Jack-up barges for rig-less interventions

Size: px
Start display at page:

Download "Jack-up barges for rig-less interventions"

Transcription

1 Subsurface INVESTMENT OPPORTUNITY: Jackup barges for rigless interventions

2 Executive summary To bring locally operated jackup barges to Qatari waters would provide additional deck space, crane capacity, and accommodation for: Coiled tubing operations Well testing and stimulations Accommodation during shutdowns and maintenance campaigns. Currently, lowspec drilling rigs are also used to accommodate this demand, however, with rig rates expected to increase from 2019 on, this creates an opportunity for more costeffective jackup barges. On average, the demand for jackup barges is expected to reach QAR 50M/yr in , with little capex investment required if an existing barge is relocated. It is forecasted that at least one jackup barge can be kept fully utilized throughout the year. More maintenance campaigns are expected to become economical if jackup barges are shared between operators and utilization rates are kept high. Performancebased bonuses and support with lowcost logistics and utilities may be provided. 2

3 Detailed opportunity description Jackup barges for rigless interventions Text Accommodation jackup barge Localization opportunity Business scope A jackup barge is a selfelevating platform with long support legs that can be selfpropelled or towed into position. Compared to a jackup rig, a barge does not have drilling equipment on board (e.g., derrick). Currently, lowspec jackup rigs are also used for coiled tubing operations, well stimulation and testing, and maintenance jobs, however, their rates are expected to increase from 2019 on, creating an opportunity for jackup barges. Simple jackup barges are more cost effective than rigs and can provide the needed deck space and equipment for these operations. Relocating an existing jackup barge to Qatari waters Refurbishment and mob/demob costs to make the barge suitable for: Well services: stimulation services, running and retrieving tubing, coiled tubing operations, e line/slickline etc. Installation of temporary well testing equipment: flare booms and burners, test separators, choke manifolds, surge tanks, etc. Additional accommodation for well interventions, well test, or shutdown crew Crew for managing daily barge operations (e.g., crane operators, roustabouts) Out of scope Purchasing of a new jackup barge Ownership and operation of temporary equipment (e.g., well testing equipment) Capital intensity Low (QAR 010M) Medium (QAR 1050M) High (QAR 50M+) 3

4 Market size Estimated spend (Qatar only) on jackup barges, QAR M Historic Forecast Also includes drilling rigs used for well testing and interventions Estimated jackup barge activity, days Accomodation Well testing Coiled Tubing Key highlights Between 2013 and 2017, the demand for jackup barges/rigs for rigless interventions and related services such as well testing and stimulation, coiled tubing operations, and accommodation has more than doubled. Currently, jackup barges are present in Qatar and in the region, but are not always locally owned or operated. With the exception of 2020, at least 330 days of jackup barge/rig activity have been forecasted for each year from 2019 to 2023, and spend on barges alone is expected to reach at least QAR 40M/yr. This implies that there is an opportunity for at least one jackup barge to be kept fully utilized throughout the year. Additional potential could come from more intervention and maintenance campaigns to become economical if jackup barges are shared between operators and utilization rates are kept high. Relevant stakeholders (2017) Top 3 buyers Other demand TOP 3 BUYERS : 4

5 Disclaimer The material, data, charts and pieces of information contained in this document ( Information ) is for general information purposes only and should not be construed as an investment or commercial advice or as a recommendation whatsoever. The user of the Information ( User ) is responsible for independently verifying the Information and shall make his own determination as to how suitable the Information is for his own usage and intent. User should not rely upon the Information as a basis for making any business or investment decisions. Whilst Qatar Petroleum endeavours to provide and keep the Information up to date and correct, Qatar Petroleum makes no representations or warranty of any kind, express or implied about the content, completeness, accuracy, quality, reliability or suitability with respect to the Information for any purpose. Qatar Petroleum expressly disclaims liability for errors and/or omissions in the Information contained in this document and shall in no event be liable for damages resulting from the use or reliance of User upon the Information. Any reliance the User of the Information places on such Information is strictly at User s own risk. 5

6 Website:

Coiled-tubing operations and basic tools

Coiled-tubing operations and basic tools Subsurface INVESTMENT OPPORTUNITY: Coiled-tubing operations and basic tools Executive summary There is potential to establish local capabilities for coiled-tubing operations and basic tools (including

More information

The EDR Aerial Photo Decade Package

The EDR Aerial Photo Decade Package Wickenburg/Forepaugh W. US Highway 60/N. 436th Ave Wickenburg, AZ 85390 Inquiry Number: April 22, 2011 The Aerial Photo Decade Package Aerial Photo Decade Package Environmental Data Resources, Inc. ()

