An End User Approach to Teaching Specifications
|
|
- Meredith Johns
- 5 years ago
- Views:
Transcription
1 An End User Approach to Teaching Specifications Ausbra E. McFarland, Ph. D. Northern Kentucky University Highland Heights, Ky This paper presents a method for teaching specifications and estimating that emphasizes linkage of drawing content to accompanying specification information to determine project details for estimating and bidding which are complete and which incorporate an intent or strategy for their execution. In this approach, the CSI MasterFormat is taught using an organizational approach (one that focuses on how the format is organized and how to find information within its structure) instead of a specification development approach (i.e., those approaches that teach the organizational structure of the CSI MasterFormat by having students develop specification content, then organize and write a specification(s) using the CSI MasterFormat structure). A set of non-csi MasterFormat based specifications is used for this. Students are required to reorganize the content into specifications using the CSI MasterFormat. Thus, they must read and understand the content, and develop understanding of how CSI MasterFormat specifications are organized; two important learning objectives in Specifications courses. Linkage of specifications and drawing content and proficiency in developing descriptive job details which are complete and include execution strategy are taught and developed using a project that requires students to utilize the content of the specifications they converted into the CSI MasterFormat. Key Words: Specifications, Estimating, CSI MasterFormat, Estimate Detail, Job Detail Introduction A good understanding of specifications and their relationship to construction drawings is a key component in good project management, planning, and execution. And while this is an undeniable fact, courses in Specifications and Estimating, quite often, do not adequately make and/or emphasize this connection to students when taught in a formal learning environment. The causes for this are sometimes rooted in the approach used to teach these courses. They include methods that focus on writing specifications, methods that focus on reading specifications and discussing the content, and methods that combine the two. Additionally, when development of estimate details is included in course content, it s taught without appropriate consideration for its execution, i.e., there is little to no indication of execution strategy included in the detail descriptions. Generally, all courses include some coverage of the CSI MasterFormat. This paper presents the methodology used in a Specifications and Estimating course taught by the writer. Central to this approach is (1) a thorough understanding of the CSI MasterFormat Three-Part format; not just from an organization perspective, but from a structural perspective (i.e., what the category titles mean with regard to the type of information contained in each of them), (2) a thorough understanding of the CSI MasterFormat numerical scheme, (3) a thorough understanding of construction drawings and the symbols and terminology used by them to convey information regarding what is required, and (4) the importance of presenting all of the information gleamed and extracted from all of the construction documents into job details that conveys a clear construction management strategy and/or plan of execution. Item four highlights the end-user prospective that is the basis of this approach. In short, specifications should be utilized with drawings to develop job details that have descriptions which are complete and which convey a strategic plan and approach for their successful execution. The job details developed can be used to generate estimates for bids, schedule activities, materials list, procurement activities, project control documents, and other tools necessary for successful job management. The author uses the approach summarizes in this paper in a course that is generally taught three times a year.
2 Drawing Symbols and Fundamentals The course begins with a review of common symbols on construction drawings. Building construction project management is the focus of the curriculum this course is taught in; hence, drawing symbols commonly used for materials and systems in this industry are the primary focus of this review. This occurs in week one. A review of plan reading and basic drafting fundamentals is also conducted using construction drawings assigned for the first project (Spence, 1991). This starts in week two. Major topics covered during this review include (1) category of drawings, a topic used to illustrate the alphabetized system utilized for drawings and how this system can provide the first indications of the scope required and the specifications needed to supplement and complete scope definition, and (2) types of drawings found in construction packages. Drawing symbols, and what they represent, is also covered and is a major topic in this review. This topic does not just focus on identifying drawing symbols, but discusses and emphasizes how the information gained from a symbol can aid in identifying where specification information for it can be found in specifications that utilize the CSI MasterFormat. Thus, the process of linking the drawings to specifications begins here. The connection of the two is facilitated by class activity that require students to identify symbols on the drawings and list or state the MasterFormat s Level One number(s) and/or title(s) where the accompanying specification information can be located. Additionally, this activity provides an opportunity for course participants to crystallize the drawing symbol information covered during the review in week one. As stated, the information represented by the symbols is not just presented from the point of view of simply highlighting the information conveyed by it to the plan reader. Also emphasized is the symbol s connection to the specifications particularly to CSI MasterFormat, and where in the format s organizational structure information necessary to completing the scope requirements for the item can be found. Hence, at this point, the emphasis on drawings and drawing symbols is two-fold: (1) their use in conveying project scope and other instructional information and requirements, and (2) their use as an aid for identifying the specifications needed to complete the information contained on them The CSI MasterFormat The CSI MasterFormat is the organizational system used for conveying, organizing, and presenting the information contained in specifications. It utilizes a numerical organizational scheme and format to locate the specification(s) needed, and a three