1 Harmonizing the Changing Resource Mix Keeping the Grid Together Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 30, 2017
2 NERC-IEEE Memorandum of Understanding NERC and IEEE have signed a Memorandum of Understanding to: Encourage communication between the two organizations; Promote shared knowledge of the standards development activities of each organization; and Facilitate liaisons between each other s technical groups and other cooperation where possible Joint Operating Committee to determine structure 2
3 IEEE PES and Committees as Qualified Organization(s) New pre-qualifying process for organizations to provide or assist in development of Compliance Guidance for NERC Standards PES or possibly Committees such as PSRC could become qualified Structure under discussion 3
4 NERC Memorandum of Understanding with Mexico NERC recently signed a Memorandum of Understanding with: Comisión Reguladora de Energía (CRE) regulator Centro Nacional de Control de Energía (CENACE) planner/ operator Outlines a framework for a cooperative relationship between Mexico and NERC to enhance grid reliability of North America Recognizes established and growing interconnections between the United States and Mexico Establishes a collaborative mechanism for identification, assessment and prevention of reliability risks to strengthen grid security, resiliency and reliability. 4
5 Changing Load Load composition changing Electric vehicle charging LED lighting Variable speed drive motors Distributed Energy Resources Inverter-based resources o Roof-top solar panels o Micro turbines o Small wind turbines Load becoming schizophrenic Load models no longer adequate for simulations 5
6 Changing Resources Changing Dispatch Mix High penetration of renewables variable resources Minimum generation levels on conventional units Ramping needs increase for load following Retirement of large fossil-fired generation plants Loss of dynamic reactive support for voltage control Possible reduced system inertia Lower levels of synchronizing torque Changing System Inertia Trade-offs between inertia and Primary Frequency Response 6
7 Cautionary Tales Inadvertent creation of new reliability hazards Very large DC transmission projects New largest single hazards Series-compensated transmission lines Sub-synchronous resonance Sub-synchronous controls interaction Inverter-based resources Digital controls on conventional generation System controls SVCs, Statcoms, DC converter stations, 7
8 Potential Interaction Examples Potential response to combination of voltage and frequency perturbations associated with complex system disturbances High-quality supply loads that are Voltage/Frequency-sensitive Experience of 600 to 900 MW load loss due to transfers to backup supplies during faults Locational injection impact on transmission elements and interfaces Response masquerading as a power swings protection system concerns 8
9 Western Interconnection Frequency 9
10 Solar Resource Loss 10
11 PV Impact 26 different solar developments All utility scale Connected at 500kV or 230kV 10 different inverter manufacturers Reported causes of trips Under frequency Over voltage DC overcurrent 1 loss of synchronism 11
12 Not an Isolated Event 12
13 Inverter Task Force Harbinger of very large event based on common-mode performance Task Force forming Includes inverter manufacturers Talking about desired performance Ride through Blocking Partial run-back Prescribed return seconds rather than minutes 13
14 Frequency Response Strategy All resources should have the capability of providing Primary Frequency Response 14 Regardless of dispatch, frequency response should be available Comments to FERC on SGIA and LGIA Create a continuum of frequency response based on capabilities of specific resources: Arresting energy injection from fast frequency response from storage and modulated load Contracting for frequency responsive loads Sustained response from conventional generation resources and modulated load Cohesive Frequency Response regulations IEEE 1547 NERC PRC-027
15 Traditional generation Wind Turbines Synthetic Inertia Off-optimal blade attack angle backing down from maximum Energy Storage Distributed Energy Resources Solar Micro turbines Micro grid resources Load acting as a resource Tripped by specialized under-frequency relays Smart appliances independent operation Aggregated load controlled by aggregator Modulated load Potential Sources of Primary Frequency Response 15
16 Frequency Response Control Continuum Inertial Response Primary Control (Gen. Response) Milliseconds Seconds to 1-2 minutes Spinning Reserves Secondary Control (AGC) Recovery of Reserves Minutes Minutes to Hours Non-Spinning Reserves 16
17 Importance of System Inertia in ERCOT 60.0 Hz 59.4 Hz Bus frequency (Hz) Generation Trip: 2,750 MW Case 1---: Net Load = 65 GW, SI = 372 Case 2---: Net Load = 35 GW, SI = 236 Case 3---: Net Load = 17 GW, SI = Hz Time (sec) Inertia (GW-second): 1 > 2 > 3
18 Inertial Response Variability High Inertia Light Inertia 18
