 LETTER OF TRANSMITTAL ADDRESS: ATTENTION: 80-A East Street Pittsboro, NC 27312-0130 Lynn Richardson Chatham County

More information

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel CHAPTER 10 SHOP DRAWING REVIEW 10.01 TYPES OF SHOP DRAWINGS 10.01.01 Structural Steel 10.01.02 Prestressed Concrete 10.01.03 Bearings 10.01.04 Metal Stay - In - Place Forms () 10.01.05 Expansion Joints

More information

610 Junction Rd., Ste. 101, Madison, Wisconsin District S. 27 th St. P.O. Box 357, 202 W. Main St. Franklin, WI Hortonville, WI 54944

610 Junction Rd., Ste. 101, Madison, Wisconsin District S. 27 th St. P.O. Box 357, 202 W. Main St. Franklin, WI Hortonville, WI 54944 November 12, 2008 November 19, 2008 x 610 Junction Rd., Ste. 101, Madison, Wisconsin District 9 City Center Junction, llc. Blue Design Group, llc. 6495 S. 27 th St. P.O. Box 357, 202 W. Main St. Franklin,

More information

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035. SUBMITTAL REVIEW Submittal: No. 035.00 Spec Section: 11 4000 Food Service Equipment Reviewed By: Laura Landon, Comma-Q Architecture Date: July 23, 2012 Project: BPS Belgrade Elementary School Location:

More information

Working Drawing Procedure

Working Drawing Procedure Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 LETTER OF TRANSMITTAL To: DeKalb Mechanical 339 Wurlitzer Drive DeKalb, Illinois 60115 Date:

More information

TRANSMITTAL LETTER. As Builts Change Order Contract Copy of Letter Insurance. For approval Approved as submitted Resubmit copies for approval

TRANSMITTAL LETTER. As Builts Change Order Contract Copy of Letter Insurance. For approval Approved as submitted Resubmit copies for approval Redwood City Electric, Inc. TRANSMITTAL LETTER To: Transworld Construction, Inc. 1178 Folsom Street San Francisco, CA 94103 Date: 05/31/12 Job #: 9340 Regarding: SFO DATA CENTER Attn: Rob Acero We are

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

Request for Information 0026

Request for Information 0026 Request for Information 0026 Detailed, RFIs Grouped by RFI Number SLAC Photon Science Lab (PSLB) Project # 02001.105960 2575 Sand Hill Road Tel: Fax: Menlo Park, CA 94025 RFI #: 0026 Date Created: 4/4/2017

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

Date of Comment Commenter Page

Date of Comment Commenter Page Master Responses MR1 N/A Master Response 1 Summary of U.S. 101 Alignment Alternatives 2-7 MR2 N/A Master Response 2 Diridon Station Short-Term Parking 2-8 MR3 N/A Master Response 3 Diridon Long-Term Parking

More information

PROCEDURE FOR PROCESSING WORKING DRAWINGS

PROCEDURE FOR PROCESSING WORKING DRAWINGS PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 02/02/2017 Job #: 289-11805 Submittal #: D-11135-003-A

More information

Letter of Transmittal

Letter of Transmittal 3710 QUINCY AVENUE OGDEN, UT 84403-1934 Ph : (801)627-1414 Letter of Transmittal To: GEN ARCHITECTS, INC. 11001 SW RIVERSIDE DRIVE PORTLAND, OR 97219 Ph: (503)243-7183 Fax: (503)243-7193 Subject: Submittal

More information

BOARD MEMBER REQUESTS & INFORMATIONAL ITEMS

BOARD MEMBER REQUESTS & INFORMATIONAL ITEMS NON-AGENDA September 1, 2017 Board Policy: EL-7 Communication and Support to the Board The BAOs shall inform and support the Board in its work. Page # CEO BULLETIN / NEWSLETTERS 4 CEO Bulletin: 08/25/17

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 08/29/2016 Job #: 289-11150 Submittal #: D-11235-001-A