part format system for organizing the information contained within the specification. It also utilizes additional subtitles and divisions within the three category headings that comprise the three major parts of the format to aid in the presentation of the material contained within the specification(s) (Rosen & Regener, 2005) (Construction Notebook News, 2008) (Construction Specification Institute, 2008). The CSI MasterFormat is taught in distinct parts to course participants. First, the numbering scheme and titles the MasterFormat utilizes to locate specification information is presented. Level One numbers and titles utilized by the format are introduced first with particular emphasis on where the Level One numbers are located in the numbering scheme. This is done in week one. Next, Level Two and Level Three numbers and titles are introduced, and the location of these numbers in the numbering scheme is presented. This is also done in week one. The CSI 16 division, 5 digit numbering scheme, or the expanded 48 division, 6 digit numbering scheme can be used. Generally, this writer uses the 16 division format system to explain the concepts for the MasterFormat system s use, as well as for tests to assess students understanding of them, and alternately uses each system for project work assigned in class. Finally, the Three-Part Format is presented. Titles and subtitles used within the three major categories, as well as discussion of types of information commonly found therein, are presented. Additionally, example entries are provided to illustrate the methods the format uses to conveys information to other sections within each specification, and entries are also provided that illustrate the methods the format uses to convey information to or highlight the need of information from other specifications. This is done in Week 3. As mentioned above, week 2 is devoted to construction drawings and the topics noted. Classroom discussion centers on students identifying symbols shown on drawings, what they represent, and establishing connections to the MasterFormat s Level One number(s) and title(s) where specification information for the items represented by the
3 (1) Name the following symbols and Three (3) Level One Division Numbers in the Specifications where additional information for what the symbol depicts might be found. A. B. Name CSI Divisions Name CSI Divisions Figure 1: Example of Quiz questions used to develop linkage between drawing symbols and CSI MasterFormat Level One division numbers. symbol would be found. This identification procedure continues throughout the duration of the course and is utilized for all concepts presented and topics covered in it. A quiz is given at the end of week 2 on the drawing symbols assigned for review in week one. The quiz assesses three student skills. First, it assesses the student s knowledge of the MasterFormat s Level One numbers and titles. Second, it assesses the student s knowledge and recognition of basic/common construction drawing symbols. Last, and important for this approach, it aids in reinforcing the process of developing the student s ability to connect information contained in the drawings to the specifications where supplemental information required for complete scope development for the item can be found (see Figure 1). The process of developing the student s ability to connect information contained in the drawings to the specifications where supplemental information required for complete scope development for the item can be found is continued and further developed by means of the two projects. The first project, described below, is a residential house project (Spence, 1991). Students must complete this project individually. The second project is an industrial/commercial project that students complete as a part of a project team. The learning outcomes from each project are similar. However, the house project has an additional learning component that is key to the overall objective for this approach to teaching specifications and estimating: it will be discussed below. First Project - Part I A set of specifications from a residential home project (Spence, 1991) is used to teach and crystallize students understanding of the CSI specification format method. The original specifications do not utilize CSI MasterFormat (see Figure 2). The objective of Part I of the project is to reorganize the original house specifications into a set formatted using the CSI MasterFormat. After presenting the MasterFormat s level I numbering scheme and titles to the students, the project is introduced. The first phase of this project requires the students to rename and replace the project headings used in the original specifications with the proper MasterFormat level one heading and its accompanying level one number. However, the original specification set uses category headings, in some instances, that do not directly coincide to level one titles used in the CSI format. Thus, the student is also required to read through the entire specifications to determine the MasterFormat level one category that best fits the information contained in the original specification. Reading the entire specification also reinforces the point that all specifications should be read in order to gain a thorough understanding of project requirements prior to soliciting for and/or beginning any work on it. The second phase of this project begins shortly after the first phase and then runs concurrently with it. As previously mentioned, the Level Two/Level Three titles and the accompanying numbering scheme is presented to the students in week one. At this point in the course, emphasis is placed on the Level scheme providing (1) the system s uniform organizational methodology for all projects utilizing this system and, as a result, how it provides a consistent means for finding project information regardless of project type and/or location; and (2) the provisions that allow for adaptability within the system s uniform scheme and structure, and how this provides the means for customizing elements of the MasterFormat to meet individual project needs. Content in each section of the original specification (i.e., each item, sentence and/ or listing in the original specification) is evaluated to determine the