More information

The EDR Aerial Photo Decade Package

The EDR Aerial Photo Decade Package I-710 Corridor - Segment 5 I-710 Corridor - Segment 5 Los Angeles County, CA 90201 Inquiry Number: March 25, 2009 The EDR Aerial Photo Decade Package EDR Aerial Photo Decade Package Environmental Data

More information

The EDR Aerial Photo Decade Package

The EDR Aerial Photo Decade Package Former Delco Chassis Plant -Site ID 1104 12950 Eckles Road Livonia, MI 48150 Inquiry Number: August 10, 2009 The EDR Aerial Photo Decade Package EDR Aerial Photo Decade Package Environmental Data Resources,

More information

Appendix B: Historic Aerial Photographs

Appendix B: Historic Aerial Photographs Yolo County - Solar Ground Tracker Project Phase I Environmental Site Assessment Appendix B: Historic Aerial Photographs Michael Brandman Associates H:\Client (PN-JN)\1759\17590008\Phase I ESA\17590008

More information

Results Briefing Fourth Financial Quarter, 2012* Analyst & Investor Update 20 th December 2012

Results Briefing Fourth Financial Quarter, 2012* Analyst & Investor Update 20 th December 2012 Results Briefing Fourth Financial Quarter, 2012* Analyst & Investor Update 20 th December 2012 *Financial Quarter ending 30 September 2012 Disclaimer This Analyst Presentation has been prepared by Mermaid

More information

Draugen Infill: Optimizing late life production with Subsea Processing

Draugen Infill: Optimizing late life production with Subsea Processing Draugen Infill: Optimizing late life production with Subsea Processing Shell @ MSE DD, Amsterdam, March 2017 Tatiana Hoeydal, Subsea Systems Team Lead, A/S Norske Shell Contributors: Pal Johnsen, Flow

More information

Swiber Holdings Limited

Swiber Holdings Limited Swiber Holdings Limited 12 months ended 31 Dec 2006 26 February 2007 A niche service provider to the offshore oil and gas industry Forward Looking Statements Important Note The following presentation contain

More information

HELIX ENERGY SOLUTIONS

HELIX ENERGY SOLUTIONS HELIX ENERGY SOLUTIONS OFFSHORE CAPABILITIES www.helixesg.com About Us WELL OPERATIONS SUBSEA WELL INTERVENTION PRODUCTION FACILITIES The purpose-built vessels of our Well Operations business units serve

More information

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015 Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015 Special Notes API publications necessarily address problems

More information

A Rebirth in the North Sea or simply a False Dawn

A Rebirth in the North Sea or simply a False Dawn The North Sea has seen record levels of investment in 2012 and 2013 Drilling activity is forecast to increase in the coming years Utilization in the Region is the highest it has ever been and there are

More information

Wood Group Investor Briefing Q1 2016

Wood Group Investor Briefing Q1 2016 Wood Group Investor Briefing Q1 2016 Our business Wood Group is an international projects, production and specialist technical solutions provider with around $6bn sales and 36,000 employees. We are focused

More information

bakerhughes.com Artificial Lift Research and Technology Center Pushing production boundaries

bakerhughes.com Artificial Lift Research and Technology Center Pushing production boundaries bakerhughes.com Artificial Lift Research and Technology Center Pushing production boundaries 2 Production challenges are becoming more complicated 3 The oil required to fuel the world s future energy requirements

More information

Reversing candles. Three black crows. Exhibit 13.0 The three black crows pattern

Reversing candles. Three black crows. Exhibit 13.0 The three black crows pattern Three black crows Reversing candles Three black crows Exhibit 13.0 The three black crows pattern The pattern of upside gap two crows has two black candles gap upon the previous bullish real body. The three

More information

Opportunities and Challenges in Deepwater West Africa Projects

Opportunities and Challenges in Deepwater West Africa Projects Opportunities and Challenges in Deepwater West Africa Projects Finding Petroleum - Finding African Oil Mark Jones - INTECSEA (UK) Royal Society of Chemistry, London 28th January 2015 Opportunities and

More information

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells A Truly Integrated Service Delivery 09 August 2017 Agenda Introduction to Light Well Intervention

More information

Well Abandonment Services. Plug into a New Approach

Well Abandonment Services. Plug into a New Approach Well Abandonment Services Plug into a New Approach Get it Right the First Time Permanent Solutions to Your Well Abandonment Challenge Thousands of wells await safe and permanent abandonment. It s critical

More information

Brent Charlie Ultra Late Life. A Journey in Optimising for Platform Decommissioning

Brent Charlie Ultra Late Life. A Journey in Optimising for Platform Decommissioning Brent Charlie Ultra Late Life A Journey in Optimising for Platform Decommissioning Ian Jackson, Andy Colman, Fola Sanwoolu & Joanna Chan Production Technology Brent Field, Shell UK Ltd 1 Disclaimer Reserves:

