CCSDS 2011 SPRING MEETING

Size: px
Start display at page:

Download "CCSDS 2011 SPRING MEETING"

Transcription

1 CCSDS 2011 SPRING MEETING Berlin (Germany) May 2011 SLS RF&Modulation Working Group - Minutes of the Meeting 1. Action items review AI_09-16 (Provide simulations of UQPSK and GMSK with PN ranging) is closed by input paper SLS-RFM_ AI_10-03 (Verify the GMSK ranging acquisition results with realistic synchronization) is closed by input paper SLS-RFM_ AI_10-09 (Generate the first draft version of the CDMA Green Book) is closed by input paper SLS-RFM_ AI_10-10 (Resolve the differences between NASA SLS-RFM_10-20 paper and its presentation, add the OBO to the total degradation) is closed by input paper SLS-RFM_ AI_10-11 (Modify recommendation (8PSK vs. 4D-8PSK-TCM) for consistency with DVB-S2 and SCCC books when they become blue) is open pending books approval. AI_10-12 (Consider the two missing spectral efficiency cases and finalize the analysis for Recommendation on 4D-8PSK-TCM impairments) is open and expected to be closed at the next meeting. AI_10-13 (Editorially modify charter and projects along the agreement reached at the meeting, and distribute charter to the WG and the SLS AD) was closed in November The revised charter was meanwhile approved. 2. New recommendations (22, 26, 32 GHz plus Lunar and Earth Relay 2 GHz links, HR TLM and PN ranging) 2.1 High rate telemetry and PN ranging Document SLS-RFM_11-04 was presented by NASA. Such document is the response to AI-09_16) and reported on the independent NASA simulations of GMSK/PN and UQSPK/PN with the goal of verifying the ESA results presented to date. All the proposed PN shaping (square, sine and SRRC with roll-off 0.5) were simulated along with both GMSK (BTs=0.25 and 0.5) and UQPSK modulations and both ranging (T4B and T2B) codes. For GMSK/PN, the ranging modulation index was normalized as in ESA documents with a 2 factor in front of the sine wave shaping impulse response. The only difference in the assumptions was that for UQSPK NASA used the 10-W ESA s SSPA model while ESA simulations assumed a TWTA. Additionally, the NASA simulations assumed ideal synchronization while ESA s paper SLS-RFM_11-01 assumed realistic synchronizers. GMSK/PN spectra are identical to ESA s results. Conclusions are that both GMSK schemes have the same performance with PN ranging. The combined telemetry and ranging signal 1/10

2 (with sine wave shaping) almost meets the SFCG mask for telemetry only while even better results are obtained with SRRC filtering. UQPSK/PN spectra exceed the above mentioned SFCG mask due to the SSPA. ESA s results (worse than NASA s due to the use of a TWTA) show discrete spurious lines at the clock frequency (and its harmonics) that are not visible in NASA simulations. D. Lee took the action (AI_11-01) to verify if the missing discrete lines are due to the resolution bandwidth used. Additionally, for the case of rectangular shaping, the spurs by NASA are lower than the ones by ESA but this could be due to the use of SSPA vs. TWTA. Discussion continued with the performance results. The GMSK modulator in the receiver was implemented by NASA as an ideal GMSK modulator. The transfer function of the LPF filter in the receiver was not available and D. Lee took the action (AI_11-02) to provide this function. The BER degradation for the GMSK/PN case is of the order of db as per ESA simulations. The ranging chip error rate is also identical to ESA results. No significant variations were found among the various shaping and modulation combinations. The BER losses for the UQPSK/PN case are around 1.1 db while ESA results were around 1.3 db. This could be explained by the SSPA vs. TWTA used in the simulations and by the real synchronizers used in ESA simulations. The ranging chip error rate is also smaller than the one computed by ESA. In conclusions, GMSK/PN is more spectrally efficient than UQPSK/PN, the SFCG mask can be met by SRRC shaping and almost met by sine wave shaping, T4B is slightly more efficient than T2B. No difference in BER losses or ranging chip error rate degradation was noticed between T2B and T4B. For UQPSK/PN, SRRC is the only way to meet the SFCG mask. Document SLS-RFM_11-01 was presented by ESA. Such document is the response to AI ) and reported on the GMSK/PN performance for the case of real synchronizers. The document shows that the simulated receiver scheme correctly works for the considered cases in which the ranging chip rate is exactly or almost equal to the telemetry bit rate or twice this value. The losses due to synchronization are in the range db. No significant differences were found among the various ranging pulses and codes: it is therefore convenient to use the more bandwidth efficient solutions (SRRC or sinusoidal pulses) to transmit the PN ranging signal. As for telemetry, again there are no significant differences in the performance of GMSK with BTs = 0.5 or Acceptable values of h are from 0.05 to 0.2, where h = 0.05 favors telemetry and h = 0.2 favors ranging. The intermediate value h = 0.1 is a good compromise, and is the suggested value in practical applications. If h is smaller than 0.05, then the ranging acquisition time increases dramatically. Different chip rate/telemetry symbol rate ratios were also simulated by ESA and found not to differ too much for the presented cases. They are included in an ESA internal document that upon internal approval will be made available to CCSDS. Considering both papers SLS-RFM_11-01 and SLS-RFM_11-04, the group concluded that the necessary work was completed and that standardization of GMSK/PN could proceed with two small exceptions resulting in two action items. The first action item (AI_11-03) calls for G. Sessler to carry out a link budget for missions at Mars and Lagrange (L2) so as to determine the expected typical end-to-end performance for this new modulation. 2/10

3 It is recalled that due to the normalization used for the sine wave shaping, the ranging modulation loss is given by: L mod J h 2 whereas for the square wave shaping this is given by: L mod h sin 2 2 The second action has to do with the effect of phase array jumps and NCO offset on the GMSK/PN modulation scheme in light of the small modulation index associated with ranging. An action item (AI_11-04) was taken by G. Sessler to check the effect of phase array jumps and NCO offset on ranging. It was agreed to draft a stand-alone recommendation to be inserted in 401. The following points were noted: Consider if appropriate to have one recommendation for deep space missions and one for missions to Lagrange points. Consider if both BTs value for GMSK should be used. If two recommendations were to be proposed (see previous bullet), it would make sense to adopt 0.25 for Lagrange missions and 0.5 for deep space missions consistent with recommendation A and B. Consider the PN ranging shaping: sine wave only? Consider the range of ranging mod index h. Select h=0.1 or specify range with preferred value 0.1? Consider if both T2B and T4B should be included or only one code selected. Propose a range of chip rate/telemetry symbol rate ratios. Consider if constraints from the result of the action item on phase array jumps/nco offset need to be included. It was also agreed to prepare a summary of results to justify the selections for the above bulleted options GHz modulation Document SLS-RFM_11-02 was presented by NASA. The document was in response to AI_ Initial results presented by NASA in previous paper did not include any phase imbalance compensation. This is significant for 32 and 64 APSK. The overall results compare favorably with ESA and POLITO results. There still is less than 0.25 db difference in some cases and NASA results give better performance than ESA. This is expected to be due to the quantization used by ESA whereas NASA used floating point arithmetic. No error floor has been detected by NASA down to a BER of NASA considers therefore that the verification work is completed and recommends adding decoder specs in the SCCC book. 3/10

