D HANDRAIL. Doc No. A-39. Item Description. Hand hold for deck entry or exit equipment. Available in 0.6M, 0.9M, 1.2M, 1.5M and 1.8M heights.
|
|
- Arleen Richardson
- 5 years ago
- Views:
Transcription
1 D HANDRAIL 1 D Handrail 1 2 M10 Flat Washer 2 Materials: 3 M10x25mm Torx Bolt 2 Hand hold for deck entry or exit equipment. Available in 0.6M, 0.9M, 1.2M, 1.5M and 1.8M heights. 1. Refer to drawings for location of D Handrail. 2. Position D Handrail and fix to upright with Torx Bolts with Flat washers under bolt head. 3. Ensure bolts are tightened prior to use. 1 week after installation. Doc No. A-39 Age Groups:
2 End Rung / Pipe Twirl 1 End Rung / Twirl Bar 1 2 M10x25mm Torx Bolt 4 Materials: 3 M10 Flat Washer 4 25nb Galvanized steel 1. Refer to plan view for position of End Rung / Twirl Bar. 2. Lift the bar into position and secure to the uprights as shown in detail A using the hardware provided. 3. Ensure all Bolts are fully tightened. Doc No. A-46 STRUCTURE: MIRACLE:
3 CENTRE BRACKET 1 Centre Bracket 1 2 M10x25mm Torx Bolt 4 Materials: 3 M10 Flat Washer 4 1. Refer to drawings for Centre Bracket location. 2. Lift into to position and attach to Upright using M10x25mm Torx Bolts and Flat Washers. 3. Ensure all bolts are fully tight. Doc No. A-53
4 0.9m TWIRL BAR 1 Twirl Bar 1 2 M10x25mm Torx Bolt 2 Materials: 3 M10 Flat Washer 2 25nb Galvanized steel 1. Refer to plan view for position of Twirl Bar. 2. Excavate footing as per Drawing. 3. Lift the bar into position and secure to the uprights as shown in detail A using the Torx Bolts. 4. Ensure all Bolts are fully tightened when concrete has fully cured. Doc No. BA-02 STRUCTURE: MIRACLE:
5 1.2M HONEYCOMB CLIMBER 1 Honeycomb Climber 1 2 D Handrail 2 Materials: 3 M10x25mm Torx Bolt 6 4 M10 Flat Washer 8 5 M10 Nyloc Nut 2 For use as an exit or entry point to decks. Designed for Hand Eye Coordination Available in 0.6m,0.9m,1.2m & 1.5m heights. 1. Refer to plan view for position of Honeycomb Climber. 2. Lift the climber into position against the outside face of the deck ensuring that the legs are in the foundation holes. 3. Drill out two centre pilot holes in deck to 12mm and secure the climber to the deck using Torx Bolts with Flat Washers secured with Nyloc Nuts. 4. Secure the top and bottom of each of the handrails to the upright with a Torx Bolt. Doc No. C-39
6 0.9M INCLINE HEX TUNNEL 1 Hex or Half Hex Tunnel 1 2 Handrail- Optional 2 Materials: 3 M10x25mm Torx Bolt 8 4 M10 Flat Washer 8 With handrail add 3 M10x25mm Torx Bolt 8 4 M10 Flat Washer 8 For use as an exit or entry point to decks. Designed for Hand Eye Coordination 2m available in straight or incline of 0.3m, 0.6m & 0.9m. 1m available only in straight or 0.3m incline. 1. Refer to plan view for position of Hex or Half Hex Tunnel. 2. Secure both ends of the tunnel to the inside face of the uprights using 25mm Torx Bolts and Washers. 3. Ensure all bolts are fully tightened. Doc No. C-99-2 Age Groups: 3-7 Years 7-15 Years
