OFFSHORE SERVICES JAN DE NUL GROUP OFFSHORE RENEWABLES

Size: px
Start display at page:

Download "OFFSHORE SERVICES JAN DE NUL GROUP OFFSHORE RENEWABLES"

Transcription

1 OFFSHORE SERVICES JAN DE NUL GROUP OFFSHORE RENEWABLES

2 INSTALLATION OF OFFSHORE WIND FARMS Jan De Nul Group provides services related to the installation of offshore wind farms and related subsea inter-array and export cables. Today, with the combination of in-house design and detailed engineering together with all aspects of civil works, heavy lifting, dredging and rock installation Jan De Nul Group can offer a total package on an EPC basis. Clients worldwide are increasingly seeking an all-in solution for their projects with an integrated approach of design and execution Jan De Nul Group recognises this trend and offers clients complete packages. The group is well equipped for the installation of cables and Gravity Based Foundations, as well as for the installation of scour protection and other seabed preparation services. For the design and fabrication of the various components, Jan De Nul has its own in- house design and engineering and quality control departments. With the jack-up installation vessels Vole au vent and Taillevent Jan De Nul Group can install all kinds of foundations, as well as the latest generation of wind turbines, offering a unique all-in solution to the offshore market. cargo deck space and payload and the lifting capacity of its crane up to 1,500 tonnes enable swift and safe installation of the heaviest foundations and other components of offshore wind parks. The vessel is 140 m long and is equipped with four legs to lift itself above the sea level for stable working without impact of the waves. The jack-up vessel Taillevent, with similar dimensions and a crane capacity of 1,000 tonnes, entered into the fleet in The jack-up vessel Vole au vent was specifically built to install offshore wind parks and is one of the largest of its kind in the world. The large JAN DE NUL GROUP S IN-HOUSE ENGINEERING DEPARTMENT ALLOWS TO DESIGN, BUILD AND INSTALL ENTIRE OFFSHORE WIND FARMS. 2 OFFSHORE RENEWABLES

3 NOBELWIND, BELGIUM The EPCI project included the design (engineering), procurement, construction and offshore installation of 51 monopiles for 50 wind turbines and one offshore high voltage substation (OHVS), as well as the supplying and installation of the scour filter and armour layer and the installation of 50 wind turbine generators. The entire area of the park is 22 square kilometers and will provide an annual CO 2 reduction of approximately 197,000 tonnes. Monopiles The monopiles were manufactured in Rostock, with a variable length up to 77 m and weights ranging from 430 to 800 metric tonnes. They have proven to be an efficient solution in case of reasonable ground conditions and in water depths up to 35 m, which is the case in the Bligh Bank concession. Transition Pieces The transition piece (TP) is situated in the transition area between the salty water, the drying air, the heating sun or being in icy winters and it is therefore exposed to extremely corrosive conditions. The TP therefore requires special care with regard to corrosion protection, which is subject to a particular high attention on quality control. Typically the TP contains amongst other a boat landing and a work platform, the latter being assembled in the marshalling harbour of Ostend after their arrival. Offshore installation process The process of installation starts with the construction of the filter layer for scour protection by a rock installation vessel. After that the Heavy Lift Jack-up Vessel Vole au vent was equipped with a pile gripper holding the monopile in place after being upended and lifted with special lifting tools, and after which the hydrohammer drove the pile through the filter material of mm. Once the pile was in position, the TP was bolted on to the MP and the annular void between the grout skirt of the TP and the MP was filled with grout for corrosion protection reasons. The Vole au vent installed 4 MP s and 4 TP s per installation cycle. After the installation of the temporary TP cover, the TP is left behind until the cables are installed. Then the armour rock is placed as a finalisation of the scour protection. Wind Turbine Generators The last stage in the scope was the transport and installation of the Wind Turbine Generators (WTG). The Vole au vent is for this purpose deployed again and equipped with custom made seafastenings in order to accommodate 8 entire WTG s consisting of towers, nacelles and blades. The wind turbines were supplied, installed and maintained by the company MHI Vestas Offshore Wind and produce 3.3 MW each, totalling to 165 MW. These turbines were loaded in Esbjerg (Denmark). 3 OFFSHORE RENEWABLES

