TYPE APPROVAL PROCEDURE
|
|
- Ashley Barber
- 6 years ago
- Views:
Transcription
1 Approval Amendment Record Approval Date Version Description 15/06/ Initial issue under MTM. Replaces Connex documents cml PR-002 & cml-8.21-po /11/ Document revised and updated to simplify process 07/09/ Document revised and updated. (Major update). PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 21
2 Table of Contents 1. Procedure Purpose Scope Abbreviations and Acronyms Definitions Reference and Legislation Related Documents Type Approval Categories Type Approval Process Process Flow Chart Request for a Type Approval TA Go/NoGo Decision by Process Engineering Type Approval with a Trial Provisional Type Approval Full Type Approval Successful Trial Unsuccessful Trial Full Type Approval without a Trial Engineering Product Approval Grandfather Rights Approval Records Appendix A - Type Approval Request Form Appendix B Guide to Type Approval Request Form Table of Figures Figure 1 - Type Approval Process flow... 8 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 2 of 21
3 1. Procedure This document describes the Type Approval process that is required to qualify and approve assets (products) for use on the Metro Trains Melbourne (MTM) managed rail network. A Type Approval (TA) is required for any new products that are proposed for use on the MTM rail network that are deemed safety or service critical. Once a product is Type Approved, it will be added the Approved Engineering Product List (AEPL) as a Qualified Product. Any new products proposed for use on the MTM rail network that are not deemed safety or service critical may be approved via the less rigorous Engineering Product Approval process. Once a product is Engineering Product Approved, it will be added the AEPL as an Approved Product. Note: In the case where an engineering approved product is proposed for use in a service or safety critical application, the product will be required to be qualified via the Formal TA process. Legacy assets that where introduced to the rail network prior to the MTM franchise being awarded in 2009 are considered to have legacy Grandfather Rights and may be given approval at the discretion of relevant Head of Engineering (HoE) via Grandfather Rights process detailed in this document. Note: In the case where a legacy item is modified or used in a new application Grandfather Rights are not applicable. 2. Purpose The purpose of this procedure is to ensure So Far As Is Reasonably Practicable (SFAIRP) that the product being introduced to the network is fit-for-purpose, safe, compatible, reliable and all possible risks have been mitigated and controlled prior to its introduction into MTM s Rail network. This procedure also provides prospective suppliers an insight into understanding MTM s expectations for Type Approving products. Funding for the development of the TA Request\Review\Approval for an MTM sponsored product will be the responsibility of the requesting party (i.e. work order number) e.g. Maintenance and Renewals, MTM Projects. Funding for the development of the TA Request\Review\Approval for an external sponsored product will be the responsibility of the requesting organisation. 3. Scope This procedure is applicable to all new Infrastructure operational assets that are introduced to the MTM railway, whether supplied by the Rail industry, custom-built or approved by other Accredited Rail Transport Operators (ARTO). Compliance with this procedure is not required for any enabling equipment (tools) such as hammers or drills; however a TA is required for permanent or semi-permanent equipment, e.g. a TA will be required where safe working or test equipment interface with MTM rail network, however this may be waived at the discretion of applicable HoE or Chief Engineer (CE). Note: In the future, it is intended to also cover new Rolling Stock assets for TA. Current Rolling Stock TAs are conducted via the MTM Engineering Change (EC) process. (A Rolling Stock EC is initially raised to conduct a Trial. If the Trial is successful, then another Rolling Stock EC is raised to implement the actual change covered by the Trial.) PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 3 of 21
4 4. Abbreviations and Acronyms AEPL Approved Engineering Products List ARTO CE EC HoE MDBF MoC MSDS MTBF MTM MTTR PTA Requestor SCA SCI SFAIRP SIL SME TA TAC TARM Accredited Rail Transport Operators Chief Engineer Engineering Change Head of Engineering Mean Distance Between Failures Management of Change Material Safety Data Sheet Mean Time Between Failures Metro Trains Melbourne Mean Time To Repair Provisional Type Approval Person or Organisation making the request for a Type Approval Service Critical Asset Safety Critical Item So Far As Is Reasonably Practical Safety Integrity Level Subject Matter Expert Type Approval Type Approval Certificate Type Approval Recommendation Memorandum PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 4 of 21
5 5. Definitions Approved Products Products that qualify for inclusion in the Approved Engineering Product List (AEPL) after having been: approved via the Full Type Approval process; or approved via the Provisional Type Approval process for specified period of time and only used under specified conditions; or approved via the Engineering Product Approval process; or approved via the Grandfather Rights Approval process. Approved Products are allowed for use on the Rail Network however their use will be limited by the conditions detailed on the TA certificate. Desktop Analysis Full Type Approval Is an activity performed by SME(s) nominated by Head(s) of Engineering (applicable to the candidate product) to determine whether MTM s requirements have been satisfied to issue a Provisional Type Approval (whether a trial is required) or Full Type Approval (TA). It involves assessing the product s compliance with specific standards, specifications and confirming that it has been manufactured to acceptable quality standards. It also includes a determination of the product s final Acceptance Criteria. Depending on the outcome of the Desktop Analysis, a recommendation may be made to grant Provisional or Full TA. A product that has been formally assessed to be qualified as fit for purpose for a defined application within MTM rail network, with, or without, stated conditions and limitations. Grandfather Rights A category of TA for existing products within the MTM rail network that have no current, existing TA. Products with Grandfather Rights may be used, maintained and renewed. These products may only be used in new works or upgraded installations at the discretion of the CE or delegate. Legacy Assets Products Provisional Type Approval Qualified Products All products that were introduced into the metropolitan rail network prior to the MTM franchise. Rolling Stock and Infrastructure operational assets including systems, sub-systems and equipment that are required to be compliant to MTM s operation, functional and technical standards and specifications. It includes commercially available products, modified commercially off the shelf products and products yet to be developed for MTM. A product that has been formally assessed and accepted for trial purposes only. Items that have been successfully approved via the Full Type Approval process. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 5 of 21