7 SQUARE DECK 1 Square Deck Aluminium 1 2 M10 Flat Washer 8 Materials: 3 M10x25mm Torx Bolt 8 Decks may be used singularly or in combination to form the structures of the Playville System. Decks may be also be used as multipurpose and take off decks. Decks may be installed at heights of 0.3m, 0.6m, 0.9m, 1.2m, 1.5m & 1.8m above finished ground level. 1. Refer to the plan view for the position of the Deck. 2. Lift the Deck into position in between the four Uprights. 3. The Deck can now be bolted to the Uprights using Torx Bolts with Flat Washers under the heads. (Into nutserts). 4. All Deck edges are supplied with a 5mm pilot hole. A 12mm hole is needed to attach components. Do not drill hole if not required. A 5mm hole is in compliance with the Australian Standards Doc No. D-31
8 SAFETY, PIRATE LOOKOUT, STEERING WHEEL or HOUSE PANEL 1 Safety Panel, or Pirate Lookout Panel, or 1 1 Steering Wheel Panel, or House Panel 1 Materials: 2 M10x25mm Torx Bolt 4 3 M10 Flat Washers 4 Pirate s Lookout Panel: 4 Universal Telescope (Fitted) 1 5 3/8 Nyloc Nut (Fitted) 1 M10 Flat Washer (Fitted) 1 Steering Wheel Panel: 6 Poly Steering Wheel with Plate (Fitted) 1 7 M10 Nyloc Nut (Fitted) 1 M10 Flat Washer (Fitted) 1 Panels may be used as infills or as role play items. This panel is available for 0.0m, 0.3m, 0.6m, 0.9m, 1.2m, 1.5m & 1.8m high decks. 1. Refer to the plan view for the position of the Panel. 2. Lift the panel into position and bolt it to the inside of the uprights with Torx Bolts and Flat Washers under the bolt heads. 3. Ensure all Bolts are fully tightened. Doc No. P-01
9 UPRIGHT No. Specifications 1 Upright 1 Material: Galv Steel Colour: 1. Locate the Upright on the plan drawing provided. 2. Install Posts so that ID Tag sits at Finished Ground Level where indicated, use this as master post to give measurements for other uprights. 3. Allow concrete to cure prior to use. *Wear item: See Warranty Doc No. Upright Age Groups: 3-7 Years 7-15 Years
10 LOG ROLL 1 Log Roll Barrel 1 2 Log Roll Shaft 1 Materials: 3 Log Roll Barrel Mount 2 4 Log Roll Handrail 1 5 Log Roll Bearing & Bearing Block * 2 6 M10x25mm Torx Bolt (8 fitted) 16 7 M10x16mm Grub Screw 2 8 M10 Flat Washer (8 fitted) 16 Designed as a fun balancing activity 1. Refer to plan view for position of Log Roll. 2. Slide the Log Roll Barrel Mounts over shaft on the Log Roll Barrel. 3. Lift the Barrel, with the mounts, into position between the uprights and secure the using Torx Bolts with Flat Washers under the bolt heads. 4. When secure, tighten the Grub Screws locking the Mounts to the shaft. 5. Fit the Log Roll Handrail with the. * If Bearings are not replaced when worn, this will cause damage to the Shaft an Barrel Please The Log Roll Barrel should be filled with 8 1/2 litres of dry river sand to prevent it from spinning too fast. Doc No. W-12 Age Groups: 3-7 Years 7-15 Years
11 FIXED BALANCE WALK 1 Fixed Balance Walk Chain 6 2 Fixed Incline Balance Walk Main Bar (Fitted) 1 Materials: 3 Fixed Incline Balance Walk Timber (Fitted) 1 4 Burmese Bridge 2m Incline Handrail 2 5 M10x25mm Torx Bolt 12 6 M10 Nyloc Nut 4 7 M10 Flat Washer 12 8 M8x20mm Cup Head Bolt 6 9 M8 Nyloc Nut 6 10 M8 S Hook 6 Doc No. W Refer to plan drawing for position of Fixed Incline Balance Walk, drill out 2 centre holes to 12mm. 2. Locate the Handrails between the Uprights and secure using Torx Bolts with Flat Washers under the bolt heads. 3. Bolt the Main Bar to the Deck using Torx Bolts, Nyloc Nuts and Washers. 4. Attach the chain to the welded links on the Main Bar and using Cup head bolts with Washer and Nyloc Nuts (8, 9, 10). 5. Attach chain(1) to main bar(2) with S Hooks(11), ensure S Hooks fully clamped metal on metal. 6. Ensure all bolts are tight.
