JE A 575 I Oil Based Caulking. Compounds for Buildings JAPANESE I NDUSTRIAL STANDARD. Japanese Standards Association
|
|
- Giles Chambers
- 5 years ago
- Views:
Transcription
1 a JIS UDC JAPANESE I NDUSTRIAL STANDARD e Oil Based Caulking Compounds for JE A 575 I e Translated and Published by Japanese Standards Association Printed in Japan
2 JIS A m 4933b08 CI B Translation without guarantee in the event of any doubt arising, the original standard in Japanese is to be evidence
3 JIS Ax m T m -_ -~ ~- e JAPANESE INDUSTRIAL STANDARD UDC JIS Oil Based Caulking Compounds for Buildings (Reaffirmed: 1983) 1, Scope a 1 e This Japanese Industrial Standard specifies oil based caulking compounds ( ) to be applied for the joint portions, the space filling around sashes and to mend the cracks of buildings, hereinafter referred to as the caulking compound. Note (l) Remark: Caulking compounds are classified into such two groups as gun caulking compounds and knife caulking compounds or especially as for summer use or for winter use. The units and numerical values given in { } in this standard are in accordance with the International System of Units (SI), and are appended for reference, 2. Crude Material and Manufacturing. The caulking compound shall be manufactured from mineral filler (such as asbestos, calcium carbonate) and liquid extender (such as natural or synthetic oils and fats or resin) as principal material by well-mixed into uniformness. These raw materials and manufactured caulking compounds shall be free from those injurious to men and beasts. 3. Quality 3.1 The caulking compounds shall have the appropriate workability and shall be free from affecting steel, aluminium and others which come in contact herewith The caulking compounds shall not have remarkable colour difference compared with the specimen which is prescribed by the agreement between the parties concerned. Applicable Standards: JIS K 2201-Gasoline for Industrial Purpose JIS K 2530-Testing Method for Penetration of Petroleum Asphalt JIS K 8575-Calcium Hydroxide JIS P 3801-Filter Paper (for Chemical Analysis) JIS R 9111-Plaster of Paris Mold for Pottery JIS Rules for Rounding off of Numerical Values JIS Z 9001-General Rules for Sampling Inspection Procedures ~-
4 JIS A*575L 75 W 4933b L The caulking compounds shall conform to the requirements specified in Table 1. The test shall be carried out in a room and the test temperature shall be OCI2OoC 1: 3 KI. Provided that those marked with "for summer use" or "for winter use" shall be subjected to the test respectively at OC { 3OoC i 3 K} or 5 & 2OC {5OC i 2 KI. Items Table 1 I Specified Contraction (%) I 7 max. Oi 1 pieces (sheets) Slump (mm) Adhesion Hardening rate (%) Crack Alkali resistance 5 max. 3 max. 3 max. Accepted 30 max. Accepted I Accepted 4. Tests 4.1 Rounding off of Numerical Value The rounding off of numerical value shall comply with JIS Z Contraction following Test Devices The test devices shall be of those shown in the (1) to (4) (see Fig. 1). (1) (2) Ring This shall be of those made of anti-corrosive metal having 12 mm in height, about 65 mm in inner diameter and about 2 mm in thickness, The upper and lower surfaces shall be finished in flatness and shall come in close contact with the upper and lower boards respectively. Upper Board and Lower Board These shall be of glass plates having a size of about 85 mm x 85 mm, the upper board (2) 2 mm in thickness and the lower board 3 mm therein, also free from warping strain and well kept in close contact with the ring. ( 3) Levelling Spatula Fig. 1 (3). This shall be of those having the size shown in
5 3 (4) Burette This shall be those having a content not more than 50 ml and to be used in chemical analysis. Notes (2) it makes the glass plate easily operatable to cut a notch of V-shape on the upper board beforehand. i (3) When pack the interior of anti-corrosive ring with the sample, those to be able to level1 at 4 mm in height of the sample Test Method (1) Volumetry of Rin Mount the ring approximately upon the middle of the lower boar:.and let come in close contact ( 4, with each other so as not to leak water. Fill water (at about 20%) to about fullness in the ring with a burette, cover with the upper board ( 5, and further add water until no air bubble have been seen more. Find the volume v, (mi) of ring from the reading difference of the burette. (2) Volume of Sample and Measurement of Contraction Upon the approximately middle of the lower board mount the ring, upon the lower board within the interior of ring let the sample keep well in close contact with the ring and the lower board, spread so as not to let the clearance admit thereinto, level to flatness by the use of a levelling spatula and make the thickness of the sample 4 mm. Fill up the water to about fullness in vacant portion of the ring by the use of a burette, cover ( 5, with the upper board and add water until no air bubble have been seen more in the interior. Find the poured water quantity VI (mi) from the reading the burette. Discard the poured water, remove the upper board, place three pieces of specimens within a desiccator (240 mm in diameter of middle board) of 45 k 3 % (6) humidity, let alone for 15 days and find also similarly the poured water quantity v2 (mi). Find the contraction S (%) of the sample from the following formula: where ve : volume of sample (mi) Ve (mi) = V, - VI
6 ~~~~ JIS A*575L Notes (4) At this time it is preferable to seal from the outer side of the lower board and ring with grease so as not to leak water. When covering with the upper board, carry out so as to slide upon the ring, however, never press from above the upper board. In order to maintain the humidity at 45 i 3 %, it is preferable to use saturated potassium carbonate solution. Rem ark : When the test device is weighed before and after filling the sample in the ring, the weighing of the sample enables to find the apparent specific gravity of the sample. Hereby the existence of vacant space is to be capable of being checked. Fig. 1. Test Device of Contraction Upper board (glass plate 2 mm) Anti-corrosive metaiiic ring Lower board I portion of caulking compounds) Levelling spatula n.- - About 1 mm 4. 3 Oil Retention About 1 mm smaller - than inner diameter of ring Test Devices Use the test devices as shown in the following (1) to (3): (1) Ring The Mng same as the ring for contraction test specified i n 2. 1 (1). (2) Lower Board The board same as the lower board for contraction test specified in (2).
