AERONAUTICAL COMMUNICATIONS PANEL (ACP)

Size: px
Start display at page:

Download "AERONAUTICAL COMMUNICATIONS PANEL (ACP)"

Transcription

1 International Civil Aviation Organization WORKING PAPER ACP/1-WP/20 7/5/07 English only AERONAUTICAL COMMUNICATIONS PANEL (ACP) FIRST MEETING Montréal, 10 to 18 May 2007 Agenda Item 1: Review of the progress on the future communication study EUROPEAN TECHNOLOGY ASSESSMENT - STEP 2 ASSESSMENT (Presented by J. Pouzet) SUMMARY This working paper presents the activities currently underway in Europe to assess candidate future technologies. In particular the paper provides information on the methodology to assess candidate technologies against a set of criteria. Action by the ACP is in paragraph INTRODUCTION 1.1 The second step (Step 2), which is currently underway, is conducting further, in-depth evaluation of the Step 1 short-listed technologies or evolutions of them. The Step-2 process is identifying how and where each technology could be applied, and how they would perform in a typical operational environment. This entails a more detailed assessment of performance and characteristics of the candidate technologies identified in the Step 1 report (ACP/1-IP/4 refers). 1.2 To compare the suitability of technologies to meet the requirements an assessment methodology has been developed which is described in this paper. The detailed report describing the Step 2 assessment methodology is appended in this paper. 2. METHODOLOGY 2.1 In developing the assessment process and associated criteria the following points were considered: (33 pages) ACP.1.WP en.doc

2 ACP/1-WP/ a) the process had to be transparent, understandable; b) the key (essential) criteria which candidate technologies must meet have been identified; and c) a set of desirable features has been identified against which the technologies can be ranked. 2.2 The assessment process applies the essential criteria to the selected technologies to identify those that meet the basic needs. In addition desirable features are evaluated in the detailed technology assessment phase and a ranking of the technologies is provided. A key input to the process is the ability of the technologies to meet the basic capacity requirements defined in the Evaluation Scenarios document (ACP/1-WP/21 refers). 2.3 Two essential criteria have been defined: d) spectrum compatibility in the target band of operation; and e) openness of the standard. 2.4 The desirable criteria are being used to help rank the candidate technologies against the key requirements. Two subsets of the desirable criteria have been defined: a) general criteria which covers the robustness of the RF signal, technology readiness level, flexibility and cost; and b) performance based criteria in each airspace type covering capacity, integrity, availability, and latency. 2.5 The assessment process is now being applied to technologies identified below. It should be noted that in the course of the Step 2 assessment some technologies have been renamed to those identified in the Step 1 results. These renamed technologies are not new technologies as they are based in the work and developments of their predecessors. LDL (L band datalink) was formerly referred to as (x)dl3 and B-AMC (Broadband Aeronautical Mobile Communications) is based on the B-VHF system but operating in the L-band. Additionally, two technologies in the Step 1 shortlist have been merged. The technology now called AMACS (All-purpose Multi-channel Aviation Communication System) combines the best features of the ETDMA and (x)dl4 system. 2.6 The list of the technologies being currently assessed in Europe as part of the Step 2 investigations and technology assessment is shown in the table below. Evolution of existing aeronautical systems or concepts: Terrestrial systems Satellite systems LDL AMACS B-AMC WCDMA P34 INMARSAT SwiftBroadband

3 - 3 - ACP/1-WP/20 New satellite systems Airport/surface systems IEEE e 2.7 It is planned to provide the final outcome of the assessment in the next WG-C meeting in September ACTION BY THE ACP 3.1 The ACP is invited to consider the information provided herein and to provide comments.

4 ACP/1-WP/20 Appendix APPENDIX EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION

5 EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL Future Communications Infrastructure - Technology Investigations Technology Assessment Methodology Edition Number : 0.9 Edition Date : 01/05/07 Status : Draft Intended for : EUROPEAN AIR TRAFFIC MANAGEMENT PROGRAMME

6 DOCUMENT CHARACTERISTICS TITLE Future Communications Infrastructure - Technology Investigations EATMP Infocentre Reference: Document Identifier Edition Number: 0.9 Edition Date: 01/05/07 Abstract This document describes the methodology to assess candidate technologies as part of the Eurocontrol/FAA Future Communication Study. Keywords future communication technologies FCI evaluation Datalink COCR Terrestrial systems Satellite systems aeronautical communications shortlist Requirements spectrum AMSS/AM(R)S Contact Person(s) Tel Unit Nikos Fistas DAP/CSP STATUS, AUDIENCE AND ACCESSIBILITY Status Intended for Accessible via Working Draft General Public Intranet Draft EATMP Stakeholders Extranet Proposed Issue Restricted Audience Internet ( Released Issue Printed & electronic copies of the document can be obtained from the EATMP Infocentre (see page iii) ELECTRONIC SOURCE Path: P:\EATM\DAS\BD_CSM\CMU\FUTURE_COM\Technology investigations\step 2\Step 2 method development Host System Software Size Windows_NT Microsoft Word Kb Page ii Draft Edition Number: 0.9

7 EATMP Infocentre EUROCONTROL Headquarters 96 Rue de la Fusée B-1130 BRUSSELS Tel: +32 (0) Fax: +32 (0) Open on 08:00-15:00 UTC from Monday to Thursday, incl. DOCUMENT APPROVAL The following table identifies all management authorities who have successively approved the present issue of this document. AUTHORITY NAME AND SIGNATURE DATE Please make sure that the EATMP Infocentre Reference is present on page ii. Quality Manager Hd Communications Domain Jacky Pouzet Hd CSP Rob Stewart Edition Number: 0.9 Draft Page iii

8 DOCUMENT CHANGE RECORD The following table records the complete history of the successive editions of the present document. EDITIO N NUMBE R EDITION DATE INFOCENTRE REFERENCE REASON FOR CHANGE PAGES AFFECTED 0.a Sept 06 Original All 0.d Nov 06 Modification following ACP Co-ord mtg. All 0.e Dec 06 Further comments incorporated All 0.f Jan 07 Further comments incorporated All 0.g April 07 Further comments incorporated All 0.9 May 2007 Released version to ACP/1 All Page iv Draft Edition Number: 0.9

9 CONTENTS DOCUMENT CHARACTERISTICS... II DOCUMENT APPROVAL... III DOCUMENT CHANGE RECORD... IV 1. INTRODUCTION Future Communication Study Action Plan Two Step Approach to Technology Assessment Step Step Document References STEP 2 METHODOLOGY List of technologies to be assessed Performance Requirements TECHNOLOGY ASSESSMENT Introduction Assessment Categories ESSENTIAL CRITERIA Compatibility within the target band RF interference rejection / signal robustness Transmitter Power Control... Error! Bookmark not defined Openness of the Standard DESIRABLE CRITERIA Generic Criteria Performance based Criteria Generic Criteria Performance Based Criteria Ranking Classes Masks Class 1 Mask Class 2 Mask Class 3 Mask Class 4 Mask Edition Number: 0.9 Draft Page v

10 3.6.7 Comparison of technologies CONCLUSIONS Page vi Draft Edition Number: 0.9

11 1. INTRODUCTION 1.1 Future Communication Study Action Plan 17 EUROCONTROL and the FAA initiated a joint study under a Memorandum of Co-operation (MoC) through a dedicated Action Plan (AP 17) to identify potential future communications technologies to meet safety and regularity of flight communication requirements, i.e. those supporting Air Traffic Services (ATS) and safety-related Aeronautical Operational Control (AOC) communications. This work is being input to the ICAO ACP/WGC and ACP/WGW to ensure a global consultation. The Future Communication Study (FCS) consists of two main sets of activity: 1. A study to identify future communication requirements. This activity is covered by the Communication Operating Concept Requirements (COCR) document. 2. A Technology Assessment to identify the most appropriate technologies to support these communication requirements. This document describes the assessment methodology to assess candidate technologies and produce a relative ranking between them. In Europe, EUROCONTROL has established the Air Ground Communications Focus Group (AGCFG), which provides a forum for European stakeholders to discuss future aeronautical communications, review progress and advise the EUROCONTROL Agency. In addition, EUROCONTROL has been working very closely with the active European ACP/WGC members (France, Germany, Spain, Sweden and UK). This work is being carried out to produce options for the Future Communications Infrastructure (FCI). In line with recommendations from the 11th Air Navigation Conference (ANC), the goal of the Future Communication Infrastructure (FCI) is to meet future aeronautical communication requirements with a minimum set of technologies deployed globally. The FCI will be a main enabler for new ATM services and applications that will bring operational benefits in terms of capacity, efficiency and safety. The FCI will support both data and voice communication with an emphasis on data communication in the longer term. The FCI must support new operational concepts that are being investigated and researched throughout the world as well as the emerging requirements for both voice and data communications of all types. The FCI will be the minimum set of technologies needed to meet the future requirements globally. New technologies as well as system strategies must be identified to support the FCI. This may include concepts for new communication technologies as well as multi-function equipment that can be tailored to operate in differing operational environments. Indeed, although the goal is to develop global standards, it might happen that availability of different systems with their own performance, cost, spectrum, transition and characteristics would be necessary to provide the required services in different types of airspace (e.g. continental, oceanic) and therefore a single universal solution may not be achievable. Edition Number: 0.9 Draft Page 1