4 2.3 Modulation for Earth Relay 2-GHz links CCSDS SLS-RFM WG MEETING The working group reviewed and disposed all the RIDs (by DLR, ESA and NASA) received during agency review of the CCSDS red book R-1. Disposition of the individual RIDs can be found in each RID as submitted to CCSDS Secretariat. A revised document was generated and agreed at the meeting. However, some editorials mainly involving pictures in the document could not be fixed at the meeting due to the limited time availability. This editorial task was therefore assigned to the chairman with help from V. Sank. As soon as this is done, the document will be sent to CESG/CMC for adoption as Blue Book. Concerning the Green Book, the first draft provided per action AI_10-09 was briefly discussed at the meeting. It was noted that the title had to be the same as in the Blue Book. Figure 8A was found to have the same mistake (in code generators) as in the BB and should be changed. Also the figures containing NASA codes examples should be replaced with CCSDS codes examples. Performances should be added as well as an expanded section on time correlation. An action item was given to everybody to review the current draft GB as far as the material that is covered (AI_11-05) and provide comments within 2 months from this meeting. V. Sank took the action (AI_11-06) to provide a revised draft version 2 months prior to the Fall 2011 meeting. 2.4 Other work items (Miscellanea) GHz modulation Paper SLS-RFM_11-05 by NASA was presented. This input deals with recommendation B that recommends GMSK for symbol rates higher than 20 Msps. Since no modulation scheme is specified for lower rates, a non efficient scheme below this rate could use up all spectrum. Additionally, residual carrier modulation is needed for specific radio science experiments and for autotracking of certain antennas. NASA advocates both NRZ-L and bi-phase modulation directly on the carrier with a mod. index around 72 deg (1.25 rad). ESA stated that NRZ-L directly on the carrier would not be a good choice (was discarded for the 2 and 8 GHz bands) and would defeat the requirement for a clean carrier. It was noted that a companion paper on adopting 60-MHz channels was being sent to the upcoming SFCG. If such channelization was adopted by SFCG, CCSDS could start working on the needed modulation. The issue was tabled for the next CCSDS meeting Agency revision of pink recommendation (CCSDS P-20.1) Four RIDs were received from INPE and one from ECSS. The INPE RIDs were rejected since the changes requested by INPE were as a matter of fact the ones included in the pink version. The RID by ECSS was partly accepted and partly rejected. The accepted part relates to replacing may with could in the considering, and adding should in the recommend. The other requested changes (basically, a completely new structure for any recommendation) was rejected on the ground that the necessary resources to change this as well as all other individual recommendations in 401 are not available. 4/10

5 Disposition of the individual RIDs can be found in each RID as submitted to CCSDS Secretariat. The WG agreed to request CESG/CMC to proceed with adoption of the revised recommendation Proximity-1 Physical Layer Blue Book Paper SLS-RFM_11-03 by CNES was presented. This input deals with the frequency bands of the BB. Currently only the bands MHz (FW) and MHz (RT) are specified along with placeholders for unspecified S, X and Ka bands. The proposal by CNES is to add also the bands currently being proposed by CNES at SFCG for the lunar proximity. It was remarked that the current BB is restricted to Martian missions and therefore does not encompass lunar missions. Decision was taken to only leave the and MHz bands in the BB, delete all references to S, X and Ka bands, and add a generic placeholder section called Other frequency bands. Such decision resulted in changes to SLS-RFM_11-06 that would be presented at the joint meeting with C&S, NGU, RNG, SLP. 3. Joint meeting with C&S, NGU, RNG, SLP 3.1 NGU joint issues A short discussion took place on time tagging of telemetry with regenerative PN Ranging. Regenerative ranging requires inclusion of sophisticated correlating hardware in the flight transponder for the time-tagging of the spacecraft clock. 3.2 C&S joint issues Document SLS-RFM_11-02 by NASA was briefly presented also to this larger audience. Conclusions are as per section 2.2. No further work is needed since NASA and ESA results for SCCC are aligned. 3.3 Prox-1 physical layer BB issues Before presenting SLS-RFM_11-06 with the additional changes agreed by the RFM WG meeting on the frequency bands, discussion started on the common definitions to be used in all three Proximity-1 books. After several attempts, a symbol rate definition was agreed to be applied across these 3 books with the specific interface for the PL BB in the figure below: 5/10

6 This figure will be inserted in the PL BB along with the necessary text. Additionally, there is a need to cross check all instances of data/bit/symbol rates in the book so that they are aligned with the above definition (including checks of the bi-phase rate peculiarity). The frequency band changes agreed in the RFM WG meeting were presented to the joint meeting and accepted. E. Vassallo took the action (AI_11-07) to insert the frequency band changes, the symbol rate definition figure, cross check/change all data rates occurrences in the book and generate a clean document for further distribution to all interested WGs. G. Kazz and E. Vassallo took the action (AI_11-08) to submit the clean document generated by AI_11-07 to the NASA and ESA EXOMARS teams for an independent review. The goal is to finalize all discussions at the Fall 2011 meeting. It was agreed in principle to include the PICs pro-forma as an exception also in the PL BB for consistency with the other Prox-1 books. 5. Charter discussion The following was noted: Some activities (review of CDMA book and revised rec , high rate TLM and PN RNG, 26 GHz modulations) are approximately on schedule; Some activities (CDMA green book, 4D-8PSK TCM impairments) are behind schedule since required effort could not be made available. It was decided to revisit the charter at the Fall 2011 meeting. 6. Resolutions The meeting resolved to request publication of the revised recommendation 401 (2.2.8), on high rate telecommand. The meeting resolved to request publication of the blue book B-1, on CDMA for 2 GHz DRS links. 6/10

7 Annex 1 - Action Item List AI # AI description Actionee Due date AI_10-11 Modify recommendation (8PSK vs. 4D- 8PSK-TCM) for consistency with DVB-S2 and SCCC books when they become blue E. Vassallo (2) AI_10-12 Consider the two missing spectral efficiency G. Lesthievent (1) cases and finalize the analysis for Recommendation on 4D-8PSK-TCM impairments AI_11-01 Verify if the missing discrete lines in UQPSK/PN D. Lee (3) spectra is due to the resolution bandwidth used and check the levels of the existing lines AI_11-02 Provide the transfer function of the LPF filter in D. Lee (3) the receiver for the GMSK/PN case AI_11-03 Carry out a link budget for missions at Mars and G. Sessler (1) Lagrange (L2) so as to determine the expected typical end-to-end performance of GMSK/PN AI_11-04 Check the effect of phase array jumps and NCO G. Sessler (1) offset on ranging for GMSK/PN AI_11-05 Review the current draft CDMA GB as far as the ALL (4) material that is covered (contents) and provide comments AI_11-06 Provide revised draft CDMA GB V. Sank (5) AI_11-07 Insert the frequency band changes, the symbol E.Vassallo (6) rate definition figure, cross check/change all data rates occurrences in the Prox-1 PL BB and generate a clean document AI_11-08 Report on an independent review of the clean G. Kazz, (7) document generated by AI_11-07 via the NASA E.Vassallo and ESA EXOMARS teams (1) 2 weeks prior to Fall 2011 meeting. (2) Date dependent on approval of the two mentioned Blue Books. (3) 2 weeks after the Spring 2011 meeting. (4) 2 months after the Spring 2011 meeting. (5) 2 months prior to the Fall 2011 meeting. (6) By 1 September (7) By 1 October Note: deadlines shown in yellow highlight are those for which an early action is needed. 7/10

8 Annex 2 - List of Participants RF and Modulation Meeting CCSDS SLS-RFM WG MEETING (Please see other WG minutes for joint meetings participants) Name Affiliation E Vassallo (chairman) ESA enrico.vassallo@esa.int M. Bertinelli ESA massimo.bertinelli@esa.int G. Sessler ESA gunther.sessler@esa.int M. Baldi ESA/UNIVPM m.baldi@univpm.it L. Wu BITT wlmsh2000@sohu.com L. Li CAST lili.xian2012@gmail.com Y. Xu CAST yangxu561@hotmail.com X. Liang CSSAR/CAS liangxf@cssar.ac.cn J.L. Gerner CNES jeanluc.gerner@yahoo.com J.L. Issler CNES jean-luc.issler@cnes.fr G. Lesthievent CNES guy.lesthievent@cnes.fr D. Dikanskis DLR daniils.dikanskis@dlr.de W. Fong NASA/GSFC wai.h.fong@nasa.gov V. Sank NASA/GSFC/MEI victor.j.sank@nasa.gov H. Garon NASA/GSFC/MEI howard.garon@nasa.gov D. Lee NASA/JPL dennis.k.lee@jpl.nasa.gov F. Pollara NASA/JPL fabrizio.pollara@jpl.nasa.gov A. Schlesinger NASA/JSC adam.m.schlesinger@nasa.gov E. Chistov RFSA chistov@laspace.ru 8/10