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

Submittal Transmittal

Submittal Transmittal Submittal Transmittal Standard St. Joe's - Sonntag Pavillion St. Joseph s Hospital 350 W. Thomas Road Phoenix, AZ 85013 Project # 5690A Tel: Fax: Kitchell Contractors Inc of AZ Date: 10/7/2011 Reference

More information

Submittal Transmittal

Submittal Transmittal Submittal Transmittal Standard St. Joe's - Sonntag Pavillion St. Joseph s Hospital 350 W. Thomas Road Phoenix, AZ 85013 Project # 5690A Tel: Fax: Kitchell Contractors Inc of AZ Date: 11/29/2011 Reference

More information

Managing the Line Between Cx Provider and MEP Coordinator

Managing the Line Between Cx Provider and MEP Coordinator Managing the Line Between Cx Provider and MEP Coordinator Kevin Fish, P.E., LEED TM AP Northwest Engineering Service, Inc. 2008 National Conference on Building Commissioning An important and difficult

More information

BOARD OF DIRECTORS MEETING. Thursday, January 4, 2018 MINUTES

BOARD OF DIRECTORS MEETING. Thursday, January 4, 2018 MINUTES MEETING Thursday, January 4, 2018 1. CALL TO ORDER AND ROLL CALL The Regular Meeting of the Santa Clara Valley Transportation Authority s (VTA) Board of Directors (Board) was called to order by Chairperson

More information

ENGLISH TRANSLATION MILLIMETER-WAVE RADAR EQUIPMENT FOR SPECIFIED LOW POWER RADIO STATION

ENGLISH TRANSLATION MILLIMETER-WAVE RADAR EQUIPMENT FOR SPECIFIED LOW POWER RADIO STATION ENGLISH TRANSLATION MILLIMETER-WAVE RADAR EQUIPMENT FOR SPECIFIED LOW POWER RADIO STATION ARIB STANDARD ARIB STD-T48 Version 2. 1 Version 1.0 December 26th 1995 Version 2.0 February 2nd 1999 Version 2.1

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Addendum No.2. Rehabilitation of Maqam en-nabi Musa in Jericho Governorate. 29 September 2:00 PM (Jerusalem Time)

Addendum No.2. Rehabilitation of Maqam en-nabi Musa in Jericho Governorate. 29 September 2:00 PM (Jerusalem Time) United Nations Development Programme Programme of Assistance to the Palestinian People برنامج الا مم المتحدة الا نماي ي/ برنامج مساعدة الشعب الفلسطيني ITB-2016-205 Addendum No. 2 dated 8 September 2016

More information

CITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package

CITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package CITY OF RICHMOND CITY OF RICHMOND Notice of Public Opening Contract T.3263 Contract: Richmond Speed Skating Interior/ Exterior Signage Package Tenders have been issued for the Richmond Speed Skating Interior/

More information

BOARD OF DIRECTORS MEETING Thursday, April 4, 2013 MINUTES

BOARD OF DIRECTORS MEETING Thursday, April 4, 2013 MINUTES BOARD OF DIRECTORS MEETING MINUTES Chairperson Pirzynski welcomed Chuck Page, Alternate Board Member, who replaced Evan Low as Alternate Board Member representing the West Valley Cities, Group 3. 1. CALL

More information

333 W. Santa Clara Street

333 W. Santa Clara Street Interior Renovations Complete! Class A, 12-Story Highrise Office Building Market Ready Spaces Superior Identity Location in Downtown - Steps Away from Restaurants, Hotels, Arena, Diridon Station-Caltrain

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

10930 W. Sam Houston Parkway N., Suite 900

10930 W. Sam Houston Parkway N., Suite 900 ADDENDUM NO. 1 10930 W Sam Houston Pkwy. North Suite 900 Houston, Texas 77064 281.664.1900 281.664.1912 (f) www.salasobrien.com March 21, 2018 Project: Prepared by: Taylor Career Center Welding Labs Beaumont