12 As documented in the work of the AGCFG 1, the aeronautical communication requirements in the future are expected to include: voice and data communications; air/ground (a/g) and air/air (a/a) communications; addressed and broadcast /multicast communications; cockpit communications (ATS and AOC); other ATM exchanges (SUR, NAV, SAF/SEC info etc); if required from the business point of view, cabin (AAC and APC) communications, with the appropriate priority and pre-emption facilities for the safety/regularity of related ATS/AOC services. As documented in the work of the AGCFG the key drivers for the FCI are: support the future ATM communications requirements, as required in all phases of flight; employ technology in a way that is transparent to the user; avoid single points of failure affecting simultaneously the various types of communication enable smooth transition and provide support for legacy systems (backward compatible); be implementable (time and space) in a phased manner and be globally applicable (if so required); include provision(s) for growth in capabilities; maximise synergies (telecomm, military) and maximise reuse of available technology; be spectrally efficient; be cost-beneficial; make efficient use of existing and already planned infrastructure; if required, use different technologies for different phases of flight and/or applications. 1.2 Two Step Approach to Technology Assessment Following discussions, agreement was reached with the European ACP members to work on a two-step technology selection approach. In the first step the focus was on selecting the technologies using a subset of the initially considered criteria, for which their applicability can be more easily agreed. For this subset it was agreed to consider the separate COCR requirements for air/ground, air/air and broadcast services and establish a list of promising technologies. In the second step, additional considerations/investigations covering the concerns covered by the other initial selection criteria will be applied to the Step 1 selected technologies, aiming to produce a further short list and recommendations for implementation. 1 AGCFG: Key terms and definitions, v1.3 Page 2 Draft Edition Number: 0.9

13 The next two sections describe the proposed methodology in the various steps. This report provides a high level indication of the proposed work for step 2, which shall be updated as Step 2 work is carried out Step 1 The agreement for the first step was that the re-evaluation will focus on providing information on the capabilities of the candidate technologies to meet a reduced set of criteria composed of capacity (throughput) and QoS (i.e. Continuity, Integrity and Availability). The evaluation investigated the technologies considering two aspects. The first one was the capability to support the different type of services such as a/g and a/a and broadcast and addressed. The second one was the capability to operate in various type of airspace such as high and low density, en-route, TMA etc. The requirements for the parameters forming the reduced set of criteria are extracted from the COCR and then matched to those able to be supported by the candidate technologies in different airspace and for the different services. The Step 1 analysis [2] concluded with a list of promising technologies, with identification of their area of applicability (in terms of services and airspace) and list of further investigations that need to be undertaken for each of the technologies in the Step 2 to complete the technology assessment Step 2 The remainder of this document defines the methodology to undertake the technology assessment under Step Document References The primary references used in this document are: 1 EUROCONTROL/FAA Communications Operating Concept and Requirements (COCR) v1.0, March EUROCONTROL, Future Communications Infrastructure - Technology Investigations Step 1: Initial Technology Shortlist, QinetiQ, September EUROCONTROL, Future Communications Infrastructure - Technology Investigations. Evaluation Scenarios draft AENA - Framework for Spectrum Compatibility Analysis in L-Band for FCI technology Candidates version ICAO Annex 10 Volume V Aeronautical Radio Frequency Spectrum Utilisation 6 EUROCONTROL - Standard Inputs for EUROCONTROL Cost Benefit Analyses 2005 Edition Edition Number: 0.9 Draft Page 3

14 2. STEP 2 METHODOLOGY The aim of Step 2 is to conduct further, in-depth evaluation of the Step 1 short listed technologies. The Step-2 process will attempt to ascertain how and where each technology could be applied, and how they would perform in a typical operational environment. A more detailed assessment of performance and characteristics will be undertaken using to the maximum extent involvement of those people involved in developing candidate technologies. Parameters such as the number of base stations and the amount of channels/spectrum required to meet the COCR requirements (in terms of delivering the necessary capacity and QoS) will only become apparent when the technology is applied to a typical operational environment. To enable such evaluations to take place, a family of generic operational environments have been defined (referred to hereafter as scenarios) based on an extrapolation of real world ATC sectors and traffic loading from the SAAM tool which are expected to exist in the Phase 2 timeframe (~2025). The scenarios will allow simulation to take place to demonstrate the capacity and performance of each candidate technology. As a common set of scenarios will be used by all technologies (where appropriate), it will be possible to compare results and identify the technologies which are best suited to the various operational scenarios List of technologies to be assessed The results of the Step 1 analysis concluded with the following promising technologies as shown in Table 2-1. Page 4 Draft Edition Number: 0.9

15 Evolution of existing aeronautical systems or concepts: LDL AMACS Terrestrial systems: B-AMC WCDMA P34 Satellite systems INMARSAT SwiftBroadband Airport/surface systems e new satellite system(s) (commercial and/or custom ATS) Table 2-1 : Step 1: List of technologies for Step 2 assessment Each of these technologies will be described using a common template as shown in Appendix A, which will highlight their key features and description of how the technology has been tailored to meet ATM requirements. Wherever possible these templates will be populated by those developing candidate technologies. 2.2 Performance Requirements EUROCONTROL and the FAA have jointly developed the Communications Operating Concept and Requirements (COCR) for future Air-Ground communications infrastructure. The COCR specifies requirements for two time frames Phase 1 (up to 2020) where a mixture of voice and data communications will exist, and Phase 2 (beyond 2020) where data communications are expected to dominate. Within each Phase, communication requirements for ATS and AOC operations are determined for Air-Ground and Air-Air communications. The nature of communications is also split according to whether data is addressed or broadcast. There are therefore, 4 functional types of data communication to be considered: Air-Air (A/A) Addressed Air-Ground (A/G) Addressed Air-Air (A/A) Broadcast Air-Ground (A/G) Broadcast The Step 2 technology assessment will be against the COCR version 1.0 as the basis for defining requirements. Specifically it identifies capacity and quality of service requirements to meet ATS and AOC requirements for Phase 2 with and without the A-EXEC service. Edition Number: 0.9 Draft Page 5

16 The Performance Requirements are contained in a separate document which describes the Evaluation Scenarios Ref. 3. Page 6 Draft Edition Number: 0.9

17 3. TECHNOLOGY ASSESSMENT 3.1 Introduction The assessment process and its application are described in this section. In developing the assessment process and associated criteria the following points were considered The process had to be transparent and understandable It must have acceptance by Stakeholders the key (essential) criteria which candidate technologies must meet have been identified a set of desirable features against which the technologies can be ranked The assessment process applies the essential criteria to the selected technologies to identify those that meet the basic needs. In addition desirable features are evaluated in the detailed technology assessment phase and a ranking of the technologies is provided. A key input to the process is the ability of the technologies to meet the basic capacity requirements defined in the Evaluation Scenarios document Ref. 3. In developing the assessment process the evaluation scenarios and assessment criteria have been co-ordinated with the FAA/NASA task which is also assessing technology. The criteria have been reviewed by Stakeholders and their comments taken into account. 3.2 Assessment Categories As mentioned above there are two main categories used in the assessment, essential and desirable. Under each category there are a number of criteria. All the criteria under the essential category must be complied with before further detailed technical evaluation is undertaken to assess technologies against the desirable criteria. If a technology does not pass the essential criteria it is rejected. This is shown diagrammatically in Figure 3-1 below. ONE FOR EACH TECHNOLOGY PASS ESSENTIAL CRITERIA - spectrum compatibility - openness of stanards EVALUATION AGAINST DESIRABLE CRITERIA RANK TECHNOLOGIES FAIL REJECT TECHNOLOGY Edition Number: 0.9 Draft Page 7

18 Figure 3-1 Illustration of applying the criteria The set of desirable criteria has been chosen to identify the main requirements to be candidates for a future radio system. These are described in section 3.4 below. 3.3 ESSENTIAL CRITERIA Compatibility within the target band This criterion is used to determine if the proposed technology can co-exist with users currently operating or planned to be implemented in the target band. The target bands being considered in the FCS are VHF Band MHz (upper end of the VOR band) for airport, TMA and en-route communication L-Band 960 to 975 MHz MHz for airport, TMA and en-route communication C-Band MHz for airport surface communication Acceptance of this criterion will be against existing or planned ITU planning requirements using theoretical calculations, simulations or measurement see below. The conditions under which the technology is planned to utilise the target band must be stated. This should include assumptions of band usage such as whether the technology is designed to overlay the spectrum of existing users, does it assume the use of a dedicated part of the existing spectrum and what assumptions are made regarding the utilisation of the target band with current users. The follows interference effects should be considered - Co-site compatibility onboard the aircraft Air-to-Air compatibility Air-Ground compatibility Ground-to-Ground compatibility The type of emissions from the interferer to the victim receiver can be classified as follows: Out-of-Band Emissions. Out-of-band emissions are those on a frequency or frequencies immediately outside the necessary bandwidth which results from the modulation process, but excluding spurious emissions. Out-of-band emissions from a transmitter will cause an increase of background noise in the victim receiver pass band. The level of OOB emissions depends on the transmitted spectrum, the reception filter performance and the frequency separation between systems. The FRS non essential emissions attenuation are assumed to be in compliance with ITU- R Recommendation SM 329-9, i.e. a minimum of - 67 dbc Spurious Emissions. Spurious Emissions occur on a frequency or frequencies which are outside the necessary bandwidth and the level of which may be reduced without affecting the corresponding transmission of information. They include harmonic emissions, parasitic emissions, intermodulation products and frequency Page 8 Draft Edition Number: 0.9