19 Trade-off between Inertia and Primary Frequency Response 60.0 Hz Bus frequency (Hz) Generation Trip: 2,750 MW Case 1---: Net Load = 65 GW, PFR=1,300MW Case 2---: Net Load = 35 GW, PFR=2,500MW Case 3---: Net Load = 17 GW, PFR=4,700MW Hz Time (sec) Primary Frequency Response (MW): 3 > 2 > 1 19
20 Multiple Roles for Energy Storage in Maintaining Reliability High-speed energy injection following loss of resources High-speed response during Arresting Phase of a Frequency Event o Response proportional to the change in frequency and rate of change in frequency o Help to offset loss of system inertia due to displacement or retirement of generation Continuous proportional response to frequency deviations Frequency control services Energy injection to perform ramping services Reduce severity of solar-based resource drop-off in evening 20
21 Frequency Response Basics A Pre Event Frequency NERC Frequency Response = Generation Loss (MW) Frequency Point A -Frequency Point B Governor/Load Response (MW) C c Frequency Nadir: Generation and Load Response equals the generation loss Slope of the dark green line illustrates the System Inertia (Generation and Load). The slope is ΔP/(D+2H) B Settling Frequency: Primary Response is almost all deployed Governor Response Load Response Frequency Frequency (Hz) Time (Seconds)
22 Potential Operating Mode for Battery Charging Hz Hz Energy storage can move from a charge to discharge cycle similar to traditional generator droop characteristic 22
23 CAISO Load Balancing Concerns 23
24 Ramping / Load-Following Services Role for Storage Supplement generation during severe upward ramps Morning load pick-up before solar reaches full output Evening load pick-up when solar output is dropping off Absorb energy during downward ramps When solar and wind output ramps up to full output and morning load stabilizes Absorb energy to prevent over-generation Charge storage when solar and wind output exceeds energy demand Load-following to provide balance for variable resources Wind and solar variability due to changes in weather 24
25 Other Frequency Developments Significant frequency characteristics changes in ERCOT TRE BAL-001 Standard in effect in 2015 Requires active frequency response on ALL resources, including wind Sets deadband at ± Hz Tremendous impact on response and characteristics 25
26 One Minute Occurances ERCOT Frequency Profile Comparison January through December of each Year In 2015 there were 46,008 one minute average frequency values equal to Hz or less than Hz
27 MW January thru December db vs db MW Minute Movement of a 600 MW 5% Droop MW Response of db 76.35% MW Response of db Decrease in MW movement from 2008 to MW Response of db 2015 MW RELIABILITY Response of ACCOUNTABILITY db
28 28
Robert W. Cummings - NERC Director of System Analysis and Reliability Initiatives William Herbsleb - Chairman of Frequency Response Standard Drafting
Generator Governor and Information Settings Webinar Robert W. Cummings - NERC Director of System Analysis and Reliability Initiatives William Herbsleb - Chairman of Frequency Response Standard Drafting
More informationGrid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017
Grid codes and wind farm interconnections CNY Engineering Expo Syracuse, NY November 13, 2017 Purposes of grid codes Grid codes are designed to ensure stable operating conditions and to coordinate the
More informationFrequency Response Initiative Industry Advisory Generator Governor Frequency Response
Frequency Response Initiative Industry Advisory Generator Governor Frequency Response Troy Blalock South Carolina Electric and Gas Bob Cummings NERC Reliability Initiatives and System Analysis Rich Bauer
More informationImplementation of Revised IEEE Standard 1547
MAY 31, 2017 HOLYOKE, MASSACHUSETTS Implementation of Revised IEEE Standard 1547 Presentation to ISO-TO Operations Committee David Forrest Key Points As New England adds significant amounts of Distributed
More informationLessons Learned in Model Validation for NERC Compliance
Lessons Learned in Model Validation for NERC Compliance usa.siemens.com/digitalgrid NERC Modeling, Data, and Analysis MOD 025 2: Generator Real and Reactive Power Capability Demonstration MOD 026 1: Verification
More information1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report
1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report Rich Bauer Associate Director Reliability Risk Management / Event Analysis Mid C Seminar July 19, 2017 Western Interconnection
More informationDemonstration of PFR Improvement September ERCOT Operations Planning
Demonstration of PFR Improvement September 2017 ERCOT Operations Planning Agenda Overview BAL-001-TRE-1 Standard Applicability to Alternative Resources Ancillary Service Products & Dispatch Improvements
More informationEH2741 Communication and Control in Electric Power Systems Lecture 2
KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment
More informationTable of Contents Error! Bookmark not defined.
