SPECIAL SPECIFICATION 4196 Railroad Construction
|
|
- Felicia Brenda McKinney
- 5 years ago
- Views:
Transcription
1 2004 Specifications CSJ SPECIAL SPECIFICATION 4196 Railroad Construction 1. Description. Construct railroad tracks including turnouts and other appurtenances, in accordance with this specification, and with Volume 1, Track, of the 2004 American Railway Engineering and Maintenance-of-Way Association's (AREMA) Manual for Railway Engineering, and as shown on the plans. 2. Materials. A. General. For material not designated as second hand, provide new material conforming to this specification. Material designated as second hand may be either new or second hand. Provide straight and true second hand material, in good condition, and free from excess rust, pits, or wear. Test second hand rail for head wear, corrosion, base wear, sweeps, kinks, cracking, delamination, or any other defect including internal metal defects. Ensure the material meets the appropriate specifications indicated below. Provide new material in an unblemished condition, free from defects, rust, or damage. B. Rail. Provide rail meeting the requirements of AREMA Manual Chapter 4, Rail, for 136 RE with properties including Brinell hardness as noted in Chapter 4, Table 2-2 and Table 2-3. For rail on tangent track and on curves of 3 degrees or less provide new 136 RE standard carbon rail. For rail on curves greater than 3 degrees provide 136 RE head hardened rail. Furnish reports of the chemical and mechanical test results to the Engineer. Excluding rail for industry leads, provide continuously shop welded rail and transport in 400 ft. or longer sections to the project site unless shorter sections are required due to curve length, or fit between switches. Perform shop welding meeting the requirements of AREMA Manual, Chapter 4, Section 2.2, Specifications for Fabrication of Continuous Welded Rail (electric flash butt welds). Use the Thermite welding process to field weld joints between sections. Furnish rail for industry leads in lengths of 39 ft. with 11% shorts, varying by 1 ft. increments from 38 ft. down to 25 ft. in length. Submit to the Engineer five copies of a layout showing proposed rail types, continuous welded rail (CWR) lengths, and field welds for approval prior to track construction. Designate on the track layouts the size of compromise joints necessary at locations where proposed rail joins with existing rail. Field verify the sizes of required compromise joints and submit a detailed list to the Engineer before beginning track construction
2 C. Angle Bars, Tie Plates, Track Bolts, and Rail Anchors. 1. General. Unless noted otherwise in this specification, provide new angle bars, tie plates, and rail anchors. 2. Angle Bars. Provide angle bars matching the 136 RE rail and in accordance with AREMA Manual, Chapter 4, Section 1.2, Joint Bars and Assemblies, for six-hole angle bars, drilled in accordance with the plans. 3. Tie Plates. Provide 8-1/2 in. x 16 in. tie plates, inclined, double shoulder for 6 in. base rail as shown on the plans and in accordance with AREMA Manual, Chapter 5, Part 1. Ensure fabrication and workmanship is in accordance with AREMA Manual, Chapter 5, Part 1, Tie Plates, for hot worked, high carbon steel tie plates. Ensure the manufacturer's identity, rail section, and year rolled is visible on top of the field side of the tie plate. Exercise caution to ensure the cant is directed toward the track centerline when installed. Ensure the track is fully plated. 4. Track Bolts. Provide new track bolts with square nuts for 136 RE rail in accordance with AREMA Manual, Chapter 4, Section 2.9, Specifications for Heat-Treated Carbon-Steel Track Bolts, and Carbon-Steel Nuts, latest revision. Furnish 1 in. x 6 in. track bolts. A 200 lb. Keg is considered to consist of approximately 100 bolts, including one nut on each bolt. 5. Rail Anchors. Provide new or reformed rail anchors for 6 in. base rail per AREMA Manual Chapter 5, Part 7, Rail Anchors. Provide rail anchors of the drive-on type, which may be installed either mechanically or by hand. Install Channel-Loc or improved fair anchors, or an approved equal. D. Ties. 1. General. Provide new cross and switch ties and fabricate them from Douglas Fir, Southern Pine, or Oak timber, out of straight grained timber, with opposite faces parallel, with anti-splitting devices applied at ends, and free from defects materially affecting the strength or durability of the ties, and conforming to AREMA Manual, Chapter 30, Part 3, Section 3.1, Timber Cross Ties, latest revision. 2. Treating and Sizing. Provide seasoned ties and handle according to AREMA Manual Chapter 30, Part 3.5. Treat ties with a 50/50 mixture of creosote and petroleum base with a minimum retention of 8 lb. creosote per cubic foo t of timber per AREMA Manual Chapter 30, Part 3, Sections 3.6, 3.7, 3.8, and 3.9 for applicable timber species. Treat field cuts or drilled holes with a compatible preservative before installing, spiking, or bolting. Fabricate timber switch ties from Oak timber in accordance with AREMA Manual Chapter 30, Part 3, Section 2. Install anti-splitting devices meeting the requirements of AREMA Manual Chapter 30, Part 3, Section 3.1. Ensure timber switch ties are well sawn on each side and cut square at the end to the dimensions specified on the plans. For seating tie plates where ties are not properly sawn to provide a plane top surface, adzing is required before treatment
3 The Department may require, at its option and expense, an independent laboratory inspection of ties before creosote treatment. If ties are found to be acceptable and free of excessive checking, stamp them with an identifying mark that is not obscured by the end plate or s-iron. A secondary inspection will be conducted by the Department at the project site to ensure that no damage occurred to the ties during transportation or handling. During the secondary inspection, the Department will again check each tie for the degree of checking that has occurred. If, in the opinion of the inspector, excessive checking has occurred, the tie(s) will be rejected. 3. Minimum Dimensions. For track except industry leads and under concrete crossing panels, provide timber cross ties that are 7-in. grade, 7 in. x 9 in. in cross section, and 9 ft. 0 in. long, in conformance with AREMA Manual, Chapter 30, Part 3, Section 3.1, Timber Cross Ties. For industry leads, timber cross ties may be 7 in. grade, 7 in. x 9 in. in cross section, and 8 ft. 6 in. long, in conformance with AREMA Manual, Chapter 30, Part 3, Section 3.1, Timber Cross Ties. For ties under concrete crossing panels, provide timber cross ties that are 7-in. grade, 7 in. x 9 in. in cross section, and 10 ft. 0 in. long, in conformance with AREMA Manual, Chapter 30, Part 3, Section 3.1, Timber Cross Ties. Provide switch ties of the dimensions shown on the switch tie layout plans. 4. Shakes. A shake is a separation along the grain, most of which occurs between the rings of annual growth. The maximum allowable shake is one third the width of the tie in length, provided it does not extend nearer than 1 in. to any surface. 