NAUTICUS CLASS NOTATIONS

Size: px
Start display at page:

Download "NAUTICUS CLASS NOTATIONS"

Transcription

1 RULES FOR CLASSIFICATION OF SHIPS SHIPS IN OPERATION PART 7 CHAPTER 7 NAUTICUS CLASS NOTATIONS JANUARY 2003 CONTENTS PAGE Sec. 1 General... 5 Sec. 2 Scope of the Rules... 6 Sec. 3 Assignment of Class... 7 Sec. 4 Maintenance of Class... 8 Sec. 5 Retention of Class... 9 Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

2 CHANGES IN THE RULES General This booklet is a reprint of the previous edition and apart from clarifications of text and the inclusion of amendments and corrections, published in the July 2002 edition of Pt.0 Ch.1 Sec.3, no other changes have been made. This chapter is valid until superseded by a revised chapter. Supplements will not be issued except for an updated list of minor amendments and corrections presented in Pt.0 Ch.1 Sec.3. Pt.0 Ch.1 is normally revised in January and July each year. Revised chapters will be forwarded to all subscribers to the rules. Buyers of reprints are advised to check the updated list of rule chapters printed in Pt.0 Ch.1 Sec.1 to ensure that the chapter is current. Comments to the rules may be sent by to rules@dnv.com For subscription orders or information about subscription terms, please use distribution@dnv.com Comprehensive information about DNV and the Society's services is found at the Web site Det Norske Veritas Computer Typesetting (FM+SGML) by Det Norske Veritas Printed in Norway If any person suffers loss or damage which is proved to have been caused by any negligent act or omission of Det Norske Veritas, then Det Norske Veritas shall pay compensation to such person for his proved direct loss or damage. However, the compensation shall not exceed an amount equal to ten times the fee charged for the service in question, provided that the maximum compensation shall never exceed USD 2 million. In this provision "Det Norske Veritas" shall mean the Foundation Det Norske Veritas as well as all its subsidiaries, directors, officers, employees, agents and any other acting on behalf of Det Norske Veritas.

3 Pt.7 Ch.7 Contents Page 3 CONTENTS SEC. 1 GENERAL... 5 A. General...5 A 100 NAUTICUS notations...5 B. Definitions...5 B 100 Product model...5 B D graphic model...5 B 300 Software tools and features...5 B 400 DNV Exchange...5 SEC. 2 SCOPE OF THE RULES... 6 A. Applicability...6 A 100 Application of the rules...6 A 200 Storage and retrieval of data...6 SEC. 3 ASSIGNMENT OF CLASS... 7 A. Establishment of Product Model... 7 A 100 General...7 A 200 Necessary data...7 A 300 Confidentiality...7 SEC. 4 MAINTENANCE OF CLASS... 8 A. IT Maintenance... 8 A 100 Maintenance of IT standard...8 A 200 Maintenance of product model...8 SEC. 5 RETENTION OF CLASS... 9 A. Change of Ownership... 9 A 100 Change of ownership...9

4 Pt.7 Ch.7 Contents Page 4

5 Pt.7 Ch.7 Sec.1 Page 5 SECTION 1 GENERAL A. General A 100 NAUTICUS notations 101 General provisions governing the assignment of the NAUTICUS class notations, with appropriate additional notations, are stated in Pt.1 Ch.1 Sec.2 B For the notation NAUTICUS(Operation), no additional requirements are specified in this chapter. B. Definitions B 100 Product model 101 The term product model refers to the principle of collecting relevant information pertaining to classification about a product over its life cycle and to link this information directly to the product in a computer model. The product model includes the ship structure and essential equipment for which an involvement by the Society has been defined. B D graphic model 201 The 3-D graphical model is part of the product model and consists of a three dimensional view of the entire hull structure and associated features. Other relevant elements of information are linked to this model. B 300 Software tools and features 301 Software tools are computer programs designed to perform specific tasks. Selected tools are accessible to the owner for vessels with NAUTICUS class notations. 302 Software feature is a common description of the data handling capabilities and characteristics associated with the various software tools accessible through NAUTICUS. 303 NAUTICUS is the registered trade name of the software applications associated with the Society's product model technology. B 400 DNV Exchange 401 DNV Exchange is the user interface software, which provides the user with access to relevant parts of the product model.

6 Pt.7 Ch.7 Sec.2 Page 6 SECTION 2 SCOPE OF THE RULES A. Applicability A 100 Application of the rules 101 The NAUTICUS class notations define a degree of exchange between the owner and the Society of data and information stored in the product model. At his own discretion, the owner may also allow other authorised users direct access to the product model. 102 The NAUTICUS class notations apply to the ship in the operation phase. The notation may be assigned at any stage of the ship's life provided the data and information needed to establish a product model and 3-D graphic model for the ship is available. A 200 Storage and retrieval of data 201 Data related to the condition of the ship are stored in the product model by the Society. The product model is updated upon completion of a periodical survey or upon receipt of other service experience that may be relevant for the ship. 202 Retrieval of product model data may be arranged through DNV Exchange.