7 5 (3) Filter Paper The filter paper of 11 cm diametral Class 2 specified in JIS P L, Test Method Heap the filter paper in five sheets upon a glass plate and place the ring on the approximate middle. Fill up the ring to fullness to the upper rim with the sample and level to flatness. After letting alone for 15 days measure the stains on the filter paper as follows: (1) Measure the stained width from inner periphery to outward of the ring at the quartering point including the maximum staining width and the average value (mm). (2) Count the number of sheets of oil stained paper including the filter paper being in contact with the caulking compounds. 4.4 Slump Test Devices Use the test devices as those shown in the following: (1) Channel Type Container Those made of brass sheet (about 1 mm thick) into a channel shape of 100 mm in length, 15 mm in inner width and 10 mm in depth. Polish the inner surface of the channel in finishing and let it in vertical when being loaded with the sample (see Fig. 2). (2) Cleanse the test device with Grada No. 2 in JIS K 2201 and furthermore wash it with neutral detergent. Next, wash well with water and confirm the cleanness. Fig. 2. Channel Type Container for Slump Test Unit: mm
8 JIS A*575L btI8 U Test Method So as to let the channel type container not admit air bubble, fill up the channel carefully with the sample uniformly to fullness. Suspend this for 24 h in vertical and then suspend successively for 24 h in vertical within a vessel at a temperature 30% K higher than that specified in 3.3. Express the slump value by the distance from the lower end of the container to the suspending tip in mm. 4.5 Adhesion Test Devices Use the test devices as shown in the following (1) to (3): (1) Filling Table Those as shown in Fig. 3. (2) Pulling Bed Those as shown in Fig. 4. (3) Gypsum Square Bar Mix gypsum ( ) and Toyoura standard sand for Portland cement testing at a ratio of 1 : 1 by weight, make into a gypsum mortar at a water-gypsum ratio of about 60 % and mould into a size of 18 mm x 18 mm x 130 mm. The gypsum square bar shall be dried at a temperature of about 40% to a constant weight before being used for the test. (4) Cleanse the filling table in compliance with (2). Note ( 7, To be those of Grade A specified in JIS R Test Method (1) Fill the sample up to about fullness into a joint portion (15 mm x 15 mm x 110 mm) in the filling table between the gypsum square bar and the fixing bed as shown in Fig. 3, and keep it stand for 15 days. Carry out the filling by the use of a spatula or a knife carefully so as not to let stain the upper surface of gypsum square bar. In this case, set the equipment so as to let the caulking compounds come in contact with the moulded surface side of gypsum square bar. (2) After leaving for 15 days, cutting the middle of the surface skin on the sample, if formed, slightly in the longitudinal direction with a razor or others, fit the filling table to a pulling device as shown in Fig. 4 and detach the fixing device for the gypsum square bar. In this case fit the fixing bed so as to be fixed by being engaged into the groove existing in the pulling device.
9 7 (3) Next, fit the hook as Fig. 4, pull in a distance of 15 mm and observe the state of the sample and the adhesion of it to the fixing bed as well as to the gypsum square bar. Consider those free from breaking-off of adhesive surface and sample to be accepted. Note Remark: Consider the standard required time to be 20 sec. Care should be taken on use when there is seeping of oil of not less than 5 mm from the contact surface of sample to gypsum square bar. Fig. 3. Filling Table for Adhesion Test Unit: mm
10 ~ 8 ~ A JI'S A*575L 75 W Fig. 4. Pulling Bed Unit: mm Fastener (fixing device) Caulking compound 4.6 Hardening Rate Test Devices Use the test devices as shown in the following (1) to (3): (1) Filling Device This shall be of those shown in Fig. 5. (2) Penetrometer This shall be the penetrometer and needle specified in JIS K (3) Gypsum Square Bar This shall be moulded in similar manner to the gypsum square bar specified in (3). Provided that the size shall be considered to be 20 mm x 40 mm x 100 mm Test Method (1) Fill the sample into the caulking compound filling part (15 mm x 40 mm x 95 mm) of the filling device shown in Fig. 5 to about fullness. Carry out the filling by the use of a spatula or knife carefully enough so as not to let air bubbles admit therein.