6 Safety Critical Item Service Critical Asset Stakeholder Subject Matter Expert A product that has been assessed to be a Safety Critical Item by the Safety Critical Item Procedure (L1-ASY-PRO-002). A product that has been assessed to be a Service Critical Asset by the Service Critical Assets Procedure, (L1-ASY-PRO-003). Any Division or Department within MTM i.e. Infrastructure, Rolling Stock, Network Strategy and Development, Projects, Safety Environment and Risk, Operations and Commercial that is interested in the outcome of a TA request. A subject matter expert (SME) is a domain expert in a particular area or topic and is nominated by the CE or delegate. 6. Reference and Legislation L1-ASY-PRO-001 Engineering Change Procedure L1-ASY-PRO-002 L1-ASY-PRO-003 L1-SQE-PRO-001 L1-SQE-PRO-002 EN Safety Critical Item Procedure Service Critical Assets Procedure Management of Change Process Risk Management Procedure Railway applications - Communications, signalling and processing systems - Software for railway control and protection systems 7. Related Documents L4-CHE-FOR-009 Type Approval Requisition Form. L4-CHE-FOR-033 L4-CHE-FOR-041 Type Approval Recommendation Memorandum. Type Approval Certificate 8. Type Approval Categories The process below defines four (4) different categories to grant a product approved status and be added to the AEPL: 1) Full Type Approval (Qualified Product); 2) Provisional Type Approval (Approved Product); 3) Engineering Product Approval (Approved Product); and 4) Approval via Grandfather Rights Approval (Approved Product). The AEPL also has a fifth category of Rejected for products that have failed acceptance via any of the above mentioned approval categories. A product may be rejected for various reasons, including but not limited to, the two examples below: Product not fit for purpose; and Inadequate supporting data. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 6 of 21
7 If feasible (i.e. inadequate supporting data) the product may be resubmitted for approval once the re-submission is in an adequate state. Any product categorised as Rejected is not permitted to be used to the MTM rail network. All proposed products that are candidates for type approval for use on the MTM rail network and have been determined to be either a Safety Critical Item (SCI) or a Service Critical Asset (SCA) shall require a Full TA. In the case where an unapproved product requires access to the MTM rail network for the purpose of a trial, a Provisional TA shall be requested. A Provisional TA will only be approved for a finite time and will generally have conditions and restrictions applied to the product. 9. Type Approval Process 9.1 Process Flow Chart The flowchart in Figure 1 below depicts the four different paths that can be taken to have a product approved for use on MTM rail network. The Grey boxes indicate a generic step that is not unique to an approval path. The Blue boxes depict the Full TA path. The Red boxes depict the Provisional TA path. The Green boxes depict the Engineering Product Approval path. The Yellow boxes depict the Grandfather Rights Approval path. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 7 of 21
8 Start New Is Product New or Existing on MTM Network? No SME to Conduct Desktop Analysis Is Product Service or Safety Critical? Yes No* Approve Product Via Type Approval process *Products which fail to be approved by the CE or relevant HoE are to be re-evaluated to determine whether the TA application will be re-submitted or withdrawn. If If the product has been rejected it it shall be added to the AEPL as a Rejected product. Existing Is a Trial required? No Engineering Review and Decision Does the CE approve the product? Yes Provide Full Type Approval Certificate No* Approve Product via Grandfather Rights Does the relevant Engineering Head approve the product? No* Yes Does the CE approve the product? Yes Approve Product Via Engineering Product Approval process Raise MoC and EC Provide Provisional Type Approval Certificate SME to Conduct Desktop Analysis Yes Perform Trial & Was Trial Successful? Does the relevant Engineering Head approve the product? No Yes Engineering Review and Decision Yes No* Figure 1 - Type Approval Process flow Update AEPL PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 8 of 21
9 9.2 Request for a Type Approval A request for a type approval is performed by the Requestor. The Requestor shall:- 1) Use the Type Approval Requisition Form (L4-CHE-FOR-009) for the Type Approval Request. Refer to Appendix A - Type Approval Request Form and Appendix B Guide to Type Approval Request Form for details. 2) Assess the Safety Criticality of the product by using the Safety Critical Item Procedure (L1-ASY-PRO-002) and add the result to the Type Approval Requisition Form. 3) Assess the Service Criticality of the product by using the Service Critical Assets Procedure, (L1-ASY-PRO-003) and add the result to the Type Approval Requisition Form. 4) Provide the information identified on the Type Approval Requisition Form in the form of an information pack. 5) Submit the completed Type Approval Requisition Form (L4-CHE-FOR-009) inclusive of the information pack via to the Process Engineering group at typeapproval@metrotrains.com.au. 9.3 TA Go/NoGo Decision by Process Engineering Process Engineering shall:- 1) Create and manage a Type Approval folder structure to store all relevant Type Approval information. All Type Approval information shall be kept within this structure. 2) Upon receipt of the Type Approval Requisition Form (L4-CHE-FOR-009) duly completed by the requestor, check for completeness of information provided by the Requestor. 3) Reject the Type Approval Requisition Form (L4-CHE-FOR-009) if the supplied information is not satisfactory and return the form to the Requestor for his update. This process shall iterate until Process Engineering is satisfied with the information provided by the Requestor. 4) If the supplied information is satisfactory, consult with the CE and HoEs and stakeholders to determine the appropriate Type Approval category. The CE and HoEs shall either accept or reject the TA request. 5) If accepted, the CE and HoEs shall appoint or delegate an appropriate SME(s) to perform the agreed category of Type Approval (refer to sections 9.4 to 9.7 inclusive for details). 6) Create a unique TA number. 7) Complete the Registration section off the Type Approval Requisition Form (L4-CHE- FOR-009) and advise the SME via to perform the chosen category of the Type Approval process inclusive of a link to the folder location for the Type Approval. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 9 of 21
