P11213 LVE: Modular Student Attachment Assembly/Manufacturing Plan

Size: px
Start display at page:

Download "P11213 LVE: Modular Student Attachment Assembly/Manufacturing Plan"

Transcription

1 Table of contents P11213 LVE: Modular Student Attachment Assembly/Manufacturing Plan 1 MATERIALS AND PURCHASING REQUIRED DOCUMENTATION FACILITIES TRAINING STAFF SCHEDULE EQUIPMENT REQUIRED PERSONEL REQUIREMENTS I/O SHROUD MOUNTING PLATE LVE MOUNTING PINS SERVO, SUPPORT, GRIPPER, AND PIN MOUNTS SERVO MOUNTING GEAR SCREWS, NUTS, COTTER PINS, WASHERS, CLEVIS PINS GRIPPER CONTROL BOARD AND I/O BOARD PCB Assembly: Daughter Card Assembly: Software Downloading: Wiring Assembly... 12

2 16 STUDENT LINKS SYSTEM ASSEMBLY Chassis IO Interface Servo Assembly Bracket Mounting Link Assembly Gripper Attachment Pin Installment Servo Support MSA Attachment to LVE ASSEMBLY DRAWING... 23

3 P11213: LVE Modular Student Attachment Assembly/Manufacturing Plan 1 MATERIALS AND PURCHASING Materials for the system shall be purchased from the companies listed on the bill of materials using the product numbers indicated. This plan is designed to walk through the manufacturing of each component to most efficiently produce the components for the design. 2 REQUIRED DOCUMENTATION Mechanicals: - IO Shroud: Controls: - Control Board Schematic: %20MSA%20Mainboard%20-%20v1%20-%20Schematic.pdf - Control Board Layout file: %20MSA%20Mainboard%20-%20v1%20-%20Layout%20-%20Top.pdf - I/O Board Schematic: %20LVE%20MSA%20Chassis%20IO%20v1%20-%20Sch.pdf - I/O Board Layout: %20LVE%20MSA%20Chassis%20IO%20v1%20-%20Brd.pdf (Note: All files can be opened with the latest version of EagleCAD by Cadsoft ( or any PDF reader) 3 FACILITIES Mechanicals: - RIT Mechanical Engineering Machine Shop - RIT Mechanical Engineering Wood Shop Controls: - Surface Mount Technology (SMT) Laboratory Center for Integrated Manufacturing Studies (CIMS) Rochester Institute of Technology 4 TRAINING STAFF Mechanical: In case of issues with machining, be sure to consult with the lab supervisors, and ask for permission before using the machinery. Dave Hathaway Operations Manager

4 Phone: Office: 2361 Gleason Controls: Jeffrey G. Lonneville SMT Lab Manager Phone: Fax: Office: CIMS SCHEDULE Mechanicals: - I/O Shroud Printing 3 weeks - Machining Components 6 hours - Gripper Assembly 5 minutes Controls: - PCB Manufacture- Depends on FAB house (4-5 weeks worst case) - Hardware Assembly 2 hours - Software Downloading 5 minutes 6 EQUIPMENT REQUIRED Mechanical: - Hack Saw (Wood Shop, Brinkman Lab) - Digital Readout Mill (Building 9 Machine Shop) - Digital Readout Lathe (Building 9 Machine Shop) - Band Saw (Building 9, Machine Shop) - Belt Sander (Building 9, Machine Shop) Controls: - Bill of Materials Components - Printed Circuit Boards - Printed Circuit Board Layout and Schematic - Microscope - Solder Iron - Solder/Solder Paste - Solder Wick - Tweezers - Manual Thermal Reflow Station - Computer with USB Ports - USB Cable - Adjustable power supply (able to limit current and voltage)

5 7 PERSONEL REQUIREMENTS Mechanicals: - 2 Team Members to machine all machinable parts - Lab Management Available for Training/Assistance during normal business hours Controls: - 1 Team Member o 1 Member to Place Solder Paste, Place Components on PCB, and operate the Reflow Station - Lab Manager Available for Training/Assistance during normal business hours. 8 I/O SHROUD The I/O shroud (part 21) is meant as an interface to the connectors for the control board to the external components to be connected. The shroud should sit flush with the outside surface of the LVE paneling and will be made of white opaque plastic. The part can be 3D printed in the Brickman lab here on campus. Lead time for on campus projects is typically 2-3 weeks. The order can be placed online at: Details for the documents for placing the order are available online MOUNTING PLATE The mounting plate is to be made from an opaque white Plexiglas material. The material comes in a plastic sheet of the desired thickness, typically with a paper on each surface to protect it from scratches. The plate must be machined as follow. 1. Obtain a drawing of the mounting plate, part number 1 ( 2. Mark an 8 by 8 section on the plate to become the actual size of the mounting plate. 3. Use the hack saw in the wood shop section of the Brinkman lab in the engineering building to cut the plate down to size. Be sure to draw the saw in slowly as to avoid cracking. Leave the protective paper on throughout this process. Be careful not to pull the saw in an out, but rather make single traverses through the material from front to back. 4. Place the material in a standard digital readout mill in the main section of the mechanical engineering lab. The plate shall be placed on a piece of scrap plywood slightly smaller than the plate, to support the plastic while being cut. 5. Put in the correct size drill bit (1/4 hole). The use of 1/4 standard fractional drill bit is sufficient for the material and as a clearance for 1/4-20 bolts. 6. Zero the bit on the corner of the plate, being sure to move the origin on the x-y plane inwards by the radius of the bit. Make sure the machine is running while touching off on the corners. A hole center finder may be used for this procedure. 7. Proceed to drill out all the holes as specified by the hole table on the drawing. 8. Using a 1/4 end mill, remove the material required for the I/O mounting point as in the drawing. 9. After all procedures, remove the plate from the mill.