9 Annex 3 - List of Input Papers Radio Frequency and Modulation: Paper Title Available/ Distributed Author SLS-RFM_11-XX 01 Synchronization analysis for GMSK/PN Modulation y/y M. Visintin, E. Vassallo 02 GFSC Evaluation of SCCC-based ESA Schemes - Findings and y/y H. Garon et. al. Recommendations 03 New frequencies proposed to be added to the PL-1 frequency set y/y J.L. Issler 04 Simulations of GMSK/PN and UQPSK y/y D. Lee 05 Proposed Changes to 32 GHz Modulation Recommendation y/y D. Lee 06 Proximity-1 Physical Layer Consolidated ESA and NASA changes y/y ESA and NASA 07 CCSDS 415 (CDMA) Agency Review - ESA RIDs y/y ESA 08 CCSDS 415 (CDMA) Agency Review - NASA RIDs y/y NASA 09 CCSDS 415 (CDMA) Agency Review - DLR RID y/y DLR 10 CCSDS 401 (Rec ) Agency Review ECSS RID y/y ECSS 11 CCSDS 401 (Rec ) Agency Review INPE RIDs y/y INPE 12 CDMA Green Book first draft version y/y V. Sank 9/10

10 Annex 4 - Agenda Date Item AI/REC Actionee / Author May 17 - a.m 1 Action items review Comments / Input Papers 2 New recommendations (22 and 26 GHz, Lunar and Earth Relay 2 GHz links, HR TLM and PN ranging) AI_09-16 AI_10-03 D. Lee E. Vassallo SLS-RFM_11-04 SLS-RFM_11-01 May 17 - p.m 3 New recommendations (22 and 26 GHz, Lunar and Earth Relay 2 GHz links, HR TLM and PN ranging) AI_10-10 H. Garon SLS-RFM_ Miscellanea Prox-1 frequencies J.L. Issler SLS-RFM_11-03 Prox-1 Physical Layer ESA and NASA SLS-RFM_ GHz modulation D. Lee SLS-RFM_11-05 Rec RID disposition May 18 - a.m. 5 New recommendations (22 and 26 GHz, Lunar and Earth Relay 2 GHz links, HR TLM and PN ranging) AI_10-09 ECSS INPE ESA NASA DLR V. Sank SLS-RFM_11-10 SLS-RFM_11-11 SLS-RFM_11-07 SLS-RFM_11-08 SLS-RFM_11-09 SLS-RFM_ Joint meeting with C&S, NGU, SLP May 19 - p.m. NGU joint issues C&S joint issues H. Garon SLS-RFM_11-02 Prox-1 Physical Layer ESA and NASA SLS-RFM_ /10

CCSDS SLS-RFM WG MEETING Rome, Italy, October 2016

CCSDS SLS-RFM WG MEETING Rome, Italy, October 2016 CCSDS SLS-RFM WG - 2016 Fall Meeting Rome (Italy) 17-21 October 2016 1. Action items review AI # AI description Actionee AI_15-04 Review the Oct-2015 GMSK+PN RNG GB plus All the carrier jitter section

More information

RADIO FREQUENCY AND MODULATION SYSTEMS PART 1: EARTH STATIONS AND SPACECRAFT

RADIO FREQUENCY AND MODULATION SYSTEMS PART 1: EARTH STATIONS AND SPACECRAFT Draft Recommendations for Space Data System Standards RADIO FREQUENCY AND MODULATION SYSTEMS PART 1: EARTH STATIONS AND SPACECRAFT DRAFT RECOMMENDED STANDARD CCSDS 401.0-P-26.1 PINK SHEETS March 2017 Draft

More information

SIMULTANEOUS TRANSMISSION OF GMSK TELEMETRY AND PN RANGING

SIMULTANEOUS TRANSMISSION OF GMSK TELEMETRY AND PN RANGING Report Concerning Space Data System Standards SIMULTANEOUS TRANSMISSION OF GMSK TELEMETRY AND PN RANGING INFORMATIONAL REPORT CCSDS 413.1-G-1 GREEN BOOK May 2017 Report Concerning Space Data System Standards

More information

DVB-S2 HOMs: EVM and PSD simulations in non-linear channel SLS-RFM_15-04

DVB-S2 HOMs: EVM and PSD simulations in non-linear channel SLS-RFM_15-04 Consultative Committee on Space Data Systems Space Link Services Radio Frequency and Modulation Working Group DVB-S2 HOMs: EVM and PSD simulations in non-linear channel 1. Introduction SLS-RFM_15-04 J.-P.

More information

CNES Position Regarding the Use of the X- X and Ka- Bands for EESS

CNES Position Regarding the Use of the X- X and Ka- Bands for EESS Orlando March 25-27, 2003 CNES Position Regarding the Use of the X- X and Ka- Bands for EESS Frédéric Cornet Centre National d'etudes Spatiales (Frederic.Cornet@cnes.fr) Data Rates Requirements Future

More information

Satellite System Engineering. -- Communication Telemetry/Tracking/Telecommand (TT&C)

Satellite System Engineering. -- Communication Telemetry/Tracking/Telecommand (TT&C) 1 st APSCO & ISSI-BJ Space Science School Satellite System Engineering -- Communication Telemetry/Tracking/Telecommand (TT&C) Prof Dr Shufan Wu Chinese Academy of Science (CAS) Shanghai Engineering Centre

More information

RADIO FREQUENCY AND MODULATION SYSTEMS

RADIO FREQUENCY AND MODULATION SYSTEMS Consultative Committee for Space Data Systems REPORT CONCERNING SPACE DATA SYSTEMS STANDARDS RADIO FREQUENCY AND MODULATION SYSTEMS SPACECRAFT-EARTH STATION COMPATIBILITY TEST PROCEDURES CCSDS 412.0-G-1

More information

Space engineering. Radio frequency and modulation. ECSS-E-ST-50-05C Rev. 2 4 October 2011

Space engineering. Radio frequency and modulation. ECSS-E-ST-50-05C Rev. 2 4 October 2011 ECSS-E-ST-50-05C Rev. 2 Space engineering Radio frequency and modulation ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series

More information

RECOMMENDATION ITU-R M.1580 *, ** Generic unwanted emission characteristics of base stations using the terrestrial radio interfaces of IMT-2000

RECOMMENDATION ITU-R M.1580 *, ** Generic unwanted emission characteristics of base stations using the terrestrial radio interfaces of IMT-2000 Rec. ITU-R M.1580 1 RECOMMENDATION ITU-R M.1580 *, ** Generic unwanted emission characteristics of base stations using the terrestrial radio interfaces of IMT-2000 (Question ITU-R 229/8) (2002) The ITU

More information

SPACE FREQUENCY COORDINATION GROUP (S F C G)

SPACE FREQUENCY COORDINATION GROUP (S F C G) SPACE FREQUENCY COORDINATION GROUP (S F C G) Recommendations Space Frequency Coordination Group The SFCG, Recommendation SFCG 4-3R3 UTILIZATION OF THE 2 GHz BANDS FOR SPACE OPERATION CONSIDERING a) that