Free Standing Frame and Canopy
Patriot Docks Free Standing Frame and Canopy Required Tools: Cordless Drill, 3/8 drill bit, 17mm wrench, 18mm wrench, 6mm hex key (included), 8mm hex key (included) Helpful Tips: Assembling and installing
More informationFORPARK AUSTRALIA
FORPARK PRICE LIST AS AT 10/19/2018 Contents Prepare the site... 3 Equipment required for installation... 3 Fasteners... 4 Argonaut... 5 Carousel - With Rails/no rails... 6 Concord... 7 Cyclone... 8 Flying
More informationS48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM
PAGE 1 OF 6 PORTA-DOCK, INC. S48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM Thank you for purchasing our product! *Please read these instructions and follow
More informationCONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013
U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -
More informationPLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts
PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts USER GROUP: 2-12 RECOMMENDED CREW: 2 people TOOLS REQUIRED: T-30 TORX tool (supplied by manufacturer) T-45 TORX tool (supplied by manufacturer)
More informationA59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK
Page 1 of 5 PORTA-DOCK, INC. A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK *For Beige Decking Add the Letter B to model* Thank you for purchasing our product! *Please read these instructions and follow
More informationAssembly Instructions 10 X 10 Aluminum Roof Support
Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1
More informationLarge Wood Windmill Assembly Instructions
CROW S NEST (TOP VIEW) TOWER (SIDE VIEW) 0 QTY 2 2 ITEM QTY 2 QTY QTY 8 QTY 8 QTY 4 TOP TOP TOP 47 9 QTY 4 QTY 4 QTY 4 QTY 4 QTY 4 ITEM 6 ITEM 7 ITEM 8 ITEM 3 ITEM 9 ITEM 4 ITEM 2 ITEM 5 47 Leg QTY 4 42.5
More informationBoat Lift Canopy Frame Assembly Instructions
Patriot Docks Boat Lift Canopy Frame Assembly Instructions Helpful Tips: Assembling and installing the canopy frame and cover is a two person job. Additional help makes installation easier and is recommended.
More informationParts list Instruction guide Warnings Please read carefully before assembling and using product.
Parts list Instruction guide Warnings Please read carefully before assembling and using product. Jet Rail XL Part Number 27377 Tools required for assembly Hammer 9/16 Wrench 3/4 Wrench Ratchet 9/16 Socket
More information55000/55010 Installation Instructions
A. Install 55015 B. Bolt roof rails, 55020/55025, to front hoop. C. Assemble 55026 D. To install without drilling into bumper. E. If mounting directly to bumper. A. 55015 Installation Instructions 55000/55010
More informationMODEL T28173/T28174 ROLLER TABLES INSTRUCTIONS
MODEL T28173/T28174 ROLLER TABLES INSTRUCTIONS FOR MODELS MFD. SINCE 10/17 For questions or help with this product contact Tech Support at (570) 546-9663 or techsupport@grizzly.com Rails Rollers Reversible
More informationBISON GOOSENECK FOOTBALL 1 PAIR OF GOAL POSTS
Instruction Manual BISON GOOSENECK FOOTBALL 1 PAIR OF GOAL POSTS Customer Service (800) 247-7668 P A R T S L I S T Item Qty Description Item Qty Description A 2 GOOSENECK POLE I 4 UPRIGHTS B 2 BAND CLAMP
More information#709 Magnum Shear Stand
#709 Magnum Shear Stand Mounting Brackets Sold Separately Operators Manual Assembly Operation Parts List Warnings Bullet Tools 800-406-8998 3390 W. Hayden Avenue, Hayden, ID 83835 www.bullettools.com Congratulations
More informationThank you for purchasing our product! *Please read these instructions and follow them step by step.*
07/07/08.rev1 PAGE 1 OF 11 601AL VERTICAL 60120VL LIFT W/CHAIN DRIVE WINCH Thank you for purchasing our product! *Please read these instructions and follow them step by step.* Step 1. Separate and group
More informationH HD Adult Wheelchair Swing Frame & Hangers(perm) IMPORTANT
Page 1 IMPORTANT PLEASE READ THESE INSTRUCTIONS BEFORE COMMENCING ASSEMBLY. All equipment must be installed in accordance with these instructions. Check your shipment against Bill of Lading and Parts list.