More information

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION

More information

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION Ardmore, PA Atlantic City, NJ REQUEST FOR INFORMATION PROJECT: 1845 - Renaissance Hotel Renovations RFI NUMBER: 51.0 JONATHAN NEHMER & ASSOC ATTN: Lauren Maccherone Dacey 7361 Calhoun Place Suite 310 Rockville,

More information

Inventory of the Lewis Family Papers D-329

Inventory of the Lewis Family Papers D-329 http://oac.cdlib.org/findaid/ark:/13030/kt0g5018bk Online items available Sara Gunasekara University of California, Davis General Library, Dept. of Special Collections 2005 1st Floor, Shields Library,

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2 PROJECT: June Jordan School for Equity DATE: April 17, 2017 Security Cameras & Science Classrooms Improvements Project

More information

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION

More information

Case3:12-cv VC Document96 Filed09/14/15 Page1 of 10

Case3:12-cv VC Document96 Filed09/14/15 Page1 of 10 Case:-cv-0-VC Document Filed0// Page of (Counsel listed on signature page) UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF CALIFORNIA SAN JOSE DIVISION LLC, et al., v. Plaintiffs, HUAWEI TECHNOLOGIES

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

Chapter 1 General Design Information

Chapter 1 General Design Information Chapter 1 General Information Introduction The primary aim in both designing and checking is to produce a structure that will safely carry the anticipated loads. The design team, consisting of the designers,

More information

CONVEYANCE PIPELINE AND PUMP STATION

CONVEYANCE PIPELINE AND PUMP STATION SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SUBMITTAL LOG EXCEL PDF

SUBMITTAL LOG EXCEL PDF SUBMITTAL LOG EXCEL PDF ==> Download: SUBMITTAL LOG EXCEL PDF SUBMITTAL LOG EXCEL PDF - Are you searching for Submittal Log Excel Books? Now, you will be happy that at this time Submittal Log Excel PDF

More information

Freedom of Information Act 2000 (FOIA) Decision notice

Freedom of Information Act 2000 (FOIA) Decision notice Freedom of Information Act 2000 (FOIA) Decision notice Date: 21 June 2017 Public Authority: Address: NHS Guildford and Waverley Clinical Commissioning Group 3 rd Floor Dominion House Woodbridge Road Guildford

More information

FEDERAL RESERVE BANK OF SAN FRANCISCO 12TH DISTRICT STATE MEMBER BANKS

FEDERAL RESERVE BANK OF SAN FRANCISCO 12TH DISTRICT STATE MEMBER BANKS ARIZONA PHOENIX 3138146 WESTERN ALLIANCE BANK MR. KEN VECCHIONE, CHIEF EXECUTIVE OFFICER CALIFORNIA SANTA ROSA 3453737 ALTAPACIFIC BANK MR. CHARLES O. HALL, CHIEF EXECUTIVE OFFICER AND DIRECTOR SAN FRANCISCO

More information

EMC Evaluation of Comtrend Ethernet Powerline Adaptors

EMC Evaluation of Comtrend Ethernet Powerline Adaptors Page 1 of 81 ERA Business Unit: ERA Technology Ltd Report Title: Author(s): EMC Evaluation of Comtrend Ethernet Powerline Adaptors Roger Smith Client: Ofcom (Contract Ref No 410000327) Client Reference:

More information

FEDERAL RESERVE BANK OF SAN FRANCISCO 12TH DISTRICT STATE MEMBER BANKS

FEDERAL RESERVE BANK OF SAN FRANCISCO 12TH DISTRICT STATE MEMBER BANKS ARIZONA PHOENIX 3138146 WESTERN ALLIANCE BANK MR. KEN VECCHIONE, CHIEF EXECUTIVE OFFICER CALIFORNIA SANTA ROSA 3453737 ALTAPACIFIC BANK MR. CHARLES O. HALL, CHIEF EXECUTIVE OFFICER AND DIRECTOR SAN FRANCISCO