More information

Offshore Drilling Rigs

Offshore Drilling Rigs Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions

More information

For personal use only

For personal use only Octanex NL ABN 61 005 632 315 Level 21 500 Collins Street Melbourne Victoria 3000 Australia Tel: +61 (0)3 8610 4702 Fax: +61 (0)3 8610 4799 Email: admin@octanex.com.au Website: www.octanex.com.au 16 January

More information

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015 Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general

More information

The W.I.S.E. Generator System

The W.I.S.E. Generator System D I S C L A I M E R O F L I A B I L I T Y A N D W A R R A N T Y This publication describes the author s opinions regarding the subject matter herein. The author and publisher are not rendering advice or

More information

EURASIA DRILLING COMPANY LTD

EURASIA DRILLING COMPANY LTD EURASIA DRILLING COMPANY LTD Cowen s Ultimate Energy Services Conference New York, USA 3-4 December, 2013 1 Disclaimer The materials contained herein (the Materials ) have been prepared by Eurasia Drilling

More information

MERMAID MARITIME PUBLIC COMPANY LIMITED READY FOR THE RISING TIDE FACT SHEET

MERMAID MARITIME PUBLIC COMPANY LIMITED READY FOR THE RISING TIDE FACT SHEET MERMAID MARITIME PUBLIC COMPANY LIMITED READY FOR THE RISING TIDE FACT SHEET 1 MERMAID MARITIME MERMAID MARITIME SNAPSHOT To be the Preferred Global Oil Service Specialist Partner Having served the industry

More information

Disruptors in the Automotive Aftermarket

Disruptors in the Automotive Aftermarket Disruptors in the Automotive Aftermarket Road Map Towards a Sustainable Future CONNECTED AUTONOMOUS SHARED ELECTRIC OCTOBER 2017 Executive Summary AUTOMOTIVE INDUSTRIES ASSOCIATION OF CANADA Disruptors

More information

Transferring knowledge from operations to the design and optimization of work systems: bridging the offshore/onshore gap

Transferring knowledge from operations to the design and optimization of work systems: bridging the offshore/onshore gap Transferring knowledge from operations to the design and optimization of work systems: bridging the offshore/onshore gap Carolina Conceição, Anna Rose Jensen, Ole Broberg DTU Management Engineering, Technical

More information

A niche service provider to the offshore oil and gas industry. Swiber Holdings Limited Corporate Presentation

A niche service provider to the offshore oil and gas industry. Swiber Holdings Limited Corporate Presentation A niche service provider to the offshore oil and gas industry Swiber Holdings Limited Corporate Presentation by Raymond Goh, CEO 21 April 2007 A niche service provider to the offshore oil and gas industry

More information

Recommended Practice for Flexible Pipe

Recommended Practice for Flexible Pipe Recommended Practice for Flexible Pipe ANSI/API RECOMMENDED PRACTICE 17B FOURTH EDITION, JULY 2008 Document includes Technical Corrigendum 1, dated June 2008 ISO 13628-11:2007 (Identical), Petroleum and

More information

E3X-DRT21/SRT21/CIF11

E3X-DRT21/SRT21/CIF11 for E3X-DA-N-series Fiber Amplifiers /SRT21/CIF11 CSM SRT21_CIF11_DS_E_3_1 Three New s for Fiber Amplifiers DeviceNet CompoBus/S RS-422 Features Fibers RS422 Mobile Console Connecting a hand-held Mobile

More information

A Step Change in Activity

A Step Change in Activity IGAS ENERGY PLC ( IGas ) Final Results 2010 and Operational Update A Step Change in Activity Disclaimer Certain statements included in this presentation contain forward-looking information concerning IGas's

More information

WELLBORE ABANDONMENT CHALLENGES & OPERATIONS A-1, A-2, A-3, A-5, A-6, DEEP MENSA A-4 (PREVIOUSLY ABANDONED)

WELLBORE ABANDONMENT CHALLENGES & OPERATIONS A-1, A-2, A-3, A-5, A-6, DEEP MENSA A-4 (PREVIOUSLY ABANDONED) MENSA FIELD (MC 768) WELLBORE ABANDONMENT CHALLENGES & OPERATIONS A-1, A-2, A-3, A-5, A-6, DEEP MENSA A-4 (PREVIOUSLY ABANDONED) Chris Gerace Completions and Well Intervention Engineer 1 DEFINITIONS &