6 10. Peel the paper off the plate. Use of water or low amounts of heating may be used. 11. Cut off all burrs and leftover material with a knife, sand paper, or the belt sander as desired. 12. Part complete. I/O Port Notching Mounting Holes 8 x8 Platform 10 LVE MOUNTING PINS The LVE mounting pins are used to attach the mounting plate to the LVE by press fitting into the studs of the chassis section. Holes are drilled in the pins to allow cotter pins for quick and easy attachment to the chassis. Since standard press pins are a case hardened steel, softer steel pins will be custom made to allow this additional machining. The part shall follow the following machining process. 1. Obtain a drawing of the mounting pins, part number 16 ( 2. Mark a length of steel on the steel rod of the minimum length of 5 pins per LVE, adding on the necessary amount of slack for free play. 3. Place the steel rod in the lathe using a standard center mount chuck or more preferably, a collet made to fit the material obtained. 4. Turn down the rod to the desired diameter as called out in the print for the first pin. 5. Remove the rod from the lathe. 6. Cut the desired section off the rod above the desired lengths leaving a small amount of room to be ground off. Do this using the band saw in the machine shop of building Sand off the ends if they are rough from the band saw, using the belt sander in the machine shop. 8. Measure the length of the pin. Now place back into the lath, and resurface the end down to length until the desired length is found. Remove from the lathe. 9. Place the pins now into the vice on a digital readout mill. Zero the machine on all sides as required to mark the hole properly. 10. Drill a pilot hole using a center drill, smaller than that of the final hole diameter. 11. Using the correct diameter drill bit (1/8 ) drill the hole desired at the proper depth.

7 12. Remove the pin from the vice. 13. Repeat for the desired number of press fit pins. 14. De-burr and remove any excess material not necessary. 15. Part complete. 11 SERVO, SUPPORT, GRIPPER, AND PIN MOUNTS There are 5 mounting locations on the MSA which utilize the angle aluminum purchased. Each requires bolting on each surface, so holding tolerances in both planes is highly important. Each process begins with a similar manner, but is completed with a different hole pattern. The parts should be made as follows. 1. Obtain drawings for the brackets and mounting surfaces, part numbers 2, 3, 13, and 17 ( 2. Mark the length of the angle iron desired. 3. Cut the length desired on the band saw in the machine shop. It s best to cut with the flange edges sitting flat on the table, and the right angle pointing directly upwards. Leave some extra room to be ground down flat. 4. Repeat for each component. 5. Place each component in a mill device such that the edge is overhanging the device. Face the side of the part to make a square edge. 6. Repeat with the part flipped, cutting the final pass to the desired length. 7. Place each angle in the vice of a digital readout mill. This is best done using a horizontal standoff to support the angle. Zero the component on the desired right angle corner to maintain dimensioning. Be sure the machine is running while touching off on the part to not damage the blade, and account for the radius of the bit. 8. Cut or drill the desired holes or openings in each component. 9. Once complete, flip the part by 90 degrees such that the opposite back surface is exposed. 10. Zero the machine off the same corner to maintain dimensioning with respect to each side. 11. Cut or drill the required openings in the part. 12. Remove the part from the mill. 13. Remove and de-burr any excess material from drilling. 14. Repeat for each component. 15. Parts complete.

8 Intermediate Step Brackets 12 SERVO MOUNTING GEAR The servo mounting gear is made of plastic, and must be slightly altered to allow for more bulky machine screws to be used. This should hopefully improve the durability and life of the part, as well as make machining easier. This should be performed as shown. 1. Obtain a drawing for the servo output gear part number 5 ( 2. Place the servo gear in the vice of a digital readout mill, such that the flat side is facing upwards exposed to the mill. 3. Zero the machine on the output gear, finding the exact center of the output gear. Make sure a small enough bit is used (approximately the same size as being used to cut) and that the machine is running while this is being performed. Make sure the pre-drilled holes in the gear are either being removed by the new hole or out of range so as to keep integrity of the hole. 4. Offset the drill placement as desired by the drawing, and drill the desired holes in the output gear. 5. Remove the part from the mill. 6. Remove and de-burr the part, removing the extra material. 7. Part complete. 13 SCREWS, NUTS, COTTER PINS, WASHERS, CLEVIS PINS These materials are all obtained and will be assembled as purchased. 14 GRIPPER The gripper is to be ordered and will be received with assembly instructions. The final assembly will look as follows.

9 MSA Gripper Assembly 15 CONTROL BOARD AND I/O BOARD The control board for the MSA interfaces with the main control board for the entire MSA. This part has the longest lead time of all parts in the MSA, and should be ordered allowing more than 6 weeks to allow for the boards to be printed and shipped. Note: the Gerber files were generated by using the CAM script provided by Sparkfun Electronics for BatchPCB.com (The CAM script is also available on EDGE) 15.1 PCB Assembly: 1. Use microscope and solder station to place solder paste on Top PCB pads. 2. Place Surface Mount Components on top of PCB with tweezers. Check orientation of parts with PCB layout and schematic. 3. Use Manual Thermal Reflow Station to solidify the connection between components and pads. 4. Allow PCB to cool. Wait at least 30 seconds before handling PCB. 5. If the PCB is still hot, use a pair of pliers to move the board. 6. Use microscope and multi-meter to check for short circuits on PCB. 7. Use microscope and solder station to place solder paste on bottom pads. 8. Place Surface Mount Components on bottom of PCB with tweezers. Check orientation of parts with PCB layout and schematic. 9. Allow PCB to cool. Wait at least 30 seconds before handling PCB. 10. Use microscope and multi-meter to check for short circuits on PCB. 11. Use solder and solder iron to solder all thru-hole parts and connectors to the PCB Daughter Card Assembly: 1. Use solder and solder iron to solder the thru-hole header pins on each long edge of the daughter card

10 2. Insert the daughter card into the control board. Note the orientation. a. The reset button should be closest to the 6 pin ISP programming header (See the illustration below) Power supply: The power supply connection is located at the blue screw terminal port on the lower left hand side of the MSA control board. This connector only accepts gauge wire. Connect as follows:

11 1. Insert positive lead (with copper exposed) into the port marked positive 2. Tighten wire down with screw driver 3. Insert positive lead (with copper exposed) into the port marked negative 4. Tighten wire down with screw driver 5. Power the control board with a desktop power supply. Provide 7V with a 100 ma current limit. 6. The green LED and the red LEDs should light up when power is applied Software Downloading: 1. Download Arduino IDE and code from EDGE. 2. Connect a unpopulated Arduino board to a PC using USB A cable. a. Note: a USB-to-RS232 board from Sparkfun.com or Pololu.com can suffice as well

12 3. Connect a ground wire from the unpopulated Arduino board to the control board. 4. Connect the TX and RX pins of the unpopulated Arduino board to the TX and RX pins of the control board respectively 5. Open Arduino IDE. 6. Go to File open and navigate to the Arduino Code, click open. 7. Select the correct board type(arduino with Atmega328). 8. Select the correct com port for the Arduino. 9. Click the program button. 10. Wait for all but TX LED to stop blinking. 11. Remove all wire connections after programming Wiring Assembly The wiring necessary for connection between the I/O ports, main control board, MSA control board, and power supply shall be assembled as follows. Battery Connection: The battery connection is located at the blue screw terminal port on the lower left hand side of the MSA control board. This connector only accepts gauge wire. Connect as follows:

13 1. Insert positive lead (with copper exposed) into the port marked positive 2. Tighten wire down with screw driver 3. Insert positive lead (with copper exposed) into the port marked negative 4. Tighten wire down with screw driver 5. When connected the green LED and the red LED should light up. Serial connection: 1. Connect provided two-pin serial jumper wire (Sparkfun Part PRT-10367) to the UART header on the MSA control board. (Located top left hand corner) a. Note: ensure the Red wire is connected to the pin labeled TX 2. Connect the other end to the UART pins on the LVE Control board. a. Note: ensure the Red wire is connected to the pin labeled RX

14 Ribbon cable assembly: The ribbon cable assembly provides a straight through connection from the MSA Control board to the chassis I/O board. 1. Insert the ribbon cable connector with the ribbon leading away from the control board 2. Insert the ribbon cable into the chassis I/O board. a. Note: The middle notch in the connector on the PCB should not be covered by the ribbon cable 16 STUDENT LINKS The student links are the part that will be continuously be remade each time an MSA project is created. These links will vary greatly in their lengths, hole patterns, and sometimes shape. Each

15 student will be responsible for creating their own link as part of the lab section of their class. The links should follow the standard protocol and be made as follows. 1. Obtain student made drawings for the materials and parts listed as part numbers 6, 11, and Obtain the link material in the shop, and mark the required length desired for the link. 3. Cut the required length for each link on the band saw in the machine shop. 4. Use the belt sander to smooth out any rough edges and remove burrs or excess material. 5. Place the link material in the vice of a digital reading mill. Be sure to properly support the link and allow room behind the link for all holes to be made. 6. Zero the part on the mill using the required bit, making sure the machine is operating while zeroing. 7. Drill the necessary openings and holes in the links as called out by the student made link drawings. 8. Add required machining as necessary. 9. Remove all burrs or excess material. 10. Repeat for each link. 11. Parts complete. 17 SYSTEM ASSEMBLY 17.1 Chassis IO Interface The servo connections are made to the chassis IO interface board via the cutout in the cab of the LVE. The servo connections can be made as indicated below:

16 Note: The control signals for the servo headers should be to the left. (White or Orange Wires) 17.2 Servo Assembly The servo connects to the servo mount by sliding the servo through the opening. Note it s a tight fit and some filing may be required to get the appropriate clearance for the wiring. Once the servo has been fit within the bracket, it may be mounted with 4-40 x 1/2" bolts and nuts at the retaining locations. Servo Servo Mount Retaining Bolts and Nuts Servo Assembly 17.3 Bracket Mounting All the brackets mounted to the mounting plate may be attached using the required bolts and nuts as required. The mounting bolts are 1/4-20 pan head machine screws, with corresponding nuts. The nuts are fastened to the underside of the mounting plate.note to

17 check here for alignment of the holes for brackets and servos with the designed link geometry. Pinned Brackets Mounting Bolts and Nuts Servo Brackets 17.4 Link Assembly The link and servo output gear must be assembled before attaching the output gear to the servo. This is achieved by bolting the servo bracket to the link with the required 4-40 bolts and nuts as required.

18 Driving Link Servo Output Gear Servo Output Gear Driving Link Mounting Bolts and Nuts Once this is included, the output gear can be attached to the servo.

19 Attached Pinned Link Arm Attached Drive Link Arm After the brackets are all in place and the servo and link have been connected, the remainder of the links may be attached using the necessary amount of spacers, clevis pins, and cotter pins as desired. Attached Pinned Link Arm

20 17.5 Gripper Attachment The gripper is attached using the gripper mount using 4-40 hex screws included. The mount should first be connected to the gripper and second connected to the top link on the arm as desired by the design. Note the nuts and bolts used to connect the servo to the servo bracket are same as that for the gripper to the gripper bracket. Also, the bolts for connecting the link to the gripper bracket are the same as the mounting bolts and nuts. Gripper Nuts and Bolts Gripper 17.6 Pin Installment The dowel pins are to be permanently pressed into the studs of the chassis subsystem. This can be achieved by hand if possible, or by using an arbor press. If the pins can t be pressed in, remove a small amount of material on the lathe (about increments until it fits with a press). If the bottom of the pin hole should be exactly 0.25 above the top of the stud. If it s too high, press further in or remove and cut down material. If it s too low pull up until at the proper height.

21 Attached Pin 17.7 Servo Support Due to the nature of potential impacts to the system, the servo should be properly supported using a balance pin. Here, the use of spacers, clevis pins, and cotter pins whould be incorporated to press the servo mount onto the servo and help remove some axial load from the servo output shaft. Servo Support 17.8 MSA Attachment to LVE The MSA can be attached to the platform LVE by sliding the mounting plate over the dowel pins in the correct orientation, and sliding cotter pins through the exposed holes. The servos can be connected to the LVE controls through the I/O port exposed on the LVE. Note the correct orientation of the servo wiring as denoted in the I/O and controls assembly. The assembly of the MSA system is the complete and operational.

22 Attached MSA LVE

23 18 ASSEMBLY DRAWING Attached below is the assembly drawing of the MSA.