10 9.4 Type Approval with a Trial Provisional Type Approval When Process Engineering has determined a product requires a Provisional TA (Safety and/or Service critical Item and requiring a Trial), the appointed SME shall:- 1) Perform a Desktop Analysis (Engineering Review) to ensure that all the relevant, supporting information/data has been supplied in a TA Data Pack and that the quality of the provided data is deemed satisfactory, taking into account all affected stakeholders. 2) Perform a mandatory Risk Assessment (as per L1-SQE-PRO-002). 3) Upon completion of the Desktop Analysis:- a) Determine the purpose and success criteria for the trial. b) Complete a Provisional Type Approval Recommendation Memorandum (L4-CHE- FOR-033), detailing their recommendation for Provisional Type Approval and any conditions, restrictions or limitations on the approval of the product. c) Complete a Provisional Type Approval Certificate (L4-CHE-FOR-040), using the information contained on the TARM. 4) Arrange for the Provisional TARM to be endorsed by all affected Engineering Managers, the Process Engineering Manager and then subsequently approved by all relevant Heads of Engineering. Process Engineering shall:- 5) Present the completed Provisional TAC to the CE for his approval, supported by the signed TARM. If the CE signs Provisional TAC, the product is Provisionally Approved. 6) If the product is Provisionally Approved, add it to the AEPL as a Provisionally Qualified product and shall not publish it on the MTM intranet. 7) If the product has been rejected, add it to the AEPL as a Rejected product. If a Provisional TA has been granted, the Requestor shall:- 8) Raise a Management of Change (MoC), Form 1 and Form 2 and EC for the trial. The EC must include the purpose and the success criteria of the trial. 9) Once the EC is approved, a trial can be conducted. Note: All successful Provisional TAs are granted for a finite time only. Once the trial has concluded, the product must be removed from MTMs rail network. The expiry date and any caveats will be identified on the Provisional TA certificate. Note: A successful TA only qualifies the product for use on the MTM network. Any alteration to MTMs network can ONLY be made via an authorised EC which is preceded by an approved MoC Form 1 and Form2. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 10 of 21
11 9.4.2 Full Type Approval Successful Trial After a successful trial, the SME shall:- 1) Update the Provisional Desktop Analysis with any and all information gained during the trial. 2) Update the Provisional mandatory Risk Assessment (as per L1-SQE-PRO- 002). 3) Upon completion of the updated Desktop Analysis:- a) Complete a Type Approval Recommendation Memorandum (L4-CHE- FOR-033), detailing their recommendation for Type Approval and any conditions, restrictions or limitations on the approval of the product. b) Complete a Type Approval Certificate (L4-CHE-FOR-041), using the information contained on the TARM. 4) Arrange for the TARM to be endorsed by all affected Engineering Managers, the Process Engineering Manager and then subsequently approved by all relevant Heads of Engineering. Process Engineering shall:- 5) Present the completed TAC to the CE for his approval, supported by the signed TARM. If the CE signs the TAC, the product is approved. 6) If the product is approved, it shall be added to the AEPL as a Qualified product and published on the MTM intranet. 7) If the product has been rejected it shall be added to the AEPL as a Rejected product Unsuccessful Trial After an unsuccessful trial, the SME shall determine whether: 1) The Provisional TA is rejected and withdrawn. 2) The success criteria should be re-evaluated or 3) Product modification is required prior to Type Approval. If the Provisional TA is rejected and withdrawn, the SME shall:- 4) Update the Provisional Desktop Analysis with any and all information gained during the trial and detailing the reasons why the trial was unsuccessful. 5) Update the Provisional mandatory Risk Assessment (as per L1-SQE-PRO- 002). 6) Upon completion of the updated Desktop Analysis, complete a Type Approval Recommendation Memorandum (L4-CHE-FOR-033), detailing the recommendation for the Type Approval rejection. 7) Arrange for the TARM to be endorsed as rejected by all affected Engineering Managers, the Process Engineering Manager and then by all relevant Heads of Engineering. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 11 of 21
12 If the success criteria are to be re-evaluated, the SME shall:- 8) Determine the revised success criteria for the trial. 9) Re-evaluate the trial based on the revised success criteria. 10) If successful, refer to section Successful Trial. If Product modification is required, the SME shall:- 11) Reject and withdraw the Provisional Type Approval 12) Be involved with the new Type Approval process once the modified Product is available from the supplier. Note: A successful TA only qualifies the product for use on the MTM network. Any alteration to MTMs network can ONLY be made via an authorised EC which is preceded by an approved MoC Form 1 and Form Full Type Approval without a Trial When Process Engineering has determined a product requires a TA (Safety and/or Service critical item and does not require a trial), the appointed SME shall:- 1) Perform a Desktop Analysis (Engineering Review) to ensure that all the relevant, supporting information/data has been supplied in a TA Data Pack and that the quality of the provided data is deemed satisfactory, taking into account all affected stakeholders. 2) Perform a mandatory Risk Assessment (as per L1-SQE-PRO-002). 3) Upon completion of the Desktop Analysis:- a) Complete a Type Approval Recommendation Memorandum (L4-CHE-FOR-033), detailing their recommendation for Type Approval and any conditions, restrictions or limitations on the approval of the product. b) Complete a Type Approval Certificate (L4-CHE-FOR-xx), using the information contained on the TARM. 4) Arrange for the TARM to be endorsed by all affected Engineering Managers, the Process Engineering Manager and then subsequently approved by all relevant Heads of Engineering. Process Engineering shall:- 5) Present the completed TAC supported by the signed TARM to the CE for his approval. If the CE signs the TAC, the product is approved. 6) If the product is approved, it shall be added to the AEPL as a Qualified product and published on the MTM intranet. 7) If the product has been rejected it shall be added to the AEPL as a Rejected product. Note: A successful TA only qualifies the product for use on the MTM network. Any alteration to MTMs network can ONLY be made via an authorised EC which is preceded by an approved MoC Form 1 and Form2. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 12 of 21
13 9.6 Engineering Product Approval When Process Engineering has determined a product requires Engineering Product approval (not Safety nor Service critical), the appointed SME shall:- 1) Perform a Desktop Analysis (Engineering Review) to ensure that all the relevant, supporting information/data has been supplied in a TA Data Pack and that the quality of the provided data is deemed satisfactory, taking into account all affected stakeholders. 2) Consult with the relevant HoE to determine if a Risk Assessment. Perform the Risk Assessment (as per L1-SQE-PRO-002). 3) Upon completion of the Desktop Analysis, complete a Type Approval Recommendation Memorandum (L4-CHE-FOR-033), detailing their recommendation for Engineering Product Approval and any conditions, restrictions or limitations on the approval of the product. 4) Arrange for the TARM to be endorsed by all affected Engineering Managers, the Process Engineering Manager and then subsequently approved by all relevant Heads of Engineering. Process Engineering shall:- 5) If the product is approved, it shall be added to the AEPL as an Approved product and published on the relevant MTM internet web page. 6) If the product has been rejected it shall be added to the AEPL as a Rejected product. 