11 9 (2) Next, after standing still for about 24 h, remove surface skin produced, if any, let the needle or penetration measurement penetrate for 5 sec. at the falling gross weight of 12.5 g along the joint centre, and measure the said penetration quantity up to 0.1 mm by means of a penetrometer. Carry out the measurement three times and find the average value Pl. Wipe the needle at every time of measurement with a soft cloth saturated with a small quantity of industrial gasoline specified in (2) and further wipe with a dry soft cloth to use. (3) Level the surface of the sample, let alone for 14 continuous days, remove the surface skin produced, if any, and find the average penetration quantity Ps in the same method as (2). (4) Find the hardening rate from the following formula: Hardening rate (%) = V X 100 Remark: In case where the measured value is strikingly changing, there is possibly the case of vacant space existing in the sample. In such a case re-test may be carried out. Fig. 5. Filling Device Unit: mm Gypsum square bar Space to be filled with caulking compounds Space to be filled with caulking compounds
12 JIS A* OU03383 O Cracks Before pulling in the adhesion test and before removing the surface skin in the hardening rate test, observe with the naked eye the existence of surface cracks also the existence of stripping in the adhesive portion. At this time accept the case where no crack and stripping are.produced. 4.8 Alkali Resistance Test Devices Use the test devices as shown in the following (1) Polyethylene Beaker content. This shall be of those having 300 ml Test Tube This shall be of those about 15 mm in outer diameter and 105 mm in length. Test Method Wash well the outer surface of a test tube with a hanger at the top as shown in Fig. 6, dry and then apply the sample in a thickness of about 3 mm as shown in Fig. 6. Pour about 300 ml of saturated calcium hydroxide solution of Grade 1 specified in JIS K 8575 into a polyethylene beaker and hereinto hang the test tube in the approximate middle of the beaker so as to let the lower sample immerse by 3 cm into the solution. After being immersed for 15 days, cut the sample to strip off and observe the adhesivity to the glass. Accept the case where there is no difference between the adhesivities of the upper and lower samples seen. Remark: In case where no alkali resistance is especially needed, the test may be omitted.
13 11 Fi.g. 6. Test Device for Alkali Resistance Unit: mm! about 3 mm in thickness) about 3 mm in thickness) 5. Inspection i 300 mi polyethylene beaker The inspection shall be so carried out on the size of the lot in compliance with JIS Z 9001 and taking three specimens for every test. The adhesivity, crack and alkali resistance shall accept the said lot in the case where all the three pieces are approved. Idening: rate shall accedt the where X : Sv : average value for measured values of three pieces upper limited standard value shown in Table 1 U : standard deviation, in general found from past data in the works. In case where no inspection data is available and standard deviation is unknown, the number of specimens shall be seven and found from the following formula:
14 JIS A*575L 75 W' where xi, x,,...x,: u : standard deviation g : individual measured values average value of measured values 6. Marking r The caulking compounds shall be marked for each container clearly with the commodity name, content, manufacturer's name and date of manufacture or the abbreviation, storage limit and the working temperature range.
15 l i Edition 1 Japanese Text Established by Minister of International Trade and Industry Date of Establishment: O1 Date of Revision: Date of Reaffirmation: Date of Public Notice in Official Gazette: Investigated by: Japanese Industrial Standards Committee Divisional Council on Architecture Technical Committee on Caulking Compounds for Buildings This English translation is published by: Japanese Standards Association 1-24, Akasaka 4, Minato- ku, Tokyo 107 Japan 0 JSA, 1985 Rinted in Tokyo by Hdibundia Co.,Ltd. e-
Test methods for lead-free solders- Part 5 : Methods for tensile tests and shear tests on solder joints
IS JAPANESE STRIAL STANDARD Translated and Published by Japanese Standards Association Test methods for lead-free solders- Part 5 : Methods for tensile tests and shear tests on solder joints ICs 25.160.50
More informationMAGNUM BOARD INTERIOR INSTALLATION GUIDELINES
TECHNICAL BULLETIN No.: 090509-1405 Subject: Issue Date: September 4, 2009 Issue No.: II MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES 1. CUTTING MAGNUM BOARD You can easily cut Magnum Board with carbide
More informationJIS G3465 Seamless Steel Tubes for Drilling
JIS G3465 Seamless Steel Tubes for Drilling 1. Scope This Japanese Industrial Standard specifies the seamless steel tubes, hereinafter referred to as the "tubes", used for casing tube, core tube and drill
More informationMeasurement instruments and procedures
To study and understand Natural Science we have to do some work in the laboratory. To carry this out we need to use a range of lab material. In this presentation we will see the essential materials and
More informationBy using the system correctly you will obtain very high quality repairs.