4 Division 2: Concrete(D3) Sec. 1. Scope. This division includes all concrete and related items required to complete the work indicated on the drawings and/or specified. (03050)(Part 1: Summary) Sec. 2. Materials. (03050) (Part 2: Materials) (a.) Portland cement shall meet the requirements for Type 1. (b.) (c.) (d.) Aggregates. (1) Fine aggregates shall be natural sand, or sand prepared from inert materials having similar characteristics, if approved by the architect. (2) Coarse aggregates shall be crushed stone, ground clean and free from foreign matter. Size range for walls shall be designated, as no. 4 to 3/4". Water. Water used for concrete work shall be clean and free from injurious amounts of oils, acids, alkalies, organic, or other deleterious substances. Metal reinforcement. Wire mesh reinforcing shall conform to A.S.T.M. Designation A82-34 and shall be free from excessive scale, rust, or coatings, which reduce bond to the concrete. (03050, 03200, or 03220) Sec. 3. Depositing Concrete. (03050) (Part 3: E/I/A) (a.) (b.) Deposit concrete as nearly as practicable in its final position to avoid segregation due to rehandling or flowing. Retempering. No concrete that has partially hardened or has been retempered shall be used. (c.) Compaction. Concrete shall be thoroughly compacted by vibrating during placement. Sec. 4. Curing. All concrete shall be covered with a polyethylene plastic, airtight cover for three days at 70 o F or five days at 50 o F. (03050) (Part 3: E/I/A) Sec. 5. Cleaning. Clean all exposed concrete surfaces and all adjoining work which has been stained by the leakage of concrete. (03050) (Part 3: E/I/A) Figure 2: Example of specification in its original form with CSI Three Part Format components identified for content (Spence, 1991). Used with permission from Glencoe, MacMillian/McGraw-Hill Inc. correct or most appropriate level two/level number and category heading for it. Thus, at the end of this phases I and II of the project, the students have placed the contents of the original specification with its proper CSI level one number and category, and with its proper level two or level three number and category (see Figure 2). The third phase of this project begins after completion of phase I and II. In this phase, students are required to reformat the contents of the original specifications into a specification formatted using the CSI Three Part Format methodology. Students must first identify the Three Part Format category for each entry of the original specification (see Figure 2). Next, they reformat the content into a CSI MasterFormat specification (see Figure 3). Each specification developed includes a Part I Summary Scope Includes section and a statement from the original specification content which describes the scope for it. Students are instructed to develop a statement when one does not exist within and/or for the contents of the original specification. The remaining Three Part Format categories
5 03050 Basic Concrete Materials and Methods Part 1 General 1.01 SUMMARY A. Section Includes: This division includes all concrete and related items required to complete the work indicated on the drawings and/or specified. Part 2 Products 2.01 MATERIALS A. Portland cement shall meet the requirements for Type 1. B. Fine aggregates shall be natural sand, or sand prepared from inert materials having similar characteristics, if approved by the architect. C. Coarse aggregates shall be crushed stone, ground clean and free from foreign matter. Size range for walls shall be designated, as no. 4 to 3/4". D. Water used for concrete work shall be clean and free from injurious amounts of oils, acids, alkalies, organic, or other deleterious substances. E. Metal reinforcement: Wire mesh reinforcing shall conform to A.S.T.M. Designation A82-34 and shall be free from excessive scale, rust, or coatings, which reduce bond to the concrete. Part 3 Execution 3.01 ERECTION/INSTALLATION/APPLICATION A. Depositing Concrete: Deposit concrete as nearly as practicable in its final position to avoid segregation due to rehandling or flowing. 1. Retempering: No concrete that has partially hardened or has been retempered shall be used. 2. Compaction: Concrete shall be thoroughly compacted by vibrating during placement. B. Curing: All concrete shall be covered with a polyethylene plastic, airtight cover for three days at 70 o F or five days at 50 o F ADJUSTING/CLEANING A. Cleaning: Clean all exposed concrete surfaces and all adjoining work which has been stained by the leakage of concrete. Figure 3: Example of concrete specification content reformatted using the CSI MasterFormat Three Part Format. Original specification content from Spence (Spence, 1991). titles and their accompanying sub-category titles are utilized as necessary by the students to present the information contained in the specification in the most efficient, practical, and effective manner that they can develop. Students are encouraged to make use of references to other specifications developed by them in this exercise, use the subcategories such as items provided but not installed under this specification and items installed but not provided under this specification, and make use of reference standards in order to learn their proper use. They are also given the leeway to break out and/or separate the original specification content as discretely as they see fit as long as a CSI category and level two, level three, or level four title exists for the entry. This also discourages duplication of effort between students while still allowing collaboration and peer-learning (i.e., it s very easy to spot duplicate efforts).
6 Figure 4: Wall section used for part 2 of the project (Spence, 1991). Drawing Designation: A- 4. Used with permission from Glencoe, MacMillian/McGraw-Hill Inc. Students are also required to develop a table of contents listing the specification number, its title, and the page number where the specification can be found. Additionally, formats for General Conditions and General Requirements are covered in the class and included in the original specification contents. Students are required to developed CSI MasterFormat specifications for this content also and include it. The entire set of specifications developed is submitted in a binder with a cover sheet. At this point, students have created a re-ordered set of specifications in the CSI MasterFormat. The project has crystallize the following objectives; (1) learning the CSI level 1 and level 2/level 3 numbering system, (2) learning the CSI level 1 and level2/levl 3 category titles and subtitles, and (3) learning the CSI Three-Part format, how its organize, the categories and sub-categories utilized in the Three-Part format, and how to make use of the categories and organization of them to create specifications that can be used to effectively convey information. By doing this, the student learns the structure of the CSI format, and thus, learns how to efficiently find and retrieve information in the CSI specification system, the ultimate goal for the end user approach methodology, and a fundamental and important learning component key to the overall objective for this approach to teaching specifications and estimating.