Table of Contents Table of Contents... 1 Introduction... 2 Background... 2 Rationale by Requirement... 204 Requirement 1... 204 Background and Rationale... 204 Requirement 2... 268 Background and Rationale...
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationTexas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event
Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event
More information1
Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive
More informationIntegration of Variable Renewable Energy
Integration of Variable Renewable Energy PRAMOD JAIN, Ph.D. Consultant, USAID Power the Future October 1, 2018 Almaty, Republic of Kazakhstan Venue: Almaty University of Power Engineering and Telecommunications
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationFrequency Response Standard Background Document November, 2012
Frequency Response Standard Background Document November, 2012 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents Table of Contents... 1 Introduction...
More informationInverter-Based Resource Disturbance Analysis
Inverter-Based Resource Disturbance Analysis Key Findings and Recommendations Informational Webinar February 15, 2018 August 16, 2016 Blue Cut Fire Disturbance Key Findings and Recommendations 2 Western
More informationIndustry Webinar. Reactive Power Planning. NERC System Analysis and Modeling Subcommittee (SAMS) March 2017
Industry Webinar Reactive Power Planning NERC System Analysis and Modeling Subcommittee (SAMS) March 2017 Webinar Topics Reliability Guideline on Reactive Power Planning Webinar Topics Fundamentals of
More informationForward Looking Frequency Trends Technical Brief ERS Framework 1 Measures 1, 2, and 4: Forward Looking Frequency Analysis
Forward Looking Frequency Trends Technical Brief ERS Framework 1 Measures 1, 2, and 4: Forward Looking Frequency Analysis The NERC Planning Committee and Operating Committee jointly created the Essential
More informationReliability Guideline: Generating Unit Operations During Complete Loss of Communications
1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble: It is in the public interest for the North American Electric Reliability Corporation
More informationWind Power Facility Technical Requirements CHANGE HISTORY
CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical
More informationIntegration of Wind Generation into Weak Grids
Integration of Wind Generation into Weak Grids Jason MacDowell GE Energy Consulting NERC ERSTF Atlanta, GA December 10-11, 2014 Outline Conventional and Power Electronic (PE) Sources Stability limitations
More informationReliability Guideline: Generating Unit Operations During Complete Loss of Communications
1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble It is in the public interest for the North American Electric Reliability Corporation
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements
Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system
More informationFinal ballot January BOT adoption February 2015
Standard PRC-024-21(X) Generator Frequency and Voltage Protective Relay Settings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and
More informationStandard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction. See the Implementation Plan for PRC
A. Introduction 1. Title: Generator Frequency and Voltage Protective Relay Settings 2. Number: PRC-024-2 3. Purpose: Ensure Generator Owners set their generator protective relays such that generating units
More informationStandard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction
A. Introduction 1. Title: Generator Frequency and Voltage Protective Relay Settings 2. Number: PRC-024-1 3. Purpose: Ensure Generator Owners set their generator protective relays such that generating units
More informationEndorsed Assignments from ERS Framework
ERSTF Completion Endorsed Assignments from ERS Framework Ref Number Title ERS Recommendatio n Ongoing Responsibility 1 Synch Inertia at Interconnection Level Measure 2 Initial Frequency Deviation Measure
More informationBPS-Connected Inverter-Based Resource Performance
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Reliability Guideline BPS-Connected Inverter-Based Resource Performance May 2018 20 21 22 23 24 25 26 27 28 29 NERC Report Title Report Date I 30 31 32 33