HBC System E English Dear user, We hope that you will enjoy your new HBC system. We recommend that you take our training programme and that you study the manual thoroughly before taking the system into
More informationBUREAU OF INDIAN STANDARDS. Draft Indian Standard TWO COMPONENTS HIGH BUILD EPOXY MICACIOUS IRON OXIDE (MIO) PIGMENTED INTERMEDIATE COAT SPECIFICATION
FOR BIS USE ONLY DOC:CHD 20 (1932)C December 2012 BUREAU OF INDIAN STANDARDS Draft Indian Standard TWO COMPONENTS HIGH BUILD EPOXY MICACIOUS IRON OXIDE (MIO) PIGMENTED INTERMEDIATE COAT SPECIFICATION (Not
More informationAluminum Clad Wood Window Field Mulling and Stacking Instructions
Aluminum Clad Wood Window Field Mulling and Stacking Instructions Mulling Stacking Mulling and Stacking IMPORTANT: Please read before you begin. TABLE OF CONTENTS AND TOOL / MATERIAL REQUIREMENTS START
More informationSeries Sloped glazed Curtain wall. Installation Instructions
Series 5600 Sloped glazed Curtain wall Installation Instructions Part NO. Y308 February 2013 SECTION TABLE OF CONTENTS PAGE I. General Notes & Guidelines. 3-4 II. Gutter and Mullion Assembly.. 5 III. End
More informationInstallation Instructions
www.marlite.com Effective Date 03/01/2018 ARTIZAN FRP, SYMMETRIX FRP, ENVUE FRP, STANDARD FRP Installation Instructions Statements expressed in this technical bulletin are recommendations for the application
More informationMake every component count.
Make every component count. Technical Bulletin Installation Instructions ABOUT THE MATERIAL The frame and material have been thoroughly tested for strength, durability and low maintenance, offering a never
More informationInnovative Leading in Glass. Glass glossary
Glass glossary Innovative Leading in Glass Acrylic A type of thermoplastic, sometimes used for glazing. Good weather resistance, shatter resistance and visual clarity. Air Infiltration The amount of air
More informationGas Solutions. Perfection Permasert 2.0 Gas Coupling Installation Guide
Gas Solutions Perfection Permasert 2.0 Gas Coupling Installation Guide Permasert 2.0 Mechanical Gas Couplings A B C D E F A B C D Permasert 2.0 Coupling: Molded from PE4710 resin. Meets or exceeds US DOT
More informationUser Manual. Digital Compound Binocular LED Microscope. MicroscopeNet.com
User Manual Digital Compound Binocular LED Microscope Model MD82ES10 MicroscopeNet.com Table of Contents i. Caution... 1 ii. Care and Maintenance... 2 1. Components Illustration... 3 2. Installation...
More informationFOR READY MIXED PAINT, ALUMINIUM, BRUSHING, PRIMING, WATER RESISTANT, FOR WOODWORK
FOR BIS USE ONLY DOC:CHD 20(1907)C August 2011 BUREAU OF INDIAN STANDARDS Draft Indian Standard SPECIFICATION FOR READY MIXED PAINT, ALUMINIUM, BRUSHING, PRIMING, WATER RESISTANT, FOR WOODWORK (First Revision
More informationVinyl Windows Manufactured by VPI Quality Windows
Vinyl Windows Manufactured by VPI Quality Windows Part Number: 531&591 Installation 531 & 591 SERIES SLIDING AND HUNG WINDOW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction.
More informationA. Special feature. B. Basic characteristic J3-ESM
A. Special feature 1. Solderability test for nickel 2. Solderability test for stainless 3. Reliability of J3-ESM-3 3-1: Insulation resistance test 3-2: Humidity test under DC voltage (Migration test) 4.
More informationInstalling Digital Wallcoverings
Installing Digital Wallcoverings Hints & Tips Muraspec Digital (Hints & Tips) 1 BEFORE YOU START Make sure that your image is intact and has not been damaged in transit. For best results, use only Murabond
More informationraft for comments only Not to be cited as East African Standard FINAL DRAFT EAST AFRICAN STANDARD EAST AFRICAN COMMUNITY
ICS 71.100 HS 3401.19.00 FINAL DRAFT EAST AFRICAN STANDARD Laundry soap Specification EAST AFRICAN COMMUNITY EAS 2011 Second Edition 2011 ii Table of contents Introduction... iv 1 Scope... 1 2 Definitions...
More informationSteel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.
Steel Reinforced Joining (Horizontal/Vertical) for Andersen 400 Series Woodwright & Tilt-Wash Double-Hung, Picture, and Transom Windows and 400 Series Double-Hung Half Circle and Flexiframe Specialty Windows
More informationInstallation Instructions Stainless Steel Wall Panels
Please read all instructions before installing wall panels. Always plan before you place! 1. Before installation: a. Acclimate Stain Steel Panels, Trim, adhesives and wall substrates to room temperature
More informationMOLD INSTRUCTION MANUAL
ProFiller RDT MOLD INSTRUCTION MANUAL Disclaimer: For use in prescription pharmacy compounding only, in accordance with applicable law. MEDISCA makes no warranty or representation regarding the use of
More informationKANEKA OLED Lighting Module SL (LE-01L, LE-02L, LE-03L, LE-01H, LE-02H, LE-03H) Instruction Manual
KANEKA OLED Lighting Module SL (LE-01L, LE-02L, LE-03L, LE-01H, LE-02H, LE-03H) Instruction Manual Safety Information p. 2 1 Product Overview p. 6 2 Connections and Wiring (when dimming is required) p.