More information

Experiment of 348 Mbps downlink from 50-kg class satellite

Experiment of 348 Mbps downlink from 50-kg class satellite 10th IAA Symposium on Small Satellites for Earth Observation April 20-24, 2015 Berlin, Germany IAA-B10-1302 Experiment of 348 Mbps downlink from 50-kg class satellite Tomoya Fukami, The University of Tokyo

More information

CCSDS Telemetry over DVB-S2: Characteristics, Receiver Implementation and Performances

CCSDS Telemetry over DVB-S2: Characteristics, Receiver Implementation and Performances CCSDS Telemetry over DVB-S2: Characteristics, Receiver Implementation and Performances Item Type text; Proceedings Authors Guérin, A.; Millerious, J.-P.; Deplancq, X.; Lesthievent, G.; Llauro, M.; Pasternak,

More information

RECOMMENDATION ITU-R SA Protection criteria for deep-space research

RECOMMENDATION ITU-R SA Protection criteria for deep-space research Rec. ITU-R SA.1157-1 1 RECOMMENDATION ITU-R SA.1157-1 Protection criteria for deep-space research (1995-2006) Scope This Recommendation specifies the protection criteria needed to success fully control,

More information

TSEK38 Radio Frequency Transceiver Design: Project work B

TSEK38 Radio Frequency Transceiver Design: Project work B TSEK38 Project Work: Task specification A 1(15) TSEK38 Radio Frequency Transceiver Design: Project work B Course home page: Course responsible: http://www.isy.liu.se/en/edu/kurs/tsek38/ Ted Johansson (ted.johansson@liu.se)

More information

Using Variable Coding and Modulation to Increase Remote Sensing Downlink Capacity

Using Variable Coding and Modulation to Increase Remote Sensing Downlink Capacity Using Variable Coding and Modulation to Increase Remote Sensing Downlink Capacity Item Type text; Proceedings Authors Sinyard, David Publisher International Foundation for Telemetering Journal International

More information

The Space Frequency Coordination Group (SFCG)

The Space Frequency Coordination Group (SFCG) The Space Frequency Coordination Group (SFCG) Edoardo Marelli ITU-R WP 7C Chairman and SFCG Executive Secretary ITU-R Seminar Manta (Ecuador) 20 September 2012 The SFCG in a nutshell The SFCG in a nutshell

More information

High Data Rate QPSK Modulator with CCSDS Punctured FEC channel Coding for Geo-Imaging Satellite

High Data Rate QPSK Modulator with CCSDS Punctured FEC channel Coding for Geo-Imaging Satellite International Journal of Advances in Engineering Science and Technology 01 www.sestindia.org/volume-ijaest/ and www.ijaestonline.com ISSN: 2319-1120 High Data Rate QPSK Modulator with CCSDS Punctured FEC

More information

THE RF MODELLING OF A GENERIC COMMUNICATIONS SATELLITE TRANSPONDER. P. James (1) Portsmouth, Hampshire, PO3 5PU, England

THE RF MODELLING OF A GENERIC COMMUNICATIONS SATELLITE TRANSPONDER. P. James (1) Portsmouth, Hampshire, PO3 5PU, England THE RF MODELLING OF A GENERIC COMMUNICATIONS SATELLITE TRANSPONDER P. James (1) Abstract (1) Astrium Ltd Portsmouth, Hampshire, PO3 5PU, England The increasing complexity of today s telecommunications

More information

Performance of Wideband Mobile Channel with Perfect Synchronism BPSK vs QPSK DS-CDMA

Performance of Wideband Mobile Channel with Perfect Synchronism BPSK vs QPSK DS-CDMA Performance of Wideband Mobile Channel with Perfect Synchronism BPSK vs QPSK DS-CDMA By Hamed D. AlSharari College of Engineering, Aljouf University, Sakaka, Aljouf 2014, Kingdom of Saudi Arabia, hamed_100@hotmail.com

More information

Payload measurements with digital signals. Markus Lörner, Product Management Signal Generation Dr. Susanne Hirschmann, Signal Processing Development

Payload measurements with digital signals. Markus Lörner, Product Management Signal Generation Dr. Susanne Hirschmann, Signal Processing Development Payload measurements with digital signals Markus Lörner, Product Management Signal Generation Dr. Susanne Hirschmann, Signal Processing Development Agenda ı Why test with modulated signals? ı Test environment

More information

Multi-Signal, Multi-Format Analysis With Agilent VSA Software

Multi-Signal, Multi-Format Analysis With Agilent VSA Software Multi-Signal, Multi-Format Analysis With Agilent 89600 VSA Software Ken Voelker Agilent Technologies Inc. April 2012 1 April, 25 2012 Agenda Introduction: New Measurement Challenges Multi-Measurements

More information

ECE 6390 Project : Communication system

ECE 6390 Project : Communication system ECE 6390 Project : Communication system December 9, 2008 1. Overview The Martian GPS network consists of 18 satellites (3 constellations of 6 satellites). One master satellite of each constellation will

More information

RECOMMENDATION ITU-R F.386-5

RECOMMENDATION ITU-R F.386-5 Rec. ITU-R F.386-5 1 RECOMMENDATION ITU-R F.386-5 RADIO-FREQUENCY CHANNEL ARRANGEMENTS FOR MEDIUM AND HIGH CAPACITY ANALOGUE OR DIGITAL RADIO-RELAY SYSTEMS OPERATING IN THE 8 GHz BAND (Question ITU-R 136/9)

More information

SHF Communication Technologies AG. Wilhelm-von-Siemens-Str. 23D Berlin Germany. Phone Fax

SHF Communication Technologies AG. Wilhelm-von-Siemens-Str. 23D Berlin Germany. Phone Fax SHF Communication Technologies AG Wilhelm-von-Siemens-Str. 23D 12277 Berlin Germany Phone +49 30 772051-0 Fax ++49 30 7531078 E-Mail: sales@shf.de Web: http://www.shf.de Application Note Jitter Injection

More information

Coordination and Analysis of GSO Satellite Networks

Coordination and Analysis of GSO Satellite Networks Coordination and Analysis of GSO Satellite Networks BR-SSD e-learning Center BR / SSD / SNP 1 Summary: 1) How to Identify Satellite Networks and other Systems for which Coordination is Required? 2) Several

More information

DVB-S2 Demodulator VHDL RTL/structural Macro

DVB-S2 Demodulator VHDL RTL/structural Macro Technical Specifications DVB-S2 Demodulator VHDL RTL/structural Macro DVB-S2 Macro is a DVB-S2 Demodulator VHDL design capable of Demodulating, on a single FPGA device of a suitable family, in CCM, VCM

More information

Sideband Smear: Sideband Separation with the ALMA 2SB and DSB Total Power Receivers

Sideband Smear: Sideband Separation with the ALMA 2SB and DSB Total Power Receivers and DSB Total Power Receivers SCI-00.00.00.00-001-A-PLA Version: A 2007-06-11 Prepared By: Organization Date Anthony J. Remijan NRAO A. Wootten T. Hunter J.M. Payne D.T. Emerson P.R. Jewell R.N. Martin

More information

RECOMMENDATION ITU-R F.386-6

RECOMMENDATION ITU-R F.386-6 Rec. ITU-R F.386-6 1 RECOMMENDATION ITU-R F.386-6 RADIO-FREQUENCY CHANNEL ARRANGEMENTS FOR MEDIUM AND HIGH CAPACITY ANALOGUE OR DIGITAL RADIO-RELAY SYSTEMS OPERATING IN THE 8 GHz BAND (Question ITU-R 136/9)