More information

POWER SYSTEM FREQUENCY AND TIME ERROR MONITORING

POWER SYSTEM FREQUENCY AND TIME ERROR MONITORING POWER SYSTEM FREQUENCY AND TIME ERROR MONITORING January 2013 PREPARED BY: DOCUMENT REF: System Performance and Commercial SP&C_01 VERSION: 1 DATE: 19 February 2013 FINAL Am,tolion l:neror 1\Jln,ketOpe

More information

Investor Relations Presentation April 30, 2013

Investor Relations Presentation April 30, 2013 Investor Relations Presentation April 30, 2013 FORWARD LOOKING STATEMENTS In addition to the historical data contained herein, this document may include forward-looking statements regarding the future

More information

TN LPC1800, LPC4300, MxMEMMAP, memory map. Document information

TN LPC1800, LPC4300, MxMEMMAP, memory map. Document information Rev. 1 30 November 2012 Technical note Document information Info Keywords Abstract Content LPC1800, LPC4300, MxMEMMAP, memory map This technical note describes available boot addresses for the LPC1800

More information

Exploring Growth in the Liftboat Market

Exploring Growth in the Liftboat Market Exploring Growth in the Liftboat Market Chan Eng Yew CEO, TRIYARDS Group Asian Offshore Support Journal Conference 2015 8 September 2015 Macro overview Developments in the Oil & Gas Industry in 2015 Oil

More information

Ordering Information. Ratchet Relay G4Q. Plug-in Models. Model Number Legend

Ordering Information. Ratchet Relay G4Q. Plug-in Models. Model Number Legend Ratchet Relay CSM OEE_DS_E_1_1 Unique Ratchet Mechanism Assures Positive Alternate Transfer/Switching Operation Each contact in the double-pole contact mechanism performs alternate make-brake operation

More information

Intervention/Decommissioning

Intervention/Decommissioning Intervention/Decommissioning By Nicholas Samford Lloyds Register Intervention/Decommissioning SME Working together for a safer world Planning Decommissioning Operations Planning Decommissioning and P&A

More information

IRRIGATION 810-T PLUS TRANSMITTER GUIDE

IRRIGATION 810-T PLUS TRANSMITTER GUIDE IRRIGATION 810-T PLUS TRANSMITTER GUIDE Pg. 2 HOT SHOT OVERVIEW 3 BASIC WIRING INSTRUCTIONS 4 HOW TO CONTROL AND SHARE MULTIPLE WELLS 5 TRANSMITTER FUNCTION SWITCH SETTINGS 5 LED INDICATORS 5 OPERATING

More information

Integrated Energy Services Data Pack. 25 June 2013

Integrated Energy Services Data Pack. 25 June 2013 Integrated Energy Services Data Pack 25 June 2013 Important Notice This document has been prepared by Petrofac Limited (the Company) to assist analysts and investors in understanding the key operational

More information

FRESCO WHITEPAPER

FRESCO WHITEPAPER FRESCO WHITEPAPER 01.21.2018 CONTENTS I. Disclaimer II. About III. Art market today IV. Art market with Fresco V. TOKEN (FRES) distribution VI. Roadmap Disclaimer IMPORTANT NOTICE PLEASE READ THIS ENTIRE

More information

Simonson Design Lab, Inc. Design Agreement

Simonson Design Lab, Inc. Design Agreement 2016-2017 Simonson Design Lab, Inc. The Terms Consultation Time: The time you spend working directly with a designer either with or without your builder. We highly recommend you use the A Guide to Designing

More information

GTSC Rig for Hands-on Training

GTSC Rig for Hands-on Training GTSC Rig for Hands-on Training The Rig To meet the high demand of Petroleum Industry, GTSC has launched the Middle East s first fully operational Training Rig & Well in May 2010 at its main building location

More information

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia ASX Release 20 April 2018 Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia ADX Energy Ltd (ASX: ADX) are pleased to advise that the Tunisian national oil company ETAP has requested

More information

Aker Solutions Next Generation Control Systems Fornebu, April 26, 2017 Einar Winther-Larssen Product Manager All Electric and New Concepts

Aker Solutions Next Generation Control Systems Fornebu, April 26, 2017 Einar Winther-Larssen Product Manager All Electric and New Concepts Aker Solutions Next Generation Control Systems Fornebu, April 26, 2017 Einar Winther-Larssen Product Manager All Electric and New Concepts Controls System and Automation Integrated, modular and standardized

More information

Husky Energy East Coast Update

Husky Energy East Coast Update Husky Energy June 17, 2009 Trevor Pritchard General Manager Operations Advisory Husky Energy is an integrated energy and energy-related company headquartered in Calgary, Alberta, Canada. Husky Energy is

More information

Gas Well Deliquification Workshop. David J Southern, P. Eng. Control Microsystems, Inc. Gas Well Deliquification Workshop

Gas Well Deliquification Workshop. David J Southern, P. Eng. Control Microsystems, Inc. Gas Well Deliquification Workshop Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 27 March 2, 2011 Presentation Title: The Truly Wireless Twenty-Two Well Pad David J Southern, P. Eng. Control Microsystems, Inc.