7 Table 1: Estimate Detail Sheet Developed For Concrete Foundation for Foundation Wall Dwg. # Of TO. Est. Description Comments/ Calculations No. Spec. Items L W H Unit Unit Qty. House Foundation (A) North Foundation Wall 32 Long Wall S-1 (i)grade Beam: Cast In Place Concrete (1) Concrete Footing, 3000 psi Concrete Footing Trenches to be excavated; forms to be omitted. Consolidation by Vibration only. Placed 3" from S-1, A- 5, A-6, A-7, A- 4, S A.3; (A - D) Ft. Ft 3 48 (2) #4 Rebars sides A-4, S-3 Polyethylene Plastic - Airtight cover - 3 days at (3) Curing 70F or 5 days at Material 50F S B 32 1 Ft. Sq Ft 32 (5) Stirrups 6 on center A-4 32 Ft. Each 63 First Project Part II The objectives of this part of the project are twofold. First, it continues the process of developing the student s ability to connect information contained on a drawing to those MasterFormat formatted specifications where supplemental information required for it can be found. Additionally, it aids in the goal of reinforcing the importance of presenting all of the information gleamed and extracted from all of the construction documents into job activity details with descriptions that convey a clear construction management plan of execution, a central goal of the class. Students are required to develop the job details for five systems contained in the project. The estimate details shown in Table 1 are for the concrete components of the north foundation wall. The Descriptions and Comments/Calculations entries are the columns that are used to fully describe the job detail and the plan/approach incorporated into the description for its execution. Additionally, the drawings and the specifications used to develop the detail are shown in Dwg. No. and Spec. columns of the tables as well. Entries in the Spec column provide the number of the specification where the content for the detail was obtained and the Three Part Format item number where the content is located within the specification. This ensures that students have reviewed both the specifications and drawings to develop the detail and it provides reviewers a means to check it. Also, this provides students with additional training in connecting drawings content to specification content, and it also provides additional training in connecting drawings to locations within the MasterFormat system where information to complete job detail requirements for the items displayed on them can be found. Lastly, note that since students use the CSI MasterFormat specifications that they developed previously for this exercise, no two students will have the exact same specification information listed in the column entitled Spec. In the examples shown, drawings are use to establish the direction needed to identify the location of the wall under consideration, the length of the wall, as well as other estimate/job details required for the wall s construction. For
8 example, Figure 4, designated as drawing A-4, shows dimensional information for the concrete details developed and shown in Table 1, and reinforcement requirements for it. However, the compressive strength of the concrete needed for the element is not shown on the illustration. Students have to go to another drawing, S-3, to find that information. The cross-sectional dimension of the element can also be obtained from A-4 (Figure 4); however, drawing S-1, the foundation plan, is needed to find the element s length. The north arrow needed to identify the wall is shown on the floor plan, a drawing labeled A-1 in the set. Thus, all of the aforementioned drawings, as well as others needed for development of this detail, are listed in the Dwg. No. column. However, development of this detail is not complete. The student must also read the specifications to obtain information on curing requirements concrete mix ingredient requirements, concrete placement requirements (i.e., consolidation by vibration only ). All of this information is necessary to complete the requirements of this project activity. However, the symbol for concrete on the aforementioned drawing (s) should trigger the thought Division 3 in the student s mind: this is an example of the linkage this writer seeks to establish between drawings and CSI formatted specifications, and is one of the major objectives in this class. (Note: This class stops at job detail development as it relates to estimating. Pricing and estimating principles are taught in another course.) All of the drawings and specifications used for job detail development are listed on the detail sheet. This reinforces the linkage between drawings and specifications, and additionally, provides a way to check student work and the completeness of the job details and takeoffs developed by them. Finally, an entry from the earthwork specification, 02300, illustrates how information contained in specifications can be used to incorporate plan of execution aspects into scope development. Note item 3.02-A-3 in the specification, where the 3 connotes Part Three - Execution. It reads Footing trenches may be excavated to the exact dimensions of the concrete, and side forms may be omitted if concrete is poured in clean-cut trenches without caving. Place footing and foundations upon undisturbed and firm bottoms. The contractor shall not pour foundation footing until the architect inspects and approves the bearing. Options for casting the grade beam include exaction to the exact dimensions of the concrete or using formwork if soil conditions do not allow. In the Comments/Calculations column of the detail sheet, the basis for execution for this detail is listed as Footing Trenches to be excavated; forms to be omitted. This highlights that the basis for this work is no forms; an adjustment to the cost of this item must be made if formwork must be used. Thus, this entry s description provides an element of the execution plan included in the job details. While it is not necessary to provide execution elements for each job detail, the elements should be provided for all entries that reflect execution decisions and/or for items that reflect an option chosen when multiple are options available. Additionally, execution elements and the entries accompanying them provide information that can be useful when making risk and unlisted/contingency assessments. And since they provide the basis for the method of execution assumed for the project, this information is useful and aids in quantifying the impacts of scope alterations that result from project changes. Summary This method of teaching specifications and estimating focuses on end users of the information and emphasizes the following key concepts: (1) understanding the CSI MasterFormat s numbering scheme for locating specifications and the organization scheme it uses to arrange information contained within them, (2) establishing a linkage between symbols and other information contained on drawings to the CSI number(s) and division(s) supplemental information for the item conveyed by the symbol can be found in, (3) using the drawings and specifications together to develop job details, and descriptions for them, which are complete and that incorporate an execution strategy. The details developed then provide the project s basis, and any changes, adjustments, deviations, or additions to the basis can be tracked, managed, and controlled. Getting the job details right, which includes capturing execution methodology intent, approach, and/or strategy, is fundamental to successful project control, execution, and completion.