More informationReal Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions
MATERIALS: 3 - Main Sections (Only 2 Sections for 10 ) 8 3 deck screws for joining sections inside of 2 Rock Wall Panels (with pre-installed t-nuts. Top panel comes with ladder mounting block preinstalled.)
More informationCalf-Tel Pen System Assembly Instructions
Calf-Tel Pen System Assembly Instructions (Instructions work for 4, 6, and the 7 Pen Systems) 1 ASSEMBLY OF PEN FRONT AND WALLS START THE ASSEMBLY BY LINING UP THE TWO UNI-DIRECTIONAL ARROWS IN THE TOP,
More information3,500/4,500lb. Vertical Cable Feighner Lift
3,500/4,500lb. Vertical Cable Feighner Lift CAUTION - PUT SAFETY FIRST 1. Before attempting to install or operate this lift, study and fully understand the proper operating procedures and safety precautions
More informationPORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12
Page 1 of 7 PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12 *For Beige Decking Add the Letter B to Model* Thank you for purchasing out product! *Please read these instructions and follow
More informationThank you for purchasing out product! *Please read these instructions and follow them step by step. *
Page 1 of 7 AD17 AA DS 4 X 16 T12 Thank you for purchasing out product! *Please read these instructions and follow them step by step. * STEP 1. Slide two support posts (REF. # 24) into the two outside
More informationThis manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.
This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified. Step #1 Lay all parts out to verify quantities. (2) 2 x 25-1/4
More informationAssembly Instructions
Assembly Instructions * Pro Version shown Platform - Safety Rail Assembly Platform - Safety Rail Assembly IMPORTANT: To avoid assembly problems follow these instructions exactly. Note: If assembling the
More informationUser Instructions Multiline Otter Scoreboard Caddy Assembly
List of parts: User Instructions Multiline Otter Scoreboard Caddy Assembly Single Caddy Double Caddy 1 1 Base assembly with attached wheels 2 4 1 1 2 4 4 8 10 20 12 Uprights (60 or 74 aluminum extrusion)
More informationSwerve Rack CUSTOM RACKS AVAILABLE
CUSTOM RACKS AVAILABLE Swerve Rack The design of the Swerve mirrors the bike frame, thus providing superior bike support while making it easy to secure both the bike frame and wheel with a standard u-lock.
More informationClassic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 Classic Roll Tarp Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com
More informationYOUNG EXPLORER TECHNICAL DATA HILLARY INSTALLATION DETAILS HILLA PROD. CODE L:11.25 W:4.55 H:2.8 SIZE FFH 2.2M 6-11 YEARS OLD AGE RANGE
YOUNG EXPLORER HILLARY TECHNICAL DATA MINIMUM SPACE REQUIRED 14.25M X 8.15M PROD. CODE HILLA SUPERVISED PLAY RECOMMENDED SIZE L:11.25 W:4.55 H:2.8 EQUIPMENT TYPE HIGH LEVEL FFH 2.2M LARGEST PART 2.3M X
More information400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS
12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions
More informationTELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL.
TELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL. Telescopic gates have been manufactured for many years essentially in the same way they are largely today. In recent years hardware suppliers have
More informationREVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION
INSTALLATION INSTRUCTIONS Service Doors, Counter Service Doors & Grilles REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION GENERAL NOTES: Instructions are intended for qualified door mechanics
More informationAssembly Instructions for a Double Climbing Frame
Assembly Instructions for a Double Climbing Frame Step A: Lay out both bases with 8ft of spacing between them (See Diagram X) Once you are happy with the position of each base, remove bases and follow
More informationAssembly Instructions
1 BLT-27565 FDB Stand Assembly Instructions BLT-27565 FDB Stand Part Drawing Description Qty Part Drawing Description Qty P-1 Top Shelf 1 EA P-10 LL Lower Leg 1 EA P-11 Middle Shelf 1 EA P-2 L-Upper Leg
More informationRoll In W/L Dock PAGE 1
Roll In W/L Dock PAGE 1 1 2 3/8 X 1 CARRIAGE BOLT SS 3/8 FLANGE NUT BRASS 3 4 1/2-13 X 1.25 SQ BOLT SS 1/2 SQ NUT BRASS 5 3/8-16 X 2.5" BOLT SS PAGE 2 6 7 BRACE BRKT SINGLE AXLE TUBE 8 9 3" AXLE WASHER
