15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

Size: px
Start display at page:

Download "15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS"

Transcription

1 15,000 psi 20,000 psi BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

2 DXe Gasket Profile DXe Locking Profile BigBore IIe SUBSEA WELLHEAD SYSTEM Mud Stick 18 ¾" BigBore IIe Wellhead Housing The BigBore IIe Subsea Wellhead System meets the severe demands of HPHT well environments, eliminates trips, and saves you money. Slope Indicator 36" Wellhead Housing 36" x 28" 18 ¾" BigBore IIe Seal Assembly Second Position 18 ¾" BigBore IIe Seal Assembly First Position The BigBore IIe Wellhead is the only system that is fatigue tested to over 90+ million bending cycles. It has been tested to Normal MM ft-lbs, Extreme MM ft-lbs, Survival MM ft-lbs rated loads per API 17TR7. The BigBore IIe Wellhead DXe locking profile is approved by both I3P and BSEE per API 17TR8. Operator s existing BigBore II-H inventory can be converted to BigBore IIe. Annulus Access Valve The BigBore IIe Subsea Wellhead System is highly flexible to accommodate a complex and heavy casing program that satisfies deep HPHT well objectives, while providing superior structural strength and unmatched fatigue life. 28" Positive Stop 16" Seal Assembly 16" FEATURES AND BENEFITS Reduces capital expense by eliminating the need for extra drilling and production lockdown devices Reduces operational expenses by eliminating the number of trips into the well Seal Assembly provides 2 million lbs. hanger lockdown capacity to resist thermal and pressure loads High load capacity meets requirements of next generation 20 Ksi drilling rigs and HPHT well designs DXe locking profile offers industry best structural capacity and fatigue resistance proven with validation testing Structurally tested and qualified to normal, extreme and survival loads per API 16A 4th Edition and API 17 TR7 Hydrate Diverter (Optional) 36" Casing 28" Casing (Other Sizes Optional) 22" Casing 16" Casing 14" Casing (Other Sizes Optional) 18" Seal Assembly 22" / 23" x 16" 22" x 18" Full scale Wellhead and BOP connector fatigue tested Metal-to metal seal assembly qualified to 20,000 psi WP and 35 to 350 F per API 6A Appendix F PR2 Group 4, with additional dynamic cycles, metal seal endurance testing with gas 18" Positive Stop BBIIe NEXT GENERATION WELLHEAD EQUIPMENT Accommodates a variety of casing programs 2 3

3 18 ¾" BigBore IIe Subsea wellhead system 18 ¾" BigBore IIe Seal Assembly The BigBore IIe Subsea Wellhead System maximizes life of field integrity. Designed for 15,000 psi (27") and 20,000 psi (30") rated working pressure and H2S service between 35 to 350 F with all metal-to-metal sealing Supports 8.8 million lbs of end-load (combination of casing weight and test pressure) at the bottom internal landing / load shoulder profile Highest available combination of bending, tension and load capacities using the Dril-Quip DXe profile Utilizes landing adapters positioned in 22"/23" surface casing joints for landing 18" and 16" supplemental casing hanger systems 18" and 16" casing, casing hangers and testable / retrievable / replaceable seal assemblies can pass through 21" OD drilling riser, 18-3/4" BOP Stack and BigBore IIe wellhead housing All casing hangers and seal assemblies are run, set and tested on drill pipe running string in a single trip Time saving bit-runnable wear sleeves and wear busings available High pressure wellhead actively locked into low pressure wellhead with 2.0 millions lbs of preload to unitize both conductor and surface strings for superior bending load reaction and fatigue resistance Utilizes field proven BigBore II-H HPHT metal-tometal, gas tight sealing technology Incorporates ROV-assisted annulus monitoring and shutoff system for all casing strings cemented back to surface Large cement return flow-by areas on all casing hanger systems Available with hydrate diversion plate option Complex casing programs accommodated All component designs are based on existing BigBore II-H technology and long successful BigBore II field history The BigBore IIe Seal Assembly delivers bidirectional high pressure liquid and gas tight metal-to-metal sealing, and provides high lockdown capacity. Upper Body Inner Lock Ring Sealing Element Pressure Assist Puller Element Gap accommodates * stackup tolerances * pressure from above or below the seal Seals in a recessed groove in the wellhead bore, which protects against scoring in the seal bore Resilient Elastomer Backup Resilient Elastomer Backup Locks to the wellhead using the outer lock ring to hold down the seal and prevent excessive movement of casing hanger and seal when casing strings are exposed to thermal growth loading Next Generation Wellhead System BigBore IIe is fully verified and validation tested for structural capacity and high fatigue resistance Seal assembly outer lock ring as 2,000,000 lbs end-load lockdown capacity Successfully tested in gas medium per API 6A PR-2 requirements with zero leakage and Group 4 Dynamic seal endurance testing with no elastomers Weight set metal-to-metal seal assembly Seal assembly easily retrieved with hydraulic tool Seal assembly can be run separately with seal assembly running tool Casing hanger seal assembly running tool has a 2.5 million lb. load capacity Casing hanger seal assembly running tool retrieves seal assembly if it doesn t test and lockdown Same dependable running tool design used for over 25 years 4 5