More information

WELLVANTAGE REMOTE OPERATIONS DEEPWATER

WELLVANTAGE REMOTE OPERATIONS DEEPWATER WELLVANTAGE REMOTE OPERATIONS DEEPWATER (FORMALLY RTOC) National Academy of Sciences Workshop April 21 st 22 nd Barry Gaston RTOC Team Lead DEFINITIONS AND CAUTIONARY NOTE The companies in which Royal

More information

Swiber Holdings Limited 1Q FY08 Results Briefing

Swiber Holdings Limited 1Q FY08 Results Briefing Swiber Holdings Limited 1Q FY08 Results Briefing 15 May 2008 Page 1 Financial Highlights 1Q 2008 Page 2 Key highlights a record quarter Revenue (US$ m) Net Profit (US$ m) 160 1Q Y-O-Y: 266.9% 1Q Y-O-Y:

More information

The Right Place. The Right Time. The Right People. Production and Maintenance. and Maintenance. G&G and Petroleum Engineering

The Right Place. The Right Time. The Right People. Production and Maintenance. and Maintenance. G&G and Petroleum Engineering The Right People The Right Place The Right Time TEAM, an Acteon company, provides specialist personnel and recruitment services to the Oil and Gas industry. TEAM isn t just another recruitment agency.

More information

2010 Annual Results Presentation. March 2011

2010 Annual Results Presentation. March 2011 2010 Annual Results Presentation March 2011 Disclaimer Disclaimer This presentation is for reference purposes only. This presentation is prepared by Honghua Group Limited ( Honghua or the Group ) for business

More information

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Dag Almar Hansen, CEO Feb. 3-7, 2014 2014 Gas-Lift Workshop 1 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Pressure management

More information

Compact subsea gas compression solution for maximized recovery

Compact subsea gas compression solution for maximized recovery Compact subsea gas compression solution for maximized recovery Aberdeen, 6 th February 2014 Marco Gabelloni Senior engineer 2014 Aker Solutions Why subsea gas compression Gas fields require boosting of

More information

Maximising Well Intervention Efficiency in the Gulf of Mexico: A New Best Practice Model

Maximising Well Intervention Efficiency in the Gulf of Mexico: A New Best Practice Model Maximising Well Intervention Efficiency in the Gulf of Mexico: A New Best Practice Model Offshore Network Disclaimer: Whilst every effort has been made to ensure the accuracy of the information contained

More information

User s Manual. CONTROL STATION COMBINER Broad Band Short Haul MHz. Document Number: INS

User s Manual. CONTROL STATION COMBINER Broad Band Short Haul MHz. Document Number: INS User s Manual CONTROL STATION COMBINER Broad Band Short Haul 40-960MHz Document Number: INS40976-1 Company Overview RFI has been serving the needs of the wireless communications market for over 30 years.

More information

B (bottom) Package type descriptive code. VFBGA176 Package style descriptive code

B (bottom) Package type descriptive code. VFBGA176 Package style descriptive code VFBGA176, plastic, very thin fine-pitch ball grid array; 176 balls; 0.5 mm pitch; 9 mm x 9 mm x 0.86 mm 30 July 2018 Package information 1 Package summary Terminal position code B (bottom) Package type

More information

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 NTL No. 2010-N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 Frequently Asked Questions (FAQ s) Updated July 9, 2010 A. General Questions QA1: With the issuance of

More information

Provided by. RESEARCH ON INTERNATIONAL MARKETS We deliver the facts you make the decisions

Provided by. RESEARCH ON INTERNATIONAL MARKETS We deliver the facts you make the decisions Provided by RESEARCH ON INTERNATIONAL MARKETS March 2014 PREFACE Market reports by ystats.com inform top managers about recent market trends and assist with strategic company decisions. A list of advantages

More information

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements.

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements. From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements. LATE-LIFE RESERVOIR MANAGEMENT All oil and gas fields will

More information

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014 Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014 Special Notes API publications necessarily address problems of a general nature. With respect

More information

HUSTLER 7' & 8' POOL TABLE ASSEMBLY INSTRUCTIONS

HUSTLER 7' & 8' POOL TABLE ASSEMBLY INSTRUCTIONS HUSTLER 7' & 8' POOL TABLE ASSEMBLY INSTRUCTIONS Please Do Not Hesitate to Contact Our Consumer Hotline at 800-759-0977 with Any Questions That May Arise During Assembly or Use of This Product! NG2515PB/NG2520PB