More informationSEAT-831. Seat Box Kit. Club Car Precedent. Installation Instructions
SEAT-831 Seat Box Kit Club Car Precedent Installation Instructions Contents of SEAT-831 Seat Box Kit: a (1 ea.) Seat Box Platform b (1 ea.) Front Seat Box Plate c (1 ea.) Foot Plate d (1 ea.) Tailgate
More informationHD installation guide
JANUS INTERNATIONAL 1 866 562 2580 www.janusintl.c o m 1950 1950HD installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 1950 1950HD SHOWN A rolling
More informationTrack Rack. * Track Racks are not lockable
The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply
More informationJEEP JK ( 3 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT
JEEP JK ( 3 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT FAJK004 / KRJW016T INSTALL TIME: 2 Hours NOTE: Your Jeep JK (3 Door) Extreme Roof Rack Kit consists of four boxes. (1) the Tray, (2) the Roll
More informationInstallation Instructions
Installation Instructions Challengers 36 in. (914 mm) Wide Glide Slide Installation Preparation Recommended Crew:... Two (2) adults Installation Time:... 1.5 man-hours Concrete Required:... 0.03 cubic
More informationPORCH-LOC INSTALLATION INSTRUCTIONS
PORCH-LOC INSTALLATION INSTRUCTIONS 2017 HB&G Building Products, Inc. Porch-Loc Installation Instructions NOTE: DISCARD THE INSTALLATION INSTRUCTIONS AND HARDWARE THAT CAME IN YOUR PERMAPOST PACKAGING
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for Fortress Horizontal Cable Panel System with UB-05 Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all
More informationJEEP JK ( 5 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT
JEEP JK ( 5 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT FAJK001 / KRJW014T INSTALL TIME: 2.5 Hours NOTE: Your Jeep JK (5 Door) Extreme Roof Rack Kit consists of four boxes. (1) the Tray, (2) the Roll
More informationClassic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 Classic Roll Tarp Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com
More informationKwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 Installation Instructions Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com
More informationOlympic Bench Model 6600
Olympic Bench Model 6600 IMPORTANT SAFETY INSTRUCTIONS TKO Fitness products are designed and manufactured to the highest standards in order to provide you with years of great workouts. We proudly stand
More informationPlace the vehicle on a hard level surface and use an appropriate jack and jack stands to raise the vehicle of the ground.
1937-1939 Chevy Truck Rear Air Bag 4 - Link Kit Installation Instructions 1-866-925-1101 www.totalcostinvolved.com CHECK ALL PARTS INCLUDED IN THIS KIT TO THE PARTS LIST BEFORE INSTALLATING OF THE KIT.
More information4099T Parts List. Front Bow Assy. (1) Rear Bow Assy. (1) Long Mounting Rail (2) Short Mounting Rail (2)
4099T Parts List Ver.2 Front Bow Assy. (1) Rear Bow Assy. (1) Small Mnt Foot (2) Large Mount Foot (2) Ladder Hook (2) Ladder Stop (2) Handle Extension (1) Long Mounting Rail (2) Short Mounting Rail (2)
More informationSTEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION
B SERIES INDUSTRIAL BENCHES TOOLS REQUIRED FOR ASSEMBLY Socket set, Open end wrench set, Cordless drill with 3/8" socket bit (Magnetic recommended). BEFORE ASSEMBLY Read through the assembly instructions
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Furniture Solutions: 68 Shipstation with Storage Shelf Model Numbers: PB001 (D9001, D9010N, D9021, D9030, D9032/D9033, D9098, RC4054) Introduction This document provides the Pitney
More informationMAG-CONV Basic, 48, 48R & Midline Front Mount
Parts Required: Tools Used: Mag Wheels Brakes Brake Rods Mounting Bracket Anti Tippers 7/16" Wrench Screw Driver Rubber Mallet 5/8 Wrench 5mm Allen Wrench Step Execution Figures 1 Remove front 5" total
More informationDowntown Rack. Custom logo option available
Custom logo option available Downtown Rack The Downtown Rack uses thick, square-tube construction that can t be cut with a pipe cutter. The extended width of the Downtown Rack makes for easy bike parking
More informationINSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger
INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger TOOLS REQUIRED FOR INSTALLATION: Drill motor, (1) 5/16 inch drill bit, (1) 13/64 drill bit, (1) 3/16 inch hex wrench (1) 3/32 inch hex wrench.