19 conversion products but exclude out-of-band emissions. Spurious emissions begin at +/- 250 % of the system bandwidth from its centre frequency. Appendix 3 to the ITU Radio Regulations provides minimum attenuation requirements for spurious emissions for different types of services. Those minimum requirements may not be sufficient to protect other users. In this case, additional attenuation requirements have to be implemented. In-band Emissions. Some characteristics such as the temporal occupation of the transmitted signal (duty cycle) and the transmitted power will have an impact VHF Band ( MHz) Compatibility with VOR, Differential GPS transmissions and VHF AM(R)S systems must be shown. Requirements for compatibility with these systems are described in ICAO Annex 10 Volume 5 section L Band (960 to 1164 MHz) Compatibility with DME, SSR Mode S, and JTIDS systems must be shown. Guidance on applying this criterion for systems operating in this band is given in Ref. 4 Framework for Spectrum Compatibility Analysis in L-Band for FCI technology C Band ( MHz) Compatibility with MLS systems must be shown. Requirements for compatibility with these systems are described in ICAO Annex 10 Volume 5 section RF interference rejection/signal robustness. The FRS will have to exist in an environment where interference will come from existing users of the target band therefore the ability to handle a certain level of interference is vital. This will include own interference due to non-perfect frequency re-use, synchronisation, etc. Major aspects of interference rejection to be considered are Forward error corrector (FEC) mechanism; and Modulation scheme. Consideration of these topics and the design choices made in the candidate FRS must be provided as part of the system description and included in the proforma description shown in Appendix A section A2.7. The proforma provides discussion on these topics. Another technique that should be considered in reducing interference effects is that of transmitter power control. Consideration should be given to controlling the RF power to the minimum level to achieve the requirement performance. Consideration of this topic and the design choices made in the candidate FRS must be provided as part of the system description and included in the proforma description shown in Appendix A section A2.9. The proforma provides discussion on this topic. Edition Number: 0.9 Draft Page 9

20 Acceptance Acceptance will be based on demonstrating that agreed interference values such as desiredto-undesired signals levels could be achieved. It is recognised that a complete interference analysis is a very complex and a time consuming process and therefore it is unlikely to be completed within the timeframe of the FCS. However sufficient evidence must be provided to demonstrate compatibility at least theoretically but preferably through limited practical trials. If this criterion cannot be met then the technology is rejected Openness of the Standard This criterion is designed to determine if sufficient information is available on the technical standards on a fair and equitable basis. Availability of sufficient technical details is necessary to determine the characteristics of the technology and carry out some independent evaluation and validation if necessary. This information should be made available through an appropriate ICAO body. As a minimum, completion of the template shown in Appendix A to a reasonable level is required to pass this criterion. If standards exist but have a royalty payment associated with them or are subject to some form of limited usage, this could be acceptable. However has to be considered as an element of the implementation cost. If no standard currently exists then the system will be judged as passing provided that the entity progressing the system intends that the technical information will be made available in an open manner through an appropriate standardisation body including ICAO. The lack of standardisation activity could indicate lack of maturity of the technology, which will probably be reflected in the TRL level. It is also likely to increase the risk that the technology can be deployed within the relevant timeframe. If the technical standards are not open to aviation in any form then the technology is rejected. 3.4 DESIRABLE CRITERIA Desirable criteria are those for which a range of possible values can be determined in various configurations. No one technology will meet or exceed all the requirements therefore assigning values to these criteria will assist in comparing candidate technologies against each other in a common way. The importance of each desirable criterion is assigned in the ranking process as described in section 3.6 below. The set of desirable criteria is split into two main categories general and performance based. The two categories are briefly introduced below. Page 10 Draft Edition Number: 0.9

21 3.4.1 Generic Criteria The general criteria cover those attributes of potential technologies which are major discriminates in comparing one against the other. Other criteria have been considered but the following were chosen to be the most relevant Security Technology Readiness Level Flexibility Cost These criteria are described in more detail in section below Performance based Criteria Another set of key selection criteria is those associated with meeting the required capacity, integrity, availability and latency performance values. The performance values are defined in the Evaluation Scenarios document [Ref. 4] and have been determined for each of the following locations based on the requirements defined in the COCR [Ref. 1] namely: Airport Surface Airport Zone Terminal Manoeuvring Area En-Route Oceanic Remote and Polar For each of the locations, each technology will be evaluated as to its ability to meet the requirements. These criteria are described in more detail in section 3.5 below Generic Criteria Robustness of the RF signal It is assumed that the integrity and security of the message, on an end-to-end basis, is handled through authentication, integrity and encryption (if applied) features outside the FRS. Consequently this criterion is aimed at determining the robustness of the technology to interference of the RF signal. For the evaluation this is defined as the intentional manipulation of the S/N ratio of a victim radio in such a way that it is no longer operational. The COCR v1.0 (section 4.3.5) defines the following security requirements for services which have high severe, high catastrophic or medium availability requirements which covers most of the ATS and AOC services - Requirement Id R.FRS- SEC.1a Requirement The FRS shall provide a measure of resistance against deliberate insertion of RF interference when providing services with high severe or high catastrophic availability ranking. Associated FCI Requirements R.FCI-SEC.1 Edition Number: 0.9 Draft Page 11

22 Requirement Id R.FRS- SEC.1b Requirement The FRS should provide a measure of resistance against deliberate insertion of RF interference when providing services with medium availability ranking. Associated FCI Requirements R.FCI-SEC.1 The test for this criterion is dependent on the specific technology. A radio system using much more bandwidth than the bandwidth needed to transfer the information data rate is likely to be resistant to interference. This topic is discussed in further detail in section A2.8 in Appendix A. Criterion Jam resistant level 1 Robust to interference greater than 15dB 2 Not completely robust to interference greater than 5dB 3 Low tolerability to interference 5dB or less In assigning a value, evidence must be provided of any specific measures should be provided TRL The TRL value assigned under this criterion is based on the current level of development of the technology as a whole i.e. the target FRS as to be deployed in the target band supporting the designated services. The standard definition of TRL level as shown in Figure 3-2 is to be used. It should be noted that typically there is a relationship between the TRL and the length of time to deploy a technology. The lower the TRL value the less mature the technology, the longer the development phase and consequently there is a greater the risk in achievable deployment by a certain date. The timescale envisaged for this criterion is By this time the FRS must have reached a high level of maturity i.e. TRL level 9 and then be deployed by 2015 to allow a period of pre-operational use before entering operational service in The TRL will be assigned based on the information supplied by the proponent of the technology on tests and evaluations undertaken to date in the development of their system. Page 12 Draft Edition Number: 0.9

23 Figure 3-2 TRL stages For the technology evaluation the following grouping of TRL has been assigned. Criterion TRL number level 1 Technology is TRL 8 or 9 2 Technology is TRL 6 or 7 3 Technology is TRL 4 or 5 4 Technology is TRL 2 or 3 5 Technology is TRL 0 or Flexibility This general criterion is aimed at identifying options in the deployment of a technology which could enable a range of data rates/bandwidth to be chosen to meet the requirements in a particular service volume or to be tailored to a specific radio band. For example, the technology could offer a number of data rates, modulation options and channel bandwidths which can be chosen to meet the requirements. More options in the technology provide better flexibility to deploy the technology to meet local requirements or constraints. Edition Number: 0.9 Draft Page 13

24 Criterion Flexibility Value level 1 The technology can be deployed in several ways to provide a variety of performance values. 2 The technology can be deployed in only one way and provides fixed performance values Ground Infrastructure cost Note - Avionic costs are not considered as they are not a discriminator between technologies at this stage of development. An estimate of the avionics costs of each technology will be similar due to this immaturity. All avionics are expected to be implemented in similar ways e.g. a new unit which will be required with its own antenna. This criterion is used to indicate the typical cost to deploy the ground element of the FRS technology within a region (e.g. ECAC or NAS). The cost will be based on the number of radio units needed to achieve coverage in the proposed service volume of the target system. It is recognised that a single technology may not be designed to achieve entire coverage in all service volumes. In this case the technology assessment will aggregate the costs of a combination of technologies to achieve entire coverage in the region. For example a technology may be aimed at airport surface coverage only. This would need to be augmented by an air/ground service technology and therefore its cost would be added. In determining the cost, the number of ground stations is derived from the technology deployment plan for each system. This cost is compared to that of an equivalent service offered by a VHF data radio system. The comparison will be done based on a regional implementation i.e. in ECAC airspace. Criterion Cost Value level times less than the cost of VHF ground data radio system 2 10 times less than the cost of VHF ground data radio system 3 Similar cost to VHF ground data radio system 4 10 times the cost of VHF ground data radio system times the cost of VHF ground data radio system 3.5 Performance Based Criteria The performance of the candidate system will be evaluated against the requirements defined in the Evaluation Scenario document [Ref. 4] for each airspace location. Values used for this criterion range from 1 to 3. Value 1 means that the candidate technology as designed exceeds the requirements in the location for which it being assessed. A value 3 means that the technology does not meet the requirement in that particular location. A technology must meet requirements in one location from the following Airport Surface Page 14 Draft Edition Number: 0.9

25 Airport Zone Terminal Manoeuvring Area En-Route Oceanic Remote and Polar Criterion level Capacity Integrity Availability Latency 1 exceeds 1,2 or 3 1,2 or 3 1,2 or 3 1,2 or 3 requirement 2 = meets 1,2 or 3 1,2 or 3 1,2 or 3 1,2 or 3 requirement 3 = does not meet requirement 1,2 or 3 1,2 or 3 1,2 or 3 1,2 or 3 It is important to note the significance of the quantified and validated assessment criteria where the performance requirement is an absolute, quantifiable value. Quantified means that the technology has specified a value that it can meet whereby validated will mean that this quantified figure has been demonstrated by simulation or experimentation. Taking integrity as an example, the system may be designed to exceed the COCR requirement and hence this would result in a good assessment level score for the quantified category, but without some sort of demonstration, the validated score would remain low. 3.6 Ranking In the above section, a set of criteria has been defined against which technologies will be assessed in terms of key attributes. In order to rank technologies in terms of their suitability to meet requirements, a pro-forma/template has been designed to capture criteria information Classes As a result of the information supplied in the criteria, technologies will be grouped into one of 4 classes for each type of airspace. The classes represent a measure of the suitability of the technologies to meet the requirement in that environment; the lower the number the more of the requirements can be met. Class 1 Proven, viable, standardised technology, available for operational use. Class 2 - Technology has potential to meet many requirements. Class 3 - Technology has potential to meet some requirements. Class 4 - Technology has potential to few requirements. Note - It is recognised that a technology that is ranked as Class 1 will not be identified as this means it meets the requirements to be the FRS. This Class 1 is included to show the complete set of classes. Edition Number: 0.9 Draft Page 15