5. Splits. A split is a separation of the wood extending from one surface to an opposite or adjacent surface. In unseasoned crossties, the maximum split is 1/8 in. wide or 4 in. long. In a seasoned crosstie, the maximum split is 1/4 in. wide or longer than the width of the face across which it occurs. Install anti-splitting devices on hardwood ties. 6. Slanting Grain. Except in woods with interlocking grain, a slant in grain in excess of 1 in 15 is not permitted. 7. Straightness, Score Marks, and Parallel Sides. A tie is considered straight when a straight line along a side from the middle of one end to the middle of the other end is everywhere more than 2 in. from the top and the bottom of the tie. A tie is not well hewed or sawed when its surfaces are cut into with score-marks more than 1/2 in. deep or when its surfaces are not even. The top and bottom of a tie is considered parallel if any difference in the thickness at the sides or ends does not exceed 1/2 in
4 E. Spikes. Provide new 5/8 in. x 6 in. high carbon steel track spikes in accordance with AREMA Manual, Chapter 5, Part 2, Track Spikes. F. Lock Washers. Provide high power spring lock washers 1/16 in. greater diameter than the bolt furnished by the Contractor. G. Ballast. For railroad ballast material, supply crushed granite stone in conformance with AREMA Manual, Chapter 1, Part 2, Ballast. Provide a gradation conforming to AREMA Number 4. H. Gage rods. For gage rods, provide Racor Non-Insulated Figure 3882-C, or approved equal, complete with lock washer under the nut. Gage rods may be secondhand. I. Turnouts. Provide new turnouts and construct them in accordance with the railroad common standard drawings as noted on the plans. J. Compromise Rail Joints. Provide joints consisting of one left-hand and one right-hand bar, with each end conforming to rail sections and bar punch as shown on the plans. Provide alternately oval and round bolt holes to fit joint bar punch. Joints may be secondhand. Weld compromise joints in continuously welded rail (CWR) installations. K. Grade Crossings. Provide concrete panels for grade crossings conforming to special specifications for concrete panel grade crossings. 3. Construction. A. Clearing, Grading, and Ditching. Perform clearing, grading, excavation, and embankment for the preparation of railroad subgrade in accordance with Item 100, Preparing Right of Way, Item 110, Excavation, and Item 132, Embankment except as modified by this Item. B. Lime Stabilization of Subgrade. Stabilize the subgrade in accordance with Item 260, Lime Treatment (Road Mixed), to the lines, grades, and thickness as shown on the plans. C. Track Construction. Ensure the track construction, laying, and surfacing are supervised by experienced personnel skilled in railroad track construction. 1. Placing Sub-Ballast. Place sub-ballast conforming to and in accordance with Item 247, Flexible Base. Use Type A, Grade 1 flexible base. 2. Ties. Lay ties heart side down and construct the track upon the sub-ballast before the ballast is unloaded and applied. Ties may be delivered and unloaded from railroad cars operating on adjoining tracks, tracks to be built, or by trucks operating over the compacted sub-ballast. Do not allow the truck wheels on the track subgrade except on areas protected by the sub-ballast layer. Lay ties at right angles to the center line of the track. Handle ties with tongs or a tie spacing bar, and never strike them with maul, hammer, or other tool
5 If ties are not sawn correctly, hand adz them so that the tie plates have full bearing on the tie, and the rail has full bearing on the tie plate. Keep adzing on the tie to a minimum. Install switch ties in accordance with the plans. In main line, ladder, and runaround tracks, use 7-in. grade timber ties and space them on 19-1/2 in. centers. In industry spur tracks, use 7-in. grade timber ties and space them on 22 in. centers. 3. Tie Plates. Ensure turnouts and tracks are fully tie plated. To avoid unnecessary spiking, apply tie plates as the rail is laid. Place tie plates on the exact center of the tie and with the entire shoulder in contact with the base of the rail. Exercise caution to ensure that the cant is directed toward the center of the track center line when installed. Ensure the surface of the tie is free of dirt, shavings, or other material when applying the tie plate. 4. Rail. Unload, store, or distribute rails along the roadbed in such a manner as to prevent damage. Do not use rails less than 15 ft. long except for temporary closures. Lay rails and adjust them for optimum laying temperature per procedures outlined in AREMA Manual, Chapter 5, Part 5. Apply rail anchors immediately behind laying of continuous welded rail (CWR). Fully anchor the rail laid each day before competing the day's work. Lay and adjust CWR prior to field welding the joints. Ensure field welded joints have the date, welding crew, and rail temperature placed, using weatherproof paint, on the field side of the rail next to the weld. Furnish the Owner with a record of the welds made, the locations, and the above information. Provide Thermite welds meeting the requirements of AREMA Manual Chapter 4, Part 2, Section 5. Perform field welding by the Thermite welding process using preformed, factory-made molds. Supply a complete description of the Thermite weld procedure including the manufacturer's trade name and field welding process. Before beginning rail welding, provide certification that each welding crew is experienced and qualified in the process. Perform welding under the direct supervision of an experienced, qualified welding foreman or supervisor. In addition, arrange for a manufacturer's representative to observe and approve the process being performed by crews. Cut rails with a saw or chisel, in a square cut perpendicular to the vertical and horizontal line of the rail. Drill holes in blind ends of rail with an approved track drill, align the holes perpendicular to the web of the rail, and ensure the drilled