More informationAssembly Instructions
Laminate/Phenolic & 1 Pc Butcherblock Tops Before you begin, please make sure all parts and proper quantities are included. (See on next page) Any parts damaged during shipment must be reported within
More informationinstallation guide
JANUS INTERNATIONAL 1 866 562 2580 w w w. j a n u s i n t l. c o m 2000 2500 3000 installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 2000 2500 3000
More informationBoardWalk RAMP: Installation and Assembly Instructions
BoardWalk RAMP: Installation and Assembly Instructions The BoardWalk RAMP Platform and Handrail System will accommodate curbs 3" - 12" high. Adhering to ADA guidelines of 1:12 rise ratio: The system shown
More informationSunrise Deck Assembly Instructions for Kingston Left
Sunrise Deck Assembly Instructions for Kingston Left It s easiest to build the deck frame first like it will be lying on its back and then after all 4 legs and horizontals are in place, tip the deck toward
More informationIDR assembly instructions:
IDR assembly instructions: Required Tools: 2 X 12mm Open End Wrench 14mm open end wrench #2 Phillips Head Screw Driver (Drill with adjustable torque clutch recommended) 8mm nut driver (Supplied in IDR-AK)
More informationBEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs
Working with Concrete Slabs When working with concrete slabs the barrier protection can be erected in three ways - with socket bases, adjustable slab edge brackets and multi slab clamps. Socket Bases 1
More informationExploded Diagram /1/23
& Exploded Diagram www.firstdegreefitness.com 2018/1/23 Upper Frame Assembly A048 Seat Assembly A078 60806 60809 10097 A039 Lower Frame Assembly 10041 1 Nyloc Nut M10 10082 3 Washer M10x21x2 10097 1 Nut
More informationPart 7 Assembling the X axis
Part 7 Assembling the X axis 1 2 The X axis is a key part of the printer, it carries the extruder on a carriage that moves the extruder laterally in the X axis. The x axis itself is moved vertically on
More information4832A Installation Sheet Part List
4832A Installation Sheet Part List (1) 4016A-43-003 Qty 1- (2) 4016A-43-002 Qty 1- (3) 4016A-43-001 Qty 2- (4) 4016A-10-005 Qty 1- (5) 4016A-43-004L Qty 1- Mounting Bolt Kit (A) (K) Qty 2 - Qty 6 - M10
More informationHip Roof Canopy Instructions
Hip Roof Canopy Instructions - PUT SAFETY FIRST. NOT COMPLYING WITH THE PROCEDURES AND PRECAUTIONS OUTLINED IN THIS MANUAL MAY RESULT IN PERSONAL INJURY AND WILL INVALIDATE THE WARRANTY.. Before attempting
More information40993 Parts List. Front Bow Assy.(1) Rear Bow Assy.(1)
40993 Parts List Front Bow Assy.(1) Rear Bow Assy.(1) Rail Mnt Foot(4) Ladder Hook (2) Ladder Stop (2) Mounting Clip-ProMaster Only (6) Mounting Bracket(6) Long Mounting Rail(2) Short Mounting Rail(2)
More information2009 MODEL ASSEMBLY, INSTALLATION AND MAINTENANCE INSTRUCTIONS
2009 MODEL ASSEMBLY, INSTALLATION AND MAINTENANCE INSTRUCTIONS It is important that these instructions are adhered to in their entirety. Please read the instructions fully before starting installation
More informationHardware and Components:
Hardware and Components: (A) 5/16 x 2 Hex Bolt (B) 5/16 x 2-1/4 Hex Bolt (C) 5/16 x 2-1/2 Hex Bolt (D) 4X 5/16 x 3/4 Hex Bolt (E) 4X 5/16 x 1-1/4 Hex Bolt (F) 11X 5/16 Flat Washer (G) 12X 5/16 Nylock Nut
More informationJEEP JK ( 3 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT
JEEP JK ( 3 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT FAJK005 / KRJW016T INSTALL TIME: 5 Hours NOTE: Your Jeep JK (3 Door) Extreme Roof Rack Kit consists of four boxes. (1) the Tray, (2) the Roll
More informationMODEL CH25. SHIPPING PIECES: 28 WEIGHT: 1150 lbs NAME: INV #: DATE: BOX PULLED BY: STAGED BY:
MODEL CH25 NAME: INV #: DATE: BOX PULLED BY: STAGED BY: SHIPPING PIECES: 28 WEIGHT: 1150 lbs 4-clubhouse legs 1-6 x 8 Plastic lumber package 1-CH Snake Climber 1-8 Center Opening Barrier 1-8 Two Opening
More informationPost-Paint>Fuselage>Interior>Controls>Fit rudder pedals
Post-Paint>Fuselage>Interior>Controls>Fit rudder pedals Objectives of this task: To fit the rudder pedals and steering links to the aircraft, and fit the rudder cable to the rudder pedals and set the deflection
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for FortressCable H-Series Stair Panels with Simplified Stair Bracket SSB-05 and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and
More informationPowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 FOR Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com Indianapolis,
More informationCongratulations on selecting Forpark Australia equipment for your playground.