26 3.6.2 Masks For each Class a mask is applied which determines which criteria level is considered. The masks for each Class are shown as the shaded cells in the tables below. The shading depicts the criteria values that are of interest in assigning the class to a technology. Only if the technology has an assessment score in all of the categories will it be categorised as Class 1. In the above example, regardless of the assessment score in all other categories, a system that is not assessed as Level 1 for cost will not qualify as Class 1. The key thing to note is that Class 2 is wider and permits more variance between assessed levels for each category. The same approach has been extended to define Class 3 and Class Class 1 Mask Criterion Value Security TRL Flexibility Cost Capacity Integrity Availability Latency Class 2 Mask Criterion Value Security TRL Flexibility Cost Capacity Integrity Availability Latency Class 3 Mask Criterion Value Security TRL Flexibility Cost Capacity Integrity Availability Latency Page 16 Draft Edition Number: 0.9

27 3.6.6 Class 4 Mask Criterion Value Security TRL Flexibility Cost Capacity Integrity Availability Latency Comparison of technologies The candidate technologies will be ranked based on the number of cells compared against each mask. This will result in an allocation of technologies to a class. Edition Number: 0.9 Draft Page 17

28 4. CONCLUSIONS This document defines the methodology to evaluate candidate technologies to meet the requirements of the FRS. This is based on two main types of criteria essential and desirable. Essential criteria are spectrum compatibility and openness of standards. If these criteria are not passed then the technology will be rejected. The desirable criteria are used to help rank the technologies in terms of their suitability to meet requirements in the required locations. Included in this category are performance requirements i.e. capacity, continuity, availability, integrity and latency. Other desirable criteria cover those attributes of potential technologies which are major discriminates in comparing one against the other. Other criteria have been considered but the following were chosen to be the most relevant Security Technology Readiness Level Flexibility Cost Having identified a set of criteria, the technologies are evaluated against them and a ranking scheme is applied to each technology. The ranking will result in a number of technologies in each class. This will be used to assist in the selection of the most compliant technology as the FRS. Page 18 Draft Edition Number: 0.9

29 TECHNOLOGY X A1 OVERVIEW OF TECHNOLOGY APPENDIX A This section should give a general overview of the technology as it currently stands detailing its functionality etc. A.1.1 Overview Give brief description of technology and its capabilities. Specific details can be given in later sections. A 1.2 Functional Architecture Detail functions and their sub-functions and interfaces (internal and external) that define the execution sequencing, conditions for control or data flow. A 1.3 Services Provided & Key Features List of technology main features and the types of services it can provide. A1.4 Air Interface Description: PHY, MAC & Network A description of the operating system needs to be given here that will provide specifics of the radio transmission between base station and mobile unit. Details of system layers and how they are interconnected should follow. A1.5 Standards Provide information on the standards for technology detailing and their maturity. 1.6 Technology Readiness Level (TRL) Give details of TRL to describe the technology s maturity level. Edition Number: 0.9 Draft Page 19

30 A2 APPLICATION OF TECHNOLOGY TO ATM This section should deal with the actual applicability of the technology and its performance capabilities to provide aeronautical communications. A2.1 Concept of Operation A general overview should be provided here detailing technology ability to operate in the ATM environment. Adaptations required to support ATM use should be noted within this section detailing specific changes that need to be made to the technology. A2.2 Spectrum Considerations There are three specific points that need to be addressed: i) Target band which band is the system proposing to operate within i.e. VHF, C- band or L-band. ii) Basic channel bandwidth what bandwidth is proposed for the technology iii) Compatibility with existing users within the band already A2.3 Airspace Application Describe what airspace the technology will work within i.e. APT, TMA, ENR, or ORP (oceanic, remote and polar). A2.4 ATM services supported Which of the following services can the technology support: A/G Addressed, A/G Broadcast, A/A Addressed, A/A Broadcast Also detail the technology services that will support the ATM services listed above. A2.5 Proposed Architecture for Technology System Description of functional architecture mapped to physical system architecture detailing the proposed ground infrastructure. Items that need to be considered here are the number of base stations necessary, size of cells for the configuration of the system, potential link budget and the maximum range of the technology. Note: this system should have the ability to meet the traffic scenarios generated earlier in this document. A2.6 Performance Assurance This section should detail the quality of service of technology ensuring it has required capacity. (i.e. ensuring that it can meet the capacity requirements with the domain of operation as generated in the traffic scenarios.) Also it should provide some evidence, preferably through simulation or alternatively theoretical calculations showing derivation of integrity, continuity, availability, priority of messages and integrity. Page 20 Draft Edition Number: 0.9

31 Information on how performance is maintained under high Doppler shift conditions should be described. Doppler shift compensation is particularly critical for those systems supporting air/air communication which could encounter speeds of at least 2000km/h relative speed or higher if military aircraft are considered. A2.7 RF interference rejection / signal robustness. The FRS can expect interference coming from existing users of the target band (for example, for systems operating in the L band systems this includes JTIDS- DME,UAT,SSR, UAT). Therefore adequate measures to handle a certain level of interference are vital to ensure effective performance of the system. This will include a certain amount of FRS own interference due to non-perfect frequency re-use, synchronisation. This section should describe the measures taken to achieve interference rejection the main ones being: Forward error corrector (FEC) mechanism and the chosen modulation scheme. Notes on these topics are below FEC : The description should provide a clear indication/description and rough evaluation of the forward error mechanism used (FEC). Generally 2 FEC types are in use: block (such as Reed Salomon) and convolutional memory oriented (such as Viterbi) encoders, the first being far less efficient compared to the last one. Block encoder decision criteria are only based on the actual block under evaluation while memory-oriented encoders are benefiting from previously sent frames. Convolutional FEC should score higher compared to block encoders as the more overhead the more errors can be corrected ( =the higher interference is overcome). E.g. VDL2 RS ( 255,249) has only a 255/249 = 2,4% overhead and is not able to make deep corrections. WiMax uses in one of its configurations RS(24,16), has a 24/16 = 50% overhead, and is to be considered far more powerful than VDL2 FEC. Note: all this goes at the expense of bandwidth consumption.(this aspect should be handled as well but not under robustness). The same evaluation can be done for memory oriented FEC such as Viterbi. Besides being far more effective than block error FEC overhead is easily to find out. WiMax, 3GPP, CDMA2000, INMARSAT uses Viterbi such as Viterbi(1/2) : meaning that there is a 2/1=100% overhead. Others commonly used are Viterbi (1/3) Viterbi (1/4) each of them better than previous ones but also more overhead (=BW) involved. Best FEC is Turbo as they use 2 concatenated VITERBI with intermediate interleaver. As they reach the near Shannon bit error corrector threshold (around 1dB of limit) no technology today can do better. Turbos are characterised the same way Viterbi are: so Turbo (1/2) means also a 100% overhead. Note :Turbo goes often at the expense of processing power and not of BW (compared against Viterbi). MODULATION SCHEME : Robustness is also directly linked to modulation scheme as the higher the modulation order (= amount of bits sent within one symbol) the less robust the system becomes (this higher interference increased the bit error rate(ber). Therefore in order of Robustness the following rule should be taken : (high to low) : BPSK, QPSK, 16QPSK, 16QAM, 32QAM, 64QAM, 256QAM). In fact the more states a modulation scheme has the less robust it. Note the inverse impact on bandwidth utilisation: The higher the modulation rate the less spectrum will be needed. Once again BW demands have to be evaluated separately but not under robustness itself. It is not likely that the higher order modulation schemes such as 256 QAM will ever be Edition Number: 0.9 Draft Page 21

32 used in aviation with the exception of maybe A/C being docked at the gates. Consideration should be given to controlling the RF power to the minimum level to achieve the requirement performance. For example, it may be possible to reduce the transmitter power level when the aircraft is on the surface of an airport (triggered by contact on wheels) in order to protect adjacent channels with minimal separation distance of, say, 2 gates. A description of the power control mechanism, if any, should be described in this section. For information the following technologies have power control capability as described below - UMTS (3GPP) provides power control over a wide range, namely 80 db and with a power control update rate of 1500 HZ when operating in closed loop. (all specified for uplink). Power control for downlink is 20 db. CDMA 2000 (3GPP2) is providing a similar power control range but with an update rate of 800Hz only (reverse link). Forward link is 20 db as well. WiMax e (actually based on ) which has power control mechanism of up to 40 db. As this is proposed as an airport technology power control is important, as aircraft separation is minimal on the ground. However air/ground and reliable air/air communication will benefit from power control. VDLMode 2 power is halved when the aircraft is on the ground however the major interference is caused by aircraft flying at high flight levels. Current CNS technologies always emit full power apart from VDLM2. For example, at VHF the DOC area is based on the sector size to be supported which is roughly only 5% of the total protection area for that particular frequency channel (criteria = radio horizon). Therefore there is limited frequency re-use and spectrum cannot be used efficiently. Frequency re-use is related to the overall capacity of the FRS and determines spectrum usage flexibility. In the case of a/a communication power control may be even more important to support the several different operational range classes for dedicated services. If all aircraft emit at maximum power (corresponding to 200nmi range) there could be serious interference problems and capacity limitations. In addition, as the propagation delay times are quite different for a 20 NM range compared to a 200 NM range this will lead either to a reduction of time slots (capacity goes down) or to an increase of interference (BER goes up). Those technologies proposing the use of a flexible modulation scheme (BPSK, QPSK,16-64QAM) will need power control as well (see WiMax). ). Note - due to the line of sight path loss, signals are not attenuated with an order of 4 to 5 as for ground-based systems but decrease only with an order of 2. Another issue is that, though voice is not FCS main target, there may be little difference in the quality between voice arriving with a BER or with BER This indicates that there is not always a need for perfect link budget conditions hence justifying power emissions limitations. Power control could be handled in closed loop for air/ground addressed communication but also for air/air broadcasting could provide some kind of power control even in open loop by e.g. setting a certain fixed power level depending on the air/air range as defined by COCR. A2.8 Security of the RF signal Security of the RF signal should also be considered and design choices described. The amount of interference resistance (in dbs) should be determined. It should be noted that the bandwidth of a system has a direct relationship to its interference resistance value (in db) 10 x log (used BW / information data rate needed) - also called spreading gain. Page 22 Draft Edition Number: 0.9

