1 How is Wellhead fatigue handled by industry standards? Lorents Reinås Classification: Internal

2 Objective What is Wellhead Fatigue Industry standards for Wellheads Design approach in the industry standards Is this design approach suited for fatigue? Industry standards look-ahead 2 Classification: Internal

3 Today: 25 th march 1950 Ski jump competition in London An official said of the event: This exhibition has been such an unqualified success that we are very much hoping it will become one of the country's major sporting features *BBC archives: The competition was held on a specially-built ski jump on the Heath The ski-jump competition was never held again, despite several attempts to revive it. The ski-jump on Hampstead Heath was among the last major events to use real snow to re-create ski conditions. The first artificial snow was made two years later, in 1952, at Grossinger's resort in New York, USA. 3 Classification: Internal

4 What is Wellhead Fatigue? Environmental energy is absorbed and transmitted to the subsea well by the MODU, BOP and riser. Cyclic external loading of upper part of subsea well Resisted by material stresses in upper well region. Main symptoms expected in the wellhead system Exposure during drilling, not production 4 Classification: Internal

5 WH fatigue Fatigue is a time (usage) dependent deterioration mechanism Other time (usage) dependent deterioration mechanisms are Corrosion Wear HISCC 5 Classification: Internal

6 6 Classification: Internal

7 7 Classification: Internal

8 ISO Series Code Break 8 Classification: Internal

9 API ISO truce has ended 9 Classification: Internal

10 Timeline API 17D 10 Classification: Internal

11 ISO design approach Basically a pressure vessel design approach: pressure loads are used in design In ISO , section Design Method, it reads: The effects of external loads (i.e. bending moments, tension etc.) on the assembly or components are not explicitly addresses in this part of ISO or ISO As equipment covered by this part of ISO are exposed to external loads, ISO may be used to define the structural strength design. 11 Classification: Internal

12 Fundamentally Different Design Methodology ISO ISO Rated load method A component is rated for a pressure System integrator need to check loading vs. rating. Go/no-go decision Limit state method A component failure capacity is stated Component manufacturer states the limiting capacity The code gives utilization of limit System integrator to check system loads vs. component capacity Margin to failure is unknown on a system level Margin to failure is known on a system integration level 12 Classification: Internal

13 Well Integrity definition 13 Classification: Internal

14 Is the international design code for subsea wellhead equipment meeting regulatory expectations in Norway? No i.e need for additional requirements if an operator is purchasing subsea wellhead equipment for use in Norwegian waters. company specific type, but the future might bring more unified additional requirements Such work towards recommended practice documents is underway with the ongoing JIP 14 Classification: Internal

15 Regulatory bodies can impact standards WH products are designed and manufactured for a global market The design process is influenced by API Approx. 90 buyers of WH,s 4-5 WH suppliers 2 ways ahead: unified additional requirements amongst 90 buyers API to include guidance on system loads in design methodology US governmental pressure needed PTIL can make a difference 15 Classification: Internal

16 Further readings ISO ISO Wellhead Fatigue Analysis : Surface casing cement boundary condition for subsea wellhead fatigue analytical models Section 3: Reinås, Lorents PhD thesis can be downloaded at 16 Classification: Internal

17 17 Classification: Internal

18 How is Wellhead fatigue handled by industry standards? Lorents Reinås Leading engineer 18 Classification: Internal

Impact of Input Parameters on Wellhead Fatigue, and Alternative Solutions for Life Extension

Impact of Input Parameters on Wellhead Fatigue, and Alternative Solutions for Life Extension GE Oil & Gas Impact of Input Parameters on Wellhead Fatigue, and Alternative Solutions for Life Extension Hussain Hashemizadeh Vidar Strand 6 th December 2012 LEADING PROGRESS TOGETHER Introduction The

More information

Use of MATLAB in post-processing of offshore measurements

Use of MATLAB in post-processing of offshore measurements Use of MATLAB in post-processing of offshore measurements 1 Classification: Internal 2012-10-24 Presentation outline Who we are Statoil and Wellhead Fatigue Group Wellhead fatigue why is it an issue? Offshore

More information

Learn more at

Learn more at Design of a Monitoring System for Determining Subsea Wellhead Fatigue Utilisation Richard Baker Senior Engineer, 2H Offshore Engineering OI2016, London, March 2016 Agenda Why monitor subsea wellhead fatigue?