FORPARK PRICE LIST AS AT 10/23/2018 Congratulations on selecting Forpark Australia equipment for your playground. This manual provides you with easy to follow instructions that will enable you to install
More informationAssembly Instructions for a Double Climbing Frame
Assembly Instructions for a Double Climbing Frame Step 1: Lay out both bases with 8ft of spacing between them (See Diagram Below) Once you are happy with the position of each base, remove bases and follow
More informationAssembly Instructions for 12x16 Floating Dock
Assembly Instructions for 12x16 Floating Dock www.rollingbarge.com Congratulations on the purchase of your Floating Dock kit. This kit includes all the aluminum frame parts, and all the fasteners. You
More informationJEEP JK ( 5 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT
JEEP JK ( 5 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT FAJK002 / KRJW014T INSTALL TIME: 5 Hours NOTE: Your Jeep JK (5 Door) Extreme Roof Rack Kit consists of four boxes. (1) the Tray, (2) the Roll
More informationINSTALLATION INSTRUCTIONS
NOTE: Bolts should remain hand tight until all bolts are installed. STEP 1 Installing the door base (both sides). 1. Locate the outer, roll cage, mounting bolt (passenger side is shown in the illustration).
More informationOrchard Monkey Bars Installation Instructions ORU060/ORW060
Orchard Monkey Bars Installation Instructions ORU060/ORW060 Page 1 Monkey Bars Installation Instructions 1 Read all instructions carefully before starting the assembly. 2 Check using the parts list and
More informationGeneral Guidelines:
ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical residential shoreline application. Please
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS PARTS REQUIRED Single QuickStand Lite Parts A (1) Lower Arm A B C D B (1) Upper Arm C (1) Base D (1) Base Plate E (1) M8 Dynamic Arm Long F (1) Clamp Bracket G H (1) VESA Plate
More informationINSTRUCTION MANUAL AND PARTS LIST MODEL 14-10
VERTICAL BAND SAWS INSTRUCTION MANUAL AND PARTS LIST MODEL 1-10 DAKE/PARMA WHEN ORDERING PARTS GIVE COMPLETE SERIAL NUMBER OF MACHINE GIVE PART NUMBER AND NAME GIVE AMOUNT REQUIRED Unless the above data
More informationMODEL# SLA001-3 "SLIDE & LOCK" A-FRAME POOL LADDER
MODEL# SLA001-3 "SLIDE & LOCK" A-FRAME POOL LADDER IMPORTANT INSTRUCTIONS: : Read all instructions carefully & completely to become familiar with parts, assembly, safety and proper use of this product.
More informationClayton Off Road COR COR COR
Clayton Off Road COR-4806011 COR-4806021 COR-4806031 JEEP GRAND CHEROKEE WJ LONG ARM UPGRADE KITS (1999-2004 WJ) NOTES: This product requires general welding, fabrication and automotive mechanic skills.