Future Aeronautical Communication System - FCI

Future Aeronautical Communication System - FCI Future Aeronautical Communication System - FCI Nikos Fistas, EUROCONTROL/CND TAKE OFF Conference Salzburg, April 21 st 2009 Content Context-History Current ECTL activities SESAR dimension What s next What

More information

LDACS1 Overview and Current Status

LDACS1 Overview and Current Status LDACS1 Overview and Current Status Datenlink-Technologien für bemannte und unbemannte Missionen DGLR Symposium München, 21.03.2013 FREQUENTIS 2013 # DGLR Symposium # LDACS1 Overview and Current Status

More information

Future Communications Infrastructure - Technology Investigations Description of AMACS

Future Communications Infrastructure - Technology Investigations Description of AMACS EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL Future Communications Infrastructure - Technology Investigations Edition Number : 1.0 Edition Date : 02/07/07 Status : Issue Intended

More information

SwiftBroadband Safety Frequency Management

SwiftBroadband Safety Frequency Management SwiftBroadband Safety Frequency Management Presentation to ICAO ACP Working Group F 17-24 September 2012 Contents 1. Overview of SwiftBroadband Safety Service Performance and Benefits 2. How the SwiftBroadband

More information

Subject: Aeronautical Telecommunications Aeronautical Radio Frequency Spectrum Utilization

Subject: Aeronautical Telecommunications Aeronautical Radio Frequency Spectrum Utilization GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 4 - AERODROME STANDARDS & AIR TRAFFIC SERVICES SERIES

More information

AERONAUTICAL COMMUNICATIONS PANEL (ACP)

AERONAUTICAL COMMUNICATIONS PANEL (ACP) ACP/1-IP/2 8/5/07 AERONAUTICAL COMMUNICATIONS PANEL (ACP) FIRST MEETING Montréal, 10 to 18 May 2007 Agenda Item 1: Review of the progress on the future communication study US FCS PHASE I PRE-SCREENING

More information

ANTARES System Design Iris Public Event, 4-5 February 2013 University of Salzburg Unipark, Salzsburg

ANTARES System Design Iris Public Event, 4-5 February 2013 University of Salzburg Unipark, Salzsburg ANTARES System Design Iris Public Event, 4-5 February 2013 University of Salzburg Unipark, Salzsburg 83230917-DOC-TAS-EN-002 Contents 2 SRD requirements and system design Performance requirements and main

More information

L-DACS2 System Definition Proposal: Deliverable D2

L-DACS2 System Definition Proposal: Deliverable D2 EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL L-DACS2 System Definition Proposal: Deliverable D2 Edition Number : v1.0 Edition Date : 11 th May 2009 Status : Draft Intended for : General

More information

ICAO HANDBOOK ON RADIO FREQUENCY SPECTRUM REQUIREMENTS FOR CIVIL AVIATION

ICAO HANDBOOK ON RADIO FREQUENCY SPECTRUM REQUIREMENTS FOR CIVIL AVIATION Doc 9718 Volume II First Edition Amendment ICAO HANDBOOK ON RADIO FREQUENCY SPECTRUM REQUIREMENTS FOR CIVIL AVIATION Volume II Frequency assignment planning criteria for aeronautical radio communication

More information

MYANMAR CIVIL AVIATION REQUIREMENTS

MYANMAR CIVIL AVIATION REQUIREMENTS Civil Aviation Requirements THE REPULBIC OF THE UNION OF MYANMAR MINISTRY OF TRANSPORT DEPARTMENT OF CIVIL AVIATION MYANMAR CIVIL AVIATION REQUIREMENTS MCAR Part-5 ANS Section 9 Volume-V Aeronautical Telecommunications

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE AN-Conf/12-IP/20 4/10/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 1: Strategic issues that address the challenge of integration, interoperability and harmonization

More information

COMMUNICATIONS PANEL (CP) FIRST MEETING

COMMUNICATIONS PANEL (CP) FIRST MEETING International Civil Aviation Organization INFORMATION PAPER COMMUNICATIONS PANEL (CP) FIRST MEETING Montreal, Canada 1 5 December 2014 Agenda Item 7: Communications Panel Work Programme and Timelines Current

More information

Approved 8 November Amended 3 July 2015

Approved 8 November Amended 3 July 2015 ECC Decision (13)03 The harmonised use of the frequency band 1452-1492 MHz for Mobile/Fixed Communications Networks Supplemental Downlink (MFCN SDL) 1 Approved 8 November 2013 Amended 3 July 2015 1 Comparable

More information

ICAO Handbook on Radio Frequency Spectrum Requirements for Civil Aviation Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning

ICAO Handbook on Radio Frequency Spectrum Requirements for Civil Aviation Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning ICAO Handbook on Radio Frequency Spectrum Requirements for Civil Aviation Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning 100 khz 200 khz 300 khz 400 khz 600 khz 800 khz 1 MHz 2 MHz 3 MHz

More information

A feasibility study of CDMA technology for ATC. Summary

A feasibility study of CDMA technology for ATC. Summary International Civil Aviation Organization Tenth Meeting of Working Group C of the Aeronautical Communications Panel Montréal, Canada, 13 17 March 2006 Agenda Item 4: New technologies selection criteria

More information

HD Radio FM Transmission. System Specifications

HD Radio FM Transmission. System Specifications HD Radio FM Transmission System Specifications Rev. G December 14, 2016 SY_SSS_1026s TRADEMARKS HD Radio and the HD, HD Radio, and Arc logos are proprietary trademarks of ibiquity Digital Corporation.

More information

UK Interface Requirement 2060

UK Interface Requirement 2060 UK Interface Requirement 2060 Ground based VHF radio equipment at Aeronautical Stations of the Aeronautical Mobile (R) Service for Mode 2 and/or Mode 4 data link communications. Publication date: Feb 2006

More information

Future Communications Infrastructure - Step 2: Technology Assessment Results

Future Communications Infrastructure - Step 2: Technology Assessment Results EUROCONTROL Future Communications Infrastructure - Step 2: Technology Assessment Results Edition Number : 1.0 Edition Date : 29/10/07 Status : Final DOCUMENT CHARACTERISTICS TITLE Future Communications

More information

AERONAUTICAL COMMUNICATIONS PANEL (ACP) FIRST MEETING OF THE WORKING GROUP OF THE WHOLE. Montreal, Canada JUNE 2005

AERONAUTICAL COMMUNICATIONS PANEL (ACP) FIRST MEETING OF THE WORKING GROUP OF THE WHOLE. Montreal, Canada JUNE 2005 International Civil Aviation Organization WORKING PAPER ACP-WGW01/WP36 21/06/05 AERONAUTICAL COMMUNICATIONS PANEL (ACP) FIRST MEETING OF THE WORKING GROUP OF THE WHOLE Montreal, Canada 21 29 JUNE 2005

More information

Adoption of this document as basis for broadband wireless access PHY

Adoption of this document as basis for broadband wireless access PHY Project Title Date Submitted IEEE 802.16 Broadband Wireless Access Working Group Proposal on modulation methods for PHY of FWA 1999-10-29 Source Jay Bao and Partha De Mitsubishi Electric ITA 571 Central

More information

ETSI SMG#24 TDoc SMG2 898 / 97 Madrid, Spain December 15-19, 1997 Source: SMG2. Concept Group Delta WB-TDMA/CDMA: Evaluation Summary

ETSI SMG#24 TDoc SMG2 898 / 97 Madrid, Spain December 15-19, 1997 Source: SMG2. Concept Group Delta WB-TDMA/CDMA: Evaluation Summary ETSI SMG#24 TDoc SMG2 898 / 97 Madrid, Spain December 15-19, 1997 Source: SMG2 Concept Group Delta WB-TDMA/CDMA: Evaluation Summary Introduction In the procedure to define the UMTS Terrestrial Radio Access

More information

ICAO SARPS AND GUIDANCE DOCUMENTS ON SURVEILLANCE SYSTEMS

ICAO SARPS AND GUIDANCE DOCUMENTS ON SURVEILLANCE SYSTEMS ICAO SARPS AND GUIDANCE DOCUMENTS ON SURVEILLANCE SYSTEMS MEETING/WORKSHOP ON AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS B) IMPLEMENTATION (ADS B/IMP) (Lima, Peru, 13 to 16 November 2017) ONOFRIO

More information

ICAO Handbook on Radio Frequency Spectrum Requirements for Civil Aviation Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning

ICAO Handbook on Radio Frequency Spectrum Requirements for Civil Aviation Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning ICAO Handbook on Radio Frequency Spectrum Requirements for Civil Aviation Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning Aeronautical Spectrum Workshop Preparation for WRC-15 Cairo, Egypt,

More information

Final Project Report. Abstract. Document information

Final Project Report. Abstract. Document information Final Project Report Document information Project Title Future Satellite Communication System Project Number 15.02.06 Project Manager THALES (TAS-I) Deliverable Name Final Project Report Deliverable ID

More information

Preparatory paper: food for thought

Preparatory paper: food for thought CNS SYMPOSIUM 2-3 October 2018 EUROCONTROL s Brussels HQ Preparatory paper: food for thought 1 Introduction EUROCONTROL will host a two-day interactive CNS Symposium on October 2 nd and 3 rd, 2018. This

More information

Proposal for ACP requirements

Proposal for ACP requirements AMCP WG D9-WP/13 Proposal for requirements Presented by the IATA member Prepared by F.J. Studenberg Rockwell-Collins SUMMARY The aim of this paper is to consider what level of is achievable by a VDL radio

