1 UProtection Requirements Ufor a Large scale Wind Park Shyam Musunuri Siemens Energy Abstract: In the past wind power plants typically had a small power rating when compared to the strength of the connected electrical network and the behavior of the wind mills during faults in the network was considered non critical and wind power plants were simply pulled out of the system. Hence protection requirement of a wind mill was just restricted to simple current and voltage based measurement. This paper identifies the areas of concern where proper protection has to be introduced apart from the basic wind park requirements. Owing to the increase in demand for renewable energy large wind parks are constructed in deep seas. Such wind parks are connected to the electrical grid on the land by comprehensive underground cables. The underground cables are a potential for a fault occurrence. The next area of concern would be in the multiple mechanically switched capacitor banks or FACTS used for dynamic reactive compensation. The voltage flicker produced by large wind parks owing to the varying speed of the wind mills on the interconnected grid has a deteriorating effect on the other connected equipment and also on the grid as well. To maintain voltage stability as per NERC guidelines and to mitigate voltage flickers, dynamic reactive compensation can be provided with multiple mechanically switched capacitor banks or FACTS. Therefore the paper will discuss in detail the protection possibilities for the underground cables and the reactors for large wind parks located offshore. INTRODUCTION The exorbitant and phenomenal rise in oil prices in early 2008 and the drastic need to protect the environment from the climatic changes due to burning of fossil resources for power generation led to the increase in wind generation. Although wind generation is explored extensively on the shore, however the visually abhorrent pollution created by large wind mills on the scenic beauty of the land, led to the fast emerging alternative - the location of wind parks offshore in deep seas. The penetration of the wind mills in generating clean energy is on the increase every day and these wind mills when integrated into a large existing grid may require a redesign of the existing power system and the operation approaches. The challenge of integrating the windmills into the grid has to address the following pertinent questions. a) How to maintain acceptable voltage level at all times to the consumers? b) How can windmills co-generate with the other power plants according to the customer energy needs? Therefore this paper will focus on the following 1. Introduction and analysis of the various electrical fault possibilities in an offshore wind park. 2. Detection and prevention against Ferro resonance due to inductive reactance introduced by wind generators, reactors and capacitive reactance introduced by the long running cables and capacitor banks. 3. Automatic fault collection and analysis, and its benefits /09/$ IEEE 478
2 Figure 1 indicates the typical single line diagram with the conventional protection elements in the wind park. I) ANALYSIS OF THE VARIOUS ELECTRICAL FAULT POSSIBILITIES IN A WIND PARK The wind park faults shall be split broadly into (a) Network faults occurring in 1.1 Sea Submarine cable connection between the Onshore and the Offshore systems. 1.2 HV Transformer and cable connection to the collector bus 1.3 Bus bar faults of 34.5kV system (b) Wind park faults occurring in 1.4 Cable connection between the collector bus and the Wind turbines 1.5 Cable connection between Wind turbines 479
3 (a) Network faults 1.1- Sea Submarine cable connection between the Onshore and the offshore systems On-shore Off-shore COMMUNICATION CHANNEL(Dual) Figure 2 The conventional AC transmission via sea cables, turns out to be technically and economically attractive, however the limitation being the distances over which the power can be transmitted. This limitation of the ac power transmission capacity can be suitably compensated by the FACTS and HVDC system. However in the HVDC system it will be difficult to determine the fault current fed from the network into the wind park during the design stage. The fault typically varies from 0.0 to1.0 pu and the system behavior without the actual fault current will not be accurate enough to draw any conclusions. Alternate to the conventional current, voltage and frequency protection, the technically superior and cost effective solution will be 2 in 1 protection, where there exists two main protections like Line Differential and Distance protection. The sea submarine cable is protected by 3 terminal differential protection connected in a ring, with one relay connected to the feeder connecting the submarine cable at the on-shore and the other two relays connected to the secondary side of the step-up transformer located on the off-shore. For any faults in the submarine cable, the relays consider the fault as an in-zone fault, all the three 2 in 1 relays will trip on differential protection and isolate all the fault feeding possibilities. 480
4 1.2- HV Transformer and cable connection to the collector bus 1 A-G 2 Figure-3 The step up grid transformer typically used for the windmill is a 3 winding transformer which is star connected on the primary and connected on both the secondary as shown in figure-3 The dashed line indicates the fault trajectory and it can be seen that only when the single line to ground faults occur between the H102-T1 CTs and the transformer-t101, the fault current passes through the CT and if it occurs other than the above mentioned zone then the fault current will not pass through the CTs. Conventionally a transformer differential protection is provided for the transformer; however there will be a serious limitation with respect to the sensitivity of the settings on the differential relays during an SLG fault. Let us start analyzing the same. 481