9.7 Grandfather Rights Approval When Process Engineering has determined a product requires Approval by Grandfather Rights, the appointed SME shall:- 1) Complete a Type Approval Recommendation Memorandum (L4-CHE-FOR-033), detailing their recommendation for Grandfather Rights inclusive of any conditions, restrictions or limitations on the approval of the product. 2) Arrange for the TARM to be endorsed by all affected Engineering Managers, the Process Engineering Manager and then subsequently approved by all relevant Heads of Engineering. Process Engineering shall:- 3) If the product is approved, it shall be added to the AEPL as an Approved product and published on the relevant MTM internet web page. 4) If the product has been rejected it shall be added to the AEPL as a Rejected product. Notes: a) Approval via Grandfather Rights only applies to legacy (existing) products that have been in use on the Melbourne metropolitan rail network prior to MTM being awarded the franchise (30/11/2009). b) Products with Grandfather Rights may be used, maintained and renewed. These products may only be used in new works or upgraded installations at the discretion of the CE or delegate. c) A Risk assessment is not required for products seeking Grandfather Rights approval. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 13 of 21
14 10. Records Engineering Systems (Process Engineering team) shall file original approved and rejected TAs, and all related supporting documents as master copies. The TA register and TA certificates will be made available on the MTM Intranet by Process Engineering. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 14 of 21
15 Appendix A - Type Approval Request Form PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 15 of 21
16 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 16 of 21
17 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 17 of 21
18 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 18 of 21
19 Appendix B Guide to Type Approval Request Form This appendix provides guidance on completing the TA Request Form and is considered to define the evaluation entry criteria required to conduct a Desktop Analysis for products to be qualified for Full/Provisional Type Approval, Engineering Product Approval and Grandfather Rights approval. The User is required to consider any other criteria which may also be applicable to the product/application under review/consideration. To adequately carry out an evaluation, it is important to gain understanding of the product s performance in the intended application. Comprehensive information on the product s design, operation and maintenance should be supplied. Sections a through to c in the blue section of the form are filled out by the Process Engineering group. Sections d through to f in the section of the form are filled out by the Requestor. Sections g through to p in the grey section of the form, are filled out by either the Requestor or a third party (e.g. contractor). a. TA Request Number TA Request number is issued by Engineering Systems team after the TA request form has been initially submitted and received. Performed by Process Engineering. b. Registered Date The Date the request was registered. Performed by Process Engineering. c. Type of Approval Requested The type of approval being requested, e.g. Type Approval, Engineering Product Approval, Grandfather Rights. Performed by Process Engineering. d. Request Raised By The contact details of the requestor of the TA request including the work order number that will fund the development of the TA and the TA approval of the product. e. Product Information The product particulars e.g. Name, Model, a description of the product. The Application field refers to where or how the product is to be used on the network, e.g. Single Person Operated Train System. f. SCI/SCA Rating of Asset Impacted Safety and Service critical ratings for the product or the system of which the product will be part. g. Product / Functional Description Product Specification. Referencing supporting documentation that identifies the products parameters and limitations, e.g. dimensional data, maximum power rating, temperature rating, IP Rating, vibration, acoustic noise, Electromagnetic Compatibility, Technical Environmental Specifications, Interfaces, etc. h. Functional and Performance Analysis Is the product fit for purpose? Has the product been assessed against the requirements for its proposed application? PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 19 of 21
20 Service Life. What is the product s expected life? This may be described in hours, years or distance. Shelf Life. How long can the product be in storage before being used without any adverse impact or loss of intended designed effectiveness? Service History. The product s service history within other railway operations location, including application, quantity and period in service. MTBF or MDBF. MTTR. Note: This does not take into account travel time; however, MTM needs to ensure that the stated MTTR still conforms with MTM s service level agreements as per Schedule 10 of the 2009 Franchise agreement. i. Compliance Confirmation Indicate which of the following Specifications and Standards the product conforms to: MTM Technical, Functional & Operational Specifications. MTM Standards. Victorian Rail Industry Operators Group Standards (VRIOGS). Australian Standards. Other Relevant Standards. j. Use in other Rail Networks Evidence the product has been of used in: Similar Railway Operations. Similar Railway Environment. Similar Applications. k. Risk Assessment It is mandatory that, as part of a Full/Provisional TA request a risk assessment shall be conducted (in accordance with the Risk Management Procedure- L1-SQE-PRO-002) and attached to the TA Request. l. Safety Analysis Evidence of Fail Safe Capability. In the case of a failure, will the product create or potentially present a safety hazard? Safety Integrity Level. Identify if the product has SIL as described by EN Independent Safety Case. A rail industry recognised, independently endorsed Safety Case for the product. m. Occupational Health & Safety Material Safety Data Sheet (MSDS). Identification of all applicable MSDS documentation. Operator, Maintainer, Passenger and Public Safety. Evidence the product does not pose any hazard to the Operator, Maintainer, Passenger and Public e.g. Human Factors, Safety, manual handling etc. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 20 of 21