More information

ECC Decision (17)06. Approved 17 November 2017

ECC Decision (17)06. Approved 17 November 2017 ECC Decision (17)06 The harmonised use of the frequency bands 14271452 MHz and 14921518 MHz for Mobile/Fixed Communications Networks Supplemental Downlink (MFCN SDL) Approved 17 November 2017 Corrected

More information

Assessment of VDL Mode 4 Frequency, Capacity and Performances

Assessment of VDL Mode 4 Frequency, Capacity and Performances EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION E U R O C O N T R O L Assessment of VDL Mode 4 Frequency, Capacity and Performances TRS041 Deliverable 2.1: Contribution to Frequency Planning Criteria

More information

ARTES 1 ROLLING WORKPLAN 2010

ARTES 1 ROLLING WORKPLAN 2010 ARTES 1 ROLLING WORKPLAN 2010 INTRODUCTION This document presents the ARTES 1 Rolling Workplan for 2010. Activities have been selected based on the ARTES Call for Ideas, consultation with participating

More information

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) Page 1 Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) ECC RECOMMENDATION (06)04 USE OF THE BAND 5 725-5 875 MHz FOR BROADBAND

More information

REGULATORY GUILDELINES FOR DEPLOYMENT OF BROADBAND SERVICES ON THE GHz BAND

REGULATORY GUILDELINES FOR DEPLOYMENT OF BROADBAND SERVICES ON THE GHz BAND REGULATORY GUILDELINES FOR DEPLOYMENT OF BROADBAND SERVICES ON THE 5.2-5.9 GHz BAND PREAMBLE The Nigerian Communications Commission has opened up the band 5.2 5.9 GHz for services in the urban and rural

More information

Regional and Inter-Regional Seminar and Workshop on Search and Rescue

Regional and Inter-Regional Seminar and Workshop on Search and Rescue Regional and Inter-Regional Seminar and Workshop on Search and Rescue Mahe, Seychelles 19-22 July 2016 1 Agenda Aireon Introduction Space-Based ADS-B Overview Aireon System Deployment Status Aireon ALERT

More information

Table 1: OoB e.i.r.p. limits for the MFCN SDL base station operating in the band MHz

Table 1: OoB e.i.r.p. limits for the MFCN SDL base station operating in the band MHz ECC Report 202 Out-of-Band emission limits for Mobile/Fixed Communication Networks (MFCN) Supplemental Downlink (SDL) operating in the 1452-1492 MHz band September 2013 ECC REPORT 202- Page 2 0 EXECUTIVE

More information

Impact of ATC transponder transmission to onboard GPS-L5 signal environment

Impact of ATC transponder transmission to onboard GPS-L5 signal environment SCRSP-WG IP-A10 18 May 2006 SURVEILLANCE AND CONFLICT RESOLUTION SYSTEMS PANEL (SCRSP) TENTH MEETING WG-A Montreal, May, 2006 WG-A Agenda Item 9 Any Other Bussiness Impact of ATC transponder transmission

More information

Independent Communications Authority of South Africa Pinmill Farm, 164 Katherine Street, Sandton Private Bag X10002, Sandton, 2146

Independent Communications Authority of South Africa Pinmill Farm, 164 Katherine Street, Sandton Private Bag X10002, Sandton, 2146 Independent Communications Authority of South Africa Pinmill Farm, 164 Katherine Street, Sandton Private Bag X10002, Sandton, 2146 ANNEXURE A TECHNICAL SPECIFICATIONS ICASA 09/2018 1. Purpose of the Request

More information

3GPP TS V6.6.0 ( )

3GPP TS V6.6.0 ( ) TS 25.106 V6.6.0 (2006-12) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; UTRA repeater radio transmission and reception (Release 6) The

More information

COMMISSION IMPLEMENTING DECISION

COMMISSION IMPLEMENTING DECISION L 307/84 Official Journal of the European Union 7.11.2012 COMMISSION IMPLEMENTING DECISION of 5 November 2012 on the harmonisation of the frequency bands 1 920-1 980 MHz and 2 110-2 170 MHz for terrestrial

More information

WRC19 Preparatory Workshop

WRC19 Preparatory Workshop ICAO Doc 9718 Handbook on Radio Frequency Spectrum Requirements for Civil Aviation Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning 100 khz 200 khz 300 khz 400 khz 600 khz 800 khz 1 MHz 2 MHz

More information

TECHNICAL AND OPERATIONAL ASPECTS OF MIGRATION CONCEPTS OF A BROADBAND VHF COMMUNICATION SYSTEM (B-VHF)

TECHNICAL AND OPERATIONAL ASPECTS OF MIGRATION CONCEPTS OF A BROADBAND VHF COMMUNICATION SYSTEM (B-VHF) TECHNICAL AND OPERATIONAL ASPECTS OF MIGRATION CONCEPTS OF A BROADBAND VHF COMMUNICATION SYSTEM (B-VHF) Bernhard Haindl, Miodrag Sajatovic, Christoph Rihaceck, Frequentis GmbH Carl-Herbert Rokitansky 1

More information

ARTES 10 Phase 1 workplan of activities.

ARTES 10 Phase 1 workplan of activities. ARTES 10 Phase 1 workplan of activities franco.ongaro@esa.int nathalie.ricard@esa.int claude.loisy@esa.int 1 Background: SESAR initiative SESAR: Single European Sky Air Traffic Management Research Programme

More information

UNMANNED AIRCRAFT SYSTEMS STUDY GROUP (UASSG)

UNMANNED AIRCRAFT SYSTEMS STUDY GROUP (UASSG) 04/09/12 UNMANNED AIRCRAFT SYSTEMS STUDY GROUP (UASSG) TENTH MEETING Rio de Janeiro, 24 to 28 September 2012 Agenda Item 3d: C3 SARPs Command and Control (C2) link provision, link certification and requirement

More information

Co-Existence of UMTS900 and GSM-R Systems

Co-Existence of UMTS900 and GSM-R Systems Asdfadsfad Omnitele Whitepaper Co-Existence of UMTS900 and GSM-R Systems 30 August 2011 Omnitele Ltd. Tallberginkatu 2A P.O. Box 969, 00101 Helsinki Finland Phone: +358 9 695991 Fax: +358 9 177182 E-mail:

More information

Spectrum opportunity cost calculations in parts of VHF Band I

Spectrum opportunity cost calculations in parts of VHF Band I Report for Ofcom Spectrum opportunity cost calculations in parts of VHF Band I 24 February 2009 Contents 1 Introduction to the study 1 2 Introduction to VHF Band I 2 2.1 Characteristics of VHF Band I spectrum

More information

RECOMMENDATION ITU-R BT Error-correction, data framing, modulation and emission methods for digital terrestrial television broadcasting

RECOMMENDATION ITU-R BT Error-correction, data framing, modulation and emission methods for digital terrestrial television broadcasting Rec. ITU-R BT.1306-3 1 RECOMMENDATION ITU-R BT.1306-3 Error-correction, data framing, modulation and emission methods for digital terrestrial television broadcasting (Question ITU-R 31/6) (1997-2000-2005-2006)

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER 1 26/8/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 33: Aviation safety and air navigation monitoring and analysis SURVEILLANCE OF REMOTELY

More information

3GPP TS V ( )

3GPP TS V ( ) TS 25.106 V5.12.0 (2006-12) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; UTRA repeater radio transmission and reception (Release 5) The

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER 1 26/8/16 8/9/16 (Information paper) ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 33: Aviation safety and air navigation monitoring and

More information

CEPT has conducted a number of studies and has produced a number of deliverables related to the use of MFCN in the 1400 MHz band, as listed below.

CEPT has conducted a number of studies and has produced a number of deliverables related to the use of MFCN in the 1400 MHz band, as listed below. ESOA response to the OFCOM consultation document: Invitation to tender for frequency blocks for the national provision of mobile telecommunications services in Switzerland 6 April 2018 1. Introduction

More information

Phoenix Communication System Architecture and Protocols Consolidated Design

Phoenix Communication System Architecture and Protocols Consolidated Design ESA Artes-10 Iris Phoenix Communication System Architecture and Protocols Consolidated Design Robert Schweikert (AUDENS ACT) Markus Werner (TriaGnoSys) ESTEC, Noordwijk 06.02.2009 Presentation Outline

More information

Long Term Evolution (LTE) and 5th Generation Mobile Networks (5G) CS-539 Mobile Networks and Computing

Long Term Evolution (LTE) and 5th Generation Mobile Networks (5G) CS-539 Mobile Networks and Computing Long Term Evolution (LTE) and 5th Generation Mobile Networks (5G) Long Term Evolution (LTE) What is LTE? LTE is the next generation of Mobile broadband technology Data Rates up to 100Mbps Next level of

More information

Mobile Communication Services on Aircraft Publication date: May /34/EC Notification number: 2014/67/UK

Mobile Communication Services on Aircraft Publication date: May /34/EC Notification number: 2014/67/UK Draft UK Interface Requirement 2070 Mobile Communication Services on Aircraft Publication date: May 2014 98/34/EC Notification number: 2014/67/UK Contents Section Page 1 References 3 2 Foreword 4 3 Minimum

More information

ADJACENT BAND COMPATIBILITY OF TETRA AND TETRAPOL IN THE MHZ FREQUENCY RANGE, AN ANALYSIS COMPLETED USING A MONTE CARLO BASED SIMULATION TOOL

ADJACENT BAND COMPATIBILITY OF TETRA AND TETRAPOL IN THE MHZ FREQUENCY RANGE, AN ANALYSIS COMPLETED USING A MONTE CARLO BASED SIMULATION TOOL European Radiocommunications Committee (ERC) within the European Conference of Postal and Telecommunications Administrations (CEPT) ADJACENT BAND COMPATIBILITY OF TETRA AND TETRAPOL IN THE 380-400 MHZ

More information

BASIC CONCEPTS OF HSPA

BASIC CONCEPTS OF HSPA 284 23-3087 Uen Rev A BASIC CONCEPTS OF HSPA February 2007 White Paper HSPA is a vital part of WCDMA evolution and provides improved end-user experience as well as cost-efficient mobile/wireless broadband.