More information

Global Jackup Rig Market

Global Jackup Rig Market Global Jackup Rig Market ----------------------------------------- 2015 Executive Summary Jackup rigs are deployed in all major offshore production basins but are particularly numerous in the Middle East,

More information

Gas Storage and Oil & Gas Exploration in County Antrim

Gas Storage and Oil & Gas Exploration in County Antrim Gas Storage and Oil & Gas Exploration in County Antrim Dr Andrew Hindle InfraStrata plc 17 October 2012 1 Agenda Introduction Islandmagee gas storage project PL1/10 licence oil & gas exploration 2 Introduction

More information

CSM_G7S-_-E_DS_E_7_1

CSM_G7S-_-E_DS_E_7_1 Relays with Forcibly Guided Contacts G7S-@-E CSM_G7S-_-E_DS_E_7_ Relays with Forcibly Guided Contacts and High Switching Capacity of A Relays with forcibly guided contacts (EN525 Class A, certified by

More information

HEAVY DUTY COPPER CABLE LUGS

HEAVY DUTY COPPER CABLE LUGS Industrial products we wholesale, you distribute (SEAMLESS TUBULAR) (TIN PLATED) (SEAMLESS TUBULAR) (NON-PLATED) UL LISTED 4909 Rondo Drive, Fort Worth, Texas 76106, USA Telephone: 1-877-732-0342 Fax:

More information

IHS CHEMICAL Toluene Methylation Process by GT-TolAlk SM Technology

IHS CHEMICAL Toluene Methylation Process by GT-TolAlk SM Technology ` IHS CHEMICAL Toluene Methylation Process by GT-TolAlk SM Technology March 2016 ihs.com Toluene Methylation Process by GT-TolAlk SM Technology Anshuman Agrawal Principal Analyst Toluene Methylation Process

More information

Market Briefing: S&P 500 Bull & Bear Markets & Corrections

Market Briefing: S&P 500 Bull & Bear Markets & Corrections Market Briefing: S&P 0 Bull & Bear Markets & Corrections August 21, 2015 Dr. Edward Yardeni 516-972-7683 eyardeni@ Joe Abbott 732-497-5306 jabbott@ Mali Quintana 4-664-1333 aquintana@ Please visit our

More information

27 August 2015 SUBSEA JOINT VENTURE WITH CHIYODA CORPORATION

27 August 2015 SUBSEA JOINT VENTURE WITH CHIYODA CORPORATION 1794506-001 Central Equity_PPT Cover.pptx [ C L I E N T N A M E ] 27 August 2015 SUBSEA JOINT VENTURE WITH CHIYODA CORPORATION Important Notice This presentation is being issued by Ezra Holdings Limited

More information

Brazil Shareholder visit 2016 Re-shaping Shell, to create a world-class investment case

Brazil Shareholder visit 2016 Re-shaping Shell, to create a world-class investment case Brazil Shareholder visit 2016 Re-shaping Shell, to create a world-class investment case Royal Dutch Shell plc November 9, 2016 Let s make the future Royal Dutch Shell November 9, 2016 Harry Brekelmans

More information

Contents. iii. 3 Cable-Tool and Rotary Drilling 11 Cable-Tool Drilling 11 Rotary Drilling 14

Contents. iii. 3 Cable-Tool and Rotary Drilling 11 Cable-Tool Drilling 11 Rotary Drilling 14 Figures v Tables xii Preface xiii Units of Measurement xv Metric Conversion Factors xvi 1 Introduction 1 2 History 5 The Drake Well, 1850s 6 California, Late 1800s 8 The Lucas Well, 1901 8 3 Cable-Tool

More information

CORPORATE PRESENTATION 1Q2014 ANALYST BRIEFING

CORPORATE PRESENTATION 1Q2014 ANALYST BRIEFING CORPORATE PRESENTATION 1Q2014 ANALYST BRIEFING 1 This Presentation has been prepared by the Company and its contents have been reviewed by the Company's sponsor (the Sponsor ), Canaccord Genuity Singapore

More information

Page 1 of 18. SunRail System Installation Instructions

Page 1 of 18. SunRail System Installation Instructions Page 1 of 18 SunRail System Installation Instructions Page 2 of 18 SunRail Stainless Steel Railing Installation Guide Table of Contents Before You Begin 3 Installing Surface Mount Bases for a Two Rail

More information

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists Our experienced service personnel have supported operators with more than 80+ wells drilled to date. Our

More information

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch Training Title WELL HEAD OPERATIONS Training Duration 5 days Training Venue and Dates REF OP035 Well Head Operations 5 08-12 May $4,250 Abu Dhabi, UAE Will be held in any of the 5 star hotels. The exact