More informationLoss of Solar Resources during Transmission Disturbances due to Inverter Settings II
Loss of Solar Resources during Transmission Disturbances due to Inverter Settings II Informational Webinar on Level 2 NERC Alert Ryan Quint, Senior Manager, Advanced Analytics and Modeling Rich Bauer,
More informationHow Full-Converter Wind Turbine Generators Satisfy Interconnection Requirements
How Full-Converter Wind Turbine Generators Satisfy Interconnection Requirements Robert Nelson Senior Expert Engineering Manager and Manager of Codes, Standards, and Regulations Siemens Wind Turbines -
More informationTECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION
TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION Document 9022 Puget Sound Energy, Inc. PSE-TC-160.70 December
More informationNARUC. Summer Committee Meetings. Staff Subcommittees on Electricity & Electric Reliability
NARUC Summer Committee Meetings Staff Subcommittees on Electricity & Electric Reliability NARUC Summer Committee Meetings Agenda 10:00-11:00 am Tour of the Newtown Creek Biodigester Plant 1:00 2:00 pm
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements
Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission
More informationNERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1
NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 Charles J. Mozina, Consultant Beckwith Electric Co., Inc. www.beckwithelectric.com I. Introduction During the 2003 blackout,
More informationLessons Learned in Model Validation for NERC Compliance
Lessons Learned in Model Validation for NERC Compliance usa.siemens.com/digitalgrid NERC Modeling, Data, and Analysis MOD 025 2: Generator Real and Reactive Power Capability Demonstration MOD 026 1: Verification
More informationTransmission Interconnection Requirements for Inverter-Based Generation
Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional
More informationEE 742 Power System Components. Y. Baghzouz ECE Department UNLV
EE 742 Power System Components Y. Baghzouz ECE Department UNLV Desire to have a system with high reliability and power quality High reliability ensured by High quality of components High level of system
More informationTECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF LARGE GENERATION FACILITIES. Document 9020
TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF LARGE GENERATION FACILITIES Document 9020 Puget Sound Energy, Inc. PSE-TC-160.50 December 19, 2016 TABLE OF CONTENTS
More informationUsing Synchrophasors for Frequency Response Analysis in the Western Interconnection. Bonneville Power Administration -- WECC JSIS Chair
21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Using Synchrophasors for Frequency Response Analysis in the Western Interconnection
More informationELEMENTS OF FACTS CONTROLLERS
1 ELEMENTS OF FACTS CONTROLLERS Rajiv K. Varma Associate Professor Hydro One Chair in Power Systems Engineering University of Western Ontario London, ON, CANADA rkvarma@uwo.ca POWER SYSTEMS - Where are
More informationIEEE Major Revision of Interconnection Standard
IEEE 1547-2018 - Major Revision of Interconnection Standard NRECA & APA s Emerging Priorities in Energy Research Day, Anchorage, AK Charlie Vartanian PE Secretary, IEEE 1547 Working Group October 31, 2018
More informationEE 742 Chapter 9: Frequency Stability and Control. Fall 2011
EE 742 Chapter 9: Frequency Stability and Control Fall 2011 Meeting demand with generation Large and slow changes (24 hr) in power demand are met by unit commitment Medium and relatively fast changes (30
More informationA Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants
A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants Martin Best and Stephanie Mercer, UC Synergetic, LLC Abstract Wind generating plants employ several
More informationMonitoring and Situational Awareness Conference. Improving EMS Reliability Denver, CO September 18, 2013
Monitoring and Situational Awareness Conference Hani Alarian Improving EMS Reliability Denver, CO September 18, 2013 Director, Power Systems Technology Operations, CAISO California ISO by the numbers 57,963
More informationAnalysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link.
Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link. Mr.S.B.Dandawate*, Mrs.S.L.Shaikh** *,**(Department of Electrical Engineering, Walchand College of
More informationPossible Future Modifications to IEEE 1547
California Rule 21 SWIG Possible Future Modifications to IEEE 1547 Michael Sheehan, P.E IREC mikes@irecusa.com PV Significant Trends Installed prices for distributed PV installations fell by at least 11
More informationTECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS
TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS Puget Sound Energy, Inc. PSE-ET-160.60 October 30, 2007 TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 GENERAL
More informationKeeping it up to Speed Off-Nominal Frequency Operations. CETAC 2018 San Ramon
Keeping it up to Speed Off-Nominal Frequency Operations CETAC 2018 San Ramon 1 Welcome CETAC 2018 San Ramon Valley Conference Center General Class Information: Safety/Fire evacuation In event of emergency,
More informationGeneration and Load Interconnection Standard
Generation and Load Interconnection Standard Rev. 0A DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5
More informationFrom: Roger Clayton Re: Notes from FERC DER Technical Conference, April Panel 4 Collection and availability of data on DER installations
Memorandum From: Roger Clayton Re: Notes from FERC DER Technical Conference, April 11 2018 Panel 4 Collection and availability of data on DER installations Q1 Type of information? Q2 Current data & sharing?
More informationLecture 15 EMS Application II Automatic Generation Contol. Davood Babazadeh
Lecture 15 EMS Application II Automatic Generation Contol Davood Babazadeh 2015-12-03 Outline Generation Control - Why - How AGC design - Area Control Error - Parameter Calculation 2 Course road map 3
More informationMarket mechanisms for frequency control
George T., Wallace S., Hagaman S. A., and Mackenzie H., 2017, Market mechanisms for frequency control, 16th Wind Integration Forum, Berlin Market mechanisms for frequency control Timothy A George Managing
More informationFrequency Response Characteristic Survey Training Document
Frequency Response Characteristic Survey Training Document Training Document Subsections Frequency Response Characteristic Response to Internal and External Generation/Load Imbalances Frequency Bias versus
More informationUnit Auxiliary Transformer (UAT) Relay Loadability Report
Background and Objective Reliability Standard, PRC 025 1 Generator Relay Loadability (standard), developed under NERC Project 2010 13.2 Phase 2 of Relay Loadability: Generation, was adopted by the NERC
More informationEFCC Academia dissemination event
EFCC Academia dissemination event WP4-Hardware in the Loop Validation of the EFCC Scheme Mingyu Sun, Dr Mazaher Karimi, Rasoul Azizipanah-Abarghooee Prof Vladimir Terzija Ben Marshall University of Manchester
More informationMinutes Frequency Response Initiative Meeting
Minutes Frequency Response Initiative Meeting April 27, 2010 Tucson Electric Co. Office Tucson, Arizona A meeting of the NERC Frequency Response Initiative Team was held on April 27, 2010 at the Ameren
More informationResponse of Grid Interconnected Solar PV inverters to Transmission System Faults
Response of Grid Interconnected Solar PV inverters to Transmission System Faults David Piper, P.E. Operations Planning & Analysis SCE Grid Control Center July 18, 2017 1 OVERVIEW 1. Overview of the event
More informationApplication for A Sub-harmonic Protection Relay. ERLPhase Power Technologies
Application for A Sub-harmonic Protection Relay ERLPhase Power Technologies 1 Outline Introduction System Event at Xcel Energy Event Analysis Microprocessor based relay hardware architecture Sub harmonic
More informationE N G I N E E R I N G M A N U A L
1 1 1.0 PURPOSE The purpose of this document is to define policy and provide engineering guidelines for the AP operating companies (Monongahela Power Company, The Potomac Edison Company, and West Penn
More informationUnit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition
Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition NERC System Protection and Control Subcommittee March 2016 NERC Report Title Report Date I Table
More informationNERC Protection Coordination Webinar Series June 30, Dr. Murty V.V.S. Yalla
Power Plant and Transmission System Protection ti Coordination Loss-of-Field (40) and Out-of of-step Protection (78) NERC Protection Coordination Webinar Series June 30, 2010 Dr. Murty V.V.S. Yalla Disclaimer
More informationWind Requirements and Testing for Steady-State Voltage and Frequency Control
1 Wind Requirements and Testing for Steady-State Voltage and Frequency Control IEEE PES General Meeting, Boston: July 18, 2016 Steven Saylors, P.E. Senior Specialist Vestas Wind Systems 2 Voltage Control
More informationWind and Solar (PV) Sub harmonic Interactions with Power Systems