5 In our case study, the earth fault current is limited by the grounding transformer to 400A. Primary MVA of the Transformer = 220MVA Secondary MVA of the transformer = 110MVA CT ratio of the Transformer Secondary = 2500/1A Earth fault current = 400A Secondary voltage = 34.5kV I BSec B= U220,000 U= 3682A 3*34.5 I BDiff B= U400 U= IB0 B= U400 U= The minimum setting for the differential relay is set at 0.2, to take care of the CT errors, errors due to the variation in the transformer taps etc. When the relay is set at 0.2 and if the actual differential current works out to be or 0.16, the relay will get desensitized and will fail to trip resulting in huge over voltage in the transformer, which can ultimately lead to a catastrophe. The solution for such an application will be to use the 3IB0 Bsetting of the 51N function and set according to the utility standards. TRANSFORMER FAULTS Faults in the Step up Transformer can also be identified, utilizing the distance protection function available in all the 2 in 1 relays. On the primary side, the 2 in 1 relay located in the on shore could be set to cover 80% of the transformer primary side windings with suitable Zone-1 / Zone-2 settings and the 2 in 1 relays connected in the secondary sides can be set to have an offset reverse Zone-3 protection to cover 80% of the transformer secondary s. A REF protection can be provided for the transformer primary to locate sensitive earth faults and any transformer winding faults 482
6 Figure-4 Busbar protection of 34.5kV system The bus bar fault is the most severe fault in any power system and bus bar protection could be realized by the reverse interlocking function functionally available in the over current relays.iec61850 GOOSE helps in the intra communication between relays exchanging information.. The busbar faults can be realized by the following logic and condition Condition-1 : Relay in Circuit No2 should see the faults in reverse direction Condition-2 : Relay in Circuit No4 up to Circuit-8 should see the faults in forward direction 483
7 67(P) Reverse pickup 67(N) Reverse pickup 2 67(P) Forward pickup 67(N) Forward pickup 4 Trip all fault feeding Circuit Breakers 67(P) Forward pickup 67(N) Forward pickup 8 Reaction of a Wind park for network faults For network faults, immediate disconnection of the large wind parks is not advisable as the disconnection would put additional stress on the already troubled system. As a rule the wind parks are not disconnected as long as certain voltage and frequency limits are not exceeded as defined by the utility. Each utility has its own definition for the LVRT( Low Voltage Ride Through )and the commonly adopted characteristics is as shown below 484
8 (b) Wind Park Faults 1.4 -Cable connection between the collector bus and the Wind turbines Figure-5 The wind mills connected radially ends up in the collector bus. Therefore the collector bus carries a huge power and removal of this feeder on fault is equivalent to the aggregate sum of the wind generation connected to this feeder getting lost. The collector bus is protected by main and backup protections. The main protection could be supplied by the distance element of the 2 in 1 protection and the backup provided by the Directional / nondirectional relays. The distance element can be suitably graded to take care of all the faults and the backup protection as well. The collector bus faults can be realized by the following logic and condition Condition-1: Relay in circuit no-2 should see the faults in reverse direction Condition-2: Relay in circuit no-4 should see the faults in reverse direction Condition-3: Relay Nos 5-8 should see the faults in forward zone 485
9 When the above conditions are met then the relay identifies the fault as a fault on the collector bus feeder. 67(P) Reverse pickup 67(N) Reverse pickup 2 67(P) Reverse pickup 67(N) Reverse pickup 4 Trip the collector bus CB 67(P) Forard pickup 67(N) Forward pickup Wind mills and their interconnections Let us understand what happens when a single phase to ground fault occurs in an isolated system. A healthy isolated system is as shown in fig-(a). When there is a solid A-phase to ground fault, the voltage at phase-a equals the neutral voltage. Because of this shift in the neutral we observe that the phase to neutral voltages of the other two healthy phases equals the phase to phase voltage. Hence, during ground faults the phase voltage equals the line voltage. If the system continues operation and when the system gets stressed due to over voltage, it can lead to a catastrophe. 486
10 NETWORK 150/34.5kV 0.69/34.5kV 0.69/34.5kV 34.5kV Collector bus The individual wind mill after the step up transformer is connected radially to the other wind mills and the system is isolated without the grounding transformer. There are only CTs in the windmill switchgear and no VTs. When there is an earth fault in the radial feeder, then the collector bus feeder detects an earth fault from the broken delta VT. However this does not exactly identify the position of the earth fault but just an indication that there exists an earth fault somewhere in this feeder. Each wind mill is taken out of the collector bus circuit and when there is an indication in the broken delta, and then it is identified as a feeder with an earth fault. The minimum the time spent on the offshore windmill, the better it is for the maintenance engineer, because the offshore plants are wet and are even dangerous. Let us assume a radial feeder with an earth fault connected to a collector bus and to a bus bar as shown below. These CTs will not see this fault as the zero sequence currents will not flow through the step up transformer as the earth fault current will circulate between the circuit where the fault lies and the grounding transformer. So, if we place a core balance CT in the radial circuit which senses the earth fault and if the CT outputs can be given as the fourth input of the relay in the switchgear then the relay senses the earth fault. 487