7 Pt.7 Ch.7 Sec.3 Page 7 SECTION 3 ASSIGNMENT OF CLASS A. Establishment of Product Model A 100 General 101 It is the responsibility of the Society to establish and maintain the product model. 102 It is the owner's responsibility to supply the necessary data and information needed to establish the product model. A 200 Necessary data 201 The data and information needed in order to establish the product model corresponds to that needed in order to assign main class 1A1 and relevant additional class notations. A 300 Confidentiality 301 Product model data for individual ships is of a confidential nature and will not to be passed on to a third party without the owners written consent, except as provided in Pt.1 Ch.1 Sec.1 B600.

8 Pt.7 Ch.7 Sec.4 Page 8 SECTION 4 MAINTENANCE OF CLASS A. IT Maintenance A 100 Maintenance of IT standard 101 In the event that the owner agrees to purchase and use DNV Exchange then the responsibility for maintaining the minimum IT standard, as defined by the Society, in support of DNV Exchange, is shown in Table A It is the Society's responsibility to maintain and update the software packages supplied by the Society. A 200 Maintenance of product model 201 It is the Society's responsibility to maintain and update the product model based on survey results, damage reports and receipt of other relevant information applicable to the ship. 202 It is the owner's responsibility to supply data needed by the Society for maintenance of the product model. 203 Changes to the ship or installed equipment may necessitate changes to the product model. Such changes to the product model will be effected by the Society. Table A1 Responsibility to maintain minimum IT standard Nominated Site Responsibility Owner premises Owner Owner ships Owner DNV office DNV Other owner nominated site(s) (e.g. consultancy) Owner

9 Pt.7 Ch.7 Sec.5 Page 9 SECTION 5 RETENTION OF CLASS A. Change of Ownership A 100 Change of ownership 101 Unless otherwise agreed between the involved parties, the notation NAUTICUS(Operation) is maintained upon change of ownership of a ship.

GENERAL DESCRIPTION OF THE CMC SERVICES

GENERAL DESCRIPTION OF THE CMC SERVICES STANDARD FOR CERTIFICATION No.1.1 GENERAL DESCRIPTION OF THE CMC SERVICES MAY 2007 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property and the

More information

DNVGL-CG-0214 Edition September 2016

DNVGL-CG-0214 Edition September 2016 CLASS GUIDELINE DNVGL-CG-0214 Edition September 2016 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that it is prohibited by

More information

TECHNOLOGY QUALIFICATION MANAGEMENT

TECHNOLOGY QUALIFICATION MANAGEMENT OFFSHORE SERVICE SPECIFICATION DNV-OSS-401 TECHNOLOGY QUALIFICATION MANAGEMENT OCTOBER 2010 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property

More information

Type Approval JANUARY The electronic pdf version of this document found through is the officially binding version

Type Approval JANUARY The electronic pdf version of this document found through  is the officially binding version STANDARD FOR CERTIFICATION No. 1.2 Type Approval JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The content of this service

More information

ELECTRICAL INSTALLATIONS

ELECTRICAL INSTALLATIONS RULES FOR CLASSIFICATION OF SHIPS / HIGH SPEED, LIGHT CRAFT AND NAVAL SURFACE CRAFT NEWBUILDINGS MACHINERY AND SYSTEMS MAIN CLASS PART 4 CHAPTER 8 ELECTRICAL INSTALLATIONS JANUARY 2010 CONTENTS PAGE Sec.

More information

HULL MONITORING SYSTEMS

HULL MONITORING SYSTEMS RULES FOR CLASSIFICATION OF SHIPS / HIGH SPEED, LIGHT CRAFT AND NAVAL SURFACE CRAFT NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 11 HULL MONITORING SYSTEMS JANUARY 2011 CONTENTS

More information

Nauticus (Propulsion) - the modern survey scheme for machinery

Nauticus (Propulsion) - the modern survey scheme for machinery Nauticus (Propulsion) - the modern survey scheme for machinery Jon Rysst, Department ofsystems and Components, Division of Technology and Products, DetNorske Veritas, N-1322 H0VIK e-mail Jon.Rysst@dnv.com

More information

Electrical Installations

Electrical Installations RULES FOR CLASSIFICATION OF Ships / High Speed, Light Craft and Naval Surface Craft PART 4 CHAPTER 8 NEWBUILDINGS MACHINERY AND SYSTEMS MAIN CLASS Electrical Installations JANUARY 2012 The electronic pdf