4 verification and Validation testing Dril-Quip has taken a "systems" approach to evaluating the strength characteristics and overall performance of the Subsea Wellhead System. Subsea Wellhead Systems in-house Verification Analysis and Validation Testing is Extensive Design verification analysis using fine mesh 2-D and sophisticated 3-D FEA modeling tools used to evaluate the behavior of the wellhead system. Design and capacity validation testing is tested with machines capable of applying multiple load scenarios to a complete wellhead system. Adjustments are made to the 3-D FEA model to deliver more precise results. Dril-Quip s validation test machine is test machine than can deliver the forces required to test the system as a whole. Dril-Quip uses a fatigue test on the whole wellhead system to evaluate stresses between the wellhead and wellhead connector. Horizontal Test Machine - Capabilities Annulus Seal Assembly with Environmental Controls Subsea Wellhead and Components are Qualified to the latest Industry Standards The latest API standards are used for both design verification and validation testing. Wellhead components have been tested and qualified to API 17D 2nd Edition and 6A (PR2) 20th Edition requirements. High pressure/high temperature wellhead system components have been tested and qualified to API 6A Appendix F Group 4 in addition to dynamic seal testing over and above API industry requirements. Complete system integrated verification and validation testing assures individual component capacities match or exceed the system capacity requirements. Data Acquisition and Control System for Seal Testing * 20 million ft-lbf of bending loading * million lbf of tension / compression loading and 8 million lbf of compression loading * 6+ million lbf of simulated casing weight * Internal / External pressure and associated pressure end loads to test specimen capacities Fatigue Test Machine with Specialty Connector Test Specimen 6 7

5 W O R L D W I D E S A L E S & S E R V I C E Engineering, Manufacturing, Sales & Service Sales & Service Sales Representatives Western Hemisphere D -Q, Inc. World Headquarters 6401 North Eldridge Pkwy. Houston, Texas Tel Fax D -Q do Brasil, LTDA. Macaé, Brazil Tel Fax Eastern Hemisphere Stoneywood Park, Dyce Aberdeen, Scotland, UK AB21 7DZ Tel Fax Asia Pacific D -Q Asia Pacific Pte. Ltd. No. 80 Tuas West Drive Singapore, Tel Fax Western Hemisphere Corporate Headquarters P.O. Box Houston, Texas Tel Fax Eastern Hemisphere U.K. Limited Unit D Abbotswell Road West Tullos Aberdeen, Scotland, UK AB12 3AD Tel Fax Asia Pacific International Inc. 9 Tuas Avenue 12 Singapore Tel Fax COM

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS BigBore IIe 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS BigBore IIe SUBSEA WELLHEAD SYSTEM System Overview Dril-Quip s BigBore IIe Subsea Wellhead System meets the demands of HPHT well environments.

More information

DXe SUBSEA WELLHEAD CONNECTORS

DXe SUBSEA WELLHEAD CONNECTORS DXe SUBSEA WELLHEAD CONNECTORS Illustration shown: DXe-3 Connector with DXe latching segment Upper Body Indicator Rod Ring Gasket Retainer Latch Segment Spreader Upper Split Ring Retractor Latch Port Ring

More information

HorizontalBore SUBSEA TREE

HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE Dril-Quip s HorizontalBore Tree is a modular design subsea production component that accommodates numerous completion configuration possibilities.