4 BUTENDIEK, GERMANY Early 2014 the construction of the German offshore wind farm Butendiek, located in the North Sea west of Sylt, started. Butendiek comprises 80 turbines with each 3.6 MW, resulting in a total capacity of 288 MW. Jan De Nul Group was in charge of the installation of scour protection around the 80 monopiles. The rock was purchased at a Norwegian quarry. The filter rock, approximately 71,000 tonnes, was loaded at the quarry and installed by the Fall Pipe Vessel Simon Stevin. The armour rock, approximately 123,000 tonnes, was installed by the vessel Tiger. This vessel used to be a Split Hopper Barge but has been equipped with an inclined fall pipe to execute the rock installation works closely to the offshore structures. Jan De Nul Group has an in-house engineering department that can design new equipment or works out modifications to existing equipment. That is why Jan De Nul Group can promptly respond to specific needs, wherever in the world these may arise. For the rock installation work in Butendiek the vessel Tiger was transformed into a Dynamic Positioned Rock Installation Vessel with inclined fall pipe in only a few weeks time. 4 OFFSHORE RENEWABLES

5 RAMPION OFFSHORE WIND FARM, UK The 400 MW Rampion Offshore Wind Farm was built by E.ON, the UK Green Investment Bank plc and Canadian energy company Enbridge. It consists of 116 foundations and turbines. From February until November 2016, the Jack-up installation vessel Taillevent installed 69 monopiles and transition pieces. The monopiles had weights from 560 to 820 tonnes. In spring 2017, the vessel returned to the wind farm to start with the installation of the MHI Vestas V112-3,45MW turbines. The vessel carried components for up to eight turbines during each trip from Esbjerg Denmark to the site. By September the Taillevent had installed 78 turbines. The wind farm is expected to provide enough electricity to supply the equivalent of around 300,000 homes. HUMBER GATEWAY, UK The offshore wind farm Humber Gateway in the UK has a total capacity of 219 MW. The Jack-up Installation Vessel Taillevent was in charge of the installation of 61 foundations, existing of monopiles and transition pieces. The monopiles had weights up to 650 tonnes and diameters of 4.7 m. The installation was done in two campaigns; from August to December 2013 and July to September OFFSHORE RENEWABLES

6 KAREHAMN PROJECT, SWEDEN For the Karehamn offshore wind farm in the Swedish part of the Baltic Sea, 16 foundations were required for the 3 MW turbines. Jan De Nul Group was awarded the design, construction and installation of these foundations. All foundations were constructed on top of two large barges in the port of Zeebrugge (Belgium) in over a period of only 5 months. Because of the varying water depths in the Baltic Sea, the height of the cylindrical part had to be uniquely designed. The height of the elements ranges from 15 to 25 m with the heaviest element weighing approximately 1,940 tonnes. The seabed had been prepared before installation of the foundations. The first half a meter of the seabed was removed. In order to provide an even cushion layer for the foundations, a gravel layer was installed. To level the cushion layer, a levelling system has been developed by means of a levelling beam installed on the Cutter Suction Dredger Vesalius. This allowed for gravel bed foundation to be levelled within the design tolerances of 45 mm. With the gravel bed installed and levelled, the Heavy Lift Vessel Rambiz lifted the foundations off the barges and installed the foundation to within 30 cm of the theoretical position. After installation, they were ballasted so they could withstand the forces of waves and currents and carry the actual wind turbine. The shaft of the foundation was filled with magnadense crushed iron ore. The other compartments were filled with crushed iron ore, and finally a layer of heavy quarry stone was placed as a top capping layer in order to provide scour protection. Stones of up to 130 kg were placed in the ballast caissons by means of the inclined fall pipe of the vessel Simon Stevin positioned in DP2 mode. To prevent the gravel bedding layer from being washed away, an anti-scour quarry stone layer was installed around the external edge of each foundation. TAHKOLUOTO, FINLAND Wind power producer Suomen Hyötytuuli Oy has chosen Jan De Nul as the main contractor of marine construction for the new offshore wind farm in Pori, Finland. The world s first offshore wind farm designed for icy conditions will have ten 4 MW turbines that will be taken in use during the autumn of Jan De Nul Group will be responsible for dredging, seabed preparation work, and the installation of foundations and wind turbines with the installation vessel Vole au vent. 6 OFFSHORE RENEWABLES