9 References 1. Construction Notebook News (2008). CSI Divisions [WWW document]. URL 2. Construction Specification Institute (2008). MasterFormat TM 2004 Edition Numbers and Titles [WWW document]. URL 3. Rosen, H. J., and Regener, Jr., J. R. (2005). Construction specifications - writing, principles and procedures (5 th ed.). New Jersey: John Wiley and Sons, Inc. 4. Spence, W. P. (1991). Architecture design, engineering, drawing (6 th ed.). Illinois: Glencoe, MacMillian/McGraw-Hill Inc.
1. INTRODUCTION 2. REFERENCE SPECIFICATIONS. Page -1- Bonding and Grouting
Page -1-1. INTRODUCTION 1.1 Scope This specification covers non-shrink and epoxy grouting of structural column base plates and equipment bases, Portland cement grout for minor elements and bonding agents
More informationSECTION MANHOLES
SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.
More informationSECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION
PAGE 032015-1 SECTION 032015 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationA. Extent of structural precast concrete work is shown on drawings and in schedules.
SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification
More informationLarge Scale CalArc Pavers for Sand-Set Pedestrian Use Installations
The following specification refers to the Stepstone, Inc. product known as: Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations Large Scale CalArc Pavers are part of the California Architectural
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the
More informationBPDL Architectural precast concrete specifications USA TESTING AND INSPECTION A. Testing by Independent Agency : Materials and workmanship furn
BPDL Architectural precast concrete specifications USA 01 PART 1 General 1.1 DESCRIPTION OF WORK The work includes, but is not limited to : 1. Architectural precast concrete 2. Structural design, fabrication,
More information10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS
10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 WOOD SKID FLOOR FLOOR SYSTEM FOR 10x12 TRICO AND FLORA SHEDS RAW MATERIALS LIST: 2 (9) FLOOR FRAMING AND SHEATHING: 1) BAND BOARD 2 x 6 x 12 PRESSURE
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationSPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS
SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS 1. DESCRIPTION THESE SPECIFICATIONS ARE FOR A PRECAST THREE SIDED ARCH STRUCTURE, HEADWALLS
More informationStormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17
StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018
SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationCommonwealth of Pennsylvania PA Test Method No. 517 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for
Commonwealth of Pennsylvania PA Test Method No. 517 Department of Transportation 10 Pages 1. SCOPE LABORATORY TESTING SECTION Method of Test for DETERMINATION OF ACCELERATED POLISH OF COARSE AGGREGATE
More informationARCHITECTURE CADD Course Syllabus
6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationMH Table of Contents Standard Title/Scope Page Table of Contents SCE Public
MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................
More informationSECTION SAND CUSHION TERRAZZO FLOORING
SECTION 09 66 13.13 SAND CUSHION TERRAZZO FLOORING THIS GUIDE SPECIFICATION HAS BEEN PREPARED BY THE NATIONAL TERRAZZO AND MOSAIC ASSOCIATION, INC., AND IS DISTRIBUTED FOR USE BY ITS MEMBERS AND DESIGN
More information1. Architectural precast concrete cladding units.