More information

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing Brent Harrald Principal Engineer Plexus Ocean Systems Ltd. December 2009 Page 1 Table of Contents Introduction Plexus Ocean

More information

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions GE Oil & Gas Drilling & Production VetcoGray subsea wellhead systems Advanced solutions for extreme conditions VetcoGray subsea wellhead systems As offshore drilling pushes past 10,000-foot water depths

More information

Setting a Global Standard. Template Systems

Setting a Global Standard.  Template Systems Setting a Global Standard www.dril-quip.com Template Systems Overview When water depths are shallow, production wells can be spotted and drilled randomly relative to one another. In deeper water and more

More information

Setting a Global Standard. General Catalog

Setting a Global Standard.  General Catalog Setting a Global Standard www.dril-quip.com General Catalog Dril-quip Setting a global standard in the development of offshore drilling and production equipment Facilities Dril-quip, Inc. is one of the

More information

Cameron MBO Multi-Bowl Wellhead System

Cameron MBO Multi-Bowl Wellhead System Cameron MBO Multi-Bowl Wellhead System MBO Multi-Bowl Wellhead System The Cameron MBO Multi-Bowl Wellhead System is a compact, unitized wellhead which can be used as an alternative to conventional wellhead

More information

Working for the future POSGRIP Technology

Working for the future POSGRIP Technology Working for the future POSGRIP Technology A Request for Joint Industry Support to enable roll-out of a new method of wellhead design October 2008 Page 1 1.1 - The Principals of POS-GRIP A New Method for

More information

Subsea Wellhead Solutions

Subsea Wellhead Solutions GE Oil & Gas Subsea Wellhead Solutions Advanced technologies with industry-proven reliability, performance, and safety for all operating conditions Reliability is a must Offshore operations are moving

More information

Standard Subsea Wellheads. Integrated offshore offering for reliable, high-quality, and capital-efficient performance

Standard Subsea Wellheads. Integrated offshore offering for reliable, high-quality, and capital-efficient performance Standard Subsea Wellheads Integrated offshore offering for reliable, high-quality, and capital-efficient performance Standard Subsea Wellheads Through standardized processes, common core components, and

More information

Wellhead Control Products, Inc. Hangers

Wellhead Control Products, Inc. Hangers Wellhead Control Products, Inc. Hangers The RH series was designed to be a highly workable coiled tubing hanger with greater reliability and more efficiency than other coiled tubing hanger systems. The

More information

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision After the production casing has been installed in the well and cemented in place, the operator may elect to run a lock-down sleeve.

More information

2016 Employee Product Education Courses

2016 Employee Product Education Courses Houston Intercontinental Airport 45 John F. Kennedy Boulevard BELTWAY 8 Sam Houston Tollway 8 Fairbanks N. Houston Eldridge Rd. 290 59 tle York West Lit Recommended Hotel Omni Hotel e Parkway North Eldridg

More information

Multi-Bowl Applications

Multi-Bowl Applications Multi-Bowl Applications Standard Off-the- Shelf Casing Head Lower Profile Solution Common Support Bushing Field Proven Sealing Designs FS Seals require No Plastic Packing C-22 Profile = Standard Off-the-

More information

Land wellhead systems & offshore surface wellhead systems

Land wellhead systems & offshore surface wellhead systems Land wellhead systems & offshore surface wellhead systems Presented by Oseghale Lucas Okohue BEngr. Msc. CIPMP Objectives The objective of this chapter is to provide a brief overview of the types of wellhead

More information

CONNECTION. Certified System Components. Subsea Connections

CONNECTION. Certified System Components. Subsea Connections CONNECTION TM Certified System Components Subsea Connections Subsea Connections from Cameron: reliable, versatile links to tie production systems together. Right from the start, the leader Cameron s subsea

More information

An Introduction to Grayloc Products! Serving your Piping and Pressure Vessel requirements for over 50 years!

An Introduction to Grayloc Products! Serving your Piping and Pressure Vessel requirements for over 50 years! An Introduction to Grayloc Products! Serving your Piping and Pressure Vessel requirements for over 50 years! Grayloc Products An Oceaneering International Company Oceaneering is a global oilfield provider

More information

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton 7 Drilling Systems Cameron has designed, manufactured and delivered surface and subsea drilling systems from the wellhead through the manifold to meet a wide variety of customer requirements and drilling

More information

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N Riserless Subsea P&A Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N 7 Series S U B S E A I N T E R V E N T I O N 7 Series Nominal Bore Size 7.375

More information

WRS Artificial Lift System

WRS Artificial Lift System WRS Artificial Lift System Patent Pending Designed to adapt to any type of Artificial Lift Suspension! Artificial Lift and Down hole gauge monitoring Is fast Becoming the go to in the oil production market.

More information

Master Flo Valve Inc.