More information

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement. Training Title WELLHEAD OPERATION Training Duration 5 days Training Venue and Dates Wellhead Operations 5 19 23 May $3,750 Abu Dhabi, UAE In any of the 5 star hotel. The exact venue will be intimated prior

More information

Ordering Information. Stepping Relay Unit G9B. Model Number Legend

Ordering Information. Stepping Relay Unit G9B. Model Number Legend Stepping Relay Unit CSM DS_E_4_1 Ideal for Controlling Pumps and Production Lines with Six or Twelve Stepping Circuits Built-in relays switch 2 A at 250 VAC or 30 VDC. Initialization of stepping with reset

More information

VCS+SOCIALCARBON Project Development Process

VCS+SOCIALCARBON Project Development Process 21 May 2014, v3.0 VCS+SOCIALCARBON Project Development Process TABLE OF CONTENTS 1 INTRODUCTION... 2 1.1 Overview... 2 1.2 Terminology... 2 2 PROJECT DEVELOPMENT PROCESS... 3 3 DEVELOPMENT, VALIDATION

More information

Marine Subsea AS presentation Pareto Conference, Oslo

Marine Subsea AS presentation Pareto Conference, Oslo Marine Subsea AS presentation Pareto Conference, Oslo August 29-30, 2007 Christian Nygaard, Managing Director 1 Content Confidential Background History Vessel Fleet Financial Target Summary 2 Vision Our

More information

The Ziebel MagLev downhole pump

The Ziebel MagLev downhole pump Gas Well Deliquification Workshop Adams Mark Hotel, February 25-27, 2008 The Ziebel MagLev downhole pump Henning Hansen, VP Technologies henning.hansen@ziebel.biz QuickTime and a TIFF (Uncompressed) QuickTime

More information

CAPETANO OIL LIMITED (+233) (+233)

CAPETANO OIL LIMITED (+233) (+233) 1 CAPETANO OIL LIMITED (+233) 202 027 485 (+233) 209 985 175 www.capetano.com info@capetano.com C90/24 Osu Badu Street, Airport Residential Area, Accra Ghana. 2017 Capetano Oil Limited. All rights reserved.

More information

CLIENT GUIDE TO MEASURED BUILDING SURVEYS

CLIENT GUIDE TO MEASURED BUILDING SURVEYS CLIENT GUIDE TO MEASURED BUILDING SURVEYS ISSUE 4 FEBRUARY 2016 TSA The Survey Association s Client Guides are primarily aimed at other professionals such as engineers, architects, planners and clients

More information

G7K. Latching Relay. Compact Mechanical Lock Latching Relays with Manual Buttons. Model Number Structure. Ordering Information

G7K. Latching Relay. Compact Mechanical Lock Latching Relays with Manual Buttons. Model Number Structure. Ordering Information Latching Relay CSM DS_E Compact Mechanical Lock Latching Relays with Manual Buttons Compact design with a height of 7 mm, width of. mm, and depth of 8. mm. Plus, one Relay only weighs 7 g. Quick set and

More information

Oil & Gas Industry Competitiveness Assessment

Oil & Gas Industry Competitiveness Assessment Oil & Gas Industry Competitiveness Assessment Further Analysis on Australia s Position in the Exploration Value Chain March 2017 Global Oil and Gas Exploration Oil and gas exploration across the world

More information

Date: Paul Spaanderman, Abstract: Not know at this time. Decision Discussion Information Other <specify>

Date: Paul Spaanderman, Abstract: Not know at this time. Decision Discussion Information Other <specify> PROPOSED ITS USE CASE DESCRIPTION Use Case Title: Title Project Name: tbd Source: tbd Date: 2016-09-16 Contact: Paul Spaanderman, ps@paulsconsultancy.com Abstract: Agenda Item: Work item(s): Document(s)

More information

AM / FM RADIO TRANSMITTER KEYFOBS

AM / FM RADIO TRANSMITTER KEYFOBS Highly Secure Protocol 1 3 Switch Options Led Indication Of Transmission Directly Compatible With Keeloq Decoder Power Saving Auto Shut Off Feature Automatically Transmits Battery Low Condition. User Customisable

More information

Automation Breakout Session

Automation Breakout Session 14 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 12 13, 2017 Automation Breakout Session Anthony Allison Artificial Lift Advisor Sucker Rod Pumping Occidental

More information

SOT Package summary

SOT Package summary 1 Package summary HLQFP64, plastic, thermal enhanced low profile quad flat package; 64 terminals; 0.5 mm pitch; 10 mm x 10 mm x 1.4 mm body; 4.9 mm x 4.9 mm exposed pad 7 August 2018 Package information

More information

Simple Business Plan. for SUCCESSFUL. Online Marketing. of your offline business. Workbook & Checklist. By Theresa Delgado of