7 OFFSHORE RENEWABLES REFERENCE LIST START DATE LOCATION PROJECT NAME 2020 Taiwan Changua pilot wind farm - Turnkey Contract MW 2019 Germany Trianel Windpark Borkum - T&I for WTG's MW 2019 Belgium Northwester 2 - EPCI Foundations, Cables and WTG installation MW 2019 Taiwan Formosa 1 phase 2 - EPCI Foundations and Cables MW 2018 Germany Borkum Riffgrund 2 - Installation of 36 MP/TP Foundations 2018 Germany Borkum Riffgrund 2 - installation of Export Cable 2018 Germany Trianel Windpark Borkum - installation of Export Cable 2018 Denmark Horns Rev 3 - Installation of 49 transition pieces 2018 United Kingdom Boulby Potash - Remedial works to outfall tunnel 2017 Finland Tahkoluoto - Installation of 10 foundations and 10 WTG's - 40 MW 2017 United Kingdom Blyth Offshore Demonstrator - Installation of 5 WTG's MW 2017 Denmark Kriegers Flak - EPCI for 2 concrete GBF's for substations 2017 United Kingdom Rampion - installation of 78 WTG's MW 2017 United Kingdom Rampion - Accommodation and assistance during commissioning of substation 2016 Belgium Nobelwind - EPCI 51 foundations and Installation 50 WTG's MW 2016 United Kingdom Racebank - installation of 140 km Export Cables 2016 United Kingdom Burbo Bank Extension - installation of Export Cable and inter-array cables 2016 United Kingdom Walney OWF Phase 2 - recovery and replacement of Export Cable 2016 United Kingdom Rampion - installation of 69 MP/TP foundations 2015 United Kingdom Gunfleet Sands - installation of Scour Protection 2014 Belgium Alstom Haliade Demo - installation of subsea cable 2014 Germany Global Tech One - installation of Scour Protection at substation 2014 United Kingdom Rock Installation Services Moray Offshore 2014 Germany Butendiek - installation of Scour Protection 2014 United Kingdom Humber Gateway - installation of 61 MP/TP foundations 2014 Germany Amrumbank - installation of MP/TP foundations 2013 Belgium Northwind - installation of 2 Export Cables 2013 United Kingdom Westermost Rough - installation of Scour Protection 2013 United Kingdom Lincs - installation of 15 WTG's - 54 MW 2013 Sweden Karehamn - installation of 16 WTG's - 48 MW 2012 Sweden Karehamn - EPCI for 16 GBF foundations 2012 Belgium Alstom Haliade Demo - installation of Scour Protection 2012 United Kingdom London Array 1 installation of 101 WTG's MW 2002 Denmark Horns Rev 1 - installation of Scour Protection 7 OFFSHORE RENEWABLES