Master Flo Valve Inc. Product Overview Master Flo Valve Inc. Master Flo Valve Inc. is the technological leader and world-class manufacturer of surface and subsea chokes, specialty control valves and supporting actuation. Privately-owned,

More information

RISER SYSTEMS. Our world class innovation solving your riser challenges

RISER SYSTEMS. Our world class innovation solving your riser challenges RISER SYSTEMS Our world class innovation solving your riser challenges OUR WORLD CLASS INNOVATION SOLVING YOUR RISER contents Riser Analysis 3 Subsea Riser Systems 4 Connectors (Subsea and Surface) Surface

More information

SAFER, SMARTER, GREENER

SAFER, SMARTER, GREENER OIL & GAS Introduction to Subsea Production Systems 04 Christmas Tree (XT) Systems August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Christmas Tree Systems Onshore tree Offshore tree Subsea tree

More information

Marginal Project Development

Marginal Project Development Marginal Project Development A case study of the MC-66 / OCHRE Project Richard Weser MC66 OCHRE Joint Venture Project OCHRE PROSPECT DEVELOPMENT Mississippi Canyon 66 1 Gas Subsea 7.9-Mile Tieback to Taylor

More information

2009 Half Year Results Summary

2009 Half Year Results Summary Rig Activity - 2 - 2009 Half Year Results Summary 2009 m 2008 m Change % Revenue 219.8 201.2 +9% EBITDA 30.7 32.1-4% Profit from operations 23.0 24.0-4% Finance income (expense) 3.3 (2.9) Profit before

More information

Single / Dual Barrier HP Drilling Risers

Single / Dual Barrier HP Drilling Risers Single / Dual Barrier HP Drilling Risers Acteon HPHT Subsea Community Breakfast Meeting 23rd March 2011 Tim Eyles Director 2H Offshore Engineering tim.eyles@2hoffshore.com / +44 1483 774908 Agenda Introduction

More information

AADE-05-NTCE-39. Slender Well Plan for Lower Cost and Improved Safety. Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries

AADE-05-NTCE-39. Slender Well Plan for Lower Cost and Improved Safety. Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries AADE-05-NTCE-39 Slender Well Plan for Lower Cost and Improved Safety Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries This paper was prepared for presentation at the AADE 2005 National Technical

More information

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr. Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier Brian Piccolo, Technology Development Mgr. Agenda Pumped Riser System (PRS) Vision Initial Concept Operational

More information

Heidrun Inverted Gas Lift System

Heidrun Inverted Gas Lift System Heidrun Inverted Gas Lift System ICoTA European Intervention Conference, Aberdeen Nov. 2014 Sivert Gartland, Well Intervention Engineer, Heidrun, Statoil Agenda Background - Field and drainage techniques

More information

UCON Connection Systems

UCON Connection Systems UCON Connection Systems UCON Connection Systems Subsea fields are developed using a variety of connection system solutions. Over the past two decades, FMC Technologies has manufactured a complete range

More information

QUALITY INNOVATION RELIABILITY ENGINEERED SIMPLICITY

QUALITY INNOVATION RELIABILITY ENGINEERED SIMPLICITY PEMEX-INTSOK Deepwater Technology Seminar, May 9-10, 2013 UNITECH is QUALITY INNOVATION RELIABILITY ENGINEERED SIMPLICITY Global Reach UNITECH equipment and people support some of the world s most challenging

More information

Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications

Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications Smitha G, Mahesh Bhat GE Oil & Gas, Bangalore Abstract: In deep-sea oil fields, metal seals play an important role to facilitate

More information

Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us

Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us Table Of Contents Casing Head 02 Christmas Tree & Tubing Head 03 Tubing Spool 04 Contact Us 05 1 www.sapwellsglobal.com Casing Head Specialized large-diameter pipe lowered into an open hole and cemented

More information

Hunting Manufactures and distributes products that enable the extraction of oil and gas

Hunting Manufactures and distributes products that enable the extraction of oil and gas Hunting Manufactures and distributes products that enable the extraction of oil and gas Hunting PLC Global Footprint 2 2009 Corporate Highlights Completed three acquisitions 47.3m Sale of Hunting Energy

More information

TABLE OF CONTENTS Page

TABLE OF CONTENTS Page 2 American Petroleum Institute TABLE OF CONTENTS Page POLICY................t... 8 FOREWORD......................................................................................................................f...