More informationMaking wax cells for fluid mounts, Stephen Livermore, 29 Oct 2016
Introduction Making wax cells for fluid mounts, Stephen Livermore, 29 Oct 2016 Marson (1983) describes a good method for making deep fluid mounts using aluminium rings to make the cells. This article describes
More informationCompression test of fiberboard shipping containers
T 804 om-97 OFFICIAL TEST METHOD 1981 REVISED 1989 REVISED 1997 1997 TAPPI The information and data contained in this document were prepared by a technical committee of the Association. The committee and
More informationMetal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions
PO Box 480 Ph: 417-235-7821 Monett, MO 65708 Fax: 417-737-7140 Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions These installation instructions are recommendations
More informationMATERIAL AND EQUIPMENT STANDARD FOR COAL TAR MASTIC (COLD APPLIED) ORIGINAL EDITION AUG. 1993
MATERIAL AND EQUIPMENT STANDARD FOR COAL TAR MASTIC (COLD APPLIED) ORIGINAL EDITION AUG. 1993 This standard specification is reviewed and updated by the relevant technical committee on May 1999. The approved
More informationINSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.
INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS. Installer: DO NOT DISCARD Please leave the Installation Guide
More informationHR175 Sash Replacement Kit Installation Instructions
HR175 Sash Replacement Kit Installation Instructions IMPORTANT: Please read before you begin. Weather Shield HR175 Sash Replacement Kits Important: Thoroughly read and follow these instructions, failure
More informationSTATIONARY GLASS SECTION 4 ADHESIVE CAULKED GLASS ALL STYLES INDEX DESCRI PTION STATIONARY GLASS 4-1
STATIONARY GLASS 4-1 SECTION 4 STATIONARY GLASS INDEX Subject Page Description 4-1 Removal 4-2 Installation Short Method 4-3 Subject Page Installation Extended Method 4-4 Waterleak Correction 4-6 DESCRI
More informationWallgard 1,3 product
INSTALLATION INSTRUCTIONS Wallgard 1,3 product October 2015 GENERAL Application can be done to smooth, dry, clean, sound walls of concrete, plaster, hardboard, plywood and fibreboard. Board material must
More informationPIVOT DOOR 3400P INSTALLATION INSTRUCTIONS
Table of Contents I. Tools, Sealant Requirements, Anchor Recommended Table...1 II. Opening, Frame & Panel Verification...2-3 III. Frame Assembly...4 IV. Frame Installation...5-7 V. Glazing Instructions...8
More informationELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D
ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
More informationPreparation and Properties of Soap Experiment #7
Preparation and Properties of Soap Experiment #7 Objective: To prepare soap by alkaline hydrolysis (saponification) of natural fats and test some of the chemical properties and cleansing power of soap
More informationInstall Instructions for Solano Jurastone #4012 Mantel
Install Instructions for Solano Jurastone #4012 Mantel Please read this manual before installing the suite. This manual should remain with the homeowner. Updated 12/03/12 NOTE the installation requirements
More informationEpoxy Coal Tar. Protects Steel and Concrete in Marine and Industrial Environments.
Epoxy Coal Tar Protects Steel and Concrete in Marine and Industrial Environments. General Epoxy Coal Tar is a protective coating designed to resist chemical attack and rigorous weather conditions by combining
More informationPower Tape Rubber and Vinyl Stair Treads
Power Tape Rubber and Vinyl Stair Treads Installation and Maintenance Instructions Introduction Johnsonite Power Tape is a high strength, polyester thread reinforced, double-sided adhesive tape system
More information2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo
2016 Specification Treads, Base, Stringers and other Amenities 09400 Wausau Tile Precast Epoxy Terrazzo PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to complete, as indicated by the Contract
More informationVIEWpanel Technical Manual
VIEWpanel Technical Manual VIEWpanel is a prefabricated panel comprising 0.21 aluminium skin (1100 alloy) both sides, apart from our lite grade, which is 0.12 aluminium skin both sides and a polyethylene
More informationDAP Latex Window Glazing
DAP Latex Window Glazing PRODUCT DESCRIPTION DAP Latex Window Glazing is a ready-to-use glazing compound that may be used for face glazing single pane glass in wood or metal window frames. Its spout allows
More information675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure
INSTALLATION INSTRUCTIONS 675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure Call Technical Dept @ 1-800-452-2726 QCI1003 Page 1 of 9 Certified 10/01/09 INSTALLATION NOTES: Unpack your unit carefully
More information380 Swimming Pool Paint
Issued 21 st April 2010 PRODUCT DATA SHEET UNPAINTED CEMENT 380 Swimming Pool Paint SURFACE PREPARATION New cement or render should be allowed to cure for at least 21-28 days before any preparation is
More informationEMO. Service Instruction. created by Frank Weithöner. Table of contents: Special Tools Assembling Mixing Chamber
EMO Service Instruction created by Frank Weithöner Table of contents: - Special Tools Disassembling Mixing Chamber Assembling Mixing Chamber Adjustment Rotor / Level Indicator Unit Temperature Compensating
More informationGluing windows with SABA Glasstack 760
Info sheet 208 Gluing windows with SABA Glasstack 760 Version 2008-05-08 EN, replaces all prior versions Page 2 of 9 Info sheet 208 Gluing windows with SABA Glasstack 760, version 2008-05-08 EN 1. Introduction
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation SL-450TB (2" x 4-1/2" with 1" Glazing) & SL-600TB (2" x 6" with 1" Glazing) IMPORTANT: Read all instructions before beginning installation.