SECTION 034500 - PRECAST ARCHITECTURAL CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Architectural precast concrete cladding units. 1.2 DEFINITION A. Design Reference
More informationUNIT TO COURSE COMPARISON (UCC) FORM. Carpenter Level 1
UNIT TO COURSE COMPARISON (UCC) FORM Carpenter Level 1 The Apprenticeship and Certification Board prescribes time and content specific curriculum standards for technical training. To assist training providers
More informationSpecial Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE
DOWELS INTO CONCRETE - Item No. Special Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE 1.0 SCOPE This Special Provision covers the performance requirements
More informationMANHOLES PART I: GENERAL. A. Precast Concrete Manholes
MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a
More information3400 Tectura Designs Precast Concrete
3400 Tectura Designs Precast Concrete PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to furnish and complete the proper installation of precast concrete. B. Types of Precast Concrete work include:
More informationSUBSTATION SECURITY WALL INSTALLATION MANUAL
SUBSTATION SECURITY WALL INSTALLATION MANUAL JULY 26, 2016 OLDCASTLE PRECAST, INC. 3000 New McEver Rd, Acworth, Ga 30101 Substation Security Wall Installation Manual This Installation Manual is intended
More informationSECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative
More informationCVO/169897A OCTOBER 29, GROUT
SECTION 03600 GROUT PART 1 GENERAL 1.1 REFERENCES A. The following is a list of standards which may be referenced in this section: 1.2 SUBMITTALS 1. ASTM International (ASTM): a. C230, Standard Specification
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationSECTION BONDED TERRAZZO FLOORING
SECTION 09 66 13.19 BONDED TERRAZZO FLOORING THIS GUIDE SPECIFICATION HAS BEEN PREPARED BY THE NATIONAL TERRAZZO AND MOSAIC ASSOCIATION, INC., AND IS DISTRIBUTED FOR USE BY ITS MEMBERS AND DESIGN PROFESSIONALS.
More informationWorking with Detail Components and Managing DetailsChapter1:
Chapter 1 Working with Detail Components and Managing DetailsChapter1: In this chapter, you learn how to use a combination of sketch lines, imported CAD drawings, and predrawn 2D details to create 2D detail
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More information2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo
2016 Specification Treads, Base, Stringers and other Amenities 09400 Wausau Tile Precast Epoxy Terrazzo PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to complete, as indicated by the Contract
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation
More informationDesigner s NOTEBOOK SPECIFICATION GUIDANCE
Designer s NOTEBOOK SPECIFICATION GUIDANCE Part II Guide Specification for Architectural Precast Concrete Panels PCI s Architectural Precast Concrete Services Committee explains key considerations in specifying
More informationAMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by
AMENDMENTS to 2012 Manual of STANDARD SPECIFICATIONS Adopted by Standard Specifications Committee Amendment No. 6 Published by Utah LTAP Center Utah State University 8305 Old Main Hill Logan UT 84322-8205
More informationManholes Table of Contents
Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type
More informationSECTION COUNTERTOPS ecox PART 1 GENERAL
SECTION 11456 COUNTERTOPS ecox PART 1 GENERAL 1.1 SECTION INCLUDES A. Countertops B. Bar tops C. Vanity tops D. Table tops E. Reception counters F. Cash/back wraps G. Transaction counters H. Service counters
More information2 The UDS is a component of the United States National CAD
Sheet Specifications By Ronald L. Geren, AIA, CSI, CCS, CCCA, SCIP Some projects are of such a small size that for a separate project manual containing the project specifications is considered unnecessary.
More informationNITTERHOUSE CONCRETE PRODUCTS, INC Molly Pitcher Highway South Chambersburg, PA
NITTERHOUSE CONCRETE PRODUCTS, INC. 2655 Molly Pitcher Highway South Chambersburg, PA 17201 717-267-4505 GUIDE SPECIFICATION FOR ARCHITECTURAL PRECAST CONCRETE INDEX Page PART I - GENERAL...1 A. DESCRIPTION...1
More informationStormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18
StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute
More informationFor crossing under a railroad, contact the specific railroad company's engineering department.
PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationSpecial Provision No. 904S14 October OPSS 904, January 1995, Construction Specification for Concrete Structures, is amended as follows:
DOWELS INTO CONCRETE Item No. Special Provision No. 904S14 October 2005 OPSS 904, January 1995, Construction Specification for Concrete Structures, is amended as follows: 904.02 REFERENCES Section 904.02
More informationCM 21 Construction Graphics Course Syllabus Fall Instructor: Professor Keith Bisharat
CM 21 Construction Graphics Course Syllabus Fall 2008 Instructor: Professor Keith Bisharat Lecture: Tuesdays and Thursdays 8:00 AM 8:50 AM 208 Brighton Hall Lab 1: Tuesday 9-11:50 AM Lab 2: Thursday 9-11:50
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...
More informationSubject Description Form
Subject Description Form Subject Code Subject Title Credit Value BRE222 Workshop Practices and Draftsmanship 3 Academic Credits Level 2 Pre-requisite/ Co-requisite/ Exclusion Objectives Nil 1) Provide
More informationA. Section includes administrative and procedural requirements for project record documents, including the following:
SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01
More informationSECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.
SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section
More informationSECTION ARCHITECTURAL PRECAST CONCRETE
PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Column covers. 1.2 SUBMITTALS A. Design Mixtures: For each precast concrete mixture. Include compressive strength and waterabsorption
More informationSECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationA. Action Submittals: Written and graphic information that requires Architect's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationArchitect. Architect.