More information

Subsea Wellhead System Design for Fatigue Performance

Subsea Wellhead System Design for Fatigue Performance Subsea Wellhead System Design for Fatigue Performance F. Justin Rodriguez 11 March 2015 11 March 2015 Subsea Drilling Services Introduction to Fatigue Mechanics of the failure Dislocations accumulate near

More information

Subsea Integrity Practices in GoM A Case Study

Subsea Integrity Practices in GoM A Case Study Subsea Integrity Practices in GoM A Case Study Session 9: HSE SPE Workshop 21 st October 2011 Objectives Integrity Management Philosophy Performance Assessment Methods Integrity Issues and Mitigation Strategy

More information

Using Critical Zone Inspection and Response Monitoring To Prove Riser Condition. M Cerkovnik -2H Offshore

Using Critical Zone Inspection and Response Monitoring To Prove Riser Condition. M Cerkovnik -2H Offshore Using Critical Zone Inspection and Response Monitoring To Prove Riser Condition M Cerkovnik -2H Offshore Agenda 1. Introduction 2. High level methodology 3. Verifying condition 4. Defining requirements

More information

To Jackup Conductors And Risers

To Jackup Conductors And Risers Challenges of Deep Water To Jackup Conductors And Risers Alex Rimmer Engineering Team Leader, 2H Offshore SUT International Subsea Technical Conference 18th April 2012 Overview What is deep water for jackup

More information

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS BigBore IIe 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS BigBore IIe SUBSEA WELLHEAD SYSTEM System Overview Dril-Quip s BigBore IIe Subsea Wellhead System meets the demands of HPHT well environments.

More information

Latest Developments in Subsea Wellhead and Riser Fatigue Monitoring

Latest Developments in Subsea Wellhead and Riser Fatigue Monitoring Latest Developments in Subsea Wellhead and Riser Fatigue Monitoring Wellhead and Riser Fatigue Monitoring Background to wellhead fatigue measurement Off line data collection Real time data collection Examples

More information

Managing Ageing Infrastructure

Managing Ageing Infrastructure Managing Ageing Infrastructure Leo van der Stap, Louisiana,1967 (Safety standards have moved on since...) Andre van der Stap, Engineering Manager, Civil Marine Offshore Structures, Shell Global Solutions

More information

Working for the future POSGRIP Technology

Working for the future POSGRIP Technology Working for the future POSGRIP Technology A Request for Joint Industry Support to enable roll-out of a new method of wellhead design October 2008 Page 1 1.1 - The Principals of POS-GRIP A New Method for

More information

Mitigation and Control of Wellhead Fatigue

Mitigation and Control of Wellhead Fatigue Mitigation and Control of Wellhead Fatigue Workshop Geotechnical Input to Well Integrity Assessment BP Helios Plaza Building (Houston ) 29 April 2016 Kim Mittendorf Kim.Mittendorf@vulcanoffshore.com Overview

More information

DXe SUBSEA WELLHEAD CONNECTORS

DXe SUBSEA WELLHEAD CONNECTORS DXe SUBSEA WELLHEAD CONNECTORS Illustration shown: DXe-3 Connector with DXe latching segment Upper Body Indicator Rod Ring Gasket Retainer Latch Segment Spreader Upper Split Ring Retractor Latch Port Ring

More information

Challenges of Deep Water To Jackup Conductors And Risers

Challenges of Deep Water To Jackup Conductors And Risers Challenges of Deep Water To Jackup Conductors And Risers Alex Rimmer Engineering Team Leader, 2H Offshore Subsea Europe 14-15th November 2011 Overview What is deep water for jackup rigs? Jackup conductor/riser

More information

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS 15,000 psi 20,000 psi BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS DXe Gasket Profile DXe Locking Profile BigBore IIe SUBSEA WELLHEAD SYSTEM Mud Stick 18 ¾" BigBore IIe Wellhead Housing The BigBore IIe Subsea

More information

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs Defining the New Normal for Offshore Drilling Copenhagen 16 June 2011 Alan Spackman Vice President, Offshore Regulatory & Technical Affairs Montara & Macondo Investigations Report of the Montara Commission

More information

Send your directly to

Send your  directly to Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.