11 G G G G Collector Bus Grounding Transformer Busbar Red dotted line shows the fault trajectory in case of an earth fault. II) Ferro-resonance in Windmills- Is there a possibility? When the system capacitance is in parallel to the inductance of the voltage transformer and if there is an initiating event such as a transient overvoltage due to switching or a phase to ground fault on the ungrounded system, this can drive the voltage transformer into saturation. The ferro magnetic circuit during saturation can lead to a condition when the inductive reactance is exactly equal to the capacitive reactance and ferro resonance results. The saturation of the core is maintained by the continuous over voltage and the ferro resonant condition is stabilized. Induction generators, reactors in a wind park are a source of inductive reactance and cables, capacitor banks contribute capacitive reactance. This combination of inductive reactance and capacitive reactance can lead to a complex electrical phenomenon called Ferro resonance, characterized by the sudden onset of a very high sustained over voltage concurrent with high levels of harmonic distortion. The following are the conditions under which Ferro-resonance is likely to occur. 1. A sinusoidal voltage source A power system generator 2. Saturable Ferromagnetic inductances- Can be power transformers or instrument transformers 3. Capacitance- The large capacitance from the cables, or the capacitance to ground of an ungrounded system 4. Low Resistance- Unloaded Transformer, low short circuit power source 5. Existence of at least one point in the system whose potential is not fixed. 488
12 Refer to figure-1 and assume that there is no grounding transformer. Let us start analyzing bay no-h103 the collector feeder circuit if Ferro-resonance can be a possibility and see how the above conditions are met. 1. A sinusoidal voltage source- The wind generators feeding thro Kabel-C Saturable Ferromagnetic inductances- The voltage transformer- ( T5 ) in the collector circuit 3. Capacitance- The capacitance to ground of the 34.5kV cables 4. Low Resistance- The voltage transformer is probably very lightly loaded. 5. The existence of at least one point in the system whose potential is not fixed.-the inadequately grounded section of the 34.5kV system. The effect of Ferro resonance on a power system is excess overvoltage and harmonic distortion. The over voltages can exceed the normal phase to phase voltage and damage the insulation of the connected equipment and the harmonics confuse the protection systems from taking the right decision Prevention, Detection and Mitigation. There are relays in the market which detect the ferro resonance and alarms the condition. The following conditions can be practiced for elimination of the ferro resonance effect. 1. To prevent the system from becoming ungrounded at any point of time with suitable grounding systems 2. Introduce Losses by means of load Resistances. III) Automatic Fault Analysis As the off-shore wind parks are wet, dangerous and many other inconveniences, minimum effort should be exercised at the site for rectification of faults. The control engineer or the utility engineer would be highly benefitted with the following 1. Automatic retrieval of fault records from all devices installed. 2. Centralized Data archiving 3. Automated data analysis required for Fault analysis including distance to fault location, monitoring facilities like device monitoring and also system monitoring like communication monitoring. 4. One analysis tool instead of multitude of software packages-this reduces significantly the analysis time and the crew training times. The automatic fault analysis systems must be able to process all kinds of data recorded by digital devices like numerical protection relays, digital fault recorders and power quality recorders installed. Diagnostic results and PQ reports. Now let us see how a best result is obtained from an automatic event analysis 489
13 The following tasks are being carried out for the automatic fault analysis. Grouping of fault records Transient records are collected from different equipment capable of producing fault records. The transient records are grouped based on the trigger time information. The goal of this action is to group all records related to the same network event in one folder and to facilitate by this the searching of records. Automatic diagnosis of faults in the network The automatic diagnosis is started immediately after receipt of a new record file. The diagnosis considers all records pertaining to the same power system event. Principles of Fault Location: Basically a single ended measurement of the reactance is used to determine the fault location. This principle requires measured data from the three phase to ground voltages and the three line currents during the fault in one single record. In the next step frequency and the phasor of all analogue signals are determined. Finally depending upon the fault type the distance to the fault and the fault resistance are computed. 490