Ribcage Installation. Part 2 - Assembly. Back-Bone V1.06

Ribcage Installation. Part 2 - Assembly. Back-Bone V1.06 Ribcage Installation Part 2 - Assembly Back-Bone V1.06 Contents Section 1 Before You Get Started... 2 Included With Your Kit:... 2 Figure: A... 3 CAUTION!... 4 Note:... 4 Tools Required... 5 Section 2:

More information

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT: 175 SERIES FIXED STAIR CABLE RAIL - INSTALLATION INSTRUCTIONS PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT: FIXED STAIR TOP RAIL (1) A FIXED STAIR BOTTOM RAIL (1) B D UPPER SADDLE BRACKET (1) C BRACKET

More information

Kai Installation Instructions

Kai Installation Instructions Kai Installation Instructions Before Beginning Installation Read through the entire instruction thoroughly A minimum of 2 people are required for this assembly These instructions reflect typical assemblies;

More information

Installation Instructions

Installation Instructions Installation Instructions For Models: Model Number / Description File Name 1540 Classic Series P-Lam Toilet Partitions 1540.pdf 1 INSTALLATION INSTRUCTIONS LAMINATED PLASTIC TOILET PARTITIONS 1540 Classic

More information

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

Clocking a TD-04 Turbo Compressor Housing. Appendix A : AWIC Silicone and Tubing Fitting

Clocking a TD-04 Turbo Compressor Housing. Appendix A : AWIC Silicone and Tubing Fitting Clocking a TD-04 Turbo Compressor Housing Appendix A : AWIC Silicone and Tubing Fitting Revision A: 7-13-2015 Tools: Metric Sockets (10, 12, 14, 17mm) 5mm Hex Key Large Internal Snap Ring Pliers 3/8 Socket

More information

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side.

More information

Bill of Materials: PWM Stepper Motor Driver PART NO

Bill of Materials: PWM Stepper Motor Driver PART NO PWM Stepper Motor Driver PART NO. 2183816 Control a stepper motor using this circuit and a servo PWM signal from an R/C controller, arduino, or microcontroller. Onboard circuitry limits winding current,

More information

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000 INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000 Specifications: Accomodates Akira and Orion 84" displays without interface bracket; accomodates other large flat panel displays with

More information

INSTRUCTIONS

INSTRUCTIONS IMPORTANT: THIS IS A HIGH PERFORMANCE PART AND IMPROPER INSTALLATION COULD RESULT IN INJURY OR DEATH! NEVER WORK UNDER AN AUTOMOBILE THAT IS NOT PROPERLY SUPPORTED AND BLOCKED FROM ROLLING. NO CREDIT OR

More information

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16 Equilibrium Conference Table Installation Instruction Revision B 11/07/16 Equilibrium End User Agreement Enwork Equilibrium table bases must be installed directly onto a four inch minimum thickness concrete

More information

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side. Note: Having the hood open makes the job

More information

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

FOR PROFESSIONAL GARAGE DOOR INSTALLERS Composite Garage Doors Installation Instructions FOR PROFESSIONAL GARAGE DOOR INSTALLERS Tools required Screwdriver Claw Hammer Locking Pliers Power Drill Level with a 3/32" Drill Bit Utility Knife 9/16",

More information

Woodline USA Woodline Spacer Fence System

Woodline USA Woodline Spacer Fence System Woodline USA Woodline Spacer Fence System MADE IN THE USA Includes: (1) ¼ Spacer Fence (1) 3/8 Spacer Fence (1) ½ Spacer Fence (1) Hardware Package (1) 3 Piece Brass bar set (2) Setup Blocks Visit Us Online

More information

Ford Pick Up Rear leaf Spring Kit Installation Instructions

Ford Pick Up Rear leaf Spring Kit Installation Instructions 1948-1956 Ford Pick Up Rear leaf Spring Kit Installation Instructions 1-800-984-6259 www.totalcostinvolved.com Parts 48 inch leaf (2) springs (4) U-bolts 3/8-24 x l 1/4bolts (16) & nuts (2) 1/2-20 x 4

More information

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

Note - the nose ribs and are thinner than the main ribs. These nose ribs will use a thinner rib cap than the ribs. This is per design.

Note - the nose ribs and are thinner than the main ribs. These nose ribs will use a thinner rib cap than the ribs. This is per design. Stabilizer rev 1.2 The SE5a stabilizer is the heartbeat of the tail and is recreated like the full scale version. All tail pieces depend on the stabilizer. It uses the steel fittings, pulleys, inspection

More information

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards. Installation Instructions for Fortress Horizontal Cable Panel System with UB-05 Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS LAMINATED P LASTIC TOILET PArTITIONS 1540 ClassicSeries with Options IMPORTANT: Storage and Handling Information on last page. For faster, easier installation, please review these

More information

OpenROV. Guide 3 - Electronics. We will now move to the assembly of the electronics that will control the ROV. Written By: OpenROV

OpenROV. Guide 3 - Electronics. We will now move to the assembly of the electronics that will control the ROV. Written By: OpenROV OpenROV Guide 3 - Electronics We will now move to the assembly of the electronics that will control the ROV. Written By: OpenROV 2017 openrov.dozuki.com Page 1 of 33 INTRODUCTION We will introduce soldering

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS HIGH PRESSUE LAMINATE (HPL) TOILET PARTITIONS 1030 TrimLineSeries 1040 DesignerSeries Includes continuous hardware option.65. IMPORTANT: Storage and Handling Information on last

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SOLID PHENOLIC TOILET PARTITIONS 1080 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and Handling Information on last page. Review

More information

SoftRock v5.0 Builder s Notes. December 12, Building a QSD Kit

SoftRock v5.0 Builder s Notes. December 12, Building a QSD Kit SoftRock v5.0 Builder s Notes December 12, 2005 Building a QSD Kit Be sure to use a grounded tip soldering iron in building the QSD board. The soldering iron needs to have a small tip, (0.05-0.1 inch diameter),