8 OFFSHORE CONSTRUCTION VESSELS VOLE AU VENT TAILLEVENT WIND TURBINE INSTALLATION VESSEL WIND TURBINE INSTALLATION VESSEL Main crane capacity: 1,500 tonnes Max. water depth for jacking: 50 m Max. cargo weight: 6,500 tonnes Cargo deck: 3,535 m² Main crane capacity: 1,000 tonnes Max. water depth for jacking: 40 m Max. cargo weight: 6,000 tonnes Cargo deck: 3,600 m² TAILLEVENT SIMON STEVIN ADHÉMAR DE SAINT-VENANT TRENCHING AND OFFSHORE SUPPORT VESSEL Rock carrying capacity: 31,500 tonnes Max. discharge depth: 2,000 m Optional turntable capacity: 3,500 tonnes Dynamic Positioning: DP2 Rock carrying capacity: 4,750 tonnes Max. discharging depth: 600 m Optional turntable capacity: 4,000 tonnes AHC crane capacity: 25 tonnes JOSEPH PLATEAU DANIEL BERNOULLI TRENCHING AND OFFSHORE SUPPORT VESSEL Rock carrying capacity: 31,500 tonnes Max. discharge depth: 2,000 m Optional turntable capacity: 3,500 tonnes AHC crane capacity: 40 tonnes Dynamic Positioning: DP2 Rock carrying capacity: 4,750 tonnes Max. discharging depth: 600 m Optional turntable capacity: 4,000 tonnes AHC crane capacity: 25 tonnes ISAAC NEWTON LA BOUDEUSE and TIGER CABLE AND UMBILICAL INSTALLATION VESSEL Turntable capacity: 7,400 tonnes + 5,000 tonnes AHC crane capacity: 40 tonnes Dynamic Positioning: DP Rock carrying capacity: 3,500 tonnes Max. discharge depth: 130 m LA BOUDEUSE equipped with vertical fall pipe ROV and inclined fall pipe TIGER equipped with inclined fall pipe for large diam. rock WILLEM DE VLAMINGH POMPEI CABLE AND UMBILICAL INSTALLATION VESSEL SIDE STONE INSTALLATION VESSEL Turntable capacity: 5,400 tonnes AHC crane capacity: 40 tonnes Dynamic positioning: DP Rock carrying capacity: 1,350 tonnes Mooring system: 6 point anchoring TRENCHING EQUIPMENT UTV1200 SUNFISH MOONFISH STARFISH TRENCHING ROV PLOUGHING VEHICLE INTERTIDAL TRENCHING VEHICLE ELEVATED EXCAVATOR Operating weight: 48 tonnes Power: 900 kw (1200 hp) Max. trenching depth chain cutter: 1.6 m Max. trenching depth jetting mode: 3 m Max operating depth: 500 m Operating weight: 130 tonnes Power: 200 kw V-shaped plough width: 460 mm Max. burial depth: 1.5 m Max. operating depth: 9.5 m Operating weight: 121 tonnes Power: 600 kw Chain cutter trencher width: 400 mm Max. burial depth: 6 m Max. operating depth: 250 m Operating weight: tonnes Power: kw Operating water depth: m 8 OFFSHORE RENEWABLES V JULY

9 OFFSHORE SERVICES JAN DE NUL GROUP SUBSEA POWER CABLES AND UMBILICALS

10 SUBSEA POWER CABLES AND UMBILICALS Services for the offshore oil, gas and renewable energy industries are a key part of the services provided by Jan De Nul Group and are playing an ever increasing role. They can be divided into four main components: seabed intervention, rock installation and ballasting, offshore wind farms installation, and the installation of subsea cables and umbilicals for the oil and gas industry as well as for the offshore renewable energy market. The Multipurpose Installation Vessel Willem de Vlamingh is equipped with a 5,400 ton turntable and the Fall Pipe Vessel Simon Stevin has installed umbilicals from the aft deck. This allows a combined scope of cable, umbilical and rock installation to be executed by a single vessel, resulting in considerable saving on mobilization cost for the client. The Multipurpose Vessel Isaac Newton has a cable carrying capacity of 10,500 ton and is also able to execute trenching and subsea rock installation works. JAN DE NUL GROUP S FLEET INCLUDES CABLE INSTALLATION VESSELS, OF WHICH ONE WITH A CARRYING CAPACITY OF 10,500 TON WHICH ALLOW CABLES AND UMBILICALS OF LONGER LENGTH TO BE INSTALLED WITHOUT OFFSHORE JOINT. 2 SUBSEA CABLES AND UMBILICALS