More information

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014 NOIA ANNUAL MEETING Technology BSEE OCS Policy TECHNOLOGY Committee CONCERNS/INITIATIVES BSEE Update Joe Levine BSEE Washington DC April 11, 2014 Presentation Overview BSEE Research Program Research Drivers

More information

Single / Dual Barrier HP Drilling Risers

Single / Dual Barrier HP Drilling Risers Single / Dual Barrier HP Drilling Risers Acteon HPHT Subsea Community Breakfast Meeting 23rd March 2011 Tim Eyles Director 2H Offshore Engineering tim.eyles@2hoffshore.com / +44 1483 774908 Agenda Introduction

More information

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions GE Oil & Gas Drilling & Production VetcoGray subsea wellhead systems Advanced solutions for extreme conditions VetcoGray subsea wellhead systems As offshore drilling pushes past 10,000-foot water depths

More information

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective Kevin Taylor September 26, 2011 Eleventh U.S.-China Oil and Gas Industry Forum Chevron is a Major Operator in Subsea and

More information

Riser Lifecycle Monitoring System (RLMS) for Integrity Management

Riser Lifecycle Monitoring System (RLMS) for Integrity Management Riser Lifecycle Monitoring System (RLMS) for Integrity Management 11121-5402-01 Judith Guzzo GE Global Research Ultra-Deepwater Floating Facilities and Risers & Systems Engineering TAC meeting June 5,

More information

ISO/TR TECHNICAL REPORT

ISO/TR TECHNICAL REPORT TECHNICAL REPORT ISO/TR 13624-2 First edition 2009-12-01 Petroleum and natural gas industries Drilling and production equipment Part 2: Deepwater drilling riser methodologies, operations, and integrity

More information

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing Brent Harrald Principal Engineer Plexus Ocean Systems Ltd. December 2009 Page 1 Table of Contents Introduction Plexus Ocean

More information

Riser Installation in Deep & Ultra Deep Water

Riser Installation in Deep & Ultra Deep Water Riser Installation in Deep & Ultra Deep Water Frank Lim 38 th Annual Offshore Pipeline Technology Conference Amsterdam, February 2015 Outline Introduction Overview of current deepwater riser systems and

More information

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 Meeting with BOEMRE March 1, 2011 Presented by: Frank Gallander Chevron Chair

More information

April 10, 2013 Washington DC. Joe Levine, BSEE John Cushing, BSEE

April 10, 2013 Washington DC. Joe Levine, BSEE John Cushing, BSEE April 10, 2013 Washington DC Joe Levine, BSEE John Cushing, BSEE Emerging Technologies Branch Best Available and Safest Technology (BAST) Systems Reliability Contracts Oil and gas research of interest

More information

SAFER, SMARTER, GREENER

SAFER, SMARTER, GREENER OIL & GAS Introduction to Subsea Production Systems 04 Christmas Tree (XT) Systems August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Christmas Tree Systems Onshore tree Offshore tree Subsea tree

More information

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

June 24, 2010 RPSEA Project 1502 Thomas E. Williams  int.com June 24, 2010 RPSEA Project 1502 Thomas E. Williams www.nautilus int.com RPSEA 1502 Coiled Tubing from a Small Vessel June 2010 Update Presentation Topics Background Project Objectives System Configuration

More information

Joint relaxation behaviour of gasketed bolted flanged pipe joint during assembly

Joint relaxation behaviour of gasketed bolted flanged pipe joint during assembly Proceedings of the 2nd WSEAS Int. Conference on Applied and Theoretical Mechanics, Venice, Italy, November 20-22, 2006 319 Joint relaxation behaviour of gasketed bolted flanged pipe joint during assembly

More information

Finite element analysis of circular cross sections subjected to combined loading

Finite element analysis of circular cross sections subjected to combined loading ISSN 2395-1621 Finite element analysis of circular cross sections subjected to combined loading #1 Ajinkya Patil *, #2 DevrajSonavane *, #3 Suhasini Desai * 1 ajinkyar15@gmail.com 2 Devraj.Sonavane@akersolutions.com

More information

Looking Ahead: Management in the GoM. June 2011

Looking Ahead: Management in the GoM. June 2011 Looking Ahead: Riser System Integrity Management in the GoM June 2011 Agenda Deepwater Gulf of Mexco riser lifecycle; Background Riser systems sectioning; Section criticality vs. integrity management maturity;