More informationThermally Broken Framing and Door Installation
INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation IMPORTANT: Read all instructions before beginning installation. These instructions are provided to help prevent installation problems
More informationMasking: Each mirrored sheet is well protected by a durable paint backing and
STORAGE Horizontal storage: If mirror sheets are stored flat, care must be taken to avoid warping, slipping and scratching. If different sizes are stored together the largest panels should at the bottom
More informationUNCONTROLLED 3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES
3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES 3.1 Single-Core Copper Wire Screened Polymeric Cables 3.1.1 Removing the Outer Sheath Clean and abrade the outer sheath with an approved abrasive paper for
More informationPRIME SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS
PRIME SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
More informationVinyl Windows and Doors
Vinyl Windows and Doors Manufactured by Pella Corporation WINDOW REPLACEMENT INSTRUCTIONS FOR SINGLE-HUNG AND SLIDING WINDOWS INTO EXISTING CASEMENT FRAME Part Number: V981203 2009 Pella Corporation USING
More informationPre-printed PVC Cable Markers O-Type, K-type, Z-type, V-Type
RW-2535 Issue 2 Page 1 of 17 Oct 2013 Specification RW-2535 Document Number: 108-121034 Pre-printed PVC Cable Markers O-Type, K-type, Z-type, V-Type SCOPE This quality assurance specification establishes
More informationPREHUNG DOOR SYSTEM INSTALLATION INSTRUCTIONS: FIBRECOMP COMBINATION UNITS
PREHUNG DOOR SYSTEM INSTALLATION INSTRUCTIONS: FIBRECOMP COMBINATION UNITS Read all instructions before starting. Calgary Toll Free: 1-866-664-7664 Saskatoon Toll Free: 1-800-667-6977 Winnipeg Toll Free:
More informationAluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement
Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement 1 Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement The following instructions are a supplement
More informationSHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE
SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE SHIPLOCK CLADDING CN-04E / CN-04W / CN-W008 Prior to the installation of any form of Cladding, it is recommended
More informationV349 (CLF5043) Halide Free No Clean Core Wire Fine Wire Applications
Pb V349 (CLF5043) Halide Free No Clean Core Wire Fine Wire Applications INTRODUCTION Viromet* 349, with a composition of Sn/Ag/Cu/In + X, is one of the high-performance lead free solder available in the
More information(H) PAINTING LIST OF BUREAU OF INDIAN STANDARD CODE OF PRACTICE (ISI)
(H) PAINTING LIST OF BUREAU OF INDIAN STANDARD CODE OF PRACTICE (ISI) 6278 : Code of Practice for white washing and colour washing. 2932 : Enamel and synthetic, exterior (a) Undercoating (b) Finsihing.
More informationSECTION MANHOLES
SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard
More informationACCELERATED POLISH TEST FOR COARSE AGGREGATE
Test Procedure for ACCELERATED POLISH TEST FOR COARSE AGGREGATE TxDOT Designation: Tex-438-A Effective Date: August 1999 1. SCOPE 1.1 Use this method to estimate the polish and relative wear of coarse
More information1.1_KV PVC insulated PVC sheathed multicore Aluminium Cable (armoured & unarmoured)
WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (A Govt. of West Bengal Enterprise) Office of the Chief Engineer, Procurement & Contracts Department Vidyut Bhavan, 4 th. floor, Bidhannagar,
More informationInstalling GEKKOTEX Self Adhesive Wallcovering
Preparations Installing GEKKOTEX Self Adhesive Wallcovering Before applying GEKKOTEX, the underlying surface has to be smooth, solid and dry and should have a uniform, white colour. Remove old wallpaper,
More informationCIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General
CIRRUS AIRPLANE MAINTENANCE MANUAL Door CHAPTER 56-30: DOOR GENERAL 56-30: DOOR 1. General The cabin door windows are manufactured of acrylic and adhesive bonded to the door structure. Replacement is accomplished
More informationRoll Out Vinyl Installation Guide
Sub-floor Requirements The contractor performing the installation of the performance vinyl flooring must ensure the proper quality of the sub-floor. The sub-floor must be clean, smooth, permanently dry,
More informationInstructions for Installing Vinyl Stair Treads with Musson 3 Wide Double-Face Tape
Instructions for Installing Vinyl Stair Treads with Musson 3 Wide Double-Face Tape (For No. 300 & No. 334 treads see special note in the Installation of Vinyl Stair Tread section below) Where To Install
More information1. Architectural precast concrete cladding units.