I PCGRID Workshop - 2017 Wind and Solar (PV) Sub harmonic Interactions with Power Systems Dr. Krish Narendra Chief Technology Officer ERLPhase Protection, Automation, Control & Smart Grid ERLPhase Power
More informationRenewable Interconnection Standard & Experimental Tests. Yahia Baghzouz UNLV Las Vegas, NV, USA
Renewable Interconnection Standard & Experimental Tests Yahia Baghzouz UNLV Las Vegas, NV, USA Overview IEEE Std 1547 Voltage limitations Frequency limitations Harmonic limitations Expansion of IEEE Std
More informationGeneration and Load Interconnection Standard
Generation and Load Interconnection Standard Rev. 0 DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5
More informationJonathan (Xiangmin) Gao - GE Grid Solutions Douglas Rust - Dandsco LLC Presented by: Tom Ernst GE Grid Solutions
Jonathan (Xiangmin) Gao - GE Grid Solutions Douglas Rust - Dandsco LLC Presented by: Tom Ernst GE Grid Solutions PRC-001: System protection coordination PRC-019: Coordination with voltage regulating control
More informationWide-Area Measurements to Improve System Models and System Operation
Wide-Area Measurements to Improve System Models and System Operation G. Zweigle, R. Moxley, B. Flerchinger, and J. Needs Schweitzer Engineering Laboratories, Inc. Presented at the 11th International Conference
More informationGenerator Protection GENERATOR CONTROL AND PROTECTION
Generator Protection Generator Protection Introduction Device Numbers Symmetrical Components Fault Current Behavior Generator Grounding Stator Phase Fault (87G) Field Ground Fault (64F) Stator Ground Fault
More informationIEEE sion/1547revision_index.html
IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html
More informationVOLTAGE STABILITY OF THE NORDIC TEST SYSTEM
1 VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM Thierry Van Cutsem Department of Electrical and Computer Engineering University of Liège, Belgium Modified version of a presentation at the IEEE PES General
More informationHighgate Converter Overview. Prepared by Joshua Burroughs & Jeff Carrara IEEE PES
Highgate Converter Overview Prepared by Joshua Burroughs & Jeff Carrara IEEE PES Highgate Converter Abstract Introduction to HVDC Background on Highgate Operation and Control schemes of Highgate 22 Why
More informationITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/
ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...
More informationFrequency Response Initiative Report
Frequency Response Initiative Report The Reliability Role of Frequency Response August 31, 2012 Draft 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com NERC s Mission
More informationTarget Mchunu and Themba Khoza Eskom Transmission Division, System Operator Grid Code Management
GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE ELECTRICITY TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Target Mchunu and Themba Khoza Eskom Transmission
More informationECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control
ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control Spring 2014 Instructor: Kai Sun 1 References Saadat s Chapters 12.6 ~12.7 Kundur s Sections
More informationgeneration greater than 75 MVA (gross aggregate nameplate rating) Generation in the ERCOT Interconnection with the following characteristics:
A. Introduction 1. Title: Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions 2. Number: MOD-027-1 3. Purpose: To verify that the turbine/governor
More informationPower Plant and Transmission System Protection Coordination of-field (40) and Out-of. of-step Protection (78)
Power Plant and Transmission System Protection Coordination Loss-of of-field (40) and Out-of of-step Protection (78) System Protection and Control Subcommittee Protection Coordination Workshop Phoenix,
More informationIDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)
IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone
More informationOptimal sizing of battery energy storage system in microgrid system considering load shedding scheme
International Journal of Smart Grid and Clean Energy Optimal sizing of battery energy storage system in microgrid system considering load shedding scheme Thongchart Kerdphol*, Yaser Qudaih, Yasunori Mitani,
More informationSouthern Company Interconnection Requirements for Inverter-Based Generation
Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection
More informationInterconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System Objective Purpose
Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System NERC Synchronized Measurement Subcommittee (SMS) Scope Document Objective The objective of the
More informationABB Inc. April 1, 2016 Slide 1
Galina S. Antonova, ABB Inc., i-pcgrid Workshop - 2016 Combining subsynchronous oscillations detection and synchrophasor measurements to increase power system stability April 1, 2016 Slide 1 Sub synchronous
More informationIEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces
IEEE PES Boston Chapter Technical Meeting IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces P1547 Chair David
More informationPlanners Perspective on Series Compensated Transmission Lines
TOGETHER WE DELIVER Planners Perspective on Series Compensated Transmission Lines Kenneth A. Donohoo, PE Director, System Planning Distribution and Transmission kenneth.donohoo@oncor.com Oncor Electric
More informationSynchrophasor Technology PMU Use Case Examples
1 IEEE Tutorial on Use of Synchrophasors in Grid Operations - Oscillation Source Detection and Operational Use of Synchrophasors Synchrophasor Technology PMU Use Case Examples Sarma (NDR) Nuthalapati,
More information900 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report
900 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report Southern California Event: October 9, 2017 Joint NERC and WECC Staff Report February 2018 NERC Report Title Report Date
More informationParameters related to frequency stability
Parameters related to frequency stability EN-E guidance document for national implementation for network codes on grid connection 16 November 2016 EN-E AISBL Avenue de Cortenbergh 100 1000 Brussels Belgium
More informationAlberta Reliability Standard Frequency Response and Frequency Bias Setting BAL-003-AB-1.1
1. Purpose The purpose of this reliability standard is to: (a) require sufficient frequency response from the ISO to maintain Interconnection frequency within predefined bounds by arresting frequency deviations
More informationRisk of unintentional islanding in the presence of multiple inverters or mixed generation types
Risk of unintentional islanding in the presence of multiple inverters or mixed generation types presented by: Chris Mouw Northern Plains Power Technologies Brookings, SD USA Brief introduction to NPPT
More informationTESTING GUIDANCE FOR PROVIDERS OF ENHANCED FREQUENCY RESPONSE BALANCING SERVICE
TESTING GUIDANCE FOR PROVIDERS OF ENHANCED FREQUENCY RESPONSE BALANCING SERVICE Authors Published Version Kevin Smethurst D3 - Sean Williams 29 March 2017 Final Vicci Walsh 1 Table of Contents 1 Introduction...
More informationA Fundamental Study of Applying Wind Turbines for Power System Frequency Control
A Fundamental Study of Applying Wind Turbines for Power System Frequency Control CFES Annual Conference February 26, 2015 Felipe Wilches-Bernal and Joe H. Chow Rensselaer Polytechnic Institute 2/26/2015
More informationRevised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program
1 Revised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program Babak Enayati, PhD, PE Lead Engineer, National Grid Waltham, MA Email:
More informationTesting model data usability Excitation Systems PSS Limiters
1 2016 IEEE/PES General Meeting July 17 th -21 st, 2016 Boston, MA Panel Session Use of the New Revisions of IEEE Std. 421.2 and 421.5 to Satisfy International Grid Code Requirements Testing model data
More information1,200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report
1,200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report Southern California 8/16/2016 Event June 2017 NERC Report Title Report Date I Version 1.0 June 8, 2017 Version 1.1 June
More informationSetting and Verification of Generation Protection to Meet NERC Reliability Standards
1 Setting and Verification of Generation Protection to Meet NERC Reliability Standards Xiangmin Gao, Tom Ernst Douglas Rust, GE Energy Connections Dandsco LLC. Abstract NERC has recently published several
More informationIEEE Std Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards
IEEE Std 1547-2018 Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards Clayton Stice, ERCOT Jens C. Boemer, EPRI (on behalf of SCC21) NERC SPIDER
More informationReliabilityFirst Regional Criteria 1. Disturbance Monitoring and Reporting Criteria
ReliabilityFirst Regional Criteria 1 Disturbance Monitoring and Reporting Criteria 1 A ReliabilityFirst Board of Directors approved good utility practice document which are not reliability standards. ReliabilityFirst
More informationIndication of Dynamic Model Validation Process
Indication of Dynamic Model Validation Process Document Identifier Written by David Cashman Document Version Draft Checked by Date of Current Issue November 2013 Approved by Jon O Sullivan Disclaimer EirGrid,
More informationSarma (NDR) Nuthalapati, PhD
SYNCHROPHASOR TECHNOLOGY PMU USE CASE EXAMPLES Sarma (NDR) Nuthalapati, PhD Research Scientist Texas A&M University, College Station, TX Control Room Solutions Task Team NASPI Work Group meeting and first
More informationRENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana
RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana JANUARY 2015 i Table of Content PART A: 1 1 Introduction 1 1.1 Scope 1 1.2 Status 1 1.3 Terms