More information

Delivering Subsea Solutions Using a Systems Engineering Approach

Delivering Subsea Solutions Using a Systems Engineering Approach Delivering Subsea Solutions Using a Systems Engineering Approach William Kilpatrick, PhD, CEng MIMechE February 2018 Agenda 1. Frazer-Nash Consultancy Overview i. Systems Engineering 2. Using a Systems

More information

Subsea Intervention: Is It Worth It? Drummond Lawson

Subsea Intervention: Is It Worth It? Drummond Lawson Subsea Intervention: Is It Worth It? Drummond Lawson 1 Subsea Intervention Is It Worth It? Subsea development timeline Why Intervene? What can you achieve? Intervention methods Intervention drivers What

More information

Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017

Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017 Decommissioning in Practice Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017 Disclaimer and important notice This presentation contains forward looking statements that

More information

SWiG Subsea Wireless Group - Presentation to API

SWiG Subsea Wireless Group - Presentation to API Commercial in Confidence SWiG Subsea Wireless Group - Presentation to API January 14 Commercial in Confidence Agenda About SWiG What is the technology? Where is it used? SWiG family of standards Where

More information

Heidrun Inverted Gas Lift System

Heidrun Inverted Gas Lift System Heidrun Inverted Gas Lift System ICoTA European Intervention Conference, Aberdeen Nov. 2014 Sivert Gartland, Well Intervention Engineer, Heidrun, Statoil Agenda Background - Field and drainage techniques

More information

Learn more at

Learn more at RISER AND SUBSEA ASSET FIELD LIFE EXTENSION DHAWAL NASHIKKAR ENGINEER, 2H OFFSHORE INC. WEIHUA MO ENGINEERING SPECIALIST, 2H OFFSHORE INC. VAMSEE ACHANTA SENIOR ENGINEERING SPECIALIST, 2H OFFSHORE INC.

More information

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Prepared by Maritime NZ Contents Introduction... 3 Purpose... 3 Definitions... 4 Contents of a Well Control Contingency Plan (WCCP)...

More information

Late life management of onshore and offshore pipelines

Late life management of onshore and offshore pipelines Late life management of onshore and offshore pipelines By Nathan Baranello SUT Engineering Solutions for Mature Subsea & Pipeline Assets, July 2016 Introduction Australia s first oil & gas boom: 1960 s

More information

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13 Tore Aarsland Chairman of the Editorial Revision Committee / Senior Design Engineer @ C6 Technologies 10-Jan-13 1. The well barrier philosophy of the standard is harmonised to NORSOK D-010. The use of

More information

Standard Subsea Wellheads. Integrated offshore offering for reliable, high-quality, and capital-efficient performance

Standard Subsea Wellheads. Integrated offshore offering for reliable, high-quality, and capital-efficient performance Standard Subsea Wellheads Integrated offshore offering for reliable, high-quality, and capital-efficient performance Standard Subsea Wellheads Through standardized processes, common core components, and

More information

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D.

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D. GOMR OCS Subsea Pipelines Regulatory Perspectives Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D. Gobert Overview Governing Regulations & Guidance Documents GOMR Pipeline

More information

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro SPE 123201 A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro Copyright 2009, Society of Petroleum Engineers This paper was prepared for presentation

More information

FPSO Operation and Maintenance

FPSO Operation and Maintenance An Intensive 5 Day Training Course FPSO Operation and Maintenance (Floating Production Storage and Offloading) This course is Designed, Developed, and will be Delivered under iso Quality Standards FPSO

More information

subsea annulus management call for proposals

subsea annulus management call for proposals subsea annulus management call for proposals June 2013 Aims This is an open invitation to any organisation, from any sector, seeking partners and funding for innovative technologies in the oil and gas

More information

Mitigation of Wellhead and Conductor Fatigue Using Structural Monitoring

Mitigation of Wellhead and Conductor Fatigue Using Structural Monitoring Mitigation of Wellhead and Conductor Fatigue Using Structural Monitoring Dr. Pei An, Pulse Structural Monitoring Edward Elletson, Pulse Structural Monitoring Phil Ward, 2H Offshore Ltd ABSTRACT Wellhead