The The line line sketch sketch with with modified modified height height for for plinth plinth floor floor is is displayed. displayed. Open Open Architectural Architectural plan plan file, file, which
More informationSECTION MANHOLES
SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard
More informationRustic Arbor #6919. Please open and inspect all items upon receipt. If you have any questions or concerns, please contact us immediately.
Rustic Arbor #6919 Assembly & Installation Instructions Please open and inspect all items upon receipt. If you have any questions or concerns, please contact us immediately. 1-888-908-8733 service@natureexplore.org
More informationSECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationSECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationPART MATERIALS. Section Fencing Materials. Description
PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain
More informationSECTION SUBMITTAL PROCEDURES
SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply
More informationRelated Drafting. (Construction related trades)
(Construction related trades) I. Course Description Related Drafting This course is broken up into 36 weeks. The main goal of this course is to introduce construction related trades the necessary skills
More informationGarage Design Guide. October 2018
Garage Design Guide October 2018 The Corporation of the Township of Hamilton 8235 Majestic Hills Drive, P.O. Box 1060, Cobourg Ontario K9A 4W5 Tel: 905-342-2810 Fax: 905-342-2818 Email: Tim Jeronimus (Chief
More informationConstruction Drawings: A Cost/Benefit Case Study of Weather and Tear Resistant Drawings
Construction Drawings: A Cost/Benefit Case Study of Weather and Tear Resistant Drawings Bruce W. Smith, CPC and C. Ben Farrow Auburn University Auburn, AL Construction drawings are vital tools that contractors
More informationSECTION PRECAST CONCRETE SECTIONAL MANHOLES
SECTION 02545 PRECAST CONCRETE SECTIONAL MANHOLES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Precast reinforced concrete cylindrical sectional manholes, complete with openings, inserts, hardware,
More informationIGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction
IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction This standard developed by the International Grooving and Grinding Association (IGGA) specifies the procedures for construction of dowel
More informationNZQA registered unit standard version 1 Page 1 of 6. Manufacture precast concrete beams and columns
Page 1 of 6 Title Manufacture precast concrete beams and columns Level 3 Credits 25 Purpose People credited with this unit standard are able to: prepare, set up moulds and storage areas, carry out the
More information14 March 2016 City Hall Station Renovations Bid Documents 15 th Street Station Phase Station Improvements SECTION PRECAST CONCRETE
SECTION 03400 PRECAST CONCRETE PART 1 GENERAL 1.01 DESCRIPTION A. The work specified in this Section consists of designing, furnishing and installing precast concrete components. 1.02 RELATED SECTIONS
More informationB422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422
B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationMATERIALS DIVISION MEMORANDUM
MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Precast Concrete and Concrete Pipe Quality Control/Quality Assurance Programs SPECIFIC SUBJECT: Sections 204.22(c), 204.26(d) and Minimum Acceptance Sampling
More informationEast Central College
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationCONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01
More informationSECTION BASIC MATERIALS AND METHODS
SECTION 15050 BASIC MATERIALS AND METHODS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and Fittings. 1.02 RELATED SECTIONS A. Basic Mechanical Requirements: Section 15010. B. Supports, Anchors, and Seals:
More informationIntroduction to Site Layout Annotated Instructor s Guide. Module PREREQUISITES MODULE OVERVIEW OBJECTIVES PERFORMANCE TASKS
Introduction to Site Layout Annotated Instructor s Guide Module 78101-04 MODULE OVERVIEW This module provides an overview of the site layout trade and related tasks. The use of the builder s level and
More informationSECTION G ESTIMATE OF QUANTITIES
PROJECT STATE OF SOUTH DAKOTA NH 2115(45)87 SHEET G2 TOTAL SHEETS G27 SECTION G ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 560E0068 7'x3' Precast Concrete
More informationGUIDELINE SPECIFICATIONS
GUIDELINE SPECIFICATIONS GORDON MILLENNIUM DECORATIVE METAL COLUMN COVERS DIVISION 05 7500 or DIVISION 09 2000 Note To Specifier: Column Covers are a finished, decorative product and should be installed
More informationAmerican Institute of Timber Construction 7012 South Revere Parkway Suite 140 Centennial, CO Phone: 303/ Fax: 303/
American Institute of Timber Construction 7012 South Revere Parkway Suite 140 Centennial, CO 80112 Phone: 303/792-9559 Fax: 303/792-0669 404.1. SCOPE STANDARD FOR RADIALLY REINFORCING CURVED GLUED LAMINATED
More informationWILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305
WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal
More informationITT Technical Institute. CD111 Introduction to Design and Drafting Onsite and Online Course SYLLABUS
ITT Technical Institute CD111 Introduction to Design and Drafting Onsite and Online Course SYLLABUS Credit hours: 4 Contact/Instructional hours: 50 (30 Theory Hours, 20 Lab Hours) Prerequisite(s) and/or
More informationA Productivity Comparison of AutoCAD and AutoCAD Architecture Software
AUTODCAD ARCHITECTURE A Productivity Comparison of and Software provides the best software-based design and documentation productivity for architects. This study details productivity gains over in designing
More informationNZQA registered unit standard version 1 Page 1 of 6. Demonstrate knowledge of structural precast concrete element manufacture
Page 1 of 6 Title Demonstrate knowledge of structural precast concrete element manufacture Level 3 Credits 25 Purpose People credited with this unit standard are able to demonstrate knowledge of: preparation,
More informationITT Technical Institute. DT1110 Introduction to Drafting and Design Technology Onsite and Online Course SYLLABUS
ITT Technical Institute DT1110 Introduction to Drafting and Design Technology Onsite and Online Course SYLLABUS Credit hours: 4.5 Contact/Instructional hours: 56 (34 Theory Hours, 22 Lab Hours) Prerequisite(s)
More information10.2 GUIDE SPECIFICATION FOR ARCHITECTURAL/STRUCTURAL PRECAST CONCRETE
10.2 GUIDE SPECIFICATION FOR ARCHITECTURAL/STRUCTURAL PRECAST CONCRETE This Guide Specification is intended to be used as a foundation for the development of an office master specification or in the preparation
More informationUCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationBLM S LAND USE PLANNING PROCESS AND PUBLIC INVOLVEMENT OPPORTUNITIES STEP-BY-STEP
BLM ACTION CENTER www.blmactioncenter.org BLM S LAND USE PLANNING PROCESS AND PUBLIC INVOLVEMENT OPPORTUNITIES STEP-BY-STEP Planning What you, the public, can do the Public to Submit Pre-Planning During
More informationProject Booklet. Structural Drafting with AutoCAD
Project Booklet Structural Drafting with AutoCAD Introduction 1 General Setup 2 Border and Title Block 3 Drafting the Foundation Plan (Plate 1) 8 Drafting the South Elevation (Plate 2) 11 Drafting Section
More informationTotal Precast Concrete Structures
Total Precast Concrete Structures 1 This program is registered with CPCI for continuing professional education. CPCI s continuing-education program emphasizes on learning for architects, engineers and
More informationSECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section
02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,
More informationStandard Specifications
Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and
More informationGeneral description: Two-component high-build, high solids surface tolerant universal epoxy coating. For painting on steel and galvanized steel substrates. Certified for systems category C5I High ISO 12944.
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information
More informationInstalling a COMROD AS1R Whip Antenna with Anchor Post
Installing a COMROD AS1R Whip Antenna with Anchor Post IS10012 Issue 1.0...15 September 2010 Nautel Limited 10089 Peggy's Cove Road, Hackett's Cove, NS, Canada B3Z 3J4 T.877 6 nautel (628835) or +1.902.823.2233
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationFoundation Specifications for 5.6-Meter Modular Earth Station Antennas
Installation Instructions Bulletin 237029 Foundation Specifications for 5.6-Meter Modular Earth Station Antennas Revision A Introduction This document specifies typical foundation characteristics, designs,
More informationDIVISION: CONCRETE SECTION: CONCRETE ANCHORS REPORT HOLDER: HILTI, INC. EVALUATION SUBJECT:
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 42 6587 (562) 699 054 www.icc es.org ESR 279 Reissued 08/2018 This report is subject to renewal 08/2020. DIVISION: 0 00 00 CONCRETE
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationB. Installation Instructions. Provide installation instructions, including any special equipment, to address the following.
SAMPLING AND TESTING. The Sampling and Testing requirements contained in -03 shall apply. MARKING. The Marking requirements contained in -03 shall apply. FINAL PRODUCTION INSPECTION. The Final Production
More information2' x 3' Polymer Pull Box Cover 4'-0" 7'-0" 24" x 76" Access Opening 3'-6"
Scope.1 Precast Concrete Equipment Slab Box 8' x 10' x Pad with 4' x 7' x 3'- Box for 5-Way RAM Gas Switch, 2-Way, 3-Way, and 4-Way Pad-Mounted RAG Gas Switches, VFI 9, VFI 12, Bypass Switch, and 33 kv
More informationAnticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationQuality Control and Quality Assurance Guide
Quality Control and Quality Assurance Guide Bridge Division, Design Section April 2017 Table of Contents Chapter 1 About this Guide... 3 Chapter 2 Goals and Objectives... 5 Chapter 3 Participants... 6
More informationFoundation Specifications for 7.6-Meter Modular Earth Station Antennas
Installation Instructions Foundation Specifications for 7.6-Meter Modular Earth Station Antennas Bulletin 237186A Revision A Introduction This document specifies typical foundation characteristics, designs,
More information