21 n. Environmental Impact Environmental impacts analysis. Evidence the product does not pose any environmental risk or hazard e.g. flora or fauna. Note: This is different to technical environmental specifications. Security (Vandalism/Terrorism). Evidence the product minimise any security risk due to Vandalism/Terrorism. o. Product/Supplier Certification Quality Assurance Compliance Certificate provided? Confirm that the manufacturer has an AS/NZS 9001 certified quality assurance system. Note: Any certification such as Certificates of Conformance may be required to be supplied every time the product is purchased e.g. when spares are purchased to replenish stock levels. Product Certification and testing e.g. in-house or external testing, compliance e.g. RCM (formerly A tick and C tick ). p. Qualifications Identification of any special or new qualifications that may be required to operate/install/maintain the product. This may include training from a manufacturer/supplier or a formal qualification that is to be obtained through registered training organisation. q. Maintainability and Supportability System Impact of product maintenance or repair. Can maintenance and repair be carried out without shutting down the rest of the system? Supportability. The level of technical support available in Australia and overseas. The lead time(s) and cost of spare parts, listing of essential spare parts including cost and lead time(s). Special Tools (safe working or test equipment) that interface with MTM rail network at the discretion of applicable HoE or CE. r. Product Documentation Installation documentation, documentation describing installation process and considerations that should be taken into account e.g. special tooling. This should also include any document regarding commissioning of the product. s. Other Operation & Maintenance Manuals, documentation describing how to operate and maintain the product. Drawings, product and dimensional drawings. Any other information deemed necessary/vital for the TA of the nominated candidate product. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 21 of 21
ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)
Approval Amendment Record Approval Date Version Description 15/10/2015 1 This policy takes precedence over L1-NAM-PRO-003 Infrastructure As Built Drawing Management due to business restructures. New Content
More informationDESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN
Approval Amendment Record Approval Date Version Description 01/04/2014 1 Initial Issue under MTM PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 7 Table of Contents
More informationCHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT
Approval Amendment Record Approval Date Version Description 30/05/2014 1 Initial issue under MTM. This procedure supersedes the Overlapping Design Agreement, Application and Transfer Log documents L2-SIG-PRO-007,
More information(Non-legislative acts) DECISIONS
4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability
More informationType Approval JANUARY The electronic pdf version of this document found through is the officially binding version
STANDARD FOR CERTIFICATION No. 1.2 Type Approval JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The content of this service
More informationEarthing Requirements for HV Transmission Structures
Engineering Standard Electrical MEST 000002-07 Earthing Requirements for Transmission Structures Version: 1 Issued: February 2015 Owner: Engineering Approved By: Patrick Kelly Head of Electrical Engineering
More informationGENERAL DESCRIPTION OF THE CMC SERVICES
STANDARD FOR CERTIFICATION No.1.1 GENERAL DESCRIPTION OF THE CMC SERVICES MAY 2007 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property and the
More informationDNVGL-CP-0338 Edition October 2015
CLASS PROGRAMME DNVGL-CP-0338 Edition October 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class
More information1 SERVICE DESCRIPTION
DNV GL management system ICP Product Certification ICP 4-6-3-5-CR Document number: ICP 4-6-3-5-CR Valid for: All in DNV GL Revision: 2 Date: 2017-05-05 Resp. unit/author: Torgny Segerstedt Reviewed by:
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information
More informationELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER
Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...
More informationDESIGN PRACTICE NOTE GENERAL OCS SPECIFICATION UPDATE
Approval Amendment Record Approval Date Version Description 22/03/2017 1 Initial Issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 11 Table of Contents 1. Purpose...
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,
More informationMESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER
Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT
More informationL1-CHE-SPE-273 SIGNALLING AND COMMUNICATIONS CABLE APPLICATION GUIDELINES
Engineering Specification Signalling L1-CHE-SPE-273 SIGNALLING AND COMMUNICATIONS CABLE APPLICATION GUIDELINES Version: 1 ENGINEERING SPECIFICATION SIGNALLING AND COMMUNICATIONS CABLE APPLICATION GUIDELINES
More information***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)
DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB
More informationSECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationSignalling Documentation and Drawings
Discipline: Engineering (Signalling) Category: Standard Signalling Documentation and Drawings SCP 06 Applicability New South Wales CRIA (NSW CRN) Primary Source RIC Standard SC 00 23 00 00 SP Version 3.0
More informationSATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007
BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission
More informationGuide on the General and Administrative Aspects of the Voluntary System of Modular Evaluation of Measuring instruments
WELMEC 8.8, 2017 Guide on the General and Administrative Aspects of the Voluntary System of Modular Evaluation of Measuring instruments For information: The amendments in this guide (red) are available
More informationSECTION SUBMITTAL PROCEDURES
SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply
More informationEuropean Ground Systems Common Core
European Ground Systems Common Core Exploitation Phase ESA On behalf of EGS-CC Steering Board EGS-CC Exploitation Phase, 28 November 2013, Page 1 Outline Collaboration Agreement IPR Software Licensing
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationCARRA PUBLICATION AND PRESENTATION GUIDELINES Version April 20, 2017
CARRA PUBLICATION AND PRESENTATION GUIDELINES Version April 20, 2017 1. Introduction The goals of the CARRA Publication and Presentation Guidelines are to: a) Promote timely and high-quality presentation
More informationTitle Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)
Discipline Engineering Standard NSW Category Electrical Title Substation Auxiliary Transformer from Rectifier Transformer Secondary Reference Number PDS 01 (RIC Standard: EP 05 00 00 01 SP) Document Control
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationMESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION
Engineering Specification Head of Electrical Engineering MESP 050100-01 TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Version:
More informationGE/GN8648. Guidance on Positioning of Lineside Telephones. Rail Industry Guidance Note for GE/RT8048
GN This document contains one or more pages which contain colour. Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2013 Rail Safety and Standards Board Limited GE/GN8648 Issue
More informationVoluntary Carbon Standard
Voluntary Carbon Standard Voluntary Carbon Standard Program Guidelines 19 November 2007 VCS Secretariat 24 rue Merle-d Aubigné, 1207 Geneva, Switzerland secretariat@v-c-s.org 1 Voluntary Carbon Standard
More informationSECTION 13. ACQUISITIONS
SECTION 13. ACQUISITIONS... 13-1 13.1 Introduction... 13-1 13.2 On-Market Takeover... 13-1 13.3 Off-Market Takeover... 13-2 13.3.1 Accepting an Off-Market Bid... 13-3 13.3.2 Accepting an Off Market Bid
More informationTechnical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).