More information

Subsea Wellhead Solutions

Subsea Wellhead Solutions GE Oil & Gas Subsea Wellhead Solutions Advanced technologies with industry-proven reliability, performance, and safety for all operating conditions Reliability is a must Offshore operations are moving

More information

3D Non-Linear FEA to Determine Burst and Collapse Capacity of Eccentrically Worn Casing

3D Non-Linear FEA to Determine Burst and Collapse Capacity of Eccentrically Worn Casing 3D Non-Linear FEA to Determine Burst and Collapse Capacity of Eccentrically Worn Casing Mark Haning Asst. Prof James Doherty Civil and Resource Engineering, University of Western Australia Andrew House

More information

IWCF Well Control Level 5. Celle Drilling Conference 2017

IWCF Well Control Level 5. Celle Drilling Conference 2017 IWCF Well Control Level 5 Celle Drilling Conference 2017 Contents IWCF well control level 5 course program Background - who is it for Structure and contents Delivery approach Questions Why? Level 5 background

More information

Implementing FPSO Digital Twins in the Field. David Hartell Premier Oil

Implementing FPSO Digital Twins in the Field. David Hartell Premier Oil Implementing FPSO Digital Twins in the Field David Hartell Premier Oil Digital Twins A Digital Twin consists of several key elements and features: 1. A virtual, dynamic simulation model of an asset; 2.

More information

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A EUOAG Workshop Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A Johnny Gundersen Principal Engineer, PSA Norway Content Requirements for PP&A in Norway

More information

Reversing the trend Collaboration, Robustness and Standardization

Reversing the trend Collaboration, Robustness and Standardization Reversing the trend Collaboration, Robustness and Standardization 2017 BSEE Standards Workshop, Houston May 5th 2017 By Dr.ing Geir Loeland. Head of Structural Integrity Section Petroleum Safety Authority

More information

Semek supplies specially designed, molded plastic products in polyurethane to platforms, components of subsea installations and abrasion exposed areas

Semek supplies specially designed, molded plastic products in polyurethane to platforms, components of subsea installations and abrasion exposed areas Inlay Crane Cradles Semek supplies specially designed, molded plastic products in polyurethane to platforms, components of subsea installations and abrasion exposed areas The marked is located in the

More information

Riser Lifecycle Monitoring System for Integrity Management

Riser Lifecycle Monitoring System for Integrity Management Riser Lifecycle Monitoring System for Integrity Management 11121-5402-01 Judith Guzzo GE Global Research RPSEA Ultra-Deepwater Technology Conference October 29-30, 2013 Lone Star College Conference Center

More information

4 Briefing. Responsible investor

4 Briefing. Responsible investor Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP

More information

Subsea Integrity and Efficiency Conference

Subsea Integrity and Efficiency Conference SUBSEA INTEGRITY & EFFICIENCY CONFERENCE 2015 Subsea Integrity and Efficiency Conference - 2015 Flexible Riser Integrity Assessment with Advanced MEC-FIT Technique Andreas Boenisch a.boenisch@innospection.com

More information

AADE Houston Chapter. Group. 26 January 2011

AADE Houston Chapter. Group. 26 January 2011 AADE Houston Chapter Deepwater and Emerging Technologies Group 26 January 2011 BOEMRE Compliance Guidelines Department of Interior s Increased Safety Measures for Energy Development on the Outer Continental

More information

Oil&Gas Subsea Production

Oil&Gas Subsea Production Oil&Gas Subsea Production Oil&Gas Subsea Production The first subsea technologies were developed in the 1970s for production at depths of a few hundred meters. Technology has advanced since then to enable

More information

Research & Development

Research & Development Research & Development This global network is a fundamental component in Tenaris s approach to serving the customer. Innovation that fuels growth At Tenaris, we aim to raise the quality and range of our

More information

DEVELOPMENT OF SUBSEA REGULATIONS IN THE NORWEGIAN PETROLEUM INDUSTRY FOLLOW UP AND USE OF STANDARDS

DEVELOPMENT OF SUBSEA REGULATIONS IN THE NORWEGIAN PETROLEUM INDUSTRY FOLLOW UP AND USE OF STANDARDS NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 DEVELOPMENT OF SUBSEA REGULATIONS IN THE NORWEGIAN PETROLEUM INDUSTRY FOLLOW UP AND USE OF STANDARDS Trond Sundby Petroleum Safety Authority, Norway