More information

OPERATIONAL REQUIREMENTS ALL SHIPS

OPERATIONAL REQUIREMENTS ALL SHIPS RULES FOR CLASSIFICATION OF SHIPS SHIPS IN OPERATION PART 7 CHAPTER 3 OPERATIONAL REQUIREMENTS ALL SHIPS JANUARY 2002 CONTENTS PAGE Sec. 1 General Regulations... 5 Sec. 2 Lifesaving... 6 Sec. 3 Safety

More information

Hull Monitoring Systems

Hull Monitoring Systems RULES FOR CLASSIFICATION OF Ships / High Speed, Light Craft and Naval Surface Craft PART 6 CHAPTER 11 NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS Hull Monitoring Systems JANUARY 2011 This

More information

NAUTICAL SAFETY SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 8

NAUTICAL SAFETY SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 8 RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 8 NAUTICAL SAFETY JULY 2010 CONTENTS PAGE Sec. 1 General... 7 Sec. 2 Design of Workplace...

More information

NAUTICUS - a life-cycle approach to ship design and decision support

NAUTICUS - a life-cycle approach to ship design and decision support NAUTICUS - a life-cycle approach to ship design and decision support Morten L0vstad ^ and Simon H0jby Behrens-Nielsen ^ ^DetNorske Veritas, Product Development, Division Technology and Products, Veritasveien

More information

DNVGL-CP-0212 Edition March 2016

DNVGL-CP-0212 Edition March 2016 CLASS PROGRAMME Type approval DNVGL-CP-0212 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

P.S.C. NO. 3 ELECTRICITY LEAF: 190 ORANGE AND ROCKLAND UTILITIES, INC. REVISION: 2 INITIAL EFFECTIVE DATE: August 1, 2017 SUPERSEDING REVISION: 1

P.S.C. NO. 3 ELECTRICITY LEAF: 190 ORANGE AND ROCKLAND UTILITIES, INC. REVISION: 2 INITIAL EFFECTIVE DATE: August 1, 2017 SUPERSEDING REVISION: 1 P.S.C. NO. 3 ELECTRICITY LEAF: 190 ORANGE AND ROCKLAND UTILITIES, INC. REVISION: 2 INITIAL EFFECTIVE DATE: August 1, 2017 SUPERSEDING REVISION: 1 14.1 APPLICATION FOR NEW RESIDENTIAL CONSTRUCTION P.S.C.

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Item designation in electrotechnology

Item designation in electrotechnology AS 3702 1989 Australian Standard Item designation in electrotechnology This Australian Standard was prepared by Committee TE/13, Symbols, Units & Quantities for Electrotechnology. It was approved on behalf

More information

DNV GL approval of service supplier scheme

DNV GL approval of service supplier scheme CLASS PROGRAMME DNVGL-CP-0484 Edition February 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class

More information

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248) Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248)-858-1447 Fax (248)-858-7466 Requirements Needed for Final Condominium Approval General Requirements. 1

More information

Page 1 of 24 SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C

Page 1 of 24 SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C Page 1 of 24 SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549 SCHEDULE. INFORMATION TO BE INCLUDED IN STATEMENTS FILED PURSUANT TO 13D-1(B) AND AMENDMENTS THERETO FILED PURSUANT TO 13D-2(B) SCHEDULE

More information

LAW ON TECHNOLOGY TRANSFER 1998

LAW ON TECHNOLOGY TRANSFER 1998 LAW ON TECHNOLOGY TRANSFER 1998 LAW ON TECHNOLOGY TRANSFER May 7, 1998 Ulaanbaatar city CHAPTER ONE COMMON PROVISIONS Article 1. Purpose of the law The purpose of this law is to regulate relationships

More information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects) SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,

More information

TERMS OF SALE. Quotations & Orders

TERMS OF SALE. Quotations & Orders Quotations & Orders 1. Quotation is in USD unless otherwise indicated and is based on information provided to SolarPath Inc. at time of quotation, i.e. location, application, operating profile, etc., and

More information

Line 6 L I M I T E D R E F URBISH E D (B-ST O C K) W A RR ANT Y

Line 6 L I M I T E D R E F URBISH E D (B-ST O C K) W A RR ANT Y Line 6 L I M I T E D W A RR A N T Y PO L I C Y PLEASE READ THIS DOCUMENT CAREFULLY. IT CONTAINS IMPORTANT INFORMATION ABOUT YOUR RIGHTS AND OBLIGATIONS, AS WELL AS LIMITATIONS AND EXCLUSIONS THAT MAY APPLY