More information

Technical Requirements for Land Mobile and Fixed Radio Services Operating in the Bands / MHz and / MHz

Technical Requirements for Land Mobile and Fixed Radio Services Operating in the Bands / MHz and / MHz Issue 5 November 2013 Spectrum Management and Telecommunications Standard Radio System Plan Technical Requirements for Land Mobile and Fixed Radio Services Operating in the Bands 806-821/851-866 MHz and

More information

Response of Boeing UK Limited. UK Ofcom Call for Input 3.8 GHz to 4.2 GHz Band: Opportunities for Innovation 9 June 2016

Response of Boeing UK Limited. UK Ofcom Call for Input 3.8 GHz to 4.2 GHz Band: Opportunities for Innovation 9 June 2016 Response of Boeing UK Limited UK Ofcom Call for Input 3.8 GHz to 4.2 GHz Band: Opportunities for Innovation 9 June 2016 Introduction Boeing UK Limited (Boeing) is pleased to respond to Ofcom s Call for

More information

AIR NAVIGATION ORDER

AIR NAVIGATION ORDER (AERONAUTICAL RADIO FREQUENCY SPECTRUM UTILIZATION) AIR NAVIGATION ORDER [[ VERSION : 1.0 DATE OF IMPLEMENTATION : 15-12-2010 OFFICE OF PRIME INTEREST : Technical Standards (DAAR) 15/12/2010 ANO-006-DRTS-1.0

More information

HD Radio FM Transmission System Specifications

HD Radio FM Transmission System Specifications HD Radio FM Transmission System Specifications Rev. D February 18, 2005 Doc. No. SY_SSS_1026s TRADEMARKS The ibiquity Digital logo and ibiquity Digital are registered trademarks of ibiquity Digital Corporation.

More information

: Frequencies for new aeronautical Communication systems

: Frequencies for new aeronautical Communication systems Date : 9 November 2001 Subject Origin Status : : : Very preliminary draft EXECUTIVE SUMMARY This paper provides information on the additional radio spectrum capacity necessary for the aviation community

More information

NUMÉRO DOCUMENT / DOCUMENT NUMBER REV PAGE

NUMÉRO DOCUMENT / DOCUMENT NUMBER REV PAGE COMPANY RESTRICTED A4 F0057 5622287A279 AB 1/39 Airborne Enhanced VHF Radio FCC RULES COMPLIANCE REPORT (Part 15 Subpart B, Part 87 Subpart D & Part 2 Subpart J) EVR716-11-xxxxx WRITTEN BY Signature: Name:

More information

Report on DME interference on GPS/L5 (third version, July 99)

Report on DME interference on GPS/L5 (third version, July 99) Report on DME interference on GPS/L5 (third version, July 99) Draft I. Introduction This paper is the third report to Direction Generale de l Aviation Civile (DGAC) of a study on the potential risk of

More information

Technical Requirements for Land Mobile and Fixed Radio Services Operating in the Bands MHz and MHz

Technical Requirements for Land Mobile and Fixed Radio Services Operating in the Bands MHz and MHz Provisional - Issue 1 March 2004 Spectrum Management and Telecommunications Policy Standard Radio System Plans Technical Requirements for Land Mobile and Fixed Radio Services Operating in the Bands 138-144

More information

New spectrum for audio PMSE. Further details on approach to modelling and sharing in the band MHz

New spectrum for audio PMSE. Further details on approach to modelling and sharing in the band MHz New spectrum for audio PMSE Further details on approach to modelling and sharing in the band 960-1164 MHz Consultation update Publication date: 08 January 2016 About this document In response to our consultation

More information

SECTION 2 BROADBAND RF CHARACTERISTICS. 2.1 Frequency bands

SECTION 2 BROADBAND RF CHARACTERISTICS. 2.1 Frequency bands SECTION 2 BROADBAND RF CHARACTERISTICS 2.1 Frequency bands 2.1.1 Use of AMS(R)S bands Note.- Categories of messages, and their relative priorities within the aeronautical mobile (R) service, are given

More information

RECOMMENDATION ITU-R BT.1832 * Digital video broadcast-return channel terrestrial (DVB-RCT) deployment scenarios and planning considerations

RECOMMENDATION ITU-R BT.1832 * Digital video broadcast-return channel terrestrial (DVB-RCT) deployment scenarios and planning considerations Rec. ITU-R BT.1832 1 RECOMMENDATION ITU-R BT.1832 * Digital video broadcast-return channel terrestrial (DVB-RCT) deployment scenarios and planning considerations (Question ITU-R 16/6) (2007) Scope This

More information

ADJACENT BAND COMPATIBILITY BETWEEN GSM AND CDMA-PAMR AT 915 MHz

ADJACENT BAND COMPATIBILITY BETWEEN GSM AND CDMA-PAMR AT 915 MHz Page 1 Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) ADJACENT BAND COMPATIBILITY BETWEEN GSM AND CDMA-PAMR AT 915 MHz

More information

RECOMMENDATION ITU-R BS

RECOMMENDATION ITU-R BS Rec. ITU-R BS.1350-1 1 RECOMMENDATION ITU-R BS.1350-1 SYSTEMS REQUIREMENTS FOR MULTIPLEXING (FM) SOUND BROADCASTING WITH A SUB-CARRIER DATA CHANNEL HAVING A RELATIVELY LARGE TRANSMISSION CAPACITY FOR STATIONARY

More information

COMPATIBILITY AND SHARING ANALYSIS BETWEEN DVB T AND TALKBACK LINKS IN BANDS IV AND V

COMPATIBILITY AND SHARING ANALYSIS BETWEEN DVB T AND TALKBACK LINKS IN BANDS IV AND V European Radiocommunications Committee (ERC) within the European Conference of Postal and Telecommunications Administrations (CEPT) COMPATIBILITY AND SHARING ANALYSIS BETWEEN DVB T AND TALKBACK LINKS IN

More information

ECC Report 141 Technical supplement. TECHNICAL SUPPLEMENT TO ECC REPORT 141 FUTURE POSSIBILITIES FOR THE DIGITALISATION OF BAND II (87.

ECC Report 141 Technical supplement. TECHNICAL SUPPLEMENT TO ECC REPORT 141 FUTURE POSSIBILITIES FOR THE DIGITALISATION OF BAND II (87. ECC Report 141 Technical supplement TECHNICAL SUPPLEMENT TO ECC REPORT 141 FUTURE POSSIBILITIES FOR THE DIGITALISATION OF BAND II (87.5-108 MHz) April 2012 Technical supplement to ECC REPORT 141 Page 2

More information

Alternative PNT: What comes after DME?

Alternative PNT: What comes after DME? Alternative PNT: What comes after DME? Gerhard Berz, Valeriu Vitan, EUROCONTROL Luca Saini, Thales Air Systems Mike Spanner, NATS 20 th International Flight Inspection Symposium (IFIS) Monterey CA, USA,

More information

CEPT Report 42. Report from CEPT to the European Commission in response to Task 3 of the Mandate to CEPT on the 900/1800 MHz bands

CEPT Report 42. Report from CEPT to the European Commission in response to Task 3 of the Mandate to CEPT on the 900/1800 MHz bands CEPT Report 42 Report from CEPT to the European Commission in response to Task 3 of the Mandate to CEPT on the 900/1800 MHz bands Compatibility between UMTS and existing and planned aeronautical systems

More information

Digital Audio Broadcasting Eureka-147. Minimum Requirements for Terrestrial DAB Transmitters

Digital Audio Broadcasting Eureka-147. Minimum Requirements for Terrestrial DAB Transmitters Digital Audio Broadcasting Eureka-147 Minimum Requirements for Terrestrial DAB Transmitters Prepared by WorldDAB September 2001 - 2 - TABLE OF CONTENTS 1 Scope...3 2 Minimum Functionality...3 2.1 Digital

More information

April 1998 doc:. IEEE /158. IEEE P Wireless LANs. WINForum Sharing Rules Requirements And Goals

April 1998 doc:. IEEE /158. IEEE P Wireless LANs. WINForum Sharing Rules Requirements And Goals IEEE P802.11 Wireless LANs WINForum Sharing Rules Requirements And Goals Date: April 6, 1998 Source: WINForum 5 GHz Sharing Rules Development Committee (SRDC) Submitted by: Donald C. Johnson, Chairman

More information

RECOMMENDATION ITU-R M.1652 *

RECOMMENDATION ITU-R M.1652 * Rec. ITU-R M.1652 1 RECOMMENDATION ITU-R M.1652 * Dynamic frequency selection (DFS) 1 in wireless access systems including radio local area networks for the purpose of protecting the radiodetermination

More information

Characteristics and protection criteria for non-geostationary mobile-satellite service systems operating in the band

Characteristics and protection criteria for non-geostationary mobile-satellite service systems operating in the band Recommendation ITU-R M.2046 (12/2013) Characteristics and protection criteria for non-geostationary mobile-satellite service systems operating in the band 399.9-400.05 MHz M Series Mobile, radiodetermination,

More information

Future use of the band MHz

Future use of the band MHz Future use of the band 5030-5150 MHz Template reference : 100182080O-EN Compatibility analysis between existing AMS(R)S and ARNS/MLS allocations NSP/SSG, Montreal, 31 March - 4 April 2008, agenda Item

More information

Radio-frequency channel and block arrangements for fixed wireless systems operating in the 42 GHz (40.5 to 43.5 GHz) band. Recommendation ITU-R F.