Simple Business Plan. for SUCCESSFUL. Online Marketing. of your offline business. Workbook & Checklist. By Theresa Delgado of for SUCCESSFUL Online Marketing of your offline business Workbook & Checklist By Theresa Delgado of http://theresadelgado.co ALL RIGHTS RESERVED No part of this report may be reproduced or transmitted

More information

THE ROSEN MARKET TIMING LETTER

THE ROSEN MARKET TIMING LETTER THE ROSEN MARKET TIMING LETTER PRECIOUS METALS - FOREX - STOCK INDICES - COMMODITIES Time is more important than price; when time is up price will reverse. W.D.Gann RONALD L. ROSEN January, 2013 rrosen5@tampabay.rr.com

More information

BT-4000 LIGHT WORKOVER UNIT

BT-4000 LIGHT WORKOVER UNIT BT-4000 LIGHT WORKOVER UNIT BT-4000 LIGHT WORKOVER UNIT DESIGNED TO IMPROVE EFFICIENCY DURING WELL INTERVENTION OPERATIONS The BT-4000 LWO is the new generation DP-3 semi-submersible for efficient light

More information

Britcham Brasil X Seminário Internacional de Energia

Britcham Brasil X Seminário Internacional de Energia Britcham Brasil X Seminário Internacional de Energia Aker Solutions Provedor de Tecnologia no Presente e no Futuro Nov.2012 Public 2012 Aker 2012 Solutions Aker Solutions From reservoir to production Aker

More information

Perenco UK Ltd. SNS Decommissioning

Perenco UK Ltd. SNS Decommissioning Perenco UK Ltd. SNS Decommissioning EEEGr / Decom North Sea Decommissioning Special Interest Group Event 22 nd November 2012 SNS Decommissioning PUK Assets and Decommissioning Strategy Welland Case Study

More information

00108/00110 INSTRUCTION MANUAL

00108/00110 INSTRUCTION MANUAL 00108/00110 INSTRUCTION MANUAL Removable and Adjustable Mudflap System IMPORTANT! Please Read this Instruction Booklet prior to assembly of your Rock Tamer Kit. IMPORTANT! Exhaust Systems Note: Any modifications

More information

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015 Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015 Special Notes API publications necessarily address problems

More information

ACID STIMULATION CASE STUDY

ACID STIMULATION CASE STUDY ACID STIMULATION CASE STUDY 07/03/2018 AGENDA Introduction Rigless system overview Operational considerations Case Study Interference Test objectives & Equipment Interference Test results Summary Conclusion

More information

While you wait. write down one question we ll collect them in a moment and address some of them later. Repsol Sinopec Resources UK

While you wait. write down one question we ll collect them in a moment and address some of them later. Repsol Sinopec Resources UK While you wait write down one question we ll collect them in a moment and address some of them later 1 Share Fair Floor Plan 2 Who are we? Limited is an oil and gas exploration and production company operating

More information

Efficiency of Time Comparing with Modular Rigs for Workover Operation

Efficiency of Time Comparing with Modular Rigs for Workover Operation Efficiency of Time Comparing with Modular Rigs for Workover Operation Stalin Mark Fernandes Student-Master in Petroleum Engineering Maharashtra Institute of Technology Pune, INDIA Sanjay Joshi Professor-Master

More information

International development

International development Oslo 8 th September 2015 Vicky McNiff Head of IP Slide 1 This is Aker Solutions Global provider of products, systems and services to the oil and gas industry Built on more than 170 years of industrial

More information

Voluntary Carbon Standard

Voluntary Carbon Standard Voluntary Carbon Standard Voluntary Carbon Standard Program Guidelines 19 November 2007 VCS Secretariat 24 rue Merle-d Aubigné, 1207 Geneva, Switzerland secretariat@v-c-s.org 1 Voluntary Carbon Standard

More information

AN MIFARE Plus Card Coil Design. Application note COMPANY PUBLIC. Rev April Document information

AN MIFARE Plus Card Coil Design. Application note COMPANY PUBLIC. Rev April Document information MIFARE Plus Card Coil Design Document information Info Content Keywords Contactless, MIFARE Plus, ISO/IEC 1443, Resonance, Coil, Inlay Abstract This document provides guidance for engineers designing magnetic

More information

ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) FOR PRINOS OFFSHORE DEVELOPMENT PROJECT

ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) FOR PRINOS OFFSHORE DEVELOPMENT PROJECT ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) FOR PRINOS OFFSHORE DEVELOPMENT PROJECT Chapter 7 Alternative Solutions TABLE OF CONTENTS 7 ALTERNATIVE SOLUTIONS 7-4 7.1 INTRODUCTION 7-4 7.2 DO NOTHING

More information