More information

Terms and Conditions Unit Trust, OEIC and Investment Trust ISA Investments

Terms and Conditions Unit Trust, OEIC and Investment Trust ISA Investments Terms and Conditions Unit Trust, OEIC and Investment Trust ISA Investments Reference guide to Terms and Conditions Section 5 Explanation of cancellation rights Section 6 How income reinvestments and distributions

More information

PARTICIPATION AGREEMENT between THE REGENTS OF THE UNIVERSITY OF CALIFORNIA and INSERT PARTNER'S CORPORATE NAME

PARTICIPATION AGREEMENT between THE REGENTS OF THE UNIVERSITY OF CALIFORNIA and INSERT PARTNER'S CORPORATE NAME PARTICIPATION AGREEMENT between THE REGENTS OF THE UNIVERSITY OF CALIFORNIA and INSERT PARTNER'S CORPORATE NAME THIS AGREEMENT is made by and between THE REGENTS OF THE UNIVERSITY OF CALIFORNIA ( UC Regents

More information

Service Suppliers Engaged in the Inspection and Testing of Radio Communication Equipment and Automatic Identification System on Vessels

Service Suppliers Engaged in the Inspection and Testing of Radio Communication Equipment and Automatic Identification System on Vessels pproval of rvc upplrsno. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Approval of Service Suppliers No. 406 Service Suppliers Engaged in the Inspection and Testing of Radio Communication Equipment

More information

South African Distribution Code

South African Distribution Code South African Distribution Code Metering Code Version 6.0 July 2014 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact: Mr.

More information

IAC/INTERACTIVECORP Filed by GOLDMAN SACHS ASSET MANAGEMENT LP

IAC/INTERACTIVECORP Filed by GOLDMAN SACHS ASSET MANAGEMENT LP IAC/INTERACTIVECORP Filed by GOLDMAN SACHS ASSET MANAGEMENT LP FORM SC 13G (Statement of Ownership) Filed 11/10/09 Address 152 WEST 57TH ST 42ND FLOOR NEW YORK, NY 10019 Telephone 2123147300 CIK 0000891103

More information

Summary of Changes and Current Document Status

Summary of Changes and Current Document Status DNV SERVICE DOCUMENTS Summary of Changes and Current Document Status FEBRUARY 2012 FOREWORD DET NORSKE VERITAS (DNV) is an autonomous and independent foundation with the objectives of safeguarding life,

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

Couplings used for torque transmission in propulsion or auxiliary plants

Couplings used for torque transmission in propulsion or auxiliary plants CLASS PROGRAMME Type approval DNVGL-CP-0148 Edition March 2016 Couplings used for torque transmission in propulsion or auxiliary plants The electronic pdf version of this document, available free of charge

More information

Final ballot January BOT adoption February 2015

Final ballot January BOT adoption February 2015 Standard PRC-024-21(X) Generator Frequency and Voltage Protective Relay Settings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

MARITIME DNV GL. The European world-leading Class. Georgios Kasimatis 30 June MGUDE656 DNV GL June SAFER, SMARTER, GREENER

MARITIME DNV GL. The European world-leading Class. Georgios Kasimatis 30 June MGUDE656 DNV GL June SAFER, SMARTER, GREENER MARITIME DNV GL The European world-leading Class Georgios Kasimatis 30 June 2016 1 DNV GL 2016 20160628-MGUDE656 30 June SAFER, SMARTER, GREENER Trusted global partner with home in Europe 100 countries

More information

WHEREAS, UCMERI requires additional financial support to sustain its operations; and

WHEREAS, UCMERI requires additional financial support to sustain its operations; and PARTICIPATION AGREEMENT between THE REGENTS OF THE UNIVERSITY OF CALIFORNIA acting through THE MERCED CAMPUS OF THE UNIVERSITY OF CALIFORNIA on behalf of THE UC MERCED ENERGY RESEARCH INSTITUTE (UCMERI)

More information

UNOFFICIAL TRANSLATION

UNOFFICIAL TRANSLATION Decree 34/2014. (IX. 25.) of the Governor of the Magyar Nemzeti Bank amending MNB Decree No. 11/2011 (IX. 6.) on the processing and distribution of banknotes and on technical tasks relating to the protection

More information

Connecting Systems for Cable Repair (Cable Splices)

Connecting Systems for Cable Repair (Cable Splices) p pproval roramms for U rcos orasato Mutual coto (M)No. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Type Approval Programmes for EU recognised organisation Mutual Recognition (MR) No. MR-E015 Connecting

More information

DNVGL-CP-0338 Edition October 2015

DNVGL-CP-0338 Edition October 2015 CLASS PROGRAMME DNVGL-CP-0338 Edition October 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class

More information

AWS J1.1M/J1.1:2013 An American National Standard. Specification for Resistance Welding Controls