More information

OBSERVATORY SERVICING AND MAINTENANCE

OBSERVATORY SERVICING AND MAINTENANCE OBSERVATORY SERVICING AND MAINTENANCE How to deploy and maintain a network of observatories around Europe? We don t built what we cannot maintain! Jean-François DROGOU IFREMER Steve ETCHEMENDY M.B.A.R.I

More information

Project information. SINTEF Nord. Universtitetet i Tromsø. Troms Offshore. Opelion AS. Flagship Arctic Ocean Funding Source

Project information. SINTEF Nord. Universtitetet i Tromsø. Troms Offshore. Opelion AS. Flagship Arctic Ocean Funding Source Project information Keywords Ice; waves; marine operations; Technology Project title Ice floe interaction with ships and waves - IFiSaW Year 2016 Project leader Karl Gunnar Aarsaether Geographical localization

More information

Land wellhead systems & offshore surface wellhead systems

Land wellhead systems & offshore surface wellhead systems Land wellhead systems & offshore surface wellhead systems Presented by Oseghale Lucas Okohue BEngr. Msc. CIPMP Objectives The objective of this chapter is to provide a brief overview of the types of wellhead

More information

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:

More information

EMC Testing to Achieve Functional Safety

EMC Testing to Achieve Functional Safety Another EMC resource from EMC Standards EMC Testing to Achieve Functional Safety Helping you solve your EMC problems 9 Bracken View, Brocton, Stafford ST17 0TF T:+44 (0) 1785 660247 E:info@emcstandards.co.uk

More information

Life Extension of Subsea Umbilical Systems Assessment Process Marian Copilet Technical Solutions Manager - APAC November 2016

Life Extension of Subsea Umbilical Systems Assessment Process Marian Copilet Technical Solutions Manager - APAC November 2016 Life Extension of Subsea Umbilical Systems Assessment Process Marian Copilet Technical Solutions Manager - APAC November 2016 2016 Oceaneering International, Inc. All rights reserved. About Oceaneering

More information

Cost Reduction in Frontier Deepwater Riser Systems

Cost Reduction in Frontier Deepwater Riser Systems NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Cost Reduction in Frontier Deepwater Riser Systems Ray Burke Global Product Leader GE Oil & Gas Applications Subsea Production, Injection, Export Combines

More information

Arctic resource recovery tests materials technology

Arctic resource recovery tests materials technology Would you like to receive a hardcopy of this magazine's full publication? Please include the month and year of publication and contact Mrs. Erica Riethorst at e.riethorst@kci-world.com Arctic resource

More information

Conductor Integrity Management & Solutions

Conductor Integrity Management & Solutions Conductor Integrity Management & Solutions Delivering safe, reliable, cost effective solutions to the North Sea. Contents 1. Late Life Asset Management 2. Conductors 3. Loadings 4. Internals 5. External

More information

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity - Unrestricted Report Temporary abandoned wells on NCS Subtitle Author(s) Nils Totland SINTEF Petroleum Research Well Integrity 2011-08-24 SINTEF Petroleumsforskning AS SINTEF Petroleum Research Address:

More information

Degree Requirements

Degree Requirements 4.2.12.2 Degree Requirements Programme Information The Master of Science (Offshore Technology) programme, or MSc (OT) in short, is jointly hosted by the Department of Civil and Environmental Engineering

More information

WELLBORE ABANDONMENT CHALLENGES & OPERATIONS A-1, A-2, A-3, A-5, A-6, DEEP MENSA A-4 (PREVIOUSLY ABANDONED)

WELLBORE ABANDONMENT CHALLENGES & OPERATIONS A-1, A-2, A-3, A-5, A-6, DEEP MENSA A-4 (PREVIOUSLY ABANDONED) MENSA FIELD (MC 768) WELLBORE ABANDONMENT CHALLENGES & OPERATIONS A-1, A-2, A-3, A-5, A-6, DEEP MENSA A-4 (PREVIOUSLY ABANDONED) Chris Gerace Completions and Well Intervention Engineer 1 DEFINITIONS &