11 The Sakhalin III project is an oil and gas development program that includes the Kirinskoye gas and condensate field. It s the first Russian subsea production system producing directly from this development. For this project, Jan De Nul Group deployed the Fall Pipe Vessel Simon Stevin equipped with umbilical installation equipment on the aft deck to install four infield umbilicals between the four subsea wells and the manifold. The length of the umbilicals, with pre-fixed subsea distribution units, varied between 1.27 and 7.37 km, their weights varied between 45 and 147 ton per reel. Following the umbilical installation the vessel directly carried out rock installation to stabilize the umbilicals. SAKHALIN III PROJECT, RUSSIA NORTHWIND PROJECT, BELGIUM Jan De Nul Group installed the submarine export cable to connect the 215 MW Northwind wind farm off the Belgian coast to the power grid. Before laying the cable a deep trench through the Scheur channel, one of the most heavily navigated channels in the world, needed to be dredged. The cable itself was loaded aboard the Multipurpose Installation Vessel Willem de Vlamingh in Norway and then installed between the Belwind Platform and Zeebrugge. The 43 km long electricity cable weighs 5,250 ton. To modify this vessel for cable lay the rock installation system was replaced by a 5,400 ton capacity turntable with a diameter of 28 m and a height of over 6 m. 3 SUBSEA CABLES AND UMBILICALS

12 BELWIND PROJECT, BELGIUM In the North Sea, in front of the Belgian coast, part of the Belwind phase 2 wind power plant is providing a laboratory and testing facility for Alstom to assess their Haliade MW turbine with real-life offshore wind and sea conditions. Therefore a 33 kv cable had to be installed. Jan De Nul Group was in charge of the installation, burial and scour protection of the cable. The Fall Pipe Vessel Simon Stevin was mobilized for this job and was equipped with an ROV trencher to bury the cable after installation. 4 SUBSEA CABLES AND UMBILICALS

13 AYATSIL FIELD, MEXICO To develop the Ayatsil oil field, located in the southern part of the Gulf of Mexico, several platforms were installed and needed to be provided with electrical power. To achieve that, one platform has been equipped with a large generator with several cables branching out to provide the other platforms with power. Using the vessel Willem de Vlamingh Jan De Nul Group installed various power cables with a combined length of 82 km. A total of ten cables were laid between the various offshore platforms of which ten first end pull-ins, seven second end pull-ins and three wet storages were carried out. All cables were buried after installation using an ROV trencher with water jets. 5 SUBSEA CABLES AND UMBILICALS

14 Fifty-two nautical miles north-east of Doha, Qatar, crude oil from offshore oil fields is being processed on Halul island. To meet the present and future electrical power demand of the island two 132 kv submarine power cables between Ras Laffan and the island need to be installed. Jan De Nul Group was appointed as cable installation contractor. With a complete length of two times 100 km, and a total of 58 crossing alongside the route, this was an extremely challenging work. As the cables weighted up to 70 kg/m, the cables were installed in sections of 50 km. Next to the complete cable installation with Willem de Vlamingh, the scope includes touchdown ROV monitoring and shore end pulls in Ras Laffan an Halul Island. HALUL PROJECT, QATAR 6 SUBSEA CABLES AND UMBILICALS

15 SUBSEA POWER CABLES AND UMBILICALS REFERENCE LIST START DATE LOCATION PROJECT NAME 01/04/2018 Germany Trianel Windpark (TWP) 01/04/2018 Germany Borkum Riffgrund 2 (BR02) 01/09/2017 United Arab Emirates NASRII Project 09/05/2016 United Kingdom Western Link Interconnector Project 01/05/2016 United Kingdom Burbo Bank Extension Offshore Wind Farm (BBW02) 01/04/2016 United Kingdom Race Bank Offshore Wind Farm (ROW01) 01/03/2016 Canada Prince Edward Island - New Brunswick Interconnector Project (PEI-NB) 01/01/2016 United Kingdom Walney Offshore Wind Farm Phase 2 (WOW02) 01/12/2015 Saudi Arabia Marjan GOSPs Project 01/09/2015 Saudi Arabia Marjan & Zuluf Field Facilities Project 01/12/2014 Saudi Arabia Abu Ali Power Supply Project 01/10/2014 Qatar Halul Island Power Supply Project 04/04/2014 Belgium Alstom Belwind Demonstration Project 28/07/2013 Mexico Ayatsil Power Cable Project 01/03/2013 Belgium Northwind Offshore Wind Farm Project 26/03/2012 Russia Kirinskoye Gas and Condensate Field Umbilical Installation 7 SUBSEA CABLES AND UMBILICALS