AWS J1.1M/J1.1:2013 An American National Standard. Specification for Resistance Welding Controls An American National Standard Specification for Resistance Welding Controls An American National Standard Approved by American National Standards Institute July 29, 2013 Specification for Resistance Welding

More information

EMPLOYEE SECONDMENT AGREEMENT

EMPLOYEE SECONDMENT AGREEMENT Exhibit 10.7 Execution Version EMPLOYEE SECONDMENT AGREEMENT This Employee Secondment Agreement (this Agreement ), effective as of December 22, 2014 (the Effective Date ), is entered into by and among

More information

New Mexico Lottery Authority MY REWARDS PROGRAM DRAWING PROCEDURES v1.0

New Mexico Lottery Authority MY REWARDS PROGRAM DRAWING PROCEDURES v1.0 New Mexico Lottery Authority MY REWARDS PROGRAM DRAWING PROCEDURES v1.0 1.0 PURPOSE This document establishes the MY REWARDS Program (the Program ) Drawing Procedures utilized by the NEW MEXICO LOTTERY

More information

This circular summarizes the various important aspects of the LRIT system with a view to enabling companies to ensure compliance in a timely manner.

This circular summarizes the various important aspects of the LRIT system with a view to enabling companies to ensure compliance in a timely manner. Luxembourg, 29/10/2008 CIRCULAR CAM 02/2008 N/Réf. : AH/63353 Subject : Long-Range Identification and Tracking of Ships (LRIT) To : All ship owners, ship operators and designated persons of Luxembourg

More information

SANTANDER CONSUMER USA HOLDINGS INC.

SANTANDER CONSUMER USA HOLDINGS INC. UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 SCHEDULE 13G Under the Securities Exchange Act of 1934 (Amendment No. 2) SANTANDER CONSUMER USA HOLDINGS INC. (Name of Issuer) Common

More information

2017 All-Media Art Exhibit

2017 All-Media Art Exhibit UNION SETTLEMENT PRESENTS THE 25th ANNUAL ETHNIC EAST SIDE STORY festival 2017 All-Media Art Exhibit Paintings Prints Photographs Drawings Etchings Wood Cuts Share Your East Side Story Be a part of the

More information

Technology qualification management and verification

Technology qualification management and verification SERVICE SPECIFICATION DNVGL-SE-0160 Edition December 2015 Technology qualification management and verification The electronic pdf version of this document found through http://www.dnvgl.com is the officially

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

NZQA unit standard version 3 Page 1 of 5. Install and maintain telecommunications radio frequency systems

NZQA unit standard version 3 Page 1 of 5. Install and maintain telecommunications radio frequency systems Page 1 of 5 Title Install and maintain telecommunications radio frequency systems Level 4 Credits 25 Purpose This unit standard covers installation and maintenance of telecommunications radio frequency

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

Invention SUBMISSION BROCHURE PLEASE READ THE FOLLOWING BEFORE SUBMITTING YOUR INVENTION

Invention SUBMISSION BROCHURE PLEASE READ THE FOLLOWING BEFORE SUBMITTING YOUR INVENTION Invention SUBMISSION BROCHURE PLEASE READ THE FOLLOWING BEFORE SUBMITTING YOUR INVENTION The patentability of any invention is subject to legal requirements. Among these legal requirements is the timely

More information

THE PLANNING PROCEDURE FOR HF BROADCASTING - ARTICLE 12 OF THE RADIO REGULATIONS

THE PLANNING PROCEDURE FOR HF BROADCASTING - ARTICLE 12 OF THE RADIO REGULATIONS THE PLANNING PROCEDURE FOR HF BROADCASTING - ARTICLE 12 OF THE RADIO REGULATIONS Nedialko Miltchev Radiocommunication Bureau 1 Introduction The current procedures for the use of the HF bands allocated

More information

New York University University Policies

New York University University Policies New York University University Policies Title: Policy on Patents Effective Date: December 12, 1983 Supersedes: Policy on Patents, November 26, 1956 Issuing Authority: Office of the General Counsel Responsible

More information

Integrated Radiocommunication System (IRCS)

Integrated Radiocommunication System (IRCS) STANDARD FOR CERTIFICATION No. 2.9 Approval Programmes Type Approval Programmes No. 841.10 Integrated Radiocommunication System (IRCS) NOVEMBER 2012 The electronic pdf version of this document found through

More information

CIC SASKPOWER SMART METER REVIEW

CIC SASKPOWER SMART METER REVIEW CIC SASKPOWER SMART METER REVIEW TERMS OF REFERENCE DATE)AUGUST 15, 2014 1. PURPOSE SMART METER REVIEW Terms of Reference The Government of Saskatchewan has requested that Crown Investments Corporation

More information

NATS Swanwick. Interface Agreement. Owners: General Manager Swanwick. General Manager XXX

NATS Swanwick. Interface Agreement. Owners: General Manager Swanwick. General Manager XXX NATS Swanwick Interface Agreement between Swanwick And XXX Airport Owners: General Manager Swanwick General Manager XXX APPROVED BY Title Name Signature Date General Manager LTC Swanwick General Manager

More information

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS) Approval Amendment Record Approval Date Version Description 15/10/2015 1 This policy takes precedence over L1-NAM-PRO-003 Infrastructure As Built Drawing Management due to business restructures. New Content

More information

MFJ ENTERPRISES, INC.