14 The advantages of an automatic fault analysis system is as enumerated Feature Explanation Benefit Fast and reliable fault location after fault clearance Fast and reliable fault location after successful auto reclosing Automatic data grouping and storage Automatic analysis of fault recorder and numerical protection device records and messages Identification of weak points in the network like Identification of fault cause Minimizing outage times (down times) Identification of weak points in the network like defective Insulator Grouping of all recorded data involved in network event. This allows Availability of all concerned data sets without searching in data bases Corrective action may be started immediately after data analysis Identification of weak points in the electrical system like Ferro resonance Breakers (switching time monitoring) Frequent transient faults caused by trees Saves Money Saves Time Saves Money Saves Time Saves Money Saves Time Gives peace of mind Saves Money Conclusion With today s Multifunction relays and standard open communications protocol like IEC61850, the investment is secured. Due to higher capability with modern algorithms in the numerical relays, a reduced number of relays are required for the same protection requirement which otherwise will require many conventional relays. The 2 in 1 relay is one of such a type which can lead to a better asset management because of usage of less number of relays. Apart from the above mentioned advantages, the fault recording capabilities of the numerical relays can be used as inputs to an automated fault analysis system. The fault recordings from different relays for a same fault can be grouped and analyzed to find the exact fault location in a wind park. The automated fault analysis system also helps in maintaining records and archiving it as per NERC or other regulators storage guideline. The paper also points out to a must do in a wind park that the system cannot be left ungrounded at any point even if it is to forego some benefits as this could lead to a complex phenomenon called Ferro resonance. References 1. Siemens Power Engineering Guide Siemens Line Differential protection with Distance protection-7sd52/3 3. Book: Wind Power in Power Systems by Ackermann.T 4. Paper: Offshore Wind farm electrical connection options by W.Grainger,N.Jenkins 491
TECHNICAL BULLETIN 004a Ferroresonance
May 29, 2002 TECHNICAL BULLETIN 004a Ferroresonance Abstract - This paper describes the phenomenon of ferroresonance, the conditions under which it may appear in electric power systems, and some techniques
More informationNumbering System for Protective Devices, Control and Indication Devices for Power Systems
Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements
More informationProtection of Electrical Networks. Christophe Prévé
Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé
More informationApplication for A Sub-harmonic Protection Relay. ERLPhase Power Technologies
Application for A Sub-harmonic Protection Relay ERLPhase Power Technologies 1 Outline Introduction System Event at Xcel Energy Event Analysis Microprocessor based relay hardware architecture Sub harmonic
More informationBusbars and lines are important elements
CHAPTER CHAPTER 23 Protection of Busbars and Lines 23.1 Busbar Protection 23.2 Protection of Lines 23.3 Time-Graded Overcurrent Protection 23.4 Differential Pilot-Wire Protection 23.5 Distance Protection
More informationRequirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH
Requirements for Offshore Grid Connections in the Grid of TenneT TSO GmbH Bernecker Straße 70, 95448 Bayreuth Updated: 5th October 2010 1/10 Requirements for Offshore Grid Connections in the Grid of TenneT
More informationDesign, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter
1 Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter Nee, Staffan Norrga, Remus Teodorescu ISBN-10: 1118851560
More informationEarth Fault Protection
Earth Fault Protection Course No: E03-038 Credit: 3 PDH Velimir Lackovic, Char. Eng. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774
More informationBus protection with a differential relay. When there is no fault, the algebraic sum of circuit currents is zero
Bus protection with a differential relay. When there is no fault, the algebraic sum of circuit currents is zero Consider a bus and its associated circuits consisting of lines or transformers. The algebraic
More informationSystem Protection and Control Subcommittee
Power Plant and Transmission System Protection Coordination Reverse Power (32), Negative Sequence Current (46), Inadvertent Energizing (50/27), Stator Ground Fault (59GN/27TH), Generator Differential (87G),
More informationDigital Fault Recorder Deployment at HVDC Converter Stations
Digital Fault Recorder Deployment at HVDC Converter Stations On line continuous monitoring at HVDC Converter Stations is an important asset in determining overall system performance and an essential diagnostic
More information2 Grounding of power supply system neutral
2 Grounding of power supply system neutral 2.1 Introduction As we had seen in the previous chapter, grounding of supply system neutral fulfills two important functions. 1. It provides a reference for the
More informationPQ for Industrial Benchmarking with various methods to improve. Tushar Mogre.
General PQ: Power Quality has multiple issues involved. Thus, need to have some benchmarking standards. Very little is spoken about the LT supply installation within an industry. There is need to understand
More informationPower System Protection Where Are We Today?