More information

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl. (12) APPLICATION (19) NO (21) 11782 (13) A1 NORWAY (1) Int Cl. E21B 43/00 (06.01) E21B 43/01 (06.01) E21B 43/12 (06.01) Norwegian Industrial Property Office (21) Application nr 11782 (86) Int.application.day

More information

AADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference

AADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference AADE 01-NC-HO-02 Using Multi-Function Fishing Tool Strings to Improve Efficiency and Economics of Deepwater Plug and Abandonment Operations David B. Haughton and Walter S. Going, P.E., SPE, Baker Oil Tools

More information

Comprehensive Plug and Abandonment Systems

Comprehensive Plug and Abandonment Systems Comprehensive Plug and Abandonment Systems Abandon Your Well. Abandon Uncertainty. Complete, single-trip systems for P&A Schlumberger comprehensive plug and abandonment systems bring certainty and rig-time

More information

Controls and Communications Connectors Diamould electrical connectors

Controls and Communications Connectors Diamould electrical connectors Controls and Communications Connectors Diamould electrical connectors APPLICATIONS Subsea production systems controls Connectivity to tree, manifold, choke, and chemical injection metering valve (CIMV)

More information

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE Sandy Meldrum CEng, MIMechE Concept A means of producing oil from small offshore fields which would be uneconomic for fixed platforms or other conventional means. System Overview Comprised Production Vessel

More information

HELIX ENERGY SOLUTIONS

HELIX ENERGY SOLUTIONS HELIX ENERGY SOLUTIONS OFFSHORE CAPABILITIES www.helixesg.com About Us WELL OPERATIONS SUBSEA WELL INTERVENTION PRODUCTION FACILITIES The purpose-built vessels of our Well Operations business units serve

More information

SUBSEA 101. Find more Subsea 101 case studies online

SUBSEA 101. Find more Subsea 101 case studies online SUBSEA 101 The purpose of this document is to help define some of the rationale behind the selection of a subsea tree configuration in a theoretical field for a project we are calling Project X. This section

More information

AADE Houston Chapter. Group. 26 January 2011

AADE Houston Chapter. Group. 26 January 2011 AADE Houston Chapter Deepwater and Emerging Technologies Group 26 January 2011 BOEMRE Compliance Guidelines Department of Interior s Increased Safety Measures for Energy Development on the Outer Continental

More information

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13 Tore Aarsland Chairman of the Editorial Revision Committee / Senior Design Engineer @ C6 Technologies 10-Jan-13 1. The well barrier philosophy of the standard is harmonised to NORSOK D-010. The use of

More information

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS. AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation

More information

Focused on the future

Focused on the future GE Oil & Gas Drilling & Production Focused on the future 2 3 Worldwide, industry-wide Advanced, single-source solutions for drilling, completion and production applications Drilling & Production Equipment

More information

Designing Subsea Wells for Abandonment & Suspension

Designing Subsea Wells for Abandonment & Suspension Designing Subsea Wells for Abandonment & Suspension Graeme Rae Rig Build Project Engineer Chevron Upstream Europe Aberdeen Designing Subsea Wells for Abandonment & Suspension Subsea Well Design Aspects

More information

Well Abandonment Services. Plug into a New Approach

Well Abandonment Services. Plug into a New Approach Well Abandonment Services Plug into a New Approach Get it Right the First Time Permanent Solutions to Your Well Abandonment Challenge Thousands of wells await safe and permanent abandonment. It s critical

More information

Challenges of Deep Water To Jackup Conductors And Risers

Challenges of Deep Water To Jackup Conductors And Risers Challenges of Deep Water To Jackup Conductors And Risers Alex Rimmer Engineering Team Leader, 2H Offshore Subsea Europe 14-15th November 2011 Overview What is deep water for jackup rigs? Jackup conductor/riser

More information

Aeroquip Rynglok Tube Repair System

Aeroquip Rynglok Tube Repair System Aeroquip Rynglok Tube Repair System The system of choice for aerospace hydraulic tubing repair Approved by Boeing, Airbus, major airlines, and all branches of the U.S. military The new tube fitting performance

More information

Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International

Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International June 18-19 2014 Vienna, Austria. 2011 Weatherford. All rights reserved. 1

More information

To Jackup Conductors And Risers

To Jackup Conductors And Risers Challenges of Deep Water To Jackup Conductors And Risers Alex Rimmer Engineering Team Leader, 2H Offshore SUT International Subsea Technical Conference 18th April 2012 Overview What is deep water for jackup

More information

SOLVE DEEPEST LEVEL FLUID CHALLENGES. at their

SOLVE DEEPEST LEVEL FLUID CHALLENGES. at their O F F S H O R E T E C H N O L O G Y We SOLVE at their FLUID CHALLENGES DEEPEST LEVEL O F F S H O R E T E C H N O L O G Y Altogether, a BETTER FORMULA for your SUCCESS With over 150 years of expertise and