IDM UID: R22L3M ver 1.4 Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). Contents 1 Terms and Acronyms... 3 2 Background...
More informationProduct Guide Verizon Delaware LLC. Section 31 Delaware LLC Original Sheet 1. Connection With Certain Facilities of Others
Delaware LLC Original Sheet 1 A. GENERAL Part 68 of the Federal Communications Commission's Rules and Regulations applies to customer premises equipment, with specified exceptions. Accordingly, regulations
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationABF SYSTEM REGULATIONS
ABF SYSTEM REGULATIONS 1. INTRODUCTION 1.1 General Systems are classified according to the characteristics of their opening and overcalling structures, and will be identified by colour coding. In determining
More informationStatus Date Prepared Reviewed Endorsed Approved
Discipline Engineering Standard NSW Category Services Title Compilation of Historical Records of Buildings Scheduled for Demolition Reference Number EYP 01 (RIC Standard: G 2650) Document Control Status
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationGreenlining and Bluelining of Ergon Energy Substation Drawings
Greenlining and Bluelining of Ergon Energy Table of Contents Purpose and Scope... 1 Responsibilities... 1 Definitions, Abbreviations and Acronyms... 1 References... 1 General... 1 Requirements... 3 Testing
More informationElectrical Procedure No E032. Procedure No: ELE 032
Procedure No: ELE 032 Procedure Title: Date of Procedure: Responsible Person(s) Safety Isolation of Low Voltage Networks and Systems for work to be carried out by third parties. i.e. Non University personnel.
More informationEast Central College
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationEUROPEAN GUIDANCE MATERIAL ON CONTINUITY OF SERVICE EVALUATION IN SUPPORT OF THE CERTIFICATION OF ILS & MLS GROUND SYSTEMS
EUR DOC 012 EUROPEAN GUIDANCE MATERIAL ON CONTINUITY OF SERVICE EVALUATION IN SUPPORT OF THE CERTIFICATION OF ILS & MLS GROUND SYSTEMS First Edition Approved by the European Air Navigation Planning Group
More informationRoad signs Specifications
AS 1743:2018 AS 1743:2018 Road signs Specifications This Australian Standard was prepared by Committee MS-012, Road Signs and Traffic Signals. It was approved on behalf of the Council of Standards Australia
More informationTechnology qualification management and verification
SERVICE SPECIFICATION DNVGL-SE-0160 Edition December 2015 Technology qualification management and verification The electronic pdf version of this document found through http://www.dnvgl.com is the officially
More informationRecast of RoHS Directive
29 April 2011 Recast of RoHS Directive Joint initial input for the Commission guidance document PROVISION CONTENT TAE and DIGITALEUROPE s interpretation Scope Article 3(a) Consumables A consumable itself
More informationLICENCE. for WEB LINKS. Check if this document is current Find similar documents StandardsWatch (info and login) Visit our website
LICENCE for Licensee: Date: Conditions of use: Click here for full conditions of Licence WEB LINKS Check if this document is current Find similar documents StandardsWatch (info and login) Visit our website
More informationAT&T INDIANA GUIDEBOOK. PART 2 - General Terms and Conditions 1st Revised Sheet 1 SECTION 9 - Connections
PART 2 - General Terms and Conditions 1st Revised Sheet 1 EXCHANGE SERVICES 1. General Provisions A. General Terminal equipment and communications systems provided by the customer may be connected at the
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationWorld Leader in Rating Technology OFFSHORE RACING CONGRESS
World Leader in Rating Technology OFFSHORE RACING CONGRESS ORC Championship Rules 2018 ORC Championship Rules 1 Authority The Offshore Racing Congress (ORC) is the international authority recognised by
More informationAGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation
AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation The Republic of Belarus, Republic of Kazakhstan and the Russian
More informationUCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationWeldment Visual Inspection Requirements
Table of Contents 1.0 Purpose / Scope / Timing... 2 1.1 Purpose / Scope... 2 1.2 Compliance Date... 2 2.0 Procedure / Quality Recd Requirements... 2 2.1 General Requirements... 2 2.2 Acceptance Criteria...
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationTGA Discussion Paper 3D Printing Technology in the Medical Device Field Australian Regulatory Considerations
TGA Discussion Paper 3D Printing Technology in the Medical Device Field Australian Regulatory Considerations MTAA Response - October 2017 October 2017 Australian Regulatory Considerations Page 1 of 7 Level
More informationETSI EN V1.1.1 ( )
EN 300 471-2 V1.1.1 (2001-05) Candidate Harmonized European Standard (Telecommunications series) Electromagnetic compatibility and Radio spectrum Matters (ERM); Land Mobile Service; Rules for Access and
More informationControl Command & Signalling. Standards Brief Sept Professional Head [S&C] 11/11/2014
Control Command & Signalling Standards Brief Sept 2014 Professional Head [S&C] 11/11/2014 1 General This presentation gives headline details of the September 2014 Signalling Standards Brief It contains
More informationL1-CHE-SPE-277 TRACK CIRCUIT TYPES CHARACTERISTICS AND APPLICATIONS
Engineering Specification Signalling L1-CHE-SPE-277 TRACK CIRCUIT TYPES CHARACTERISTICS AND APPLICATIONS Version: 1 ENGINEERING SPECIFICATION TRACK CIRCUIT TYPES CHARACTERISTICS AND APPLICATIONS L1-CHE-SPE-277
More informationJoint ILAC CIPM Communication regarding the. Accreditation of Calibration and Measurement Services. of National Metrology Institutes.