16 OFFSHORE CONSTRUCTION VESSELS VOLE AU VENT TAILLEVENT WIND TURBINE INSTALLATION VESSEL WIND TURBINE INSTALLATION VESSEL Main crane capacity: 1,500 tonnes Max. water depth for jacking: 50 m Max. cargo weight: 6,500 tonnes Cargo deck: 3,535 m² Main crane capacity: 1,000 tonnes Max. water depth for jacking: 40 m Max. cargo weight: 6,000 tonnes Cargo deck: 3,600 m² TAILLEVENT SIMON STEVIN ADHÉMAR DE SAINT-VENANT TRENCHING AND OFFSHORE SUPPORT VESSEL Rock carrying capacity: 31,500 tonnes Max. discharge depth: 2,000 m Optional turntable capacity: 3,500 tonnes Dynamic Positioning: DP2 Rock carrying capacity: 4,750 tonnes Max. discharging depth: 600 m Optional turntable capacity: 4,000 tonnes AHC crane capacity: 25 tonnes JOSEPH PLATEAU DANIEL BERNOULLI TRENCHING AND OFFSHORE SUPPORT VESSEL Rock carrying capacity: 31,500 tonnes Max. discharge depth: 2,000 m Optional turntable capacity: 3,500 tonnes AHC crane capacity: 40 tonnes Dynamic Positioning: DP2 Rock carrying capacity: 4,750 tonnes Max. discharging depth: 600 m Optional turntable capacity: 4,000 tonnes AHC crane capacity: 25 tonnes ISAAC NEWTON LA BOUDEUSE and TIGER CABLE AND UMBILICAL INSTALLATION VESSEL Turntable capacity: 7,400 tonnes + 5,000 tonnes AHC crane capacity: 40 tonnes Dynamic Positioning: DP Rock carrying capacity: 3,500 tonnes Max. discharge depth: 130 m LA BOUDEUSE equipped with vertical fall pipe ROV and inclined fall pipe TIGER equipped with inclined fall pipe for large diam. rock WILLEM DE VLAMINGH POMPEI CABLE AND UMBILICAL INSTALLATION VESSEL SIDE STONE INSTALLATION VESSEL Turntable capacity: 5,400 tonnes AHC crane capacity: 40 tonnes Dynamic positioning: DP Rock carrying capacity: 1,350 tonnes Mooring system: 6 point anchoring TRENCHING EQUIPMENT UTV1200 SUNFISH MOONFISH STARFISH TRENCHING ROV PLOUGHING VEHICLE INTERTIDAL TRENCHING VEHICLE ELEVATED EXCAVATOR Operating weight: 48 tonnes Power: 900 kw (1200 hp) Max. trenching depth chain cutter: 1.6 m Max. trenching depth jetting mode: 3 m Max operating depth: 500 m Operating weight: 130 tonnes Power: 200 kw V-shaped plough width: 460 mm Max. burial depth: 1.5 m Max. operating depth: 9.5 m Operating weight: 121 tonnes Power: 600 kw Chain cutter trencher width: 400 mm Max. burial depth: 6 m Max. operating depth: 250 m Operating weight: tonnes Power: kw Operating water depth: m 8 S U B S E A CA B L E S A N D U M B I L I C A L S V JULY