More information

Assembly Guide for Printrbot - Simple Maker s Edition 1405

Assembly Guide for Printrbot - Simple Maker s Edition 1405 Assembly Guide for Printrbot - Simple Maker s Edition 1405 Last update: March 2016 Please Note: be careful on the steps that are underlined 1 Contents Tools Needed:... 3 First step: Check components and

More information

BEAST THE. Tube and Pipe Notcher Operating Instructions. Notches In Bends Straight Notches. Angled Notches. Offset Notches

BEAST THE. Tube and Pipe Notcher Operating Instructions. Notches In Bends Straight Notches. Angled Notches. Offset Notches Copyright (c) 2007 J D SQUARED INC. www.jd2.com THE BEAST Tube and Pipe Notcher Operating Instructions Notches In Bends Straight Notches Angled Notches PATENT PENDING Offset Notches Assembly After unpacking

More information

USSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS

USSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS 1 OF 17 A 1. PURPOSE: Instructions for in field replacement of 9004 mechanical suspension top pan 2. SCOPE: 9004 mechanical suspension with legacy two point LX back frame and current LX back frame 3. PROCEDURE:

More information

Printrbot Simple (Model 1403) Rev F Printrboard

Printrbot Simple (Model 1403) Rev F Printrboard Printrbot Simple (Model 1403) Rev F Printrboard Printrbot Simple is currently shipping with the Rev F Printrboard. Check which rev Printrboard your Simple kit includes and use the corresponding instructions.

More information

model tsa-sa48 Sliding Crosscut Table installation guide

model tsa-sa48 Sliding Crosscut Table installation guide model tsa-sa48 Sliding Crosscut Table installation guide A Note About Color Variations Among Anodized Aluminum Components Congratulations on the purchase of this SawStop Sliding Crosscut Table. We at SawStop

More information

J D SQUARED INC. NOTCH MASTER Tube and Pipe Notcher Operating Instructions

J D SQUARED INC.   NOTCH MASTER Tube and Pipe Notcher Operating Instructions Copyright (c) 2006 J D SQUARED INC. www.jd2.com NOTCH MASTER Tube and Pipe Notcher Operating Instructions Angled Notches PATENT PENDING Straight Notches Offset Notches Tube Clamp Slider Tube Clamp Exploded

More information

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS MM50 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.

More information

Horizontal Cable Systems

Horizontal Cable Systems ALUMINUM RAILING INSTALLATION INSTRUCTIONS Horizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications: Confirm

More information

AndyMark DART 12.

AndyMark DART 12. AndyMark DART 12 Part Number Description QTY These Parts Are Pre-Assembled by AndyMark am-0031 Bearing, 3/16"ID (R3) 1 am-0209 Bearing, 3/8"ID 1614ZZ 2 am-1028 Screw, #10-32x3/8 Pan Head Philips 8 am-1121

More information

BY ALIEN TECHNOLOGIES CORP

BY ALIEN TECHNOLOGIES CORP BY ALIEN TECHNOLOGIES CORP Assembly Instructions TopLift Pros YOU MAY ALSO REVIEW OUR ASSEMBLY VIDEO, PLAY AND PAUSE AT YOUR CONVENIENCE. JUST VISIT US AT WWW.TOPLIFTPROS.COM AND GO TO Customer Support

More information

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS 12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions

More information

Kossel Rev B Build Guide V1.0

Kossel Rev B Build Guide V1.0 Kossel Rev B Build Guide V1.0 1 Table of Contents: Step 1: BASE ASSEMBLY Gathering parts: Building the Corners and Base: Step 2: UPPER ASSEMBLY Building Upper: Step 3: VERTICAL RAIL INSTALLATION Building

More information

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS 1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Trailer system.

More information

BIFOLD FUTON FRAME TRINITY ARM. Seat Rails and Slats x 1. *Note: Use 4pc of 100mm Bolts and 4pc of 60mm Bolts to attach the arms to the Stretchers.

BIFOLD FUTON FRAME TRINITY ARM. Seat Rails and Slats x 1. *Note: Use 4pc of 100mm Bolts and 4pc of 60mm Bolts to attach the arms to the Stretchers. 1A Parts in this box. 2pc with extra holes 2pc with extra holes & plastic stoppers Arms x 2 Back Rails and Slats x 1 Full Size: Slat Supports x 6 3pc are longer for the Back deck Back Side Rails x 2 Seat

More information

OWNER S MANUAL. Safety. Please read this owner s manual before use and keep it at hand for reference. Warranty

OWNER S MANUAL. Safety. Please read this owner s manual before use and keep it at hand for reference. Warranty Please read this owner s manual before use and keep it at hand for reference. OWNER S MANUAL Safety Important safety instructions for using the INCRA Miter5000 Before using the INCRA Miter5000, read and

More information

Hinge Mortising Jig. One of the make it or break it parts of building a. 6 ShopNotes No. 74

Hinge Mortising Jig. One of the make it or break it parts of building a. 6 ShopNotes No. 74 Hinge Mortising Jig A Mortise for a Hinge. Quick, clean, and accurate that s the only way to describe the mortise you get with a trim router and this hinge mortising jig. One of the make it or break it

More information

IEEE #: March 24, Rev. A

IEEE #: March 24, Rev. A Texas Tech University Electrical Engineering Department IEEE Student Branch Milling Tutorial An EE s Guide to Using the Milling Machine Written by: Juan Jose Chong Photos by: David Hawronsky IEEE #: 90499216

More information

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS LEG CURL IP-S35 INSTALLATION INSTRUCTIONS Copyright 2009. Star Trac by Unisen, Inc. All rights reserved, including those to reproduce this book or parts thereof in any form without first obtaining written

More information

Reversing Gear. Shay Reversing Gear

Reversing Gear. Shay Reversing Gear Shay Nelson Riedel Nelson@NelsonsLocomotive.com Initial: 9/23/03 Last Revised: 06/05/2004 The reversing gear is another one of those pieces I've been putting off. The reason for the postponement was that

More information

NX7 SERIES 5-1/2 HANDRAIL

NX7 SERIES 5-1/2 HANDRAIL STORAGE & HANDLING The handrails are shipped unassembled. Upon receipt, immediately check all material for any damage that may have occurred in transit and verify that all of the items and quantities are

More information

Customer Notice: Congratulations again on your SawStop purchase, and thank you! -SawStop Tualatin, OR

Customer Notice: Congratulations again on your SawStop purchase, and thank you! -SawStop Tualatin, OR Customer Notice: Congratulations on the purchase of this Sliding Crosscut Attachment. As the owner of a SawStop saw, you are familiar with our high standards for quality, fit and finish. Different from

More information

- 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS. Factory pre-installed mud flange TOOLS REQUIRED: Phillips screwdriver, 5/16 nut driver.