More information

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application 2 Virtus Subsea Connectors Delivering Long-Lasting Reliability at Each Subsea Connection Subsea production

More information

Vertical Tie-in Systems

Vertical Tie-in Systems Vertical Tie-in Systems Vertical Tie-In Systems Vertical Tie-in systems may be used for tie-in of flexible flowlines, umbilicals, Jumper spools, Rigid Spools and Inline Tees. Vertical connections are installed

More information

Vertical Tie-in Systems

Vertical Tie-in Systems Vertical Tie-in Systems Vertical Tie-In Systems Vertical Tie-in systems may be used for tie-in of flexible flowlines, umbilicals, Jumper spools, Rigid Spools and Inline Tees. Vertical connections are installed

More information

Offshore Systems. Cameron s Subsea Production Philosophy

Offshore Systems. Cameron s Subsea Production Philosophy Offshore Systems In today s fast-paced, cost-conscious subsea production industry, Cameron has successfully met the challenge to deliver safe, reliable system solutions. This experience allows Cameron

More information

Impact of Input Parameters on Wellhead Fatigue, and Alternative Solutions for Life Extension

Impact of Input Parameters on Wellhead Fatigue, and Alternative Solutions for Life Extension GE Oil & Gas Impact of Input Parameters on Wellhead Fatigue, and Alternative Solutions for Life Extension Hussain Hashemizadeh Vidar Strand 6 th December 2012 LEADING PROGRESS TOGETHER Introduction The

More information

Learn more at

Learn more at Deepwater Riser System Challenges and Issues David Walters 2H Offshore Presentation Objectives Review riser system options Update on current industry status Highlight key issues Discuss current industry

More information

Wellhead equipment CATALOG

Wellhead equipment CATALOG equipment CATALOG Wellhead & Christmas tree Fixed the drilled wellhead.connect wellhead casing ring,seal and control the annular of casing. suspend tubing,control wellhead pressure and adjust flow rate,also

More information

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015 Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015 Special Notes API publications necessarily address problems

More information

OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD.

OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD. OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD. Release Notes: Release 2 Issued May 2016 Document # OM ST 001, Shock Tool Operating Manual Reviewed By: RG 1 P age OPERATING MANUAL SHOCK TOOL

More information

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. 1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local

More information

Tailor Made. Create your unique subsea valve

Tailor Made. Create your unique subsea valve Tailor Made Create your unique subsea valve Our engineers have developed a comprehensive range of subsea valves, operators and hydraulic actuators to deliver complete tailor made packages meeting the highest

More information

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005)

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005) Geoprober Drilling Moving from Ideas To Reality (Status August, 2005) Reel A 4 OD Reel B 3-1/8 OD Anaconda CT Unit Drilling Rig 27 m derrick, 200 tonnes Heave comp 120 tonnes 4.8m Existing Equipment Refurbishment

More information

Figure 11 Flange Adapter and Back-Up Ring

Figure 11 Flange Adapter and Back-Up Ring Flange Adapters Standard back-up rings are Standard back-up rings are convoluted ductile iron with AWWA C207 150 lb drilling. One edge of the back-up ring bore must be radiused or chamfered. This edge

More information

LEADING THE WAY IN WELLHEAD AND PIPELINE TECHNOLOGY. Wellheads Christmas Trees Gate Valves Surface Safety Valves Frac Trees Check Valves

LEADING THE WAY IN WELLHEAD AND PIPELINE TECHNOLOGY. Wellheads Christmas Trees Gate Valves Surface Safety Valves Frac Trees Check Valves LEADING THE WAY IN WELLHEAD AND PIPELINE TECHNOLOGY Wellheads Christmas Trees Gate Valves Surface Safety Valves Frac Trees Check Valves OUR Stream-Flo Industries Ltd. is committed to provide premium quality

More information

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists Our experienced service personnel have supported operators with more than 80+ wells drilled to date. Our

More information

Deep Water Definitions

Deep Water Definitions DST in Deep Water Deep Water Definitions Depth of Water (Deepwater >1000ft (300m), Ultra- Deepwater > 5000ft (1500m)) Rig Type - Floaters (Drillships and Semi-Submersibles) Approach and Profile (risk,

More information

Research & Development

Research & Development Research & Development This global network is a fundamental component in Tenaris s approach to serving the customer. Innovation that fuels growth At Tenaris, we aim to raise the quality and range of our