17 OFFSHORE SERVICES JAN DE NUL GROUP SUBSEA ROCK INSTALLATION

18 SUBSEA ROCK INSTALLATION Services for the offshore oil, gas and renewable energy industries are a key part of the services provided by Jan De Nul Group and are playing an ever increasing role. They can be divided into four main components: seabed intervention, rock installation and ballasting, offshore wind farms installation, and the installation of subsea cables and umbilicals. The Group operates DP2 Fall Pipe Vessels, of which two are the largest in the world and able of installing 32,000 ton of rock in water depths up to 2,000 m. The vessels are able to install rocks very precisely, within a tolerance of only a few centimetres. With the positioning of the vessels, one remaining in the western hemisphere and the other one in the eastern hemisphere, Jan De Nul Group can offer considerable savings on mobilization costs to its clients. The Group also disposes of DP vessels able to install rocks using an inclined fall pipe, making it possible to reach areas beneath the structures. JAN DE NUL GROUP IS AN EXPERT IN PLACING ROCK PROTECTION AND BALLASTING FOR OFFSHORE STRUCTURES IN THE MOST EXTREME WATER DEPTHS AND WEATHER CONDITIONS. 2 SUBSEA ROCK INSTALLATION

19 ADRIATIC LNG, ITALY The natural gas supply to Italy had to be increased by the installation of an offshore LNG terminal. After the GBS had been towed to the location 16 km northeast of Porto Levante and placed on the seabed, solid ballast was pumped into it to gain necessary permanent on-bottom weight. At the same time, scour protection in the form of rock was installed around the perimeter of the GBS and around the base of the two mooring dolphins. The solid ballast and scour rock installation were awarded to Jan De Nul Group. To install the scour protection, the vessel La Boudeuse was modified to work as an inclined fall pipe vessel with dynamic position and/or dynamic tracking, allowing the vessel to reach areas between the mooring dolphins and the GBS. SAKHALIN, RUSSIA In Sakhalin, Russia, Jan De Nul Group installed a rock berm on top of a subsea pipeline, which crosses the Tatar Strait, in order to protect it from water current scours and from ice impacts. The below average climate conditions over the winter triggered atypical ice accumulation and formations damaged the existing crude export pipeline and demanded extra protection matters. The berms were installed over the crossing. Some segments were insufficient in width and thickness and were upgraded. Other ones required the installation of completely new berms. An estimated amount of 176,000 ton of rock was used, predominately in one size from 40 to 70 mm and a smaller amount of 120 to 180 mm in size. Also in Sakhalin, the Fall Pip Vessel Simon Stevin was equipped with an inclined fall pipe to place rocks for remedial works at platforms and offshore oil, gas, multiphase and MEG pipelines. A total of 32,000 ton was installed. 3 SUBSEA ROCK INSTALLATION

20 WHEATSTONE, AUSTRALIA In Australia, a new offshore platform will be installed in the Wheatstone field. The platform will consist of a Steel Gravity Structure (SGS) as the foundation and topsides. Jan De Nul Group was awarded the foundation works of the SGS. The scope consist of three main activities: rock blanket installation, solid ballast installation of the four pods of the SGS and scour protection installation along the pods. For each activity specific equipment and tools have been designed and fabricated. But all works were carried out by one vessel only, the Fall Pipe Vessel Joseph Plateau. With floor dimensions of m and 76.5 m and a height of approximately 100 m the seabed needed to be perfectly flat to guarantee the stability. Therefore a rock blanket of approximately 1 m thickness was installed by Joseph Plateau. Strict tolerances were enforced during this installation work varying from 5 cm to 10 cm. To achieve these tolerances, two different levelling tools were designed and constructed by Jan De Nul Group: a subsea levelling tool and a sweep beam attached to the heave compensated ROV. 4 SUBSEA ROCK INSTALLATION

21 On top of the deck of the SGS, an extra hang-off platform was installed especially for the solid ballasting scope. Jan De Nul Group engineered a system that is fully integrated in this platform to make the connection between the ballasting units on board of Joseph Plateau, and the ballast compartments of the SGS. Internal compartments, stiffeners and girders in the SGS pods hinder the ballasting process. To select the appropriate solid ballasting material several model tests, one on scale 1/6, were carried out to define the maximum filling degree. To pump the solid ballast into the pods of the SGS, Jan De Nul Group s mixing and pumping plant was installed on the aft deck of Joseph Plateau. The use of these kinds of plants at an offshore location is of course critical. To confirm the compatibility of the ballast material and the pumping and mixing unit, a full scale test has been carried out. 5 SUBSEA ROCK INSTALLATION