- 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS. Factory pre-installed mud flange TOOLS REQUIRED: Phillips screwdriver, 5/16 nut driver. - 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS TruGroove Drywall A3 MOUNTING Ceiling INSTALLATION System Overview These instructions review how to install drywall trim versions of TruGroove recessed

More information

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013 U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -

More information

Assembly Instructions 10 X 10 Aluminum Frame Building

Assembly Instructions 10 X 10 Aluminum Frame Building Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal

More information

Installation Instructions Standalone or continuous run configurations - 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS

Installation Instructions Standalone or continuous run configurations - 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS - 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS TruGroove Drywall A3 MOUNTING Ceiling INSTALLATION System Overview These instructions review how to install trimless drywall versions of TruGroove

More information

V4 Premium Kit. Prusa i3 Build Guide

V4 Premium Kit. Prusa i3 Build Guide V4 Premium Kit Prusa i3 Build Guide Hi! Congratulations on your purchase of the DIYElectronics.co.za Prusa I3 kit, the best South African 3D Printer Kit! Hopefully this should serve as complete guide to

More information

Sliding Crosscut Table installation guide

Sliding Crosscut Table installation guide Sliding Crosscut Table installation guide model tsa-sa48 A Note About Color Variations Among Anodized Aluminum Components Congratulations on the purchase of this SawStop Sliding Crosscut Table. We at SawStop

More information

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards. Installation Instructions for FortressCable H-Series Cable Panel System With UB-05 Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain

More information

Horizontal Cable Systems

Horizontal Cable Systems ALUMINUM RAILING INSTALLATION INSTRUCTIONS v2012 orizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications:

More information

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards. Installation Instructions for FortressCable H-Series Stair Panels with Simplified Stair Bracket SSB-05 and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and

More information

LA502 Assembly guide Main PCB Resistors - (2)

LA502 Assembly guide Main PCB Resistors - (2) LA502 Assembly guide Safety warning The kits are main powered and use potentially lethal voltages. Under no circumstance should someone undertake the realisation of a kit unless he has full knowledge about

More information

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions All clutch operated shades are shipped fully assembled and ready for installation. Mounting screws are not provided. Screws for chain guide installation to meet the child safety standards are provided.

More information

Written By: Brook Drumm

Written By: Brook Drumm Simple 1401 Assembly For kits produced between 1/15/14-6/1/14. This guide is for kits with the Fan Shroud. Instructions for metal and wood extruder (and bed) included below. Written By: Brook Drumm TOOLS:

More information

EDGE2 DUAL MONITOR ARM

EDGE2 DUAL MONITOR ARM EDGE2 DUAL MONITOR ARM EDGE2 Rev A 2/17 Model EDGE2-SLV Model EDGE2-BLK Model EDGE2-WHT ASSEMBLY AND ADJUSTMENT EDGE2 DUAL MONITOR ARM PARTS AND TOOLS PLEASE REVIEW these instructions before beginning

More information

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill DEVICES COVERED IN THIS DOCUMENT: 4700S Surface Vertical Rod Device 4700SF Fire Exit Surface Vertical Rod Device TOOLS REQUIRED Metal Wood Wood and Metal Screws Sex Bolts #7 Drill ¼ -20 Tap #16 Drill #12-24

More information

MINI-LATHE QUICK CHANGE TOOL POST

MINI-LATHE QUICK CHANGE TOOL POST MINI-LATHE QUICK CHANGE TOOL POST Cutting and assembly details Machinists should familiarize themselves with the contents of this section before jumping in to the drawings. Many details are described here

More information

LP-200 Dummy Load / Wattmeter

LP-200 Dummy Load / Wattmeter LP-200 Dummy Load / Wattmeter Enclosure Retrofit Assembly Instructions March 2009 TelePost Incorporated LP-200 is a trademark of TelePost Inc. Material in this document copyrighted 2009 TelePost Inc. 1

More information

RAILING. Installation Guide

RAILING. Installation Guide RAILING Installation Guide THE BEST CHOICE FOR STRONG & DURABLE RAILING SYSTEMS Our exclusive manufacturing process ensures our vinyl railing will provide superior strength plus it is virtually maintenance

More information

Standard Kit #1 (3-way switch)

Standard Kit #1 (3-way switch) Standard Kit #1 (3-way switch) Please Read All Instructions Before Beginning. Tools you will need: Soldering Iron (35 watt preferably) Solder Wet Sponge Wire Clippers 3/8 Drill Bit 1/4 Drill Bit Variable

More information

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS 1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Dump Body tarping system. With tarping systems

More information

TURBO DRIVE INSTALLATION MODEL 1582T KNEE FEED Lagun Mill

TURBO DRIVE INSTALLATION MODEL 1582T KNEE FEED Lagun Mill TURBO DRIVE INSTALLATION MODEL 1582T KNEE FEED Lagun Mill NOTE This Turbo Drive Knee Feed is configured for mounting the feed on the front of the knee with the keypad facing left. The lead screw pitch

More information

Plans. Easy-to-Build Full-size Deluxe Murphy Bed Plan. For more plans, tools and hardware visit rockler.com

Plans. Easy-to-Build Full-size Deluxe Murphy Bed Plan. For more plans, tools and hardware visit rockler.com Easy-to-Build Full-size Deluxe Murphy Bed Plan Build a full-size Deluxe Murphy Bed complete with decorative molding and matching side cabinets! Plans For more plans, tools and hardware visit rockler.com