MFJ ENTERPRISES, INC. Model MFJ-2013 INSTRUCTION MANUAL CAUTION: Read All Instructions Before Operating Equipment MFJ ENTERPRISES, INC. 300 Industrial Park Road Starkville, MS 39759 USA Tel: 662-323-5869 Fax: 662-323-6551 VERSION

More information

Contract for Artist Professional Services and Copyright

Contract for Artist Professional Services and Copyright Contract for Artist Professional Services and Copyright This Contract constitutes an agreement between the National Gallery of Canada and a Canadian living artist, hereinafter referred to, respectively,

More information

Spectrum Licence Wireless Cable Service (500 & 600 MHz Band)

Spectrum Licence Wireless Cable Service (500 & 600 MHz Band) Fairness ~ Innovation ~ Integrity Spectrum Licence Wireless Cable Service (500 & 600 MHz Band) Licensee: World on Wireless Limited Address: P.O. Box HM 1097 Hamilton HM EX Licence Number: 021-WCS-05 Issue

More information

SYSTEM MONITORING FAULT RECORDING

SYSTEM MONITORING FAULT RECORDING * SYSTEM MONITORING FAULT RECORDING Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any losses arising under or in connection with this information. This

More information

Xena Exchange Users Agreement

Xena Exchange Users Agreement Xena Exchange Users Agreement Last Updated: April 12, 2018 1. Introduction Xena Exchange welcomes You ( User ) to use Xena Exchange s online software ( Xena s Software ) described herein in accordance

More information

SHARED TENANT SERVICE (STS) ARRANGEMENTS

SHARED TENANT SERVICE (STS) ARRANGEMENTS Southwestern Bell Telephone 2nd Revised Sheet 1 Company d/b/a AT&T Missouri Replacing 1st Revised Sheet 1 37.1 Definition of Service 37.1.1 Shared Tenant Service (STS) Arrangements are the provision of

More information

Schroders Unit Trust/OEIC ISA 2017/2018

Schroders Unit Trust/OEIC ISA 2017/2018 Schroders Unit Trust/OEIC ISA 2017/2018 Application Forms Note to Investors: Before you invest, please read the Key Investor Information Document(s) and Supplementary Information Document provided to you.

More information

WGA LOW BUDGET AGREEMENT

WGA LOW BUDGET AGREEMENT WGA LOW BUDGET AGREEMENT ( Company ) has read the Writers Guild of America ( WGA ) Low Budget Agreement (the Low Budget Agreement ). Company desires to produce (the Picture ) under the Low Budget Agreement.

More information

Thickness tolerances of steel plates and wide flats

Thickness tolerances of steel plates and wide flats (1981) (Rev.1 1989) (Rev.2 1992) (Rev.3 1995) (Rev.4 Oct 2009) (Rev.5 Feb 2012) Thickness tolerances of steel plates and wide flats.1 Scope.1.1 These requirements apply to the tolerance on thickness of

More information

FPSO Design and Technology

FPSO Design and Technology An Intensive 5 Day Training Course FPSO Design and Technology 14-OCT-18 13-17 Oct 2019, Dubai www.petroknowledge.com FPSO Design and Technology WHY CHOOSE THIS TRAINING COURSE? This 5-day Design and Technology

More information

CHESS CLEARING HOUSE ELECTRONIC SUBREGISTER SYSTEM

CHESS CLEARING HOUSE ELECTRONIC SUBREGISTER SYSTEM CHESS CLEARING HOUSE ELECTRONIC SUBREGISTER SYSTEM Information provided is for educational purposes and does not constitute financial product advice. You should obtain independent advice from an Australian

More information

AS Australian Standard. Guarding and safe use of woodworking machinery. This is a free 7 page sample. Access the full version online.