More information

Submittal Packages Detailed with Items and Reviewers

Submittal Packages Detailed with Items and Reviewers Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 1 San Diego State University 00 Campanile Drive San Diego, CA 918 Tel: 619-94-740 Fax: 0079-1116-0 Circulating Pump Author

More information

DUAL OPAMP AND VOLTAGE REFERENCE General Description. Features. Applications

DUAL OPAMP AND VOLTAGE REFERENCE General Description. Features. Applications General Description The is a monolithic IC specifically designed to control the output current and voltage levels of switch mode battery chargers and power supplies. The device contains two operational

More information

NETWORK CIRCLE SANTA CLARA CA

NETWORK CIRCLE SANTA CLARA CA 4160-4200 & 4050 PALM DRIVE ±302,066 SF Office Space Available For Lease in Silicon Valley ROMY ZEID +1 650 492 5206 romy.zeid@colliers.com CA License No. 01433654 JAKE SMART +1 650 492 5216 jake.smart@colliers.com

More information

Regional Interoperable Communications System

Regional Interoperable Communications System SAN FRANCISCO BAY AREA Regional Interoperable Communications System BayRICS By connecting our fi rst responders, we are ensuring that we will be better prepared for future disasters natural or man-made.

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

LUCAS 2009 (Land Use / Cover Area Frame Survey)

LUCAS 2009 (Land Use / Cover Area Frame Survey) EUROPEAN COMMISSION EUROSTAT Directorate E: Agriculture and environment statistics; Statistical Cooperation Unit E-1: Farms, Agro-Environment and Rural development LUCAS 2009 (Land Use / Cover Area Frame

More information

NOTICE OF REQUEST FOR PROPOSALS (RFP) RFP ADDENDUM 1 NORTH SAN JOSE STREET LIGHT CONVERSION TO LED

NOTICE OF REQUEST FOR PROPOSALS (RFP) RFP ADDENDUM 1 NORTH SAN JOSE STREET LIGHT CONVERSION TO LED NOTICE OF REQUEST FOR PROPOSALS (RFP) ADDENDUM 1 NORTH SAN JOSE STREET LIGHT CONVERSION TO LED JULY 28, 2009 INSTRUCTIONS: The purpose of this Addendum is to update information concerning the Mandatory

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

March 31, The Honorable Elaine L. Chao Secretary U.S. Department of Transportation 1200 New Jersey Avenue, S.E. Washington, D.C.

March 31, The Honorable Elaine L. Chao Secretary U.S. Department of Transportation 1200 New Jersey Avenue, S.E. Washington, D.C. The Honorable Elaine L. Chao Secretary U.S. Department of Transportation 1200 New Jersey Avenue, S.E. Washington, D.C. 20590 Dear Secretary Chao: We are writing you, as the top transit CEOs in the United

More information

A. SAFETY B. SCHEDULE

A. SAFETY B. SCHEDULE O.A.C. WEEKLY CONSTRUCTION MEETING November 9, 2015 Meeting - #16 UCC Bonnie J. Ford Health, Nursing & Science Center - ACCO Job #14-0965 cc: file Weekly O.A.C. Meeting Held @ 1:00 PM in ACCO Job Trailer

More information

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents. SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.

More information

A. Section includes administrative and procedural requirements for project record documents, including the following:

A. Section includes administrative and procedural requirements for project record documents, including the following: SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01

More information

David N. Evans. Dave lives in Santa Clara with his wife Marilyn and three children.

David N. Evans. Dave lives in Santa Clara with his wife Marilyn and three children. dave.evans@colliers.com EDUCATION BS Finance Santa Clara University, 1981 AFFILIATIONS or memberships Association of Brokers Rotary International contact details DIR +1 408 282 3825 MOB +1 408 806 3146

More information