1 Power System Protection Where Are We Today? Meliha B. Selak Power System Protection & Control IEEE PES Distinguished Lecturer Program Preceding IEEE PES Vice President for Chapters melihas@ieee.org PES
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationShortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer. Anura Perera, Paul Keller
Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer Anura Perera, Paul Keller System Operator - Eskom Transmission Introduction During the design phase of
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationApplication of Low-Impedance 7SS601 Busbar Differential Protection
Application of Low-Impedance 7SS601 Busbar Differential Protection 1. Introduction Utilities have to supply power to their customers with highest reliability and minimum down time. System disturbances,
More informationPOWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.
POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. This document may be subject to changes. Contact ARTECHE to confirm the characteristics and availability of the products
More informationTransformer Protection
Transformer Protection Transformer Protection Outline Fuses Protection Example Overcurrent Protection Differential Relaying Current Matching Phase Shift Compensation Tap Changing Under Load Magnetizing
More informationELECTRICAL POWER ENGINEERING
Introduction This trainer has been designed to provide students with a fully comprehensive knowledge in Electrical Power Engineering systems. The trainer is composed of a set of modules for the simulation
More informationEH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström
EH27401 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsn@ics.kth.se 1 Course map 2 Outline 1. Power System Topologies Transmission Grids vs Distribution grids Radial grids
More informationFERRORESONANCE SIMULATION STUDIES USING EMTP
FERRORESONANCE SIMULATION STUDIES USING EMTP Jaya Bharati, R. S. Gorayan Department of Electrical Engineering Institute of Technology, BHU Varanasi, India jbharatiele@gmail.com, rsgorayan.eee@itbhu.ac.in
More informationGrid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017
Grid codes and wind farm interconnections CNY Engineering Expo Syracuse, NY November 13, 2017 Purposes of grid codes Grid codes are designed to ensure stable operating conditions and to coordinate the
More informationElectrical Power Systems
Electrical Power Systems CONCEPT, THEORY AND PRACTICE SECOND EDITION SUBIR RAY Professor MVJ College of Engineering Bangalore PHI Learning Pfcte tofm Delhi-110092 2014 Preface xv Preface to the First Edition
More informationOPEN-PHASE DETECTION TECHNIQUES FOR CRITICAL STANDBY SUPPLIES
OPEN-PHASE DETECTION TECHNIQUES FOR CRITICAL STANDBY SUPPLIES U AJMAL, GE Grid Solutions UK Ltd, usman.ajmal@ge.com S SUBRAMANIAN, GE Grid Solutions UK Ltd, sankara.subramanian@ge.com H Ha GE Grid Solutions
More informationUtility Interconnection and System Protection
Utility Interconnection and System Protection Alex Steselboim President, Advanced Power Technologies, Inc. Utility paralleling vs. isolated operation. Isochronous kw load sharing Reactive power (VAR) sharing
More informationBabak Enayati National Grid Thursday, April 17
2014 IEEE PES Transmission & Distribution Conference & Exposition Impacts of the Distribution System Renewable Energy Resources on the Power System Protection Babak Enayati National Grid Thursday, April
More informationCOPYRIGHTED MATERIAL. Index
Index Note: Bold italic type refers to entries in the Table of Contents, refers to a Standard Title and Reference number and # refers to a specific standard within the buff book 91, 40, 48* 100, 8, 22*,
More informationESB National Grid Transmission Planning Criteria
ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and
More informationWind Power Facility Technical Requirements CHANGE HISTORY
CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical
More information2015 Relay School Bus Protection Mike Kockott March, 2015
2015 Relay School Bus Protection Mike Kockott March, 2015 History of Bus Protection Circulating current differential (1900s) High impedance differential (1940s) Percentage restrained differential (1960s)
More informationGENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW
GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy Interconnection Coordinator 1945
More informationFerroresonance Conditions Associated With a 13 kv Voltage Regulator During Back-feed Conditions
Ferroresonance Conditions Associated With a Voltage Regulator During Back-feed Conditions D. Shoup, J. Paserba, A. Mannarino Abstract-- This paper describes ferroresonance conditions for a feeder circuit
More informationGrounding System Theory and Practice
Grounding System Theory and Practice Course No. E-3046 Credit: 3 PDH Grounding System Theory and Practice Velimir Lackovic, Electrical Engineer System grounding has been used since electrical power systems
More informationPJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016
PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 Prepared by System Planning Division Transmission Planning Department PJM 2016 Table of Contents Table of Contents Approval...6
More informationTable of Contents. Introduction... 1
Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...