More information

Paper 5 DEVELOPING GUIDELINES FOR EVALUATING DAMAGE TO SUBSEA PIPELINES

Paper 5 DEVELOPING GUIDELINES FOR EVALUATING DAMAGE TO SUBSEA PIPELINES Paper 5 DEVELOPING GUIDELINES FOR EVALUATING DAMAGE TO SUBSEA PIPELINES C. Alexander*, R. Ayers Stress Engineering Services, Inc., Houston, Texas USA B. Exley Williams Gas Pipeline, Houston, Texas USA

More information

Deepwater well design, construction & drilling operations

Deepwater well design, construction & drilling operations Deepwater well design, construction & drilling operations Training and development 1 Kingdom Drilling Services Ltd Our Mission Deliver a recognized excellence in deepwater industry training, education

More information

Jørn Scharling Holm DONG Energy

Jørn Scharling Holm DONG Energy Jørn Scharling Holm DONG Energy 3 rd June 2016 Offshore BoP - Sub-topics and timelines Delivery by Delivery by Table Priority Table 2020-2025 Table 2025-2030 Delivery post 2030 Industrialized transport

More information

Formation of a standing Subsea committee in IOGP and the prioritized work areas for the committee. Roald Sirevaag IOGP Subsea committee chair

Formation of a standing Subsea committee in IOGP and the prioritized work areas for the committee. Roald Sirevaag IOGP Subsea committee chair Formation of a standing Subsea committee in IOGP and the prioritized work areas for the committee Roald Sirevaag IOGP Subsea committee chair About IOGP Wherever you are Wherever you go... Whatever you

More information

Joint Rig Committee. Integrity Management of Permanent Mooring Systems

Joint Rig Committee. Integrity Management of Permanent Mooring Systems Joint Rig Committee Integrity Management of Permanent Mooring Systems Commissioning Design rate Performance Test Initial Start-up Mock Operation Trouble Shooting Operation Construction Completion Construction

More information

IOGP JIP33 Standardisation of Equipment Specifications for Procurement Completion of the Pilot and the Next Phase

IOGP JIP33 Standardisation of Equipment Specifications for Procurement Completion of the Pilot and the Next Phase MCE Deepwater Development 2017 NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 IOGP JIP33 Standardisation of Equipment Specifications for Procurement Completion of the Pilot and the Next Phase Polina

More information

RISER SYSTEMS. Our world class innovation solving your riser challenges

RISER SYSTEMS. Our world class innovation solving your riser challenges RISER SYSTEMS Our world class innovation solving your riser challenges OUR WORLD CLASS INNOVATION SOLVING YOUR RISER contents Riser Analysis 3 Subsea Riser Systems 4 Connectors (Subsea and Surface) Surface

More information

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa InterMoor Innovation in Action InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa InterMoor is an Acteon Company linking subsea services 3 InterMoor Services MOORINGS Rig Moves Permanent

More information

Drilling Courses Overview Pressure control and drilling equipment course offering

Drilling Courses Overview Pressure control and drilling equipment course offering Drilling Courses Pressure control and drilling equipment course offering Content Introduction 3 Pressure control equipment Multiplex (MUX) control system overview Mark III subsea BOP control system electrical

More information

Summary of Changes and Current Document Status

Summary of Changes and Current Document Status DNV SERVICE DOCUMENTS Summary of Changes and Current Document Status FEBRUARY 2012 FOREWORD DET NORSKE VERITAS (DNV) is an autonomous and independent foundation with the objectives of safeguarding life,

More information

Pulse Structural Monitoring

Pulse Structural Monitoring Pulse Structural Monitoring Pulse Structural Monitoring Marin SCRASSURE Budgetary Proposal Pulse Overview SCRAssure Monitroing System Monitoring Objective System Overview System Architecture Cost and Schedule

More information

Statoil Supplier Days

Statoil Supplier Days Statoil Supplier Days 2017 2012-10-24 Shaping competitive solutions together Margareth Øvrum, EVP Technology, projects and drilling 2012-10-24 Lifting weights all summer! Aasta Hansteen Njord Cat J Oseberg

More information

/chesssubseaengineering. Deepwater Mux Subsea BOP Control System & Marine Riser System. Oseghale Lucas Okohue Bsc.Msc.CPMP.