More information

RADIO FREQUENCY AND MODULATION SYSTEMS PART 1: EARTH STATIONS AND SPACECRAFT

RADIO FREQUENCY AND MODULATION SYSTEMS PART 1: EARTH STATIONS AND SPACECRAFT Draft Recommendations for Space Data System Standards RADIO FREQUENCY AND MODULATION SYSTEMS PART 1: EARTH STATIONS AND SPACECRAFT DRAFT RECOMMENDED STANDARD CCSDS 401.0-B-27.1 RED/PINK SHEETS August 2017

More information

X/X/Ka Deep Space Transponder & Ka-Band TWTA for Bepi-Colombo Mission to Mercury. BepiColombo Technology Status Review ESTEC, February 2005

X/X/Ka Deep Space Transponder & Ka-Band TWTA for Bepi-Colombo Mission to Mercury. BepiColombo Technology Status Review ESTEC, February 2005 X/X/Ka Deep Space Transponder & Ka-Band TWTA for Bepi-Colombo Mission to Mercury BepiColombo Technology Status Review ESTEC, 22-23 February 2005 Radio Frequency Subsystem BepiColombo RFS: Functional Block

More information

EE390 Final Exam Fall Term 2002 Friday, December 13, 2002

EE390 Final Exam Fall Term 2002 Friday, December 13, 2002 Name Page 1 of 11 EE390 Final Exam Fall Term 2002 Friday, December 13, 2002 Notes 1. This is a 2 hour exam, starting at 9:00 am and ending at 11:00 am. The exam is worth a total of 50 marks, broken down

More information

RECOMMENDATION ITU-R F Radio-frequency channel arrangements for fixed wireless systems operating in the 7 GHz band

RECOMMENDATION ITU-R F Radio-frequency channel arrangements for fixed wireless systems operating in the 7 GHz band Rec. ITU-R F.385-8 1 RECOMMENDATION ITU-R F.385-8 Radio-frequency channel arrangements for fixed wireless systems operating in the 7 GHz band (Question ITU-R 136/9) (1959-1963-1978-1982-1986-1990-1992-1994-2001-2005)

More information

SIGNAL PROCESSING WIRELESS COMMUNICATION RF TEST AND MEASUREMENT AUTOMOTIVE DEFENSE AND AEROSPACE

SIGNAL PROCESSING WIRELESS COMMUNICATION RF TEST AND MEASUREMENT AUTOMOTIVE DEFENSE AND AEROSPACE SIGNAL PROCESSING WIRELESS COMMUNICATION RF TEST AND MEASUREMENT AUTOMOTIVE DEFENSE AND AEROSPACE Your One-Stop Provider for In-Vehicle Infotainment (IVI Test), Set-Top-Box, Digital TV Mobile TV test solution.

More information

Satellite Communications: Part 4 Signal Distortions & Errors and their Relation to Communication Channel Specifications. Howard Hausman April 1, 2010

Satellite Communications: Part 4 Signal Distortions & Errors and their Relation to Communication Channel Specifications. Howard Hausman April 1, 2010 Satellite Communications: Part 4 Signal Distortions & Errors and their Relation to Communication Channel Specifications Howard Hausman April 1, 2010 Satellite Communications: Part 4 Signal Distortions

More information

206, Rev. B Telemetry General Information

206, Rev. B Telemetry General Information DSN Telecommunications Link Design Handbook Telemetry General Information Released October 31, 2009 Prepared by: Approved by: A. Kwok Date T. T. Pham Date DSN Chief System Engineer Released by: Signature

More information

RADIO FREQUENCY AND MODULATION SYSTEMS

RADIO FREQUENCY AND MODULATION SYSTEMS Consultative Committee for Space Data Systems RECOMMENDATIONS FOR SPACE DATA SYSTEM STANDARDS RADIO FREQUENCY AND MODULATION SYSTEMS PART 1 EARTH STATIONS AND SPACECRAFT CCSDS 401.0-B BLUE BOOK AUTHORITY

More information

TECHNICAL ANNEX 5G In-Band and Out-Of-Band Limits and Protection of FSS Earth Stations

TECHNICAL ANNEX 5G In-Band and Out-Of-Band Limits and Protection of FSS Earth Stations TECHNICAL ANNEX 5G In-Band and Out-Of-Band Limits and Protection of FSS Earth Stations The C-Band Alliance ( CBA ) reviewed and analyzed key technical questions raised in the opening round of comments

More information

Characteristics and protection criteria for non-geostationary mobile-satellite service systems operating in the band

Characteristics and protection criteria for non-geostationary mobile-satellite service systems operating in the band Recommendation ITU-R M.2046 (12/2013) Characteristics and protection criteria for non-geostationary mobile-satellite service systems operating in the band 399.9-400.05 MHz M Series Mobile, radiodetermination,

More information

TELECOMMUNICATION SATELLITE TELEMETRY TRACKING AND COMMAND SUB-SYSTEM

TELECOMMUNICATION SATELLITE TELEMETRY TRACKING AND COMMAND SUB-SYSTEM TELECOMMUNICATION SATELLITE TELEMETRY TRACKING AND COMMAND SUB-SYSTEM Rodolphe Nasta Engineering Division ALCATEL ESPACE Toulouse, France ABSTRACT This paper gives an overview on Telemetry, Tracking and

More information

Adoption of this document as basis for broadband wireless access PHY

Adoption of this document as basis for broadband wireless access PHY Project Title Date Submitted IEEE 802.16 Broadband Wireless Access Working Group Proposal on modulation methods for PHY of FWA 1999-10-29 Source Jay Bao and Partha De Mitsubishi Electric ITA 571 Central

More information

TD-CDMA Performance Degradation with the New OQPSK Spreading

TD-CDMA Performance Degradation with the New OQPSK Spreading ETSI SMG Tdoc SMG: 187/97 Meeting No. 24 Proposed Agenda Item 4.1 (UTRA) 15-19 December 1997 Madrid, Spain Source: Fujitsu TD-CDMA Performance Degradation with the New OQPSK 1. INTRODUCTION In the SMG2

More information

Lecture 9: Spread Spectrum Modulation Techniques

Lecture 9: Spread Spectrum Modulation Techniques Lecture 9: Spread Spectrum Modulation Techniques Spread spectrum (SS) modulation techniques employ a transmission bandwidth which is several orders of magnitude greater than the minimum required bandwidth

More information

On the Multi-User Interference Study for Ultra Wideband Communication Systems in AWGN and Modified Saleh-Valenzuela Channel

On the Multi-User Interference Study for Ultra Wideband Communication Systems in AWGN and Modified Saleh-Valenzuela Channel On the Multi-User Interference Study for Ultra Wideband Communication Systems in AWGN and Modified Saleh-Valenzuela Channel Raffaello Tesi, Matti Hämäläinen, Jari Iinatti, Ian Oppermann, Veikko Hovinen

More information

DoubleTalk Carrier-in-Carrier

DoubleTalk Carrier-in-Carrier DoubleTalk Carrier-in-Carrier Bandwidth Compression Providing Significant Improvements in Satellite Bandwidth Utilization September 27, 24 24 Comtech EF Data Corporation DoubleTalk Carrier-in-Carrier Rev

More information

Satellite Link Budget 6/10/5244-1

Satellite Link Budget 6/10/5244-1 Satellite Link Budget 6/10/5244-1 Link Budgets This will provide an overview of the information that is required to perform a link budget and their impact on the Communication link Link Budget tool Has

More information

Antenna Measurements using Modulated Signals

Antenna Measurements using Modulated Signals Antenna Measurements using Modulated Signals Roger Dygert MI Technologies, 1125 Satellite Boulevard, Suite 100 Suwanee, GA 30024-4629 Abstract Antenna test engineers are faced with testing increasingly

More information

NASA Spectrum Management Update: WRC-11 Issues and Objectives and Domestic Concerns