More informationCourse ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation
Course ELEC0014 - Introduction to electric power and energy systems Additional exercises with answers December 2017 Exercise A1 Consider the system represented in the figure below. The four transmission
More informationCompany Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System
Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels
More informationELECTRICAL POWER TRANSMISSION TRAINER
ELECTRICAL POWER TRANSMISSION TRAINER ELECTRICAL POWER TRANSMISSION TRAINER This training system has been designed to provide the students with a fully comprehensive knowledge in Electrical Power Engineering
More informationSouthern Company Interconnection Requirements for Inverter-Based Generation
Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection
More informationElectrical Engineering. Power Systems. Comprehensive Theory with Solved Examples and Practice Questions. Publications
Electrical Engineering Power Systems Comprehensive Theory with Solved Examples and Practice Questions Publications Publications MADE EASY Publications Corporate Office: 44-A/4, Kalu Sarai (Near Hauz Khas
More informationTexas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event
Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event
More informationNERC Protection Coordination Webinar Series July 15, Jon Gardell
Power Plant and Transmission System Protection Coordination Reverse Power (32), Negative Sequence Current (46), Inadvertent Energizing (50/27), Stator Ground Fault (59GN/27TH), Generator Differential (87G),
More informationProblems connected with Commissioning of Power Transformers
Problems connected with Commissioning of Power Transformers ABSTRACT P Ramachandran ABB India Ltd, Vadodara, India While commissioning large Power Transformers, certain abnormal phenomena were noticed.
More informationHamdy Faramawy Senior Application Specialist ABB Sweden
Design, Engineering and Application of New Firm Capacity Control System (FCCS) Mohammed Y. Tageldin, MSc. MIET Senior Protection Systems Engineer ABB United Kingdom mohammed.tageldin@gb.abb.com Hamdy Faramawy
More informationCatastrophic Relay Misoperations and Successful Relay Operation
Catastrophic Relay Misoperations and Successful Relay Operation Steve Turner (Beckwith Electric Co., Inc.) Introduction This paper provides detailed technical analysis of several catastrophic relay misoperations
More informationSpecialists in HV and MV test and diagnostics. Testing in Substations
Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies
More informationEARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM
EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM BY MR. H. C. MEHTA AT 1 ST INDIA DOBLE PROTECTION AND AUTOMATION CONFERENCE, NOV 2008 POWER-LINKER Wisdom is not Virtue but Necessity hcmehta@powerlinker.org
More informationImpedance protection on power transformer.
Impedance protection on power transformer www.siemens.com/siprotec5 SIPROTEC 5 Application Impedance Protection on Power Transformer APN-045, Edition 1 Content 1...3 1.1 Introduction...3 1.2 Application
More information1
Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive
More informationNotes 1: Introduction to Distribution Systems
Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission
More informationCONTENTS. 1. Introduction Generating Stations 9 40
CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific
More informationImpacts of the Renewable Energy Resources on the Power System Protection by: Brent M. Fedele, P.E., National Grid for: 11 th Annual CNY Engineering
Impacts of the Renewable Energy Resources on the Power System Protection by: Brent M. Fedele, P.E., National Grid for: 11 th Annual CNY Engineering Expo - Nov. 3, 2014 Index Normal Distribution System
More informationTHE IMPACT OF NETWORK SPLITTING ON FAULT LEVELS AND OTHER PERFORMANCE MEASURES
THE IMPACT OF NETWORK SPLITTING ON FAULT LEVELS AND OTHER PERFORMANCE MEASURES C.E.T. Foote*, G.W. Ault*, J.R. McDonald*, A.J. Beddoes *University of Strathclyde, UK EA Technology Limited, UK c.foote@eee.strath.ac.uk
More informationSolving old problems with new technology: How to monitor and measure GIC and OPD currents
Solving old problems with new technology: How to monitor and measure GIC and OPD currents Marcelo Zapella (GE Grid Solutions), Lucas Oliveira (GE Grid Solutions), Rich Hunt (GE Grid Solutions), Dylan Stewart
More informationModern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions
1 Transmission transformers are important links in the bulk power system. They allow transfer of power from generation centers, up to the high-voltage grid, and to bulk electric substations for distribution
More informationHigh Voltage DC Transmission Prof. Dr. S. N. Singh Department of Electrical Engineering Indian Institute of Technology, Kanpur
High Voltage DC Transmission Prof. Dr. S. N. Singh Department of Electrical Engineering Indian Institute of Technology, Kanpur Module No. # 01 Lecture No. # 02 Comparison of HVAC and HVDC Systems Welcome
More informationA Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants
A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants Martin Best and Stephanie Mercer, UC Synergetic, LLC Abstract Wind generating plants employ several