Joint ILAC CIPM Communication regarding the Accreditation of Calibration and Measurement Services of National Metrology Institutes 7 March 2012 Authorship This document was prepared by the International
More informationRESOLUTION MSC.21(59) (adopted on 22 May 1991)
Title RESOLUTIONs / MSC Resolutions / Res.MSC.21(59) RESOLUTION MSC.21(59) (adopted on 22 May 1991) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CONVENTION ON STANDARDS OF TRAINING, CERTIFICATION AND WATCHKEEPING
More informationETSI EN V1.1.2 ( ) Harmonized European Standard
EN 302 729-2 V1.1.2 (2011-05) Harmonized European Standard Electromagnetic compatibility and Radio spectrum Matters (ERM); Short Range Devices (SRD); Level Probing Radar (LPR) equipment operating in the
More informationAS/NZS :2012. Specification for preservative treatment AS/NZS :2012. Part 4: Laminated veneer lumber (LVL) Australian/New Zealand Standard
AS/NZS 1604.4:2012 Incorporating Amendment No. 1 Australian/New Zealand Standard Specification for preservative treatment Part 4: Laminated veneer lumber (LVL) Superseding AS/NZS 1604.4:2010 AS/NZS 1604.4:2012
More informationETSI EN V1.5.1 ( ) Harmonized European Standard (Telecommunications series)
EN 300 330-2 V1.5.1 (2010-02) Harmonized European Standard (Telecommunications series) Electromagnetic compatibility and Radio spectrum Matters (ERM); Short Range Devices (SRD); Radio equipment in the
More informationSPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Edition
SPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Master version ratified by the QUALIDECO Committee on 27 April 2017 Effective from 1 July 2017 Published
More informationThank you for the opportunity to comment on the Audit Review and Compliance Branch s (ARC) recent changes to its auditing procedures.
Jim Riva, Chief Audit Review and Compliance Branch Agricultural Marketing Service United States Department of Agriculture 100 Riverside Parkway, Suite 135 Fredericksburg, VA 22406 Comments sent to: ARCBranch@ams.usda.gov
More informationJoint Industry Programme on E&P Sound and Marine Life - Phase III
Joint Industry Programme on E&P Sound and Marine Life - Phase III Request for Proposals Number: JIP III-15-03 Long Term Fixed Acoustic Monitoring of Marine Mammals throughout the Life Cycle of an Offshore
More informationWorking Drawing Manual
Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...
More informationThis document is a preview generated by EVS
INTERNATIONAL STANDARD ISO 15848-2 Second edition 2015-06-01 Industrial valves Measurement, test and qualification procedures for fugitive emissions Part 2: Production acceptance test of valves Robinetterie
More informationSAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY
SAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY D8-19 7-2005 FOREWORD This Part of SASO s Technical Directives is Adopted
More informationProposal for a COUNCIL DECISION
EUROPEAN COMMISSION Brussels, 23.5.2017 COM(2017) 273 final 2017/0110 (NLE) Proposal for a COUNCIL DECISION on the position to be adopted, on behalf of the European Union, in the European Committee for
More informationTECHNICAL SPECIFICATION FOR. CONTACT WIRE HARD-DRAWN COPPER 161mm2
Engineering Specification Electrical TECHNICAL SPECIFICATION FOR CONTACT WIRE HARD-DRAWN COPPER 161mm2 Version: 2 Issued: May 2018 Owner: Engineering Approved by: Andrew Russack, Head of Engineering Electrical
More informationUNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General
More informationCLARK COUNTY FIRE CODE AMENDMENTS
CLARK COUNTY FIRE CODE AMENDMENTS SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM is amended to read as follows: SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM 510.1 Emergency responder radio
More informationCoordinate finger jointer operations in solid wood manufacturing
Coordinate finger jointer operations in solid wood manufacturing 4547 version 5 Page 1 of 5 Level 4 Credits 20 Purpose People credited with this unit standard are able to: demonstrate knowledge of finger
More informationLevel 1 VRQ Qualifications in Photo Imaging (7512) Assessment pack
Level 1 VRQ Qualifications in Photo Imaging (7512) Assessment pack www.cityandguilds.com May 2012 Version 1.1 About City & Guilds City & Guilds is the UK s leading provider of vocational qualifications,
More informationTPS 49 EDITION 2 JUNE 2009
TPS 49 EDITION 2 JUNE 2009 Interim arrangements & guidance on the interpretation of IEC 61672 Sound Level Meters - Periodic Tests CONTENTS SECTION PAGE 1 Purpose and duration 2 2 Statement 2 3 Specific
More informationA. Action Submittals: Written and graphic information that requires Engineer's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationCompany Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes
Company Directive STANDARD TECHNIQUE: SD1E/2 Technical Requirements for Customer Export Limiting Schemes Policy Summary This Standard Technique specifies the requirements for customer owned Export Limitation
More informationBy-Product Fish Fishery Assessment Interpretation Document
By-Product Fish Fishery Assessment Interpretation Document IFFO RS GLOBAL STANDARD FOR RESPONSIBLE SUPPLY OF MARINE INGREDIENTS BY PRODUCT FISHERY MATERIAL Where fish are processed for human consumption,
More information.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal
City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings
More informationKryptonite Authorized Seller Program
Kryptonite Authorized Seller Program Program Effective Date: January 1, 2018 until discontinued or suspended A Kryptonite Authorized Seller is one that purchases Kryptonite offered products directly from