SECTION 034500 - PRECAST ARCHITECTURAL CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Architectural precast concrete cladding units. 1.2 DEFINITION A. Design Reference
More informationGlues and mastics. SILICONE ADHESIVE SEALANT 42 Marine silicone SOROMAP...42 Silicone colour RAL...42 Glue mastic MS1000 TECHNIFIX...
Glues and mastics In this chapter, we present all the products that you need to make sticking, seals, insulation and teak deck. SILICONE ADHESIVE SEALANT 42 Marine silicone SOROMAP......................................42
More informationInstallation Instructions for Old Mill Shingle and Designer Shake Lap Siding
Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding Includes: Cove, Craftsmen Staggered, Diamond, Fish Scale, Octagon, Round and Old Mill Shingle Lap Important: Read and understand
More informationEssex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationHeavy Wall Applied Stop Tube Frame and Door Installation
INSTALLATION INSTRUCTIONS Heavy Wall Applied Stop Tube Frame and Door Installation Read all instructions before beginning installation. These instructions are provided to help prevent installation problems
More informationInstall Instructions for Torrance Jurastone #4004 Mantel
Install Instructions for Torrance Jurastone #4004 Mantel Please read this manual before installing the suite. This manual should remain with the homeowner. 20/05/11 Fires of Tradition assumes no responsibility
More informationTECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING
TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING TABLE OF CONTENTS This installation guide provides detailed step-by-step instructions for do-it-yourself projects. We invite you to read it carefully and
More informationSPECIFICATION FOR WATERBORNE TRAFFIC LINE PAINT
Page 1 of 5 ATTACHMENT I Commonwealth of Pennsylvania Department of Transportation SPECIFICATION FOR WATERBORNE TRAFFIC LINE PAINT August 14, 2006 1. SCOPE 1.1 Scope. This specification covers fast-drying
More informationStudent Sheet. P003S: Making Paint with Minerals
Student Sheet In this practical I will be: Creating egg tempera paints and oil paints from different types of minerals. Evaluating the different paints, looking at various aspects, including: o what colours
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the
More informationIMPORTANT: Please read completely before you begin.
Standardized Window Installation Instructions For Maintaining Design Pressure Ratings For Aluminum or Vinyl Clad & All-Vinyl Window Units With Nailing Fin Structure With Weather Resistant Barrier Applied
More informationDULUX UNIVERSAL UNDERCOAT
TECHNICAL DATA SHEET Version 1 2015 JUNE THIS ISSUE SUPERSEDES ALL PREVIOUS PUBLICATIONS PRODUCT DESCRIPTION Intermediate coating for use under decorative topcoats, for interior and exterior use PRODUCT
More informationVYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4
VYTEX PREMIUM SLIDING GLASS DOOR Table of Contents Precautions and Safety 2 Tools Required...3 Inspect and Prepare Door...4 Hardware and Parts Check List....4 Master Frame Assembly 5 Master Frame Installation..7
More informationKinro Metal, Vinyl, Flush Mount and Recessed Fin Windows OEM INSTALLATION MANUAL
Kinro Metal, Vinyl, Flush Mount and Recessed Fin Windows OEM INSTALLATION MANUAL TABLE OF CONTENTS Introduction 2 Safety Requirements 2 Fasteners 3 Preparation 3 Rough Opening Preparation 3 Resources Required
More informationASSEMBLY INSTRUCTIONS
ASSEMBLY INSTRUCTIONS UTS LC Series BT 304 BT304 UTS LC Series Contents Tool & Material... 4 UTS LC Component details... 5 UTS LC Dimensions... 5 Assembly Instructions for UTS1JC18LCN & UTS6JC18LCN...
More informationINTERNAL LININGS INSTALLATION GUIDE
Your partner in building solutions INTERNAL LININGS INSTALLATION GUIDE General remarks on This installation guide is to be used in conjunction with: specifications Architects specific details Pacific Build
More informationFRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274
FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274 QCI0274 QCI5274 REV. Rev. 1 0 Page Page 1 1 Date Certified: Certified 06/16/2016 10/01/10 Parts List with wall mount hinges ITEM NO. Part # DESCRIPTION
More informationICC-ES Evaluation Report Reissued June 1, 2010 This report is subject to re-examination in one year.