NASA Spectrum Management Update: WRC-11 Issues and Objectives and Domestic Concerns NASA Spectrum Management Update: WRC-11 Issues and Objectives and Domestic Concerns CORF Spring Meeting May 27, 2009 John Zuzek NASA Remote Sensing Spectrum Manager Agenda Overview WRC-11 Issues of Primary

More information

DraftETSI EN V1.2.1 ( )

DraftETSI EN V1.2.1 ( ) Draft EN 301 213-2 V1.2.1 (2000-04) European Standard (Telecommunications series) Fixed Radio Systems; Point-to-multipoint equipment; Point-to-multipoint digital radio systems in frequency bands in the

More information

Potential interference from spaceborne active sensors into radionavigation-satellite service receivers in the MHz band

Potential interference from spaceborne active sensors into radionavigation-satellite service receivers in the MHz band Rec. ITU-R RS.1347 1 RECOMMENDATION ITU-R RS.1347* Rec. ITU-R RS.1347 FEASIBILITY OF SHARING BETWEEN RADIONAVIGATION-SATELLITE SERVICE RECEIVERS AND THE EARTH EXPLORATION-SATELLITE (ACTIVE) AND SPACE RESEARCH

More information

Mobile Communication Services on Aircraft Publication date: May /34/EC Notification number: 2014/67/UK

Mobile Communication Services on Aircraft Publication date: May /34/EC Notification number: 2014/67/UK Draft UK Interface Requirement 2070 Mobile Communication Services on Aircraft Publication date: May 2014 98/34/EC Notification number: 2014/67/UK Contents Section Page 1 References 3 2 Foreword 4 3 Minimum

More information

Result of ESF Study Background and Draft Conclusions

Result of ESF Study Background and Draft Conclusions Result of ESF Study Background and Draft Conclusions Gerhard Kminek Planetary Protection Officer, ESA NASA Planetary Protection Subcommittee Meeting 1-2 May 2012, Washington D.C. Framework Agreement The

More information

Lecture 10 Performance of Communication System: Bit Error Rate (BER) EE4900/EE6720 Digital Communications

Lecture 10 Performance of Communication System: Bit Error Rate (BER) EE4900/EE6720 Digital Communications EE4900/EE6720: Digital Communications 1 Lecture 10 Performance of Communication System: Bit Error Rate (BER) Block Diagrams of Communication System Digital Communication System 2 Informatio n (sound, video,

More information

TESTING METHODS AND ERROR BUDGET ANALYSIS OF A SOFTWARE DEFINED RADIO By Richard Overdorf

TESTING METHODS AND ERROR BUDGET ANALYSIS OF A SOFTWARE DEFINED RADIO By Richard Overdorf TESTING METHODS AND ERROR BUDGET ANALYSIS OF A SOFTWARE DEFINED RADIO By Richard Overdorf SDR Considerations Data rates Voice Image Data Streaming Video Environment Distance Terrain High traffic/low traffic

More information

Spread Spectrum Communications and Jamming Prof. Kutty Shajahan M G S Sanyal School of Telecommunications Indian Institute of Technology, Kharagpur

Spread Spectrum Communications and Jamming Prof. Kutty Shajahan M G S Sanyal School of Telecommunications Indian Institute of Technology, Kharagpur Spread Spectrum Communications and Jamming Prof. Kutty Shajahan M G S Sanyal School of Telecommunications Indian Institute of Technology, Kharagpur Lecture - 06 Tutorial I Hello friends, welcome to this

More information

Receiver Architecture

Receiver Architecture Receiver Architecture Receiver basics Channel selection why not at RF? BPF first or LNA first? Direct digitization of RF signal Receiver architectures Sub-sampling receiver noise problem Heterodyne receiver

More information

3-2 Configuration for Mobile Communication Satellite System and Broadcasting Satellite Systems

3-2 Configuration for Mobile Communication Satellite System and Broadcasting Satellite Systems 3-2 Configuration for Mobile Communication Satellite System and Broadcasting Satellite Systems KOZONO Shin-ichi To realize S-band mobile satellite communications and broadcasting systems, onboard mission

More information

Protection criteria for non-gso data collection platforms in the band MHz

Protection criteria for non-gso data collection platforms in the band MHz Recommendation ITU-R SA.2044-0 (12/2013) Protection criteria for non-gso data collection platforms in the band 401-403 MHz SA Series Space applications and meteorology ii Rec. ITU-R SA.2044-0 Foreword

More information

BANDWIDTH-EFFICIENT MODULATIONS

BANDWIDTH-EFFICIENT MODULATIONS Report Concerning Space Data System Standards BANDWIDTH-EFFICIENT MODULATIONS SUMMARY OF DEFINITION, IMPLEMENTATION, AND PERFORMANCE INFORMATIONAL REPORT CCSDS 413.-G-3 GREEN BOOK February 218 Report Concerning

More information

C/I = log δ 3 log (i/10)

C/I = log δ 3 log (i/10) Rec. ITU-R S.61-3 1 RECOMMENDATION ITU-R S.61-3 NECESSARY PROTECTION RATIOS FOR NARROW-BAND SINGLE CHANNEL-PER-CARRIER TRANSMISSIONS INTERFERED WITH BY ANALOGUE TELEVISION CARRIERS (Question ITU-R 50/4)

More information

RECOMMENDATION ITU-R SM * Measuring of low-level emissions from space stations at monitoring earth stations using noise reduction techniques

RECOMMENDATION ITU-R SM * Measuring of low-level emissions from space stations at monitoring earth stations using noise reduction techniques Rec. ITU-R SM.1681-0 1 RECOMMENDATION ITU-R SM.1681-0 * Measuring of low-level emissions from space stations at monitoring earth stations using noise reduction techniques (2004) Scope In view to protect

More information

Explanation of Experiments and Need for Experimental License for use of Several Frequency Bands for Lab and Factory Missile Communications Testing

Explanation of Experiments and Need for Experimental License for use of Several Frequency Bands for Lab and Factory Missile Communications Testing Raytheon Missile Systems Application to Renew WF2XLI File No: 0036-EX-CR-2017 Explanation of Experiments and Need for Experimental License for use of Several Frequency Bands for Lab and Factory Missile

More information

EVALUATING THE EFFECTIVENESS OF HYPERSTACKING FOR GPR SURVEYS. Abstract

EVALUATING THE EFFECTIVENESS OF HYPERSTACKING FOR GPR SURVEYS. Abstract EVALUATING THE EFFECTIVENESS OF HYPERSTACKING FOR GPR SURVEYS Dr. Jeffrey Feigin, GSSI, Nashua, NH Dr. David Cist, GSSI, Nashua, NH Abstract Although some benefits of Real-Time Sampling (RTS) for Ground

More information

Field Tests of 348 Mbps High Speed Downlink System for 50-kg Class Satellite

Field Tests of 348 Mbps High Speed Downlink System for 50-kg Class Satellite Field Tests of 348 High Speed Downlink System for 50-kg Class Satellite By Tomoya FUKAMI 1), Hiromi WATANABE 1), Hirobumi SAITO 2), Atsushi TOMIKI 2), Takahide MIZUNO 2), Naohiko IWAKIRI 3), Osamu SHIGETA

More information

- 1 - Rap. UIT-R BS Rep. ITU-R BS.2004 DIGITAL BROADCASTING SYSTEMS INTENDED FOR AM BANDS

- 1 - Rap. UIT-R BS Rep. ITU-R BS.2004 DIGITAL BROADCASTING SYSTEMS INTENDED FOR AM BANDS - 1 - Rep. ITU-R BS.2004 DIGITAL BROADCASTING SYSTEMS INTENDED FOR AM BANDS (1995) 1 Introduction In the last decades, very few innovations have been brought to radiobroadcasting techniques in AM bands