6 holes are the same diameter as the existing holes in the rail. Cutting rails or drilling holes in cut rails by means of acetylene or electric torch is not permitted. Apply rail joints before spiking the track. Attach joint bars to one rail end before the rail ends are abutted in laying. Orient the rail in a vertical position and in approximate alignment when the joint bars are applied by tightening the middle bolts and working towards each end. Use six specified bolts, with specified lock washers, in each joint. Ensure joint angle bars and joint compromise bars accurately fit the rail. A medium blow with a maul to assure contact surfaces are in contact is permitted while the bolts are being tightened to a required tension of 20,000 lb. to 30,000 lb. After raising the track to its final elevation, check the bolts and retighten bolts that do not have the specified tension. Ensure the length of bolts allows a minimum of two threads of the bolts to be exposed beyond the end of each nut. 5. Spiking. Perform spiking with an approved spike maul or spiking machine and exercise caution to prevent striking the rail. Replace rails damaged by spike maul or machines at no expense to the Department. Plug existing spike holes, including holes where spikes will be replaced, with specified tie plugs. Drive the plugs flush with the top of the tie and cut any portion of the plug that remains above the surface flush with the top of the tie. First, spike the right-hand rail going away from the switch points, or the outside rail on curves, in position in its proper relation to the lined end of ties. Then, spike the opposite rail to true gage (4 ft. 8-1/2 in.). On tangent track, and on curves less than 1 degree, 30 minutes, apply one gauge side and one field side rail spike on each tie plate (2 spikes per plate). On curved track ranging from 1 degree 30 minutes to less than 4 degrees, use two gauge side rail base spikes, one field side rail base spike, and one field side hold down spike for a total of 4 spikes per plate. On curved track ranging from 4 degrees to 8 degrees, use two gauge side rail base spikes, one field side rail base spike, one field side hold down spike, and one gauge side hold down spike for a total of 5 spikes per plate. Stagger spikes so that the outside and inside spikes are on opposite sides of the tie. Ensure the inside spikes on both rails are on the same side of the tie. Double spike both the inside and outside rail on curved track having a degree of curvature greater than 10 degrees, 0 minutes on inside of rail. Start and drive spikes vertically with the face of shank in full contact with the base of the rail and drive them so that it is not necessary to straighten them during driving. Using a maul to straighten spikes started crooked is not permitted. Pull spikes started crooked, plug the holes, and re-drive the spikes. Drive spikes so as to
7 allow 1/8 in. to 3/16 in. space between the underside of the head of the spikes and the top of the base of the rail. Immediately after completing track surfacing, settle spikes in place with the underside of the head of the spike contacting the top of the base with a minimum of pressure. 6. Gage. Place track on tangent and around curves to true gage (4 ft. 8-1/2in.). Gage track with an all-metal track gage tool. Spike the line side of track well ahead of gaging. Gage track on every third tie. Place the track gage perpendicular to the rails, and ensure contact points are against rail before the spikes are started. Use a bar to hold the gage rail in its proper position against the contact face of gage, and drive the spikes so that their faces are in contact with the rails and so that the gage can be removed without force. Fully box anchor the track every other tie except within 200 ft. of any bolted joint, turnout, or on curves greater than or equal to 3 degrees where it is required to fully box anchor every tie. D. New Turnouts. Furnish and construct new turnouts complete, out of 136 RE rail and in accordance with AREMA Manual, Chapters 4 and 5, these specifications, and as shown on the plans. Install new turnouts complete in place except those noted on the plans to be installed by railroad forces. After turnouts are completely installed (surfaced, lined, and dressed), oil the switches and adjust them so that the points fit properly and the switches throw easily, in accordance with provisions of the AREMA Manual. E. Track Surfacing. 1. Placing Ballast. Install and fully spike ties before unloading the stone ballast. Unload the stone ballast by opening one or more center or side dump cars, allowing the required amount of ballast to flow out as the train is moved along slowly. If ballast cars do not have attached plows, place ties or some other suitable plow, in front of the car wheels to prevent derailments. Derailments are the sole responsibility of the Contractor. Rerail derailed cars or equipment and repair damage to cars, equipment, and track at no expense to the Department. Ensure the track is capable of supporting railroad cars without damaging rail or the subgrade when delivering ballast in railroad cars. Before placing ballast, regrade and compact sub-ballast damaged during ballast hauling or Contractor operations. 2. Surfacing. After distributing ballast evenly across the track cross section, use jacks or tampers with integral jacks, to raise the track. Do not raise the track more than 4 in. at a time. Use either hand held or machine-mounted pneumatic or electric tamping tools
8 Obtain the Owner's approval before using tamping, lining, jacking, and dressing equipment. Place ballast to raise the track to within 4 in. of the final grade and compact. Construct the final lift by jacking the track to the exact elevation and grade as shown on the plans and as provided by grade stakes set at 50 ft. intervals. The initial 4 in. of ballast may be placed by truck or similar equipment, spread, and compacted by rollers or vibratory compactors before placing track material. Thoroughly tamp the ballast from 15 in. inside either rail to the ends of the ties. Leave the tie centers untamped. Set the depth for mechanical tampers below the bottom of the tie to ensure proper tamping. Always use two tamping tools opposite each other on the same tie. Start the tampers from a nearly vertical position and work downward past the bottom of the tie, after which slant the tool inward to force ballast under the tie. Give special attention to tamping of joint ties. Adjust the squeeze pressure on mechanical tampers so equipped, to suit the type of ballast being tamped to ensure that the ballast is tamped throughout portions of the track tie over which the live load is distributed. After bringing track to true surface, elevation and grade, give it a final lining and place it in true alignment. After placing in true alignment, give the ballast section its final shape by means of a ballast regulator equipped with track broom. Resurface the track as needed to meet cross level, profile grade, and alignment criteria after a maximum of three fully loaded trains have traversed the project area. Give special consideration to ensuring proper ballast compaction at turnouts. Ensure tangent track is cross level. The maximum deviation from the established cross level is 1/8 in. Provide superelevation and runoffs on curves in accordance with the typical sections and plans. The maximum deviation from profile grade and horizontal alignment is 1/8 in. in 50 ft. Maintain the inside rail on a curve at the prescribed grade and provide the proper superelevation by raising the outer rail. Obtain approval by the Owner for all work and obtain acceptance by the railroad company before allowing trains to operate over the track. F. Gage Rods. Install gage rods after the track is in its final alignment and is surfaced and dressed. Apply one gage rod between the first two track ties ahead of the turnout. Tighten gage rods until the clip and hooked end of the gage rod is firmly against the base of the rail, leaving the track in true gage. G. Concrete Panel Grade Crossings. Install concrete panel grade crossings in accordance with special specifications for concrete panel grade crossings. H. Relocating Existing Turnouts. Where indicated on the plans, relocate the existing turnouts of size and type shown. Inspect, together with Engineer, the existing turnouts and document the existing condition before performing any work. Remove the turnout together with its ties and other track material, from the existing track in one piece, from the point of the switch to the end of long ties as a minimum, and carefully lift and install