More information

Copyright 2013 Boart Longyear. All Rights Reserved. XQ WIRELINE CORING ROD. Technical Overview

Copyright 2013 Boart Longyear. All Rights Reserved. XQ WIRELINE CORING ROD. Technical Overview Copyright 2013 Boart Longyear. All Rights Reserved. XQ WIRELINE CORING ROD Technical Overview 1 XQ WIRELINE CORING ROD Patented XQ wireline coring rods feature a combination of exclusive heat treatments

More information

By: Derek Watson and Lee Robins, Tracerco, UK

By: Derek Watson and Lee Robins, Tracerco, UK TRACERCO DISCOVERY SUBSEA CT (COMPUTED TOMOGRAPHY) HELPS TO OPTIMISE YOUR OPERATIONAL PIGGING CAMPAIGN AND VERIFY ILI RESULTS: TECHNOLOGY FOR PIPELINE INTEGRITY AND FLOW ASSURANCE VISUALISATION By: Derek

More information

PRODUCT OVERVIEW NEXT-GENERATION (NXG) SOLUTIONS FOR THE OIL AND GAS INDUSTRY

PRODUCT OVERVIEW NEXT-GENERATION (NXG) SOLUTIONS FOR THE OIL AND GAS INDUSTRY PRODUCT OVERVIEW NEXT-GENERATION (NXG) SOLUTIONS FOR THE OIL AND GAS INDUSTRY A MULTI ACTIVATION CIRCULATION SUB OILSCO Technologies Multi Activation Circulation Sub - it is a breakthrough technology.

More information

Our Story. Head Office - Edmonton, Alberta

Our Story. Head Office - Edmonton, Alberta C ompany Overview Our Story is a technological leader and world-class manufacturer of surface and subsea chokes, specialty control valves and supporting actuation. Family-owned, proudly independent, and

More information

R21

R21 style r Dimensions in mm approx. pressure class ratings pitch width height of ring distance gasket weights, lbs. ring ansi, BS & mss api (psi) diameter Between of ring no. 150 300/600 900 1500 2500 2000/3000

More information

Joint Preparation prior to Tensioning: General:

Joint Preparation prior to Tensioning: General: `Hydraulic Tensioner Procedure for 50% tensioning: Document: PWL-HTS-101 Joint Preparation prior to Tensioning: General: Clean Flanges and check for scars on the flange surface area Check studs and nuts

More information

Sustainability Through the Supply Chain. Jennifer M. Bell

Sustainability Through the Supply Chain. Jennifer M. Bell Sustainability Through the Supply Chain Jennifer M. Bell Purpose Define Sustainability Discuss What a Socially Responsible Investment Looks Like Corporate Sustainability Leaders Stages of Sustainability

More information

GE Oil & Gas Drilling & Production. Drilling Systems. reliable to the extremes

GE Oil & Gas Drilling & Production. Drilling Systems. reliable to the extremes GE Oil & Gas Drilling & Production Drilling Systems reliable to the extremes Drilling Systems Combined experience, deep commitment Industry-leading VetcoGray products and systems have been proven in drilling

More information

@balance Deepwater. MPD services

@balance Deepwater. MPD services @balance Deepwater MPD services Drill faster and reach farther with @balance Deepwater MPD services Achieve drilling objectives with closed-loop systems MPD provides a closed-loop circulation system in

More information

Valve Expertise The broadest portfolio of valves. The most comprehensive life cycle programs.

Valve Expertise The broadest portfolio of valves. The most comprehensive life cycle programs. Valve Expertise The broadest portfolio of valves. The most comprehensive life cycle programs. Wherever you are, we re there with the products, people, and services you need. Discover the products, the

More information

Uncompromised Reliability for Oil & Gas Electronics

Uncompromised Reliability for Oil & Gas Electronics Uncompromised Reliability for Oil & Gas Electronics 2 3 SCHOTT is a leading international technology group in the areas of specialty glass and glass-ceramics. With more than 130 years of outstanding development,

More information

Fluid Sealing Association

Fluid Sealing Association Fluid Sealing Association STANDARD FSA-MG-501-02 STANDARD TEST METHOD FOR INWARD BUCKLING OF SPIRAL-WOUND GASKETS 994 Old Eagle School Road, Suite 1019 Wayne, Pennsylvania 19087-1866 Phone: (610) 971-4850