More information

BROADCAST SERVICES FOR NOAA S NPP/JPSS In response to CGMS action 38.47

BROADCAST SERVICES FOR NOAA S NPP/JPSS In response to CGMS action 38.47 Prepared by NOAA Agenda Item: IV/1 Discussed in WG IV BROADCAST SERVICES FOR NOAA S NPP/JPSS In response to CGMS action 38.47 In response to CGMS action 38.47, NOAA presented information on the direct

More information

PSEUDO-NOISE (PN) RANGING SYSTEMS

PSEUDO-NOISE (PN) RANGING SYSTEMS Recommendation for Space Data System Standards PSEUDO-NOISE (PN) RANGING SYSTEMS RECOMMENDED STANDARD CCSDS 414.1-B-2 BLUE BOOK February 2014 Recommendation for Space Data System Standards PSEUDO-NOISE

More information

SECTION 2 BROADBAND RF CHARACTERISTICS. 2.1 Frequency bands

SECTION 2 BROADBAND RF CHARACTERISTICS. 2.1 Frequency bands SECTION 2 BROADBAND RF CHARACTERISTICS 2.1 Frequency bands 2.1.1 Use of AMS(R)S bands Note.- Categories of messages, and their relative priorities within the aeronautical mobile (R) service, are given

More information

EUROPEAN pr ETS TELECOMMUNICATION July 1995 STANDARD

EUROPEAN pr ETS TELECOMMUNICATION July 1995 STANDARD DRAFT EUROPEAN pr ETS 300 630 TELECOMMUNICATION July 1995 STANDARD Source: ETSI TC-TM Reference: DE/TM-04014 ICS: 33.020, 33.040.40 Key words: Low capacity digital radio relay equipment, point-to-point,

More information

THE CO-EXISTENCE OF SPREAD SPECTRUM RANGING SIGNAL IN INDIAN NATIONAL SATELLITE-1B (INSAT-IB) WITH TV OR SCPC CHANNELS

THE CO-EXISTENCE OF SPREAD SPECTRUM RANGING SIGNAL IN INDIAN NATIONAL SATELLITE-1B (INSAT-IB) WITH TV OR SCPC CHANNELS THE CO-EXISTENCE OF SPREAD SPECTRUM RANGING SIGNAL IN INDIAN NATIONAL SATELLITE-1B (INSAT-IB) WITH TV OR SCPC CHANNELS Item Type text; Proceedings Authors Lal, P.M.C.; Palsule, V.S.; Kumar, Pramod Publisher

More information

0.6 kbits/s, the modulation shall be aviation binary phase shift keying (A-BPSK).

0.6 kbits/s, the modulation shall be aviation binary phase shift keying (A-BPSK). SECTION 3 RF CHANNEL CHARACTERISTICS 3.1 Modulation 3.1.1 Modulation for channel rates 2.4 kbits/s and below. For channel rates of 2.4, 1.2 and 0.6 kbits/s, the modulation shall be aviation binary phase

More information

ON SYMBOL TIMING RECOVERY IN ALL-DIGITAL RECEIVERS

ON SYMBOL TIMING RECOVERY IN ALL-DIGITAL RECEIVERS ON SYMBOL TIMING RECOVERY IN ALL-DIGITAL RECEIVERS 1 Ali A. Ghrayeb New Mexico State University, Box 30001, Dept 3-O, Las Cruces, NM, 88003 (e-mail: aghrayeb@nmsu.edu) ABSTRACT Sandia National Laboratories

More information

MODULATION AND MULTIPLE ACCESS TECHNIQUES

MODULATION AND MULTIPLE ACCESS TECHNIQUES 1 MODULATION AND MULTIPLE ACCESS TECHNIQUES Networks and Communication Department Dr. Marwah Ahmed Outlines 2 Introduction Digital Transmission Digital Modulation Digital Transmission of Analog Signal

More information

MultiMaster. Base Station Test Tools. Multi Purpose Base Station Tester. Introduction. Feature

MultiMaster. Base Station Test Tools. Multi Purpose Base Station Tester. Introduction. Feature Introduction The GenComm is a comprehensive and cost effective solution for performing base station and repeater maintenance in any environment covering all CDMA Standards including cdmaone, cdma2000 1x

More information

ANALYTICAL AND EXPERIMENTAL CHARACTERIZATION OF SOQPSK AND MULTI-H CPM IN A MULTIPATH CHANNEL

ANALYTICAL AND EXPERIMENTAL CHARACTERIZATION OF SOQPSK AND MULTI-H CPM IN A MULTIPATH CHANNEL ANALYTICAL AND EXPERIMENTAL CHARACTERIZATION OF SOQPSK AND MULTI-H CPM IN A MULTIPATH CHANNEL Item Type text; Proceedings Authors Hill, Terrance J. Publisher International Foundation for Telemetering Journal

More information

RECOMMENDATION ITU-R S.1594 *

RECOMMENDATION ITU-R S.1594 * Rec. ITU-R S.1594 1 RECOMMENDATION ITU-R S.1594 * Maximum emission levels and associated requirements of high density fixed-satellite service earth stations transmitting towards geostationary fixed-satellite

More information

Getting Started Guide

Getting Started Guide MaxEye IEEE 0.15.4 UWB Measurement Suite Version 1.0.0 Getting Started Guide 1 Table of Contents 1. Introduction... 3. Installed File Location... 3 3. Programming Examples... 4 3.1. 0.15.4 UWB Signal Generation...

More information

ETSI TS V4.0.0 ( )

ETSI TS V4.0.0 ( ) TS 151 026 V4.0.0 (2002-01) Technical Specification Digital cellular telecommunications system (Phase 2+); GSM Repeater Equipment Specification (3GPP TS 51.026 version 4.0.0 Release 4) GLOBAL SYSTEM FOR

More information

Digital Audio Broadcasting Eureka-147. Minimum Requirements for Terrestrial DAB Transmitters

Digital Audio Broadcasting Eureka-147. Minimum Requirements for Terrestrial DAB Transmitters Digital Audio Broadcasting Eureka-147 Minimum Requirements for Terrestrial DAB Transmitters Prepared by WorldDAB September 2001 - 2 - TABLE OF CONTENTS 1 Scope...3 2 Minimum Functionality...3 2.1 Digital

More information

Digital data (a sequence of binary bits) can be transmitted by various pule waveforms.

Digital data (a sequence of binary bits) can be transmitted by various pule waveforms. Chapter 2 Line Coding Digital data (a sequence of binary bits) can be transmitted by various pule waveforms. Sometimes these pulse waveforms have been called line codes. 2.1 Signalling Format Figure 2.1

More information

NXDN Signal and Interference Contour Requirements An Empirical Study

NXDN Signal and Interference Contour Requirements An Empirical Study NXDN Signal and Interference Contour Requirements An Empirical Study Icom America Engineering December 2007 Contents Introduction Results Analysis Appendix A. Test Equipment Appendix B. Test Methodology

More information

Future Concepts for Galileo SAR & Ground Segment. Executive summary

Future Concepts for Galileo SAR & Ground Segment. Executive summary Future Concepts for Galileo SAR & Ground Segment TABLE OF CONTENT GALILEO CONTRIBUTION TO THE COSPAS/SARSAT MEOSAR SYSTEM... 3 OBJECTIVES OF THE STUDY... 3 ADDED VALUE OF SAR PROCESSING ON-BOARD G2G SATELLITES...