9 it in the location shown on the plans. Exercise caution in removing, lifting, handling, and placing the turnout to prevent damage to any of the existing turnout materials. Correct damage caused by or resulting from the Contractor's work to the satisfaction of the Engineer, at no expense to the Department. Replace damaged material resulting from the Contractor's work with new material in accordance with this specification and at no expense to the Department. 4. Measurement. A. Railroad Granite Ballast. Ballast material will be measured by the net ton. The weight will be based on the volume of ballast material computed in place between the top of sub-ballast surface, and the lines, grades, and slopes of the accepted ballast shown on the plans by the method of average end areas. This is a plans quantity measurement Item. The quantity to be paid is the quantity shown in the proposal unless modified by Article 9.2, Plans Quantity Measurement. Additional measurement or calculations will be made if adjustments of quantities are required. No measurement will be made for thickness or width exceeding that shown on the typical section or provided on the plans. B. Railroad Turnouts (Complete In Place). New turnouts will be measured by each turnout complete in place, as measured from the point of switch to the last long tie, including ties, split switch, frogs, switch stand, guard rails, stock rails, connecting rods, ties, targets, and other track material necessary to complete the turnout. Where two turnouts join to form a crossover between adjacent tracks, the railroad will provide and install one turnout per crossover as noted on the plans and will provide and install the 25 ft. long ties required, but the Contractor provides the necessary rails, ties, and other track material as necessary to complete track approaches, turnout, and crossover construction in accordance with the plan documents. C. Railroad Relocate Turnout (Complete in Place). Existing turnouts relocated will be measured by each turnout relocated as measured from the point of switch to the last long tie, including ties, split switch, frogs, switch stand, guard rails, stock rails, connecting rods, ties, targets, and other track material associated with the existing turnout. D. Railroad Open Track Construction. Track constructed complete in place, including ties, rails, and other track material, will be measured by the foot along the center line of track, excluding turnouts from the point of switch to the last long tie. E. Loose Ties. Additional ties provided for use by the Railroad in connecting the new track to the existing track will be measured by each tie provided and stockpiled as indicated in the plans. 5. Payment. A. Railroad Granite Ballast. The work performed and materials furnished for ballast material in accordance with this Item and measured as provided under Measurement will be paid for at the unit price bid for RR Granite Ballast. The price is full
10 compensation for furnishing, placing, and tamping ballast in accordance with this specification and the plans including labor, tools, equipment, and incidentals necessary. B. Railroad Turnouts (Complete In Place). The work performed and materials furnished in accordance with this Item and measured as provided under Measurement will be paid for at the unit price bid for "RR Turnouts (Complete in Place) of the type and size specified. The price is full compensation for materials, labor, tools, equipment, Thermite welding, and incidentals including lining, leveling, tamping, and compacting the ballast as needed to complete the turnout installation to the line, grades, and sections shown on the plans. C. Railroad Relocate Turnout (Complete in Place). The work performed and materials furnished in accordance with this Item and measured as provided under Measurement will be paid for at the unit price bid for RR Relocate Turnout (Complete in Place) of the type and size specified. The price is full compensation for materials, labor, tools, equipment, Thermite welding, and incidentals including lining, leveling, tamping, and compacting the ballast as needed to complete the turnout installation to the line, grades, and sections shown on the plans. D. Railroad Open Track Construction. The work performed and materials furnished for constructing track sections complete in place in accordance with this Item and measured as provided under Measurement will be paid for at the unit price bid for RR Open Track Construction. The price is full compensation for materials, labor, tools, equipment, and incidentals including 136 RE rails, ties, and other track materials (including rail angle bars, tie plates, tie bolts, rail anchors, gage rods, spikes, lock washers, and compromise joints), installation, laying of ties, Thermite welding, assembling and attaching fittings, spiking, lining, leveling, tamping, and compacting the ballast as needed to complete construction to the line, grades, and sections shown on the plans. Sub-ballast will be paid for under Item 247, Flexible Base. E. Loose Ties. The work performed and materials furnished for providing additional ties for use by the Railroad in accordance with this Item and measured as provided under Measurement will be paid for at the unit price bid for Loose Ties. The price is full compensation for materials, labor, and incidentals needed to stockpile the ties as indicated in the plans
SWITCH STAND Switch Stand Assembly Connecting Rod Target Assembly (when required) TURNOUT ACCESSORIES Standard Tie Plates Rail Anchors Joints
Turnouts A turnout is an arrangement of a switch, a frog and closure rails, which diverts rolling stock from one track to another. Because industrial trackwork often handles lighter loads at slower speeds
More informationAttachment A BURLINGTON NORTHERN SANTA FE SPECIFICATIONS FOR CROSS TIES AND SWITCH TIES I. GENERAL
Attachment A BURLINGTON NORTHERN SANTA FE SPECIFICATIONS FOR CROSS TIES AND SWITCH TIES I. GENERAL 101. Scope: (a) This specification shall cover the manufacturing of grade 3, 4, 5 & SG cross ties and
More informationSPECIFICATIONS FOR TIMBER CROSSTIES (Latest Revision as of January 2014)
SPECIFICATIONS FOR TIMBER CROSSTIES (Latest Revision as of January 2014) These specifications were arrived at by a joint committee of the Railway Tie Association and the American Railway Engineering and
More informationWATCO Companies, Inc.