More information

PTC Model 4. Programmable Turntable Controller. Basic Motor Mount Kit P/N Installation Instructions

PTC Model 4. Programmable Turntable Controller. Basic Motor Mount Kit P/N Installation Instructions PTC Model 4 Programmable Turntable Controller M Basic Motor Mount Kit P/N 09-820 Installation Instructions New York Railway Supply 625 Aviator Dr Fort Worth TX 76179 (817) 233-5068 http://www.nyrs.com

More information

How to make tailwheel shock rubber donuts and aluminum shims with formed flange

How to make tailwheel shock rubber donuts and aluminum shims with formed flange How to make tailwheel shock rubber donuts and aluminum shims with formed flange The following shows how to form a flange on the inner hole of aluminum shims to go between the rubber donuts for the tailwheel

More information

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP 6-1/4 HANDRAIL W/ VINYL HANDGRIP TYPICAL ASSEMBLY 5 2 BUTT JOINT 12 10 9 1 8 11 6 3 7 4 BUTT JOINT COMPONENT LIST 1 LEFT RETURN 7 UPPER IMPACT ABSORBER 2 RIGHT RETURN 8 LOWER IMPACT ABSORBER 3 OUTSIDE

More information

The ability to make basic voltage and resistance measurements using a digital multimeter

The ability to make basic voltage and resistance measurements using a digital multimeter Congratulations on your purchase of a new OneShot chassis! The PC01 OneShot combines a rugged enclosure, power supply, and discrete instrument DI in a compact 1/4U package. A few minutes of assembly are

More information

Obtained from Omarshauntedtrail.com

Obtained from Omarshauntedtrail.com DaveintheGrave's Halloween Props Animated Crawling Skeleton Build a life-size skeleton torso that realistically crawls across the lawn one arm at a time. 1. Motor Base and Linkage Assembly BASE - I used

More information

LANDING GEAR. 1. Fit landing gear into slots on bottom of fuselage.

LANDING GEAR. 1. Fit landing gear into slots on bottom of fuselage. LANDING GEAR 1. Fit landing gear into slots on bottom of fuselage. 4. Use channel-lock pliers to press blind nuts into position (note: drilled hole should be slightly smaller than shaft of blind nut for

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SOLID PHENOLIC TOILET PARTITIONS 1080 DuraLine Series 1180 DuraLine Series Class-A Fire Rated IMPORTANT: Review these instructions thoroughly prior to installation. FLOOR ANCHORED

More information

10 Octagon Cedar Gazebo Assembly Instructions

10 Octagon Cedar Gazebo Assembly Instructions 10 Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/22/09 10 Cedar Gazebo Assembly Instructions

More information

BOB SLAY (assembly instructions)

BOB SLAY (assembly instructions) BOB SLAY (assembly instructions) Items included: 7 x Acrylic cutouts labeled A-G 1 x Acrylic IO Panel 1 x Acrylic locking plate of PCI cards 2 x Acrylic 5.25 spacers 2 x momentary switches (power/reset)

More information

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE T F W 604.549.979 604.549.9555 fluxwerx.com INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE fixture housing endcap kit optic kit join kit notch 2 cross section notch 4 cross section 4 4" 4-11/2" 4 /8 (111)

More information

INSTALLATION INSTRUCTION

INSTALLATION INSTRUCTION INSTALLATION INSTRUCTION Soild Phenolic Series contents page 1080 DuraLineSeries...2-21 1180 DuraLineSeries...2-21 2080 DuraLineSeries Maximum Privacy...22-41 2180 DuraLineSeries Maximum Privacy...22-41

More information

WARNING! ETCHED PARTS CONTAINED IN THIS KIT HAVE SHARP POINTS, EDGES AND CORNERS.

WARNING! ETCHED PARTS CONTAINED IN THIS KIT HAVE SHARP POINTS, EDGES AND CORNERS. MPD18 chassis build instructions K A (see below for details) J I G H L C D F E B M Parts list: Ident Quantity A Etched Nickel/Silver fret 1 B Wheel sets 2 C Worms 2 D Worm gears 2 E Shaft adapters 2 F

More information

Viewing the Ryca Motors CS-1 Build Video series at youtube.com/rycamotors is highly recommended before beginning the following assembly process.

Viewing the Ryca Motors CS-1 Build Video series at youtube.com/rycamotors is highly recommended before beginning the following assembly process. RYCA CS-1 ASSEMBLY GUIDE [The CS-1 installation guides should be used as supplements to the videos found on our Youtube Channel. There is no strict order to the build process, but it is highly recommended

More information

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP 6-1/4 HANDRAIL W/ VINYL HANDGRIP TYPICAL ASSEMBLY 5 2 BUTT JOINT 12 10 9 1 8 11 6 3 7 4 BUTT JOINT COMPONENT LIST 1 LEFT RETURN 7 UPPER IMPACT ABSORBER 2 RIGHT RETURN 8 LOWER IMPACT ABSORBER 3 OUTSIDE

More information

Operating Instructions

Operating Instructions Operating Instructions Holding the material against the angle gauge slide it into the forming head. Be sure that the material remains against the gauge until work is finished. NOTE: This machine will handle

More information

Twin-Wall Double Swinging Door Kit

Twin-Wall Double Swinging Door Kit 115021 Twin-Wall Double Swinging Kit READ THIS DOCUMENT BEFORE YOU BEGIN Thank you for purchasing this GrowSpan door kit. When properly assembled and maintained, this product will provide years of reliable

More information

A-LOOK ver 1 A-LOOK TM. Installation Manual

A-LOOK ver 1 A-LOOK TM. Installation Manual A-LOOK ver 1 A-LOOK TM Installation Manual Tools Required Pencil Measuring Tape Drill Hack Saw with 12D/32T Blade Jigsaw Self-Centering Punch Framing Square 7/16" Wrench Ladder 2" or 3" Paint Brush for

More information

SDR Cube Transceiver Online Assembly Guide

SDR Cube Transceiver Online Assembly Guide SDR Cube Transceiver Online Assembly Guide Detailed construction notes for building and testing each of the SDR Cube kit modules Home Bill of Materials I/O Board Controls Board DSP Board Softrock SR-Base