More information

K/Ka Band for Space Operation Services, Pros and Cons. ITU International Satellite Symposium 2017 Ing. Hernan Sineiro

K/Ka Band for Space Operation Services, Pros and Cons. ITU International Satellite Symposium 2017 Ing. Hernan Sineiro K/Ka Band for Space Operation Services, Pros and Cons ITU International Satellite Symposium 2017 Ing. Hernan Sineiro Spacecraft Operation Historically the S-Band was used for LEO satellite tracking, telemetry

More information

JPL Spectrum Management Process

JPL Spectrum Management Process JPL Spectrum Management Process CORF Meeting Irvine, California Paul E. Robbins October 17, 2005 JPL SPECTRUM MANAGEMENT ROLES AND RESPONSIBILITIES Plan and coordinate frequency allocations, assignments,

More information

ELT Radio Architectures and Signal Processing. Motivation, Some Background & Scope

ELT Radio Architectures and Signal Processing. Motivation, Some Background & Scope Introduction ELT-44007/Intro/1 ELT-44007 Radio Architectures and Signal Processing Motivation, Some Background & Scope Markku Renfors Department of Electronics and Communications Engineering Tampere University

More information

RESEARCH ON METHODS FOR ANALYZING AND PROCESSING SIGNALS USED BY INTERCEPTION SYSTEMS WITH SPECIAL APPLICATIONS

RESEARCH ON METHODS FOR ANALYZING AND PROCESSING SIGNALS USED BY INTERCEPTION SYSTEMS WITH SPECIAL APPLICATIONS Abstract of Doctorate Thesis RESEARCH ON METHODS FOR ANALYZING AND PROCESSING SIGNALS USED BY INTERCEPTION SYSTEMS WITH SPECIAL APPLICATIONS PhD Coordinator: Prof. Dr. Eng. Radu MUNTEANU Author: Radu MITRAN

More information

Protection criteria related to the operation of data relay satellite systems

Protection criteria related to the operation of data relay satellite systems Recommendation ITU-R SA.1155-2 (07/2017) Protection criteria related to the operation of data relay satellite systems SA Series Space applications and meteorology ii Rec. ITU-R SA.1155-2 Foreword The role

More information

PULSE CODE MODULATION TELEMETRY Properties of Various Binary Modulation Types

PULSE CODE MODULATION TELEMETRY Properties of Various Binary Modulation Types PULSE CODE MODULATION TELEMETRY Properties of Various Binary Modulation Types Eugene L. Law Telemetry Engineer Code 1171 Pacific Missile Test Center Point Mugu, CA 93042 ABSTRACT This paper discusses the

More information

PXI-based Radio Communications Testing. Reduce the size of your test bench at the same time you reduce cost while facilitating seamless automation.

PXI-based Radio Communications Testing. Reduce the size of your test bench at the same time you reduce cost while facilitating seamless automation. PXI-based Radio Communications Testing Reduce the size of your test bench at the same time you reduce cost while facilitating seamless automation. Introduction General radio communications testing often

More information

Signal Generators for Anritsu RF and Microwave Handheld Instruments

Signal Generators for Anritsu RF and Microwave Handheld Instruments Measurement Guide Signal Generators for Anritsu RF and Microwave Handheld Instruments BTS Master Spectrum Master Tracking Generator Option 20 Vector signal Generator Option 23 Anritsu Company 490 Jarvis

More information

COSPAS-SARSAT ACCEPTANCE OF 406 MHz BEACON TYPE APPROVAL TEST FACILITIES

COSPAS-SARSAT ACCEPTANCE OF 406 MHz BEACON TYPE APPROVAL TEST FACILITIES COSPAS-SARSAT ACCEPTANCE OF 406 MHz BEACON TYPE APPROVAL TEST FACILITIES C/S T.008 Issue 2 T8NOV05 i C/S T.008 - Issue 2 COSPAS-SARSAT ACCEPTANCE OF 406 MHz BEACON TYPE APPROVAL TEST FACILITIES History

More information

A new generation Cartesian loop transmitter for fl exible radio solutions

A new generation Cartesian loop transmitter for fl exible radio solutions Electronics Technical A new generation Cartesian loop transmitter for fl exible radio solutions by C.N. Wilson and J.M. Gibbins, Applied Technology, UK The concept software defined radio (SDR) is much

More information

EE 460L University of Nevada, Las Vegas ECE Department

EE 460L University of Nevada, Las Vegas ECE Department EE 460L PREPARATION 1- ASK Amplitude shift keying - ASK - in the context of digital communications is a modulation process which imparts to a sinusoid two or more discrete amplitude levels. These are related

More information

Picking the Optimal Oscilloscope for Serial Data Signal Integrity Validation and Debug

Picking the Optimal Oscilloscope for Serial Data Signal Integrity Validation and Debug Picking the Optimal Oscilloscope for Serial Data Signal Integrity Validation and Debug Application Note 1556 Introduction In the past, it was easy to decide whether to use a real-time oscilloscope or an

More information

ETSI EN V1.3.1 ( )

ETSI EN V1.3.1 ( ) EN 301 926 V1.3.1 (2017-10) EUROPEAN STANDARD Satellite Earth Stations and Systems (SES); Radio Frequency and Modulation Standard for Telemetry, Command and Ranging (TCR) of Communications Satellites 2

More information

INTRODUCTION OF RADIO MICROPHONE APPLICATIONS IN THE FREQUENCY RANGE MHz

INTRODUCTION OF RADIO MICROPHONE APPLICATIONS IN THE FREQUENCY RANGE MHz European Radiocommunications Committee (ERC) within the European Conference of Postal and Telecommunications Administrations (CEPT) INTRODUCTION OF RADIO MICROPHONE APPLICATIONS IN THE FREQUENCY RANGE

More information

EXPERIMENTAL STATION FREQUENCY COORDINATION REQUEST 1 USING FREQUENCIES ALLOCATED TO THE AMATEUR AND AMATEUR-SATELLITE SERVICES

EXPERIMENTAL STATION FREQUENCY COORDINATION REQUEST 1 USING FREQUENCIES ALLOCATED TO THE AMATEUR AND AMATEUR-SATELLITE SERVICES EXPERIMENTAL STATION FREQUENCY COORDINATION REQUEST 1 USING FREQUENCIES ALLOCATED TO THE AMATEUR AND AMATEUR-SATELLITE SERVICES I. Coordination procedure. 1. IARU frequency coordination is provided through

More information

Transmit Diversity Schemes for CDMA-2000

Transmit Diversity Schemes for CDMA-2000 1 of 5 Transmit Diversity Schemes for CDMA-2000 Dinesh Rajan Rice University 6100 Main St. Houston, TX 77005 dinesh@rice.edu Steven D. Gray Nokia Research Center 6000, Connection Dr. Irving, TX 75240 steven.gray@nokia.com

More information

IEEE P Wireless Personal Area Networks. LB34 Ranging comment resolution

IEEE P Wireless Personal Area Networks. LB34 Ranging comment resolution 0 0 0 0 0 0 Project Title Date Submitted Source Re: [] Abstract Purpose Notice Release P0. Wireless Personal Area Networks P0. Working Group for Wireless Personal Area Networks (WPANs) LB Ranging comment

More information

DIGITAL COMMUNICATIONS SYSTEMS. MSc in Electronic Technologies and Communications

DIGITAL COMMUNICATIONS SYSTEMS. MSc in Electronic Technologies and Communications DIGITAL COMMUNICATIONS SYSTEMS MSc in Electronic Technologies and Communications Bandpass binary signalling The common techniques of bandpass binary signalling are: - On-off keying (OOK), also known as

More information

LESSONS LEARNED TELEMTRY REDUNDANCY AND COMMANDING OF CRITICAL FUNCTIONS

LESSONS LEARNED TELEMTRY REDUNDANCY AND COMMANDING OF CRITICAL FUNCTIONS TELEMTRY REDUNDANCY AND COMMANDING OF CRITICAL FUNCTIONS Subject Origin References Engineering Discipline(s) Reviews / Phases of Applicability Keywords Technical Domain Leader Redundancy on telemetry link

More information