ICC-ES Evaluation Report ESR-2648 Reissued June 1, 2010 This report is subject to re-examination in one year. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council
More informationFrameless Inline Door With Return QCI5263
INSTALLATION INSTRUCTIONS Frameless Inline Door With Return QCI5263 WALL MOUNT HINGES FRAMELESS DOOR / PANEL / RETURN PANEL QCI5263 REV. 0 Page 1 Certified 06/17/2016 Parts List with wall mount hinges
More informationVITREO X SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS
VITREO X SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
More informationWall Installations. Chapter 16 Wall Installations 16. 1
16 Wall Installations Chapter 16 Wall Installations 16. 1 Alterna Premium Groutable Tile Create decorative backsplashes, accent walls, or other focal points with any size Alterna 16" x 16", 8" x 16", 8"
More informationProjected Capacitive Touchscreen DUS series Product Specification. Document No. DEC-S0041A
Projected Capacitive Touchscreen DUS series Product Specification Document No. DEC-S0041A Table of Contents 1. Product Specifications... 2 1-1. Product Applicable... 2 1-2. Structure... 2 1-3. Environmental
More informationGROGLASS ANTI-REFLECTIVE GLASS HANDLING GUIDELINES
GROGLASS ANTI-REFLECTIVE GLASS HANDLING GUIDELINES Table of contents: 0. Introduction of Groglass anti-reflective glass 1. Transportation / Packing 2. Storage 3. Handling / Cutting 4. Edge working 5. Washing
More informationSECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationPottery Plaster Main reference values: means greater than, means less than. Features. Strength (MPa) Uses. Influx time (minutes) Finish time (minutes)
Pottery Plaster Main reference values: means greater than, means less than Influx time Expansion (%) General-use For sand match prototype molds For cases HS-600 56-60 8.5-10 35-47 1.4 >8.3 HS-650
More informationAssmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS
Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS General Information Assmann polyethylene storage tanks are manufactured to give you the toughest, most reliable
More informationINSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233
INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233 QCI5233 Rev 0 Page 1 Certified 06/20/2016 INSTALLATION NOTES: Unpack your unit carefully and inspect for freight damage. Lay
More informationSHOWER ENCLOSURES INSTALLATION INSTRUCTIONS SHOWER ENCLOSURES:
D SHOWER ENCLOSURES INSTALLATION INSTRUCTIONS SHOWER ENCLOSURES: LBSDD4879-C+LBSED3679-CB LBSDD4879-B+LBSED3679-CB LBSDD6079-C+LBSED3679-CB LBSDD6079-B+LBSED3679-CB LBSDD7279-C+LBSED3679-CB LBSDD7279-B+LBSED3679-CB
More informationThank you for your order
Installation Guide Thank you for your order Ph: 09-9133110 Fax: 09-9133113 5 Smales Road. East Tamaki, Manukau PO Box 58031 Greenmount, Manukau 2013 AUCKLAND // WELLINGTON // CHRISTCHURCH www.bathroomdirect.co.nz
More informationA-935 RODA WALL MOUNT HINGES
INSTALLATION INSTRUCTIONS A-935 RODA WALL MOUNT HINGES NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday 8:00 A.M. - 4:30 P.M. Eastern Time FRAMELESS DOOR / PANEL CELESTA QCI0274 REV.
More information28.00 Rmt sqm sqm
SEALED BID FORMAT FOR THE INTERIOR FURNISHING WORKS AT SBI CHALAKUDY BRANCH. Sl No. Description of item Quantity Unit Rate Amount 1 Counter Table :- The width and height of the table is 100cm and 75cm
More informationChapter 5. Installation procedures. Installation procedures 24. Topics. Notes. 5.5 Flash coving General recommendations 25
Installation procedures 24 Chapter 5 Installation procedures Topics 5.1 General recommendations 25 5.2 Preparation 25 5.3 Seaming 25 5.5 Flash coving 26 5.6 Forming corners 26 5.7 Seam grooving 28 5.4
More informationDAP 33 Window Glazing
DAP 33 Window Glazing PRODUCT DESCRIPTION DAP 33 Window Glazing is a ready-to-use glazing compound that may be used for face glazing wood or metal sash. Its knife-grade consistency allows for smooth, easy
More informationInstallation Instructions for Standard Lap and Self-Aligning Lap Siding
Installation Instructions for Standard Lap and Self-Aligning Lap Siding 7/16 in. Standard Laps Include: All Old Mill Widths, Cedar Shake Lap and Smooth Lap 1/2 in. Self-Aligning Include: 8 in. and 12 in.
More informationNATURA PRO Product Information Leaflet 1
NATURA PRO Product Information Leaflet 1 1. Product composition NATURA PRO sheets consist of the following: Portland cement Mineral fillers Organic reinforcing fibers Additives Semi-transparent water-based
More informationPRISM LUX / PYRAMID SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS
PRISM LUX / PYRAMID SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
More informationManufacture of Cast Products
Manufacture of Cast Products When a layer of rubber is deposited on the interior surface of a hollow mould, it is known as casting. The latex products obtained by the casting process are hollow and toys,
More information1. INTRODUCTION 2. REFERENCE SPECIFICATIONS. Page -1- Bonding and Grouting
Page -1-1. INTRODUCTION 1.1 Scope This specification covers non-shrink and epoxy grouting of structural column base plates and equipment bases, Portland cement grout for minor elements and bonding agents
More information