More informationSIPROTEC 5 Application. SIP5-APN-025-en: 7UT8 Autotransformer bank with 2 sets of CT inside the delta connection of the compensation side
www.siemens.com/protection SIPROTEC 5 Application SIP5-APN-025-en: 7UT8 Autotransformer bank with 2 sets of CT in the delta connection of the compensation Answers for infrastructure and cities. Autotransformer
More informationCourse No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION. Course Content
Course No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION Sr. No. Course Content 1.0 Fault Current Calculations 1.1 Introduction to per unit and percentage impedance 1.2
More informationRemotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application
General Application Information Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application Hydro One Remote Communities Inc. Lori.Rice@hydroone.com 1-807-474-2828 This Application
More informationELEC Transmission i and
ELEC-1104 Lecture 5: Transmission i and Distribution ib ti Power System Layout Transmission and Distribution The transmission system is to transmit a large amount of energy from the power stations s to
More informationTHE ROLE OF SYNCHROPHASORS IN THE INTEGRATION OF DISTRIBUTED ENERGY RESOURCES
THE OLE OF SYNCHOPHASOS IN THE INTEGATION OF DISTIBUTED ENEGY ESOUCES Alexander APOSTOLOV OMICON electronics - USA alex.apostolov@omicronusa.com ABSTACT The introduction of M and P class Synchrophasors
More informationTransformer energisation after network blackout
Transformer energisation after network blackout Impact on network restoration and improvement of its process ABSTRACT According to ENTSO-E Network policy 5, responsibility for system restoration after
More informationThe Advantages and Application of Three Winding Transformers
The Advantages and Application of Three Winding Transformers MSc, CEng, FIEE, FIMechE, FIPENZ Principal, Sinclair Knight Merz Abstract Although seldom used in Australia and New Zealand, three winding transformers
More informationBC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014
BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 Expiry Year: 2018 APPROVED BY: Original signed by: Paul
More informationExtensive LV cable network. Figure 1: Simplified SLD of the transformer and associated LV network
Copyright 2017 ABB. All rights reserved. 1. Introduction Many distribution networks around the world have limited earth-fault current by a resistor located in the LV winding neutral point of for example
More informationWebinar: An Effective Arc Flash Safety Program
Webinar: An Effective Arc Flash Safety Program Daleep Mohla September 10 th, 2015: 2pm ET Agenda Arc Flash Defined and Quantified NFPA 70E / CSA Z 462 - Recent Updates What is the ANSI Z10 Hierarchy of
More informationLine protection with transformer in the protection zone
Line protection with transformer in the protection zone www.siemens.com/siprotec5 Three-end line protection with transformer in the protection range SIPROTEC 5 Application Three-end line protection with
More informationThis webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB
This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB Relion. Thinking beyond the box. Designed to seamlessly consolidate functions, Relion relays
More informationExperience with Connecting Offshore Wind Farms to the Grid
Oct.26-28, 2011, Thailand PL-22 CIGRE-AORC 2011 www.cigre-aorc.com Experience with Connecting Offshore Wind Farms to the Grid J. FINN 1, A. SHAFIU 1,P. GLAUBITZ 2, J. LOTTES 2, P. RUDENKO 2, M: STEGER
More informationProtection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin
Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc. 770 565-1556 John@L-3.com 1 Protection Fundamentals By John Levine 2 Introductions Tools Outline Enervista Launchpad
More informationModule 2 : Current and Voltage Transformers. Lecture 8 : Introduction to VT. Objectives. 8.1 Voltage Transformers 8.1.1Role of Tuning Reactor
Module 2 : Current and Voltage Transformers Lecture 8 : Introduction to VT Objectives In this lecture we will learn the following: Derive the equivalent circuit of a CCVT. Application of CCVT in power
More informationPower Plant and Transmission System Protection Coordination Fundamentals
Power Plant and Transmission System Protection Coordination Fundamentals NERC Protection Coordination Webinar Series June 2, 2010 Jon Gardell Agenda 2 Objective Introduction to Protection Generator and
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements
Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system
More informationSHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP
SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP Kiran V. Natkar 1, Naveen Kumar 2 1 Student, M.E., Electrical Power System, MSS CET/ Dr. B.A.M. University, (India) 2 Electrical Power System,
More informationSimulations of open phase conditions on the high voltage side of YNd05-power plant transformers
Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers Disclaimer: All information presented in the report, the results and the related computer program, data,
More informationEH2741 Communication and Control in Electric Power Systems Lecture 2
KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment
More informationHigh Voltage DC Transmission 2
High Voltage DC Transmission 2 1.0 Introduction Interconnecting HVDC within an AC system requires conversion from AC to DC and inversion from DC to AC. We refer to the circuits which provide conversion
More informationFerroresonance Experience in UK: Simulations and Measurements
Ferroresonance Experience in UK: Simulations and Measurements Zia Emin BSc MSc PhD AMIEE zia.emin@uk.ngrid.com Yu Kwong Tong PhD CEng MIEE kwong.tong@uk.ngrid.com National Grid Company Kelvin Avenue, Surrey
More informationLine Protection Roy Moxley Siemens USA
Line Protection Roy Moxley Siemens USA Unrestricted Siemens AG 2017 siemens.com/digitalgrid What is a Railroad s Biggest Asset? Rolling Stock Share-holders Relationships Shipping Contracts Employees (Engineers)
More informationConnection Impact Assessment Application
Connection Impact Assessment Application This form is for generators applying for Connection Impact Assessment (CIA) and for generators with a project size >10 kw. Please return the completed form by email,
More informationExperimental Investigations and Calculations in 6-35 kv Networks with Various Neutral Conditions
PQ20 June 16-18, 2010 Kuressaare Experimental Investigations and Calculations in 6-35 kv Networks with Various Neutral Conditions A. Shirkovets, A. Vasilyeva, A. Telegin LLC BOLID, Novosibirsk, Russia
More informationPower System Stability. Course Notes PART-1
PHILADELPHIA UNIVERSITY ELECTRICAL ENGINEERING DEPARTMENT Power System Stability Course Notes PART-1 Dr. A.Professor Mohammed Tawfeeq Al-Zuhairi September 2012 1 Power System Stability Introduction Dr.Mohammed
More informationFixed Series Compensation
Fixed Series Compensation High-reliable turnkey services for fixed series compensation NR Electric Corporation The Fixed Series Compensation (FSC) solution is composed of NR's PCS-9570 FSC control and
More informationProtective Relaying for DER
Protective Relaying for DER Rogerio Scharlach Schweitzer Engineering Laboratories, Inc. Basking Ridge, NJ Overview IEEE 1547 general requirements to be met at point of common coupling (PCC) Distributed
More informationSystem Protection and Control Subcommittee
Power Plant and Transmission System Protection Coordination Volts Per Hertz (24), Undervoltage (27), Overvoltage (59), and Under/Overfrequency (81) Protection System Protection and Control Subcommittee
More informationITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/
ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationGenerator Protection GENERATOR CONTROL AND PROTECTION
Generator Protection Generator Protection Introduction Device Numbers Symmetrical Components Fault Current Behavior Generator Grounding Stator Phase Fault (87G) Field Ground Fault (64F) Stator Ground Fault
More informationResonances in Collection Grids of Offshore Wind Farms
Downloaded from orbit.dtu.dk on: Dec 20, 2017 Resonances in Collection Grids of Offshore Wind Farms Holdyk, Andrzej Publication date: 2013 Link back to DTU Orbit Citation (APA): Holdyk, A. (2013). Resonances
More informationHow to maximize reliability using an alternative distribution system for critical loads
White Paper WP024001EN How to maximize reliability using an alternative distribution system for critical loads Executive summary The electric power industry has several different distribution topologies
More informationCoil Products Beginnings 1960 State of the Art. Customer partnership around the globe. Continuous innovation since 1900
Coil Products Coil Products Customer partnership around the globe More than 250,000 coil products delivered to more than 170 countries. More than 60 years of operational experience. 35,000 in Europe 13,000
More informationSystem grounding of wind farm medium voltage cable grids
Downloaded from orbit.dtu.dk on: Apr 23, 2018 System grounding of wind farm medium voltage cable grids Hansen, Peter; Østergaard, Jacob; Christiansen, Jan S. Published in: NWPC 2007 Publication date: 2007
More informationTABLE OF CONTENT
Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES
More informationPartial Power Operation of Multi-level Modular Converters under Subsystem Faults
Partial Power Operation of Multi-level Modular Converters under Subsystem Faults Philip Clemow Email: philipclemow@imperialacuk Timothy C Green Email: tgreen@imperialacuk Michael M C Merlin Email: michaelmerlin7@imperialacuk
More informationPOWER QUALITY IMPACTS AND MITIGATION OF DISTRIBUTED SOLAR POWER
POWER QUALITY IMPACTS AND MITIGATION OF DISTRIBUTED SOLAR POWER Presented by Ric Austria, Principal at Pterra Consulting to the IEEE San Francisco Chapter Feb 17, 2016 California Public Utilities Commission,
More informationECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control
ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control Spring 2014 Instructor: Kai Sun 1 References Saadat s Chapters 12.6 ~12.7 Kundur s Sections
More informationA short introduction to Protection and Automation Philosophy
Training Center A short introduction to Protection and Automation Philosophy Philippe Goossens & Cédric Moors Training Center Contents Definitions and basic concepts Differential and distance protection
More information