/chesssubseaengineering. Deepwater Mux Subsea BOP Control System & Marine Riser System. Oseghale Lucas Okohue Bsc.Msc.CPMP. Deepwater Mux Subsea BOP Control System & Marine Riser System Presented by Oseghale Lucas Okohue Bsc.Msc.CPMP Lecture 1: Subsea BOP Control Systems, Operations and Trouble Shooting Learning Outcome Understand

More information

Shell Subsea Experience

Shell Subsea Experience Shell Subsea Experience Factors to consider in cost estimating GOM Perspective Scott Sanantonio Intervention Engineering TL 1 DEFINITIONS AND CAUTIONARY NOTE The New Lens Scenarios referred to in this

More information

IADC Conference, RIO 2005 Fatigue Monitoring of Deepwater Drilling Risers. Mateusz Podskarbi, Ricky Thethi, Hugh Howells; 2HOffshore Inc

IADC Conference, RIO 2005 Fatigue Monitoring of Deepwater Drilling Risers. Mateusz Podskarbi, Ricky Thethi, Hugh Howells; 2HOffshore Inc IADC Conference, RIO 2005 Fatigue Monitoring of Deepwater Drilling Risers Mateusz Podskarbi, Ricky Thethi, Hugh Howells; 2HOffshore Inc How Far the Eye Reaches? Slide No. 2 Drilling Riser Fatigue Fatigue

More information

INDUSTRIAL PROCESS CLEANING SPECIALISTS SEPTEMBER 2017

INDUSTRIAL PROCESS CLEANING SPECIALISTS SEPTEMBER 2017 INDUSTRIAL PROCESS CLEANING SPECIALISTS SEPTEMBER 2017 A mark of a good company is one that takes an interest in solving a clients problem and committing 100% until the problem is solved and that is exactly

More information

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 NTL No. 2010-N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 Frequently Asked Questions (FAQ s) Updated July 9, 2010 A. General Questions QA1: With the issuance of

More information

DNB's 9th Annual Oil, Offshore & Shipping Conference Kristian Siem Chairman Subsea 7

DNB's 9th Annual Oil, Offshore & Shipping Conference Kristian Siem Chairman Subsea 7 DNB's 9th Annual Oil, Offshore & Shipping Conference Kristian Siem Chairman Subsea 7 1 Forward-looking statements Certain statements made in this announcement may include forward-looking statements. These

More information

Learn more at

Learn more at Deepwater Riser System Challenges and Issues David Walters 2H Offshore Presentation Objectives Review riser system options Update on current industry status Highlight key issues Discuss current industry

More information

Overview and Update of API Standards

Overview and Update of API Standards Overview and Update of API Standards IADC South East Asia Chapter Meeting Kuala Lumpur, Malaysia March 21, 2017 Eric Ho American Petroleum Institute Singapore Scope of Presentation API Background API Standards

More information

Minutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes.

Minutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes. Minutes of Meeting 2009 Exploration & Production Standards Conference on Oilfield Equipment and Materials Meeting Tuesday, June 23, 2009 Drilling Well Control Equipment SC16 8:30 am 12:00 pm Chair: Mel

More information

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals INTERNATIONAL STANDARD ISO 13628-5 Second edition 2009-12-15 Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals Industries du pétrole et du

More information

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA Dagang Zhang COTEC Offshore Engineering Solutions China Offshore Oil Engineering Company 2011 China-America Frontiers of Engineering Symposium San Diego, USA Presentation Outline Current Status of Deepwater

More information

Intervention/Decommissioning

Intervention/Decommissioning Intervention/Decommissioning By Nicholas Samford Lloyds Register Intervention/Decommissioning SME Working together for a safer world Planning Decommissioning Operations Planning Decommissioning and P&A

More information

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:

More information

Recommended Practice for Flexible Pipe

Recommended Practice for Flexible Pipe Recommended Practice for Flexible Pipe ANSI/API RECOMMENDED PRACTICE 17B FOURTH EDITION, JULY 2008 Document includes Technical Corrigendum 1, dated June 2008 ISO 13628-11:2007 (Identical), Petroleum and

More information

Diverse Capabilities Targeted Solutions

Diverse Capabilities Targeted Solutions Diverse Capabilities Targeted Solutions Today s Leader, Tomorrow s Innovation As a vertically integrated manufacturer with direct control over the entire supply chain from raw materials to finished product,

More information