WATCO Companies, Inc. MAINTENANCE OF WAY HAND TOOL RULES Effective Date January 1, 2007 INTRODUCTION The purpose of this booklet is to provide guidance to WATCO Companies, Inc. Maintenance of Way employees
More informationSOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY REGIONAL RAILROAD DIVISION- WEST TO ARSENAL
SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY SPECIFICATIONS FOR THE PROCUREMENT OF SPECIAL TRACKWORK MATERIALS: REGIONAL RAILROAD DIVISION- WEST TO ARSENAL October 5, 2015 PART 1 GENERAL 1.01 SUMMARY
More informationItem 550 Chain Link Fence
Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating
More informationMW&S STANDARD PROCEDURE
FILE 1 of 6 SCOPE AND NATURE To provide for a uniform system of adjusting both jointed and welded rail for the prevention of buckling track where the rail was laid outside the preferred rail temperature
More informationINSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA MANUAL PART NUMBER:
PARTS-1 Model 24562/28562 Crane INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA 50438-0189 641-923-3711 MANUAL PART NUMBER: 99903701 Iowa Mold Tooling Co., Inc. is an Oshkosh Truck
More informationCITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST
CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,
More informationWAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence
MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised
More informationPatented Track Rail 450 Series
Installation Instructions Patented Track Rail 450 Series Review all general instructions prior to starting installation. Note that there is no single, most appropriate method or procedure for all installations,
More informationSKT-SP Tangent Terminal
Assembly Instructions for metric SKT-SP Tangent Terminal & FLEAT-SP Flared Terminal SP Standard Post System Guardrail Terminals ROAD SYSTEMS, INC. P. O. Box 2163 Big Spring, Texas 79721 Phone: (432) 263-2435
More informationGeneral Layout Design and Trackwork
General Layout Design and Trackwork Introduction This information is written for someone who is starting to design their track layout and who has limited on no experience in this work. It covers all the
More informationSECTION BULLET- RESISTANT DOORS
1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and
More informationSECTION METAL FABRICATIONS
SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM
More informationFENCE INSTALLATION GUIDE 8 HIGH WALLS
FENCE INSTALLATION GUIDE 8 HIGH WALLS 1.866.648.9336 www.simtekfence.com INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers of SimTek decorative
More informationRAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch
Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted
More informationPega 357 with Fanuc 04PC User Pre-installation Guide
Pega 357 with Fanuc 04PC User Pre-installation Guide Amada America Inc. 7025 Firestone Blvd. Buena Park CA. 90621 Phone: (714) 739 2111 Fax.: (714) 739 4099 Email info@amada.com Print Date 03/02/2001 Revision
More informationPART MATERIALS. Section Fencing Materials. Description
PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain
More informationPega 345 Queen with Fanuc 04PC User Pre-installation Guide
Pega 345 Queen with Fanuc 04PC User Pre-installation Guide Amada America Inc. 7025 Firestone Blvd. Buena Park CA. 90621 Phone: (714) 739 2111 Fax.: (714) 739 4099 Email info@amada.com Print Date 02/28/2001
More informationFENCE INSTALLATION GUIDE 6 HIGH FENCE
FENCE INSTALLATION GUIDE 6 HIGH FENCE 1.866.648.9336 www.simtekfence.com INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers of SimTek decorative
More informationSPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS
SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS 1. DESCRIPTION THESE SPECIFICATIONS ARE FOR A PRECAST THREE SIDED ARCH STRUCTURE, HEADWALLS
More informationMM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS
MM50 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.
More informationPlastibeton Trench System. Installation Packet
Plastibeton Trench System Installation Packet Plastibeton Installation Guide This Installation Guide is intended to assist in the preparation and installation of Plastibeton products manufactured by Oldcastle
More informationALL SEASON PATIO COVER
ALL SEASON PATIO COVER 61 Where the All Season Patio Cover is to be attached to the home, create a level line showing where the top of the mounting rail is to be located. Install each section with the
More information6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax:
6o ft (18.3 m) sectional MONOPOLE TOWER INSTALLATION MANUAL Southwest Windpower, Inc. 1801 West Route 66 Flagstaff, Arizona 86001 USA Phone: 928.779.9463 Fax: 928.779.1485 www.skystreamenergy.com 3-CMLT-1390-01
More informationSwanton Pacific Railroad Track Manual
Swanton Pacific Railroad Track Manual By E. J. Carnegie January 2003 This manual is dedicated to Elmer Stone for the many years that he worked, taught, and directed the track operations of the Swanton
More informationSECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationSECTION TRAFFIC SIGNAGE
SECTION 10 14 53 TRAFFIC SIGNAGE PART 1 - GENERAL 1.01 SECTION INCLUDES A. Furnishing and installing roadside traffic signage. B. Providing additional traffic signs as required in Sections 01 55 28 Controlling
More informationCIRRUS AIRPLANE MAINTENANCE MANUAL
FASTENER AND HARDWARE GENERAL REQUIREMENTS 1. DESCRIPTION This section contains general requirements for common hardware installation. Covered are selection and installation of cotter pins, installation
More informationSECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.
SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section
More informationPega 367 with Fanuc 04PC User Pre-installation Guide
Pega 367 with Fanuc 04PC User Pre-installation Guide Amada America Inc. 7025 Firestone Blvd. Buena Park CA. 90621 Phone: (714) 739 2111 Fax.: (714) 739 4099 Email info@amada.com Print Date 03/07/2001 Revision
More informationMM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS
MM30 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.
More informationSECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP
1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of
More informationSECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail
SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail Storage and Handling Fence Preparation and Layout Locate and Set Posts
More informationDEERFIELD AND ROUNDABOUT RAILWAY LAKE FOREST LIVE STEAMERS RAILWAY MUSEUM INCORPORATED Track, Wheel and Engineering Data and Drawings
DEERFIELD AND ROUNDABOUT RAILWAY LAKE FOREST LIVE STEAMERS RAILWAY MUSEUM INCORPORATED Track, Wheel and Engineering Data and Drawings Produced and Edited by Jeffrey G. Hook NOTICE: Any and all information,
More informationAPPENDIX FENCE GENERAL NOTES
APPENDIX FENCE GENERAL NOTES 1. Fabric: 9 gage, 2" mesh, knuckle top and bottom, placed on the outside of posts, single fabric width for the entire height. 2. All fencing to be standard galvanized finish.
More informationPATRIOT DOCKS ASSEMBLY INSTRUCTIONS
6/1/2008 PATRIOT DOCKS ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical shoreline application.
More informationLoad Tables, Technical Data and Installation Instructions
W22. W22. W22. W22. W22 W22.. Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections Including Ledgers Designed to provide an easy-to-install, high-strength alternative to through-bolting
More informationFloating Lake Truss Dock Instructions
Table of Contents Floating Lake Truss Dock Instructions 1. Dock Assembly and Set-Up 1.1 Installing Dock Floats 1.2 Positioning Quick Clips 1.3 Installing Anchor Posts 1.4 Installing Docks into the Water
More informationGENERAL INSTALLATION GUIDE: WARRANTY: PRODUCT INFORMATION T F
GENERAL INSTALLATION GUIDE: Unless otherwise indicated, all Seven Oaks M.U. Architectural Products materials are to be used for decorative purposes only. All products must be installed using ample amount
More informationInstallation Instructions. Tools Needed. Tape measure. Level. Shovel or Post hole digger. Concrete. Drill. Stakes. Mallet or hammer.
Installation Guide EcoStone Fence 1330 West 400 North Orem, UT 84057 Toll Free 1.866.648.9336 Tel. 1.801.655.5236 Fax 1.801.655.5240 www.ecostonefence.com Installation Instructions Introduction. These
More informationSECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section
02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,
More informationInstallation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts
Capped Cellular PVC Fencing Installation Guide Table of Contents Storage and Handling Tools Needed Fence Layout and Locating Posts Installation instructions 4 x 4 Over Sleeve Post - 3.5 Rail Privacy Shadowbox
More informationCONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013
U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -
More informationA. Extent of structural precast concrete work is shown on drawings and in schedules.
SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification
More informationStargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe
Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe INFORMATION The Stargrip Mechanical Joint Restraint System is a unique product with a proven design that provides an exceptional
More informationFree Standing Pedestal Mounting Installation Manual
Free Standing Pedestal Mounting Installation Manual Articulated Jib Crane KickLIFT Page 1 of 5 INSTALLATION GENERAL INSTALLATION INSTRUCTIONS All AIMCO lift assist equipment and associated tooling is assembled
More informationUpdate on Bridge Deck Fastener Performance on the FAST Steel Bridge. By Duane Otter and Brian Doe ABSTRACT
Update on Bridge Deck Fastener Performance on the FAST Steel Bridge By Duane Otter and Brian Doe ABSTRACT The performance of several bridge deck fastening systems is being evaluated on the steel bridge
More information1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series
SECTION 31 66 13 HELICAL PILES AND HELICAL ANCHORS PART 1 - GENERAL 1.1 DESCRIPTION A. This work pertains to furnishing and installing Helical Piles and Bracket Assemblies shown in the Contract in accordance
More informationAgri-Fab OWNERS MANUAL. Model No WHEEL CART. CAUTION: Read Rules for Safe Operation and Instructions Carefully
Agri-Fab OWNERS MANUAL Model No. 45-0270 4-WHEEL CART CAUTION: Read Rules for Safe Operation and Instructions Carefully Assembly Operation Maintenance Repair Parts the fastest way to purchase parts www.speedepart.com
More informationPlastibeton Trench System. Installation Packet
Plastibeton Trench System Installation Packet Plastibeton Installation Guide This Installation Guide is intended to assist in the preparation and installation of Plastibeton products manufactured by Oldcastle
More informationElco Construction Products 1301 Kerr Drive Decorah, IA fax:
Technical Manual 2010 HangerMate anchors were designed to speed installation of fire sprinkler, HVAC, refrigeration, general piping, and electrical systems. They can also be used to install strut channels,
More informationEdgerail Aluminum Bridge Railing System Specification & Installation Instructions
Edgerail System Specification & Installation Instructions Hill & Smith, Inc 1000 Buckeye Park Road Columbus, Ohio 43207 Tel: 614-340-6294 Fax: 614-340-6296 www.hillandsmith.com Section A System Specification
More informationInstallation Instructions
CHEVY / GMC 20K Industry Standard Rail Custom Mounting Kit #2724 Gross Trailer Weight (Maximum)...20,000 lbs. Vertical Load Weight (Max. Pin Weight)...5,000 lbs. SYSTEM TOW CAPACITY Please note, in order
More informationAWNING / PATIO COVER INSTALLATION INSTRUCTIONS
AWNING / PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin Read the installation instructions thoroughly before beginning the installation procedure. Perspective In the Awning Instructions, Back means
More informationROOFING City of Grand Rapids Building Safety Division
ROOFING City of Grand Rapids Building Safety Division 218-326-7601 www.cityofgrandrapidsmn.com This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Grand
More informationAssembly Instructions for. for 31" MGS (Midwest Guardrail System) ROAD SYSTEMS, INC.
MSKT Assembly Instructions for MASH Tangent Terminal for 31" MGS (Midwest Guardrail System) ROAD SYSTEMS, INC. P. O. Box 2163 Big Spring, Texas 79721 Phone: (432) 263-2435 FAX: (432) 267-4039 Technical
More informationSECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section.
SECTION 06200 - FINISH CARPENTRY PART 1 GENERAL 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section. 1.2 RELATED SECTIONS A. Section 06100 - Rough Carpentry:
More informationClearSpan PolyMax Windbreak Wall
ClearSpan PolyMax Windbreak Wall Photo may show a different but similar model. 2007 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. Revision date: February 2007ldg STK# DIMENSIONS
More informationUS RACK, Inc Falcon Drive, Madera, CA
US RACK, Inc - 2850 Falcon Drive, Madera, CA 93637-559-661-3050 INSTALLATION AND USE INSTRUCTIONS for Long-John Extension Ladder Rack WARNING: Do NOT attempt to install or use this rack without following
More informationA. Suggested Tool List
These instructions are intended to be a basic guide to the installation and assembly of plate structures. Job site specific conditions may require other procedures. A Statement on Safety The assembly procedure
More informationC-Clamps and Lifting Eyes (Eye Bolts)
0-C-Clamps & Lifting Eyes-R 2/21/08 9:42 PM Page 1 C-Clamps A B C Armstrong C-Clamps When your requirements call for clamps, specify Armstrong the most accepted name in the business. When you see Armstrong
More informationNo No No
INSTALLATION, ASSEMBLY & MAINTENANCE MANUAL BASEBALL BACKSTOP No. 331025 No. 331036 No. 331039 No. 331025 No. 331036 No. 331039 INSTALLER NOTE: Upon completion of the installation/assembly of this baseball
More informationMM750 Installation Instructions
MM750 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on
More informationGURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM
Technical Specification of Back Clamp for LT Cross Arm (MS) Back clamp for LT Cross Arm made out of 50 x 6mm MS Flat suitable for 8m X 300 Kg PSC poles. After fabrication the cross arm shall be painted
More informationSOLISTRAND* Crimping Dies
SOLISTRAND* Crimping Dies Instruction Sheet (Used in Crimping Heads 08-697 69097 and 69099) 5 APR Terminals Butt Splices Parallel Splices = Wire Barrel DIE SET NUMBERS FOR DIE SET CRIMPING HEAD 69097 NUMBERS
More informationINSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT
INSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT BACKGROUND Proper alignment of the transmission input shaft to the crankshaft centerline is required in order to achieve the best results
More informationFlex Fence Instruction Manual
The Safer Stronger Smarter Choice Flex Fence Instruction Manual Table of contents 2 3 4 4 5 5 6 7 8 10 10 11 11 12 13 13 15 18 18 19 20 22 Table of contents Supplies, tools and equipment Introduction Laying
More informationProject: # Solano Community College District
ADDENDUM #02 Project: #16 007 Solano Community College District Horticulture Site Improvements Date: April 26, 2016 The following clarifications are provided based on questions received or changes in District
More informationReliance SG800 Series Steel Water Gage Valves
Installation, Operation, & Maintenance Instructions R500.541D1 10/16/2016 Reliance SG800 Series Steel Water Gage Valves Note: Design variations in Steel Water Gage Valves necessitate typical illustrations,
More informationU.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK
U.S. Rack, Inc. 2850 Falcon Drive, Madera, CA 93637 15APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK WARNING: Do NOT attempt to install or use this rack without following all instructions.
More informationASSEMBLY AND CARE INSTRUCTIONS JUST FOR KIDS 355
ASSEMBLY AND CARE INSTRUCTIONS VERSION: 8920100 (Revised 06/16) JUST FOR KIDS 355 SALES AND SERVICE spiethamerica.com Canada and International 135 Forestview Road, PO Box 40 Orillia, Ontario, Canada L3V
More information18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL
18000 HDL FOUR POST LIFT 18000 LB CAPACITY INSTALLATION AND OWNER'S MANUAL WARNING! Do not raise a vehicle unless the front stops are in place, the parking brake is set, and the wheels are chocked. Stay
More informationOWNERS MANUAL. Model No LB. POLY PRO SPIKER/SPREADER. CAUTION: Read Rules for Safe Operation and Instructions Carefully
OWNERS MANUAL Model No. -0301 CAUTION: Read Rules for Safe Operation and Instructions Carefully 17 LB. POLY PRO SPIKER/SPREADER Safety Assembly Operation Maintenance Parts PRINTED IN U.S.A. FORM NO. 78
More informationTENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018
SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationMODEL RA O RAIL ALIGNER
MODEL RA-00-93-O RAIL ALIGNER OPERATION, MAINTENANCE, AND REPAIR MANUAL 1805 2 nd AVENUE NORTH * MOORHEAD, MN, USA 56560-2310 1805 2 nd AVENUE NORTH * MOORHEAD, MN, USA 56560-2310 PHONE (218) 236-0223
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the
More informationCertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High
CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS Fence Installation Guide 3', 4' & 6' High INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers
More informationA. Rough carpentry includes but is not limited to the following:
SECTION 06100 ROUGH CARPENTRY PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections,
More informationSection 914. JOINT AND WATERPROOFING MATERIALS
914.01 Section 914. JOINT AND WATERPROOFING MATERIALS 914.01. General Requirements. Joint and waterproofing material for use in concrete construction must meet the requirements of this section. 914.02.
More informationSPECIAL SPECIFICATION 7603 Timber Rail Bridge Rehabilitation with Warranty
2004 Specifications CSJ 7107-09-003, etc. SPECIAL SPECIFICATION 7603 Timber Rail Bridge Rehabilitation with Warranty 1. Description. This Item shall govern the rehabilitation of timber trestle bridges.
More informationSliding Glass Door Assembly and Installation Guide
Sliding Glass Door Assembly and Installation Guide Index Door System Components and Hardware The following components are needed to complete the installation of your Sliding Patio Door unit. Check all
More informationFLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS
1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Trailer system.
More informationHOW TO BUILD A DEER OR ELK-PROOF FENCE. Saskatchewan Environment Resource Stewardship Branch 112 Research Drive Saskatoon, Saskatchewan S7K 2H6
HOW TO BUILD A DEER OR ELK-PROOF FENCE Saskatchewan Environment Resource Stewardship Branch 112 Research Drive Saskatoon, Saskatchewan S7K 2H6 Revised March 2005 1 This information is intended to assist
More informationInstallation Instructions
DODGE RAM 2500 20K Industry Standard SuperRail Custom Mounting Kit #2336 Gross Trailer Weight (Maximum)...20,000 lbs. Vertical Load Weight (Max. Pin Weight)...5,000 lbs. SYSTEM TOW CAPACITY Please note,
More informationPRORAC CONTRACTOR SERIES UNIVERSIAL STEEL TRUCK / CAP RACK INSTALLATION INSTRUCTIONS
PRORAC CONTRACTOR SERIES UNIVERSIAL STEEL TRUCK / CAP RACK INSTALLATION INSTRUCTIONS 1000 Lb. Capacity Bed Mount 750 Lb. Capacity Cap Mount Package Contents: Parts Hardware (4) Legs (12) 3/8-16 x 1-1/4
More informationPROJECT INSTRUCTIONS Roofing
PROJECT INSTRUCTIONS Roofing This handout outlines some basic regulations contained within the 2015 Minnesota State Building Code, as well as other good building practices. However, this handout is not
More informationInstallation Instructions
TOYOTA 16K Industry Standard Rail Custom Mounting Kit #2748 Gross Trailer Weight (Maximum)...16,000 lbs. Vertical Load Weight (Max. Pin Weight)...4,000 lbs. SYSTEM TOW CAPACITY Please note, in order to
More informationVipros 357 User Pre-installation Guide
Amada America Inc. Vipros 357 User Pre-installation Guide Amada America Inc. 7025 Firestone Blvd. Buena Park CA. 90621 Phone: (714) 739 2111 Fax.: (714) 739 4099 Email infoamada.com Print Date 04/02/99
More informationSTANDARD CANOPY WORK REPORT B-1
STANDARD CANOPY WORK REPORT B-1 No. Check Parts / Tools Qty _ Canopy Lock 1 [ ] 6E2-3 Canopy Hinge Block 1 2 [ ] 6E4-5 Canopy Side Frame 2 2 [ ] 6E2-1 Canopy Lock Assembly 1L + 1R 3 [ ] 6E2-4 Rear Lock
More informationA Collaborative Program of Arbor Day Foundation and Dimensions Educational Research Foundation. Marimba #3912, 5590
A Collaborative Program of Arbor Day Foundation and Dimensions Educational Research Foundation Marimba #3912, 5590 Assembly and Installation Instructions Please open and inspect all items upon receipt.
More informationDesign and Construction Standards SECTION ATHLETIC LOCKERS
SECTION 10505 ATHLETIC LOCKERS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The provisions of the General Conditions, Supplementary Conditions, and the Sections included under Division 1, General Requirements,
More informationModel No.'s B
owners manual Model No.'s 45-01012 190-653B UTILITY CARTS (SEE SPECIFICATIONS ON PAGE 7) CAUTION: Read Rules for Safe Operation and Instructions Carefully Assembly Operation Maintenance Repair Parts the
More informationUS RACK, Inc Falcon Drive, Madera, CA
US RACK, Inc. - 2850 Falcon Drive, Madera, CA 93637-559-661-3050 INSTRUCTIONS for MOTORCYCLE RACK with Cradling Wheel Chocks WARNING: Do NOT attempt to install or use this rack without following all instructions.
More informationASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER
ASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER Our unique assembly process quickly transforms individual pieces into a finished structure that will give you a lifetime of service. Great care has been taken
More informationCHEVY/GMC SuperRail Mounting Kit #3117
CHEVY/GMC SuperRail Mounting Kit #3117 #3100 SuperGlide (12K) Gross Trailer Weight (Maximum) Vertical Load Weight (Max. Pin Weight) 12,000 lbs. 3,000 lbs. Installation Instructions SPECIFICATIONS Fits
More informationRlGIDITY AND STRENGTH OF WALL FRAMES BRACED WlTH METAL STRAPPING
RlGIDITY AND STRENGTH OF WALL FRAMES BRACED WlTH METAL STRAPPING information Reviewed and Reaffirmed March 1955 No. R1603 UNITED STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE FOREST PRODUCTS LABORATORY
More informationAgri-Fab. Model No "ATV" DUMP CART H.D. 17 CU. FT. CAUTION: Read Rules for Safe Operation and Instructions Carefully
Agri-Fab owners manual Model No. 45-02172 190-521-100 "ATV" DUMP CART H.D. 17 CU. FT. CAUTION: Read Rules for Safe Operation and Instructions Carefully Assembly Operation Maintenance Repair Parts the fastest
More information