AS Australian Standard. Guarding and safe use of woodworking machinery. This is a free 7 page sample. Access the full version online. AS 1473 1991 Australian Standard Guarding and safe use of woodworking machinery This Australian Standard was prepared by Committee SF/7, Guarding of Woodworking Machinery. It was approved on behalf of

More information

CLIENT GUIDE TO MEASURED BUILDING SURVEYS

CLIENT GUIDE TO MEASURED BUILDING SURVEYS CLIENT GUIDE TO MEASURED BUILDING SURVEYS ISSUE 4 FEBRUARY 2016 TSA The Survey Association s Client Guides are primarily aimed at other professionals such as engineers, architects, planners and clients

More information

Seychelles Civil Aviation Authority SAFETY NOTICE. Coding and registration of Seychelles 406 Mhz Emergency Locator Transmitters (ELTs)

Seychelles Civil Aviation Authority SAFETY NOTICE. Coding and registration of Seychelles 406 Mhz Emergency Locator Transmitters (ELTs) Seychelles Civil Aviation Authority Safety Notice SAFETY NOTICE Number: Issued: 25 April 2018 Coding and registration of Seychelles 406 Mhz Emergency Locator Transmitters (ELTs) This Safety Notice contains

More information

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES CITY OF RICHMOND 112 JACKSON STREET RICHMOND, TEXAS 77469 PHONE: 281-232-6871 FAX: 281-238-1215 CITY OF RICHMOND PUBLIC

More information

ART SERVICES AND ACQUISITION AGREEMENT *******************************************************************************

ART SERVICES AND ACQUISITION AGREEMENT ******************************************************************************* Form No. OGC S 99 20 UNIVERSITY OF HOUSTON SYSTEM ART SERVICES AND ACQUISITION AGREEMENT Contract No. Account No. ******************************************************************************* THIS ART

More information

KKR Credit Advisors (Ireland) Unlimited Company PILLAR 3 DISCLOSURES

KKR Credit Advisors (Ireland) Unlimited Company PILLAR 3 DISCLOSURES KKR Credit Advisors (Ireland) Unlimited Company KKR Credit Advisors (Ireland) Unlimited Company PILLAR 3 DISCLOSURES JUNE 2017 1 1. Background The European Union Capital Requirements Directive ( CRD or

More information

Drawing Standard for Plans Showing Horizontal Alignment

Drawing Standard for Plans Showing Horizontal Alignment Discipline: Engineering (Track & Civil) Category: Standard Drawing Standard for Plans Showing Horizontal Alignment ETD-00-01 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard

More information

DEPARTMENT OF TRANSPORTATION

DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 [61 FR 625 No. 6; 01/09/96][SN] [Docket No. 94-ANE-63; Amendment 39-9458; AD 95-03-10] Textron Lycoming AD 95-03-10 Amendment

More information

Draft ETSI EN V1.3.1 ( )

Draft ETSI EN V1.3.1 ( ) Draft EN 300 659-2 V1.3.1 (2000-09) European Standard (Telecommunications series) Access and Terminals (AT); Analogue access to the Public Switched Telephone Network (PSTN); Subscriber line protocol over

More information

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario August 7, 2001 See Distribution List RE: Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario Dear Sir/Madam: The Electrical Safety

More information

NHS Greater Glasgow and Clyde Health Board. Policy on the Management of Intellectual Property

NHS Greater Glasgow and Clyde Health Board. Policy on the Management of Intellectual Property NHS Originated by: David Wyper and Lorna Kelly Title: Board Date: 6/05/2008 Authorised by: Date: 1 Introduction 1.1 NHS organisations are obliged to manage their Research & Development (R&D) to improve

More information

Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate)

Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate) API Manual of Petroleum Measurement Standards TR 2570 EI Hydrocarbon Management HM 56 Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate) First Edition, October 2010

More information

View Terms and Conditions: Effective 12/5/2015 Effective 6/17/2017

View Terms and Conditions: Effective 12/5/2015 Effective 6/17/2017 View Terms and Conditions: Effective 12/5/2015 Effective 6/17/2017 Comerica Mobile Banking Terms and Conditions - Effective 12/5/2015 Thank you for using Comerica Mobile Banking combined with your device's

More information

Radiocommunication Bureau (BR)

Radiocommunication Bureau (BR) Radiocommunication Bureau (BR) Circular Letter CM/24 20 October 2015 To Administrations of Member States of the ITU Subject: ITU maritime services database Identities for handheld VHF transceivers with

More information

DNVGL-CP-0293 Edition July 2018

DNVGL-CP-0293 Edition July 2018 CLASS PROGRAMME Type approval DNVGL-CP-0293 Edition July 2018 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that it is prohibited

More information

Guidelines to the standard EN

Guidelines to the standard EN EUROPEAN POWER SUPPLY MANUFACTURERS ASSOCIATION (Visit the EPSMA website at www.epsma.org) Harmonic Current Emissions Guidelines to the standard EN 61000-3-2 Revision Date: 2010-11-08 Page1 Edition Nov

More information

Schroders Investment Trust 2018/2019 Application Forms

Schroders Investment Trust 2018/2019 Application Forms Schroders Investment Trust 2018/2019 Application Forms Note to Investors: Before you invest, please read the Key Information Document(s) and Key Features Document provided to you. These documents are current