22 To protect the J-tubes against erosion concrete matrasses were installed. To execute this task an AHC-crane was bought and installed on board of the Fall Pipe Vessel. This heave compensated offshore crane is ideal for such installation services and can also be installed on board of other vessels. 6 SUBSEA ROCK INSTALLATION

23 SUBSEA ROCK INSTALLATION REFERENCE LIST START DATE LOCATION PROJECT NAME 23/08/2018 Vietnam Phong Lan Dai: rock installation for freespans 14/08/2018 United Kingdom Chrysaor Lomond 06/08/2018 United Kingdom Hornsea: rock installation for crossings 26/07/2018 Belgium Nemo: filter and armour installation on crossings 14/07/2018 United Kingdom Nexen Telford 30/06/2018 Norway Ula: rock installation for drill rig foundation 11/06/2018 Egypt El-Hamra Terminal 04/06/2018 Germany Wikinger OWF rock installation on inter array cables 28/05/2018 Philippines Malampaya pipeline protection 15/05/2018 The Netherlands Neptune Rock remedial 09/02/2018 Denmark Kriegers Flak 26/12/2017 Monaco Anse du Portier 25/07/2017 Germany Borkum Riffgrund 2 OWF filter installation 22/05/2017 Australia Julimar Freespan Remediation 20/05/2017 France Calais Port Expansion 07/05/2017 United Kingdom Culzean Subsea Construction Services 22/02/2017 Australia Vincent Anchor Remediation 30/01/2017 United Kingdom Racebank Platform ROW01-Z01 scour protection 22/11/2016 Taiwan Tung Hsiao Submarine Pipeline KP43-44: Rock Protection Works 11/06/2016 South Korea Ulsan KNOC SPM relocation 15/03/2016 United Kingdom Apache FNT Development 14/03/2016 Australia Wheatstone Deepwater Rock installation 01/04/2016 Belgium Bligh Bank Phase 2 - Nobelwind OWF 03/10/2015 United Kingdom Hess IVRR Decommissioning 15/08/2015 Russia Stabilization of PA-A, PA-B and pipelines SEIC /08/2015 Denmark Subsea Rock Installation for Tyra East, Valdemar & Roar 18/04/2015 Mexico Ayatsil & Tekel Cable - Cable trenching & Rock Installation 25/01/2015 Germany Butendiek armour installation 13/01/2015 Australia ICHTHYS GEP: Offshore Rock Installation 01/10/2014 Denmark Subsea Rock Installation for Tyra East & Southeast B 7 SUBSEA ROCK INSTALLATION

24 OFFSHORE CONSTRUCTION VESSELS VOLE AU VENT WIND TURBINE INSTALLATION VESSEL Main crane capacity: 1,500 tonnes Max. water depth for jacking: 50 m Max. cargo weight: 6,500 tonnes Cargo deck: 3,535 m² TAILLEVENT WIND TURBINE INSTALLATION VESSEL Main crane capacity: 1,000 tonnes Max. water depth for jacking: 40 m Max. cargo weight: 6,000 tonnes Cargo deck: 3,600 m² SIMON STEVIN Rock carrying capacity: 31,500 tonnes Max. discharge depth: 2,000 m Optional turntable capacity: 3,500 tonnes JOSEPH PLATEAU Rock carrying capacity: 31,500 tonnes Max. discharge depth: 2,000 m Optional turntable capacity: 3,500 tonnes AHC crane capacity: 40 tonnes ISAAC NEWTON CABLE AND UMBILICAL INSTALLATION VESSEL Turntable capacity: 7,400 tonnes + 5,000 tonnes AHC crane capacity: 40 tonnes WILLEM DE VLAMINGH CABLE AND UMBILICAL INSTALLATION VESSEL Turntable capacity: 5,400 tonnes AHC crane capacity: 40 tonnes ADHÉMAR DE SAINT-VENANT TRENCHING AND OFFSHORE SUPPORT VESSEL Dynamic Positioning: DP2 Rock