Radio-frequency channel and block arrangements for fixed wireless systems operating in the 42 GHz (40.5 to 43.5 GHz) band. Recommendation ITU-R F. Recommendation ITU-R F.2005 (03/2012) Radio-frequency channel and block arrangements for fixed wireless systems operating in the 42 GHz (40.5 to 43.5 GHz) band F Series Fixed service ii Rec. ITU-R F.2005

More information

Recommendation ITU-R M.1905 (01/2012)

Recommendation ITU-R M.1905 (01/2012) Recommendation ITU-R M.1905 (01/2012) Characteristics and protection criteria for receiving earth stations in the radionavigation-satellite service (space-to-earth) operating in the band 1 164-1 215 MHz

More information

Survey on the Future Aeronautical Communication System and Its Development for Continental Communications

Survey on the Future Aeronautical Communication System and Its Development for Continental Communications Survey on the Future Aeronautical Communication System and Its Development for Continental Communications Najett Neji, Raul De Lacerda, Alain Azoulay, Thierry Letertre, Olivier Outtier To cite this version:

More information

ECC Report 276. Thresholds for the coordination of CDMA and LTE broadband systems in the 400 MHz band

ECC Report 276. Thresholds for the coordination of CDMA and LTE broadband systems in the 400 MHz band ECC Report 276 Thresholds for the coordination of CDMA and LTE broadband systems in the 400 MHz band 27 April 2018 ECC REPORT 276 - Page 2 0 EXECUTIVE SUMMARY This Report provides technical background

More information

Technical Requirements for Fixed Line-of-Sight Radio Systems Operating in the Band GHz

Technical Requirements for Fixed Line-of-Sight Radio Systems Operating in the Band GHz Issue 4 March 2018 Spectrum Management and Telecommunications Standard Radio System Plan Technical Requirements for Fixed Line-of-Sight Radio Systems Operating in the Band 10.7-11.7 GHz Aussi disponible

More information

Sharing scenarios of 5G (IMT-2020) networks with the incumbent and future satellite communication systems

Sharing scenarios of 5G (IMT-2020) networks with the incumbent and future satellite communication systems Sharing scenarios of 5G (IMT-2020) networks with the incumbent and future satellite communication systems AGENDA Past and Present: IMT VS. FSST AGENDA 5GT Satellite Communications Future: IMT AND FSST

More information

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October Agenda Item 7: Aeronautical air-ground and air-to-air communications

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October Agenda Item 7: Aeronautical air-ground and air-to-air communications 7/3/03 ELEVENTH AIR NAVIGATION CONFERENCE Montreal, 22 September to 3 October 2003 Agenda Item 7: Aeronautical air-ground and air-to-air communications AERONAUTICAL MOBILE COMMUNICATION SYSTEMS DEVELOPMENT

More information

SwiftBroadband Oceanic Safety Implementation and Trials

SwiftBroadband Oceanic Safety Implementation and Trials SwiftBroadband Oceanic Safety Implementation and Trials Workshop on the implementation of datalink Gary Colledge, Aero Product and Safety Service Management Inmarsat 11 September 2012 Agenda Inmarsat Aviation

More information

ASIA-PACIFIC BROADCASTING UNION (ABU) POSITION ON WRC-12 AGENDA ITEMS 1.4, 1.10, 1.14, 1.15, 1.17, 1.19, 1.22 AND 1.25

ASIA-PACIFIC BROADCASTING UNION (ABU) POSITION ON WRC-12 AGENDA ITEMS 1.4, 1.10, 1.14, 1.15, 1.17, 1.19, 1.22 AND 1.25 World Radiocommunication Conference (WRC-12) Geneva, 23 January - 17 February 2012 PLENARY MEETING Document E ABU-2 2011 Original: English ASIA-PACIFIC BROADCASTING UNION (ABU) POSITION ON WRC-12 AGENDA

More information

Working Party 5B DRAFT NEW RECOMMENDATION ITU-R M.[500KHZ]

Working Party 5B DRAFT NEW RECOMMENDATION ITU-R M.[500KHZ] Radiocommunication Study Groups Source: Subject: Document 5B/TEMP/376 Draft new Recommendation ITU-R M.[500kHz] Document 17 November 2011 English only Working Party 5B DRAFT NEW RECOMMENDATION ITU-R M.[500KHZ]

More information

RESOLUTION 155 (WRC-15)

RESOLUTION 155 (WRC-15) ADD RESOLUTION 155 (WRC-15) Regulatory provisions related to earth stations on board unmanned aircraft which operate with geostationary-satellite networks in the fixed-satellite service in certain frequency

More information

International Spectrum Management and Interference Mitigation

International Spectrum Management and Interference Mitigation International Spectrum Management and Interference Mitigation 1 Related ITU documents Prevention of interference Resolving cases of interference Radiomonitoring as a complementary instrument of interference

More information

Kordia Submission on Preparing for 5G in New Zealand. 8 May 2018

Kordia Submission on Preparing for 5G in New Zealand. 8 May 2018 Kordia Submission on Preparing for 5G in New Zealand 8 May 2018 RELEASED: 8 MAY 2018 KORDIA SUBMISSION ON PREPARING FOR 5G IN NEW ZEALAND REV NO: V1.1 Table of Contents 1. Introduction...1 2. Kordia Submission

More information

Ready for RED. Radio Equipment Directive Introduction. / RED. Christian Reimer

Ready for RED. Radio Equipment Directive Introduction.  / RED. Christian Reimer Ready for RED Radio Equipment Directive Introduction www.rohde-schwarz.com / RED Christian Reimer Essential Requirements of Radio Equipment Directive Radio equipment shall be so constructed that it both

More information

REPORT ITU-R M Characteristics of broadband wireless access systems operating in the land mobile service for use in sharing studies

REPORT ITU-R M Characteristics of broadband wireless access systems operating in the land mobile service for use in sharing studies Rep. ITU-R M.2116 1 REPORT ITU-R M.2116 Characteristics of broadband wireless access systems operating in the land mobile service for use in sharing studies (Questions ITU-R 1/8 and ITU-R 7/8) (2007) 1

More information

TV White Spaces white space device requirements

TV White Spaces white space device requirements TV White Spaces white space device requirements 1 Introduction Response by Vodafone to the Ofcom consultation 10 January 2013 Vodafone welcomes the opportunity to respond to this consultation by Ofcom

More information

Sharing Considerations Between Small Cells and Geostationary Satellite Networks in the Fixed-Satellite Service in the GHz Frequency Band

Sharing Considerations Between Small Cells and Geostationary Satellite Networks in the Fixed-Satellite Service in the GHz Frequency Band Sharing Considerations Between Small Cells and Geostationary Satellite Networks in the Fixed-Satellite Service in the 3.4-4.2 GHz Frequency Band Executive Summary The Satellite Industry Association ( SIA

More information

RECOMMENDATION ITU-R M.1639 *

RECOMMENDATION ITU-R M.1639 * Rec. ITU-R M.1639 1 RECOMMENDATION ITU-R M.1639 * Protection criterion for the aeronautical radionavigation service with respect to aggregate emissions from space stations in the radionavigation-satellite

More information

Redline Communications Inc. Combining Fixed and Mobile WiMAX Networks Supporting the Advanced Communication Services of Tomorrow.

Redline Communications Inc. Combining Fixed and Mobile WiMAX Networks Supporting the Advanced Communication Services of Tomorrow. Redline Communications Inc. Combining Fixed and Mobile WiMAX Networks Supporting the Advanced Communication Services of Tomorrow WiMAX Whitepaper Author: Frank Rayal, Redline Communications Inc. Redline

More information

Technical Requirements for Cellular Radiotelephone Systems Operating in the Bands MHz and MHz

Technical Requirements for Cellular Radiotelephone Systems Operating in the Bands MHz and MHz Issue 7 September 2008 Spectrum Management and Telecommunications Standard Radio System Plan Technical Requirements for Cellular Radiotelephone Systems Operating in the Bands 824-849 MHz and 869-894 MHz

More information

Feb 7, 2018 A potential new Aeronautical Mobile Satellite Route Service system in the 5 GHz band for the RPAS C2 link ICAO WRC19 Workshop, Mexico

Feb 7, 2018 A potential new Aeronautical Mobile Satellite Route Service system in the 5 GHz band for the RPAS C2 link ICAO WRC19 Workshop, Mexico Feb 7, 2018 A potential new Aeronautical Mobile Satellite Route Service system in the 5 GHz band for the RPAS C2 link ICAO WRC19 Workshop, Mexico City, Mexico Command and Control (C2) link 2 RPA Command

More information

Multiple Antenna Processing for WiMAX

Multiple Antenna Processing for WiMAX Multiple Antenna Processing for WiMAX Overview Wireless operators face a myriad of obstacles, but fundamental to the performance of any system are the propagation characteristics that restrict delivery

More information

TDD and FDD Wireless Access Systems

TDD and FDD Wireless Access Systems WHITE PAPER WHITE PAPER Coexistence of TDD and FDD Wireless Access Systems In the 3.5GHz Band We Make WiMAX Easy TDD and FDD Wireless Access Systems Coexistence of TDD and FDD Wireless Access Systems In

More information

Technical characteristics and protection criteria for aeronautical mobile service systems in the frequency range GHz

Technical characteristics and protection criteria for aeronautical mobile service systems in the frequency range GHz ITU-R M.2089-0 (10/2015) Technical characteristics and protection criteria for aeronautical mobile service systems in the frequency range 14.5-15.35 GHz M Series Mobile, radiodetermination, amateur and

More information

White paper. Long Term HSPA Evolution Mobile broadband evolution beyond 3GPP Release 10

White paper. Long Term HSPA Evolution Mobile broadband evolution beyond 3GPP Release 10 White paper Long Term HSPA Evolution Mobile broadband evolution beyond 3GPP Release 10 HSPA has transformed mobile networks Contents 3 Multicarrier and multiband HSPA 4 HSPA and LTE carrier 5 HSDPA multipoint

More information