More information

INSTALLATION INSTRUCTIONS PART#:17A096400MSS\17A096400MA MODULAR GRILL GUARD FOR TOYOTA TACOMA 05-09

INSTALLATION INSTRUCTIONS PART#:17A096400MSS\17A096400MA MODULAR GRILL GUARD FOR TOYOTA TACOMA 05-09 INSTALLATION INSTRUCTIONS PART#:17A096400MSS\17A096400MA MODULAR GRILL GUARD FOR TOYOTA TACOMA 05-09 1 guard, center section 1 brush guard, left side 1 brush guard, right side 1 wire guard insert, left

More information

The Useless Machine. DIY Soldering Edition. Instruction Guide v0004

The Useless Machine. DIY Soldering Edition. Instruction Guide v0004 The Useless Machine DIY Soldering Edition Instruction Guide v0004 TM For the best outcome, follow each step in order. We recommend reading this guide entirely before you get started. Tools required: Soldering

More information

Range height adjustable assembly

Range height adjustable assembly Table of contents Digital handset operation 3 Height adjustable bench kit 4-5 Cable carrier 6 Ganging tray and ganging rail 7 Height adjustable return frame kit 8 Cable entry pole 9 24 and 30 d worksurfaces

More information

*D-1030* 1 PARTS CHECK 8 REVERSING INSTRUCTIONS F-XX-C & XX-C D Customer Service. Installation Instructions. Exit Devices

*D-1030* 1 PARTS CHECK 8 REVERSING INSTRUCTIONS F-XX-C & XX-C D Customer Service. Installation Instructions. Exit Devices *D-1030* D-1030 F-XX-C & XX-C Exit Devices Installation Instructions 8 REVERSING INSTRUCTIONS TO REVERSE THE HANDING OF A (F)XX-C DEVICE NOTE: TO REVERSE TRIM, REFER TO SEPARATE INSTALLATION SHEETS. 1

More information

Monster Tower Phone: U.S. Hwy 411 S. HS1. Installation Instructions and Owner s Manual CAUTION

Monster Tower Phone: U.S. Hwy 411 S.  HS1. Installation Instructions and Owner s Manual CAUTION Monster Tower Phone: 877-778-6937 5714 U.S. Hwy 411 S. www.monstertower.com Maryville, TN 37801 info@monstertower.com HS1 Installation Instructions and Owner s Manual Your HS1 uses many common parts and

More information

ATLANTIS RAIL Contact Information

ATLANTIS RAIL Contact Information ATLANTIS RAIL Contact Information Customer Service (800) 541-6829 (508) 732-9191 Spectrum System Installation Instructions Atlantis Rail s Spectrum System is an easy to install, universal cable railing

More information

Gared Pro-S Portable Backstop

Gared Pro-S Portable Backstop Models: 9616 & 9618 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION

More information

Sentinel Series Cigar Humidor End Tables

Sentinel Series Cigar Humidor End Tables Sentinel Series Cigar Humidor End Tables Assembly Instructions Models: Sentinel 500, 1000 and 1500 Style: Traditional SENTINEL ASSEMBLY INSTRUCTIONS Congratulations! You have purchased a superior cigar

More information

Quill Stop V2 Installation Guide 11/16/2014

Quill Stop V2 Installation Guide 11/16/2014 Thank you for purchasing the Quill Stop for the Sieg X3 (Grizzly G0463) and SX3 (Grizzly G0619) mills. Your feedback is always appreciated. Please email questions and comments to gregpriest@cox.net. What

More information

KIT. Assembly Instructions. HayDay, LLC

KIT. Assembly Instructions. HayDay, LLC KIT Assembly Instructions HayDay, LLC 1-800-732-1654 www.stablegrazer.com Read completely through the assembly instructions before starting assembly. The Stable Grazer Kit comes in two boxes. Remove all

More information

SoftRock v6.0 Builder s Notes. May 22, 2006

SoftRock v6.0 Builder s Notes. May 22, 2006 SoftRock v6.0 Builder s Notes May 22, 2006 Be sure to use a grounded tip soldering iron in building the v6.0 SoftRock circuit board. The soldering iron needs to have a small tip, (0.05-0.1 inch diameter),

More information

The Festival Assembly Instructions

The Festival Assembly Instructions The Festival Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown CONTACT INFORMATION: HomePlace Structures 301 Commerce Drive New

More information

END FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"

END FRAMES. End frames built using pressure treated 2x4 (1 1/2 x 3 1/2) 36 34 7/16 pilot hole. 5 1/2 x 1/2 lag bolt 8 wheel 23 END FRAMES End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 23" 17 1/2" (B) (B) Measure from the bottom of your stone to 1" below the lip to get your measurement. 17 1/2"(B) 36" 34" 1/2" flat

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS MAXIMUM PRIVACY HIGH PRESSURE LAMINATE (HPL) TOILET PARTITIONS 2030 TrimLineSeries 2040 DesignerSeries IMPORTANT: Storage and Handling Information on last page. Review these instructions

More information

Pivot-Door Downdraft Cabinet Plans

Pivot-Door Downdraft Cabinet Plans Pivot-Door Downdraft Cabinet Plans Finished Cabinet Closed Open Exploded View Introduction This simple downdraft-style dust collection cabinet is a great way to keep your shop cleaner and keep your router

More information

Desk/Wall-Mount Rack

Desk/Wall-Mount Rack Desk/Wall-Mount Rack Patent(s) Pending Installation Instructions Post P/N: 119-1752 119-1781 119-1782 119-4014 Frame P/N: 119-1591 119-1754 119-1755 Kit Contents (2) Frames (4) Posts Assembly Hardware

More information

Parts list Instruction guide Warnings Please read carefully before assembling and using product.

Parts list Instruction guide Warnings Please read carefully before assembling and using product. Parts list Instruction guide Warnings Please read carefully before assembling and using product. Jet Rail XL Part Number 27377 Tools required for assembly Hammer 9/16 Wrench 3/4 Wrench Ratchet 9/16 Socket

More information