More information

Plain bearings Wrapped bushes

Plain bearings Wrapped bushes BRITISH STANDARD BS ISO 3547-3:2006 Plain bearings Wrapped bushes Part 3: Lubrication holes, grooves and indentations ICS 21.100.10 National foreword This British Standard was published under the authority

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Artist Application to Consign in the Artist s Den Gallery

Artist Application to Consign in the Artist s Den Gallery Please complete the following application: Artist Application to Consign in the Artist s Den Gallery Artist Name: Address: Contact Phone: Email: Website (if applicable): Please provide a brief artist statement/biography.

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 1167.2:1999 Australian/New Zealand Standard Welding and brazing Filler metals Part 2: Filler metal for welding AS/NZS 1167.2:1999 This Joint Australian/New Zealand Standard was prepared by Joint

More information

ENTRY FORMAT AND FINALIST SELECTION:

ENTRY FORMAT AND FINALIST SELECTION: FAN ART CONTEST HOW TO REGISTER 1 of 7 Because D23 Members are some of Disney s biggest fans, the Walt Disney Archives is pleased to announce a call for entries to create a piece of work celebrating Disney

More information

Regarding the code-compliance of CCA treated laminated veneer lumber

Regarding the code-compliance of CCA treated laminated veneer lumber Determination 2015/079 Regarding the code-compliance of CCA treated laminated veneer lumber Summary This determination discusses the pathway to establishing compliance with Clause B2.3.1 for laminated

More information

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work; THIS AGREEMENT made in triplicate this th day of, 200 BETWEEN: CITY OF OTTAWA (the City -and- (the Artist WHEREAS the Council of the former City of Ottawa, an old municipality as defined in the City of

More information

Australian Standard. Precast reinforced concrete box culverts. Part 1: Small culverts (not exceeding 1200 mm width and 900 mm depth) AS 1597.

Australian Standard. Precast reinforced concrete box culverts. Part 1: Small culverts (not exceeding 1200 mm width and 900 mm depth) AS 1597. AS 1597.1 1974 Australian Standard Precast reinforced concrete box culverts Part 1: Small culverts (not exceeding 1200 mm width and 900 mm depth) The following industrial and governmental organizations

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

IGEM/TD/101 Edition 2 Communication 1740 Adoption of pipe systems by a GT management of UIP activities

IGEM/TD/101 Edition 2 Communication 1740 Adoption of pipe systems by a GT management of UIP activities Communication 1740 Adoption of pipe systems by a GT management of UIP activities Founded 1863 Royal Charter 1929 Patron: Her Majesty the Queen Communication 1740 Adoption of pipe systems by a GT management

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 2451:1998 Australian/New Zealand Standard Bolts, screws and nuts with British Standard Whitworth threads (rationalized series) AS/NZS 2451:1998 This Joint Australian/New Zealand Standard was prepared

More information

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES Issue 9: May 2013 National Grid National Grid Registered Office National Grid Electricity Transmission plc Registered Office: 1-3 Strand London

More information

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE Page 1 / 5 File number: ACM 139/1905/2 Product code: 0226H This certificate is not valid when presented without the full attached schedule composed of 7 sections www.veristar.com TYPE APPROVAL CERTIFICATE

More information

Statistical basis and overviews FSO register strategy. Purpose, strategic objectives and implementation steps.

Statistical basis and overviews FSO register strategy. Purpose, strategic objectives and implementation steps. 00 Statistical basis and overviews 1680-1700-05 FSO register strategy Purpose, strategic objectives and implementation steps Neuchâtel 2017 Published by: Federal Statistical Office (FSO) Information: Bertrand

More information

Licence Application Submission Procedure for Planned Radio Stations Below 960 MHz

Licence Application Submission Procedure for Planned Radio Stations Below 960 MHz Issue 5 October 2008 Spectrum Management and Telecommunications Radio Standards Procedure Licence Application Submission Procedure for Planned Radio Stations Below 960 MHz Aussi disponible en français

More information

ENGLISH TRANSLATION MILLIMETER-WAVE RADAR EQUIPMENT FOR SPECIFIED LOW POWER RADIO STATION

ENGLISH TRANSLATION MILLIMETER-WAVE RADAR EQUIPMENT FOR SPECIFIED LOW POWER RADIO STATION ENGLISH TRANSLATION MILLIMETER-WAVE RADAR EQUIPMENT FOR SPECIFIED LOW POWER RADIO STATION ARIB STANDARD ARIB STD-T48 Version 2. 1 Version 1.0 December 26th 1995 Version 2.0 February 2nd 1999 Version 2.1

More information