More informationSECTION - II BID DATA SHEET
SECTION - II BID DATA SHEET Kenya Power and Lighting Company II - 1 Contract: A36 SECTION -II BID DATA SHEET The following bid-specific data for the plant and equipment to be procured shall amend and/or
More informationETSI EN V1.2.1 ( ) Harmonized European Standard (Telecommunications series)
EN 300 086-2 V1.2.1 (2008-09) Harmonized European Standard (Telecommunications series) Electromagnetic compatibility and Radio spectrum Matters (ERM); Land Mobile Service; Radio equipment with an internal
More informationTechnical Standard Order
Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, D.C. TSO-C23f Effective Date: 09/21/2012 Technical Standard Order Subject: Personnel Parachute Assemblies
More informationSPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS
Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized
More informationA. Action Submittals: Written and graphic information that requires Architect's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationRegarding the durability of New Zealand grown European oak timber to be used internally in a new dwelling at 350 Jones Road, Blenheim
Determination 2016/025 Regarding the durability of New Zealand grown European oak timber to be used internally in a new dwelling at 350 Jones Road, Blenheim Summary This determination discusses the compliance
More informationCOMMISSION DELEGATED DIRECTIVE../ /EU. of XXX
EUROPEAN COMMISSION Brussels, XXX [ ](2014) XXX draft COMMISSION DELEGATED DIRECTIVE../ /EU of XXX amending, for the purposes of adapting to technical progress, Annex III to Directive 2011/65/EU of the
More informationSchedule - 20 LED LAMPS
Date: 8 th February, 2018 Revision 2 (*Red color represents the changes inserted.) Schedule - 20 LED LAMPS 1. SCOPE 1.1. This schedule specifies the energy labeling requirements for self-ballasted nondirectional
More informationETSI EN V1.1.1 ( )
EN 300 390-2 V1.1.1 (2000-09) Candidate Harmonized European Standard (Telecommunications series) Electromagnetic compatibility and Radio spectrum Matters (ERM); Land Mobile Service; Radio equipment intended
More informationTitle Operating Work - Low Voltage Distribution System. Reference Number POP 06 - (RIC Standard: EP SI)
Discipline Engineering Standard - NSW Category Electrical Title Operating Work - Low Voltage Distribution System Reference Number POP 06 - (RIC Standard: EP 95 30 00 03 SI) Document Control Status Date
More informationEstablishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario
August 7, 2001 See Distribution List RE: Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario Dear Sir/Madam: The Electrical Safety
More informationTECHNICAL AND OPERATIONAL NOTE ON CHANGE MANAGEMENT OF GAMBLING TECHNICAL SYSTEMS AND APPROVAL OF THE SUBSTANTIAL CHANGES TO CRITICAL COMPONENTS.
TECHNICAL AND OPERATIONAL NOTE ON CHANGE MANAGEMENT OF GAMBLING TECHNICAL SYSTEMS AND APPROVAL OF THE SUBSTANTIAL CHANGES TO CRITICAL COMPONENTS. 1. Document objective This note presents a help guide for
More informationAS/NZS :2017. Electrical installations Selection of cables AS/NZS :2017
Australian/New Zealand Standard Electrical installations Selection of cables AS/NZS 3008.1.1:2017 Part 1.1: Cables for alternating voltages up to and including 0.6/1 kv Typical Australian installation
More informationSpecification For. Asset Information Pr8701
Specification For Asset Pr8701 Written Direction Control Document Sponsor Document Owner Subject Matter Expert References Infrastructure Technical Standards Committee Manager, Capital Delivery, SIS Network
More informationAdministrative Change to AFRLI , Science and Technology (S&T) Systems Engineering (SE) and Technical Management
Administrative Change to AFRLI 61-104, Science and Technology (S&T) Systems Engineering (SE) and Technical Management OPR: AFRL/EN Reference paragraph 5. The link to the S&T Guidebook has been changed
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationFinal draft ETSI EN V1.3.1 ( )
Final draft EN 300 433-2 V1.3.1 (2011-05) Harmonized European Standard Electromagnetic compatibility and Radio spectrum Matters (ERM); Citizens' Band (CB) radio equipment; Part 2: Harmonized EN covering
More informationTitle: IEC TS (First Revision of IEC WT 01) The new standard for Wind Turbines and Wind Farms Onshore and Offshore
Title: IEC TS 61400-22 (First Revision of IEC WT 01) The new standard for Wind Turbines and Wind Farms Onshore and Offshore Author: Address: Mike Woebbeking Germanischer Lloyd Industrial Services GmbH,
More informationTechnology: Lighting Units
Triple E Register Eligibility Criteria Category: Lighting Technology: Lighting Units Lighting units are products that are specifically designed to provide high efficiency interior or exterior illumination.
More informationAny questions relating to this bulletin should be addressed to the Technical Group.
TECHNICAL BULLETIN TITLE: API 1581 Filter Water Separators to 5 th Edition BULLETIN NO. ATB-40-2005 DATE: NOVEMBER 1, 2005 During the Joint inspection Group ( JIG) issued an on the move from the current
More informationDesignated Institutes participating in the CIPM MRA
Designated Institutes participating in the CIPM MRA Expectations and nomination form Version 1.2 Contents 1. Introduction... 1 2. Designated Institute in Appendix A of the KCDB... 2 2.1. Designation of
More informationMEDICAL DEVICES : Guidance document
EUROPEAN COMMISSION DG ENTERPRISE Directorate G Unit 4 - Pressure Equipment, Medical Devices, Metrology MEDICAL DEVICES : Guidance document MEDDEV 2.10-2 Rev. 1 April 2001 (NOTE: For attachment 1 to 4
More information