More information

IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS

IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS WIRELESS BARRIER MONITORING JULY 2015 WIRELESS BARRIER MONITORING IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS LOCATION: North Atlantic PRODUCT: DATE: CASE STUDY: 1006/01 SERVICE: Deepwater Barrier Verification

More information

ECDM System. November, Security Classification: Restricted - Status: Draft

ECDM System. November, Security Classification: Restricted - Status: Draft ECDM System November, 2014 Objective Enhance the ability to safely and efficiently drill deep-water wells High uncertainty in pore and fracture pressure gradients Narrow drilling margins Develop system

More information

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus International Well Control Forum Well Intervention Pressure Control Subsea Syllabus November 2017 Version 1.0 IWCF Well Intervention Pressure Control Subsea Syllabus Contents Guidance Notes... 1. Introduction...

More information

Send your directly to

Send your  directly to Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.

More information

Cameron MOSAIC. Systems for the Malampaya Project

Cameron MOSAIC. Systems for the Malampaya Project MOSAIC Certified MALAMPAYA Cameron MOSAIC Systems for the Malampaya Project The Malampaya Project LUZON CALM Loading Buoy UPSTREAM Onshore Gas Plant DOWNSTREAM Alternative Fuel Electricity Power Stations

More information

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) RPSEA PROJECT DW 2301 ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) DTC International, Inc. 5540 Brittmoore Road Houston, Texas 77041 23 March 2010 RIS PROJECT TEAM MEMBERS DTC International, Inc.

More information

TYPE 3740/3740D WET/DRY RUNNING CARTRIDGE SPLIT SEAL

TYPE 3740/3740D WET/DRY RUNNING CARTRIDGE SPLIT SEAL 1 Foreword These instructions are provided to familiarize the user with the seal and its designated use. The instructions must be read and applied whenever work is done on the seal, and must be kept available

More information

Deepsea technologies INTEGRATED INTERVENTION SYSTEMS. Lowering Costs and Risks with Customized Tools and Application Expertise

Deepsea technologies INTEGRATED INTERVENTION SYSTEMS. Lowering Costs and Risks with Customized Tools and Application Expertise Deepsea technologies INTEGRATED INTERVENTION SYSTEMS Lowering Costs and Risks with Customized Tools and Application Expertise Specialized Intervention Services for Specific Field Needs AFGlobal and Deepsea

More information

Click to edit Master title style

Click to edit Master title style Atwood Osprey Construction, Commissioning & Operations John Connor Chevron Sr. D&C Superintendent Gorgon Mark Stewart Operations Manager Atwood Osprey Perth 8 September 2011 F&G Enhanced Pacesetter Water

More information

Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole. Engineering Development Advisory Committee J-DESC, JAPAN

Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole. Engineering Development Advisory Committee J-DESC, JAPAN INVEST White Paper Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole Engineering Development Advisory Committee J-DESC, JAPAN Corresponding Author: Yoshiyasu WATANABE, Tokai

More information

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

June 24, 2010 RPSEA Project 1502 Thomas E. Williams  int.com June 24, 2010 RPSEA Project 1502 Thomas E. Williams www.nautilus int.com RPSEA 1502 Coiled Tubing from a Small Vessel June 2010 Update Presentation Topics Background Project Objectives System Configuration

More information

Weco 3" 1505 Hammer Union

Weco 3 1505 Hammer Union Hammer Union We put you first. And keep you ahead. Hammer Unions, also called Wing Unions, are quick makeup and break-out pipe and fitting connectors that have been used in the oil industry since the early

More information

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015 Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general

More information

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Dag Almar Hansen, CEO Feb. 3-7, 2014 2014 Gas-Lift Workshop 1 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Pressure management

More information

MSR/MSB Mechanical Setting Tool

MSR/MSB Mechanical Setting Tool Tech Unit No: 0620000004 Revision: C Approved By: Quality Engineer Date: 201-1-9 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical

More information

Ladiz Niroo Company (Joint Stuck) Supplier of Drilling Equipment. Drilling Catalogue

Ladiz Niroo Company (Joint Stuck) Supplier of Drilling Equipment. Drilling Catalogue Ladiz Niroo Company (Joint Stuck) Supplier of Drilling quipment Drilling Catalogue LNCO is involved in the field of supplying consumable equipment for Oil & Gas Drilling Industries. 1 :Oil and Gas Drilling

More information

MSR/MSB Mechanical Setting Tool

MSR/MSB Mechanical Setting Tool Tech Unit No: 0620000004 Revision: B Approved By: Quality Engineer Date: 2014-12-16 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical

More information