More informationSuper Tube Spiral Slide Instructions
Super Tube Spiral Slide Instructions Super Tube Spiral Slide 2 SECTIONS WITH OVERLAPPING FLANGES 3 SECTIONS WITHOUT OVERLAPPING FLANGES 3-1/2 LAG SCREW W/WASHER 5/16 X 1 BOLT W/WASHERS AND LOCK NUT 5/16
More informationDepending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12
XL Quilting Frame 1 Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12 Foot frame Printed 2 June 2014 Updated
More informationLeveling Feet, Base Plates and Casters
Leveling Feet, Base Plates and Casters 77 Leveling Foot 1 1 Fastening to profile end Fastening in T-slot of profile For leveling tables and light equipment. Ratchet-type height adjustment requires no tools.
More informationPolyDock MAY RESULT IN PERSONAL INJURY OR DEATH AND WILL INVALIDATE THE
Floating PolyDock PolyDock Instructions and Safety Tips Floating PRODUCT PolyDock ASSEMBLY INSTRUCTIONS Instructions and Safety Tips - PUT SAFETY FIRST - PUT SAFETY FIRST 1. To avoid the risk of personal
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for FortressCable H-Series Cable Panel System With UB-05 Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain
More information200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH
PG. 1 OF 11 PORTA-DOCK, INC. 200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH STEP 1. Separate and group like parts and fasteners together. Locate the winch side member with the longer upright tube and
More informationItem # GUN, 12 PISTOL CABINET WITH STORAGE
Item # 37-0046 9-GUN, 12 PISTOL CABINET WITH STORAGE Tools Needed For Assembly: Screwdriver Drill Assembly Tips: If you are using an electric screwdriver for assembly, set it at low torque and do not over-tighten
More informationInstallation Instructions
Installation Instructions Playworld Systems Model XX1407 Square Picnic Table w/coated Top & Frame Installation Preparation Recommended Crew:...Two (2) adults Installation Time:...1 man-hour Assembly View
More informationMay 14, Installation Manual
May 14, 2012 Installation Manual Contents MAG TRACKER Components...1 Mount Installation...7 Module Installation & Grounding...11 Maintenance...14 Warranty......14 Contact Information......14 May 14, 2012
More informationC70 Window Roller Repair Taken from: Heres the problem:
C70 Window Roller Repair Taken from: http://www.volvospeed.com/vs_forum/topic/115086-how-to-c70-window-rollers-permanent-fix/ Heres the problem: This happened to two separate window assemblys on my c70
More informationCostco High Wire Assembly Instruc ons & Owner's Manual
2254 Costco High Wire Assembly Instruc ons & Owner's Manual Important! Read this manual completely through before assembly and use. Consumer assistance Toll free If you need to order replacement parts
More informationGlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationHeavy Duty Ceiling Tilt Mount Installation Manual
HD-CTM-5580 Heavy Duty Ceiling Tilt Mount Installation Manual *This Installation requires a minimum of two people. For your safety: Read the complete instruction manual before starting an installation
More informationFor additional assistance call
The following pages will help guide you through the process of assembling your new 48 custom prize wheel. Choose an assembly area with plenty of room to lay your pieces on the floor and also a bench or
More informationL.L.Bean. Wooden Slat Bed
L.L.Bean Wooden Slat Bed Thank you for purchasing our Slat Bed. Assembly of this product requires A Phillips head screwdriver. We have found it helpful to have a second person present in at least one step
More informationFOLDING TONNEAU RACK. 1. Rack Rail Assembly
FOLDING TONNEAU RACK Package Contents (2) Load Bars (4) Load Bar End Caps (4) ¼-20 x 9/16 Narrow Shoulder Hex Head Screw (28) ¼ Flat Washers (24) ¼ Split Lock Washers (20) ¼-20 x ¾ long Button Head Screws
More informationPowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 PowerLock Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com Indianapolis,
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for Fortress Vertical Cable Panel System with Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all required
More informationPlease read and understand the OnBoard Timpani Cart Owner s Manual before using the Timpani Cart.
Assembly and Owner s Manual OnBoard Timpani Cart Performance Position Towing Position CONTENTS Important User Information...........................2 General......................................2 Manufacturer.................................2
More informationInstruction Sheet For: SCM-2
Instruction Sheet For: SCM-2 For more information, please contact us at: 345 Log Canoe Circle, Stevensville, Maryland 2666 Toll Free: 877.28.269 Phone: 40.643.6390 Fax: 40.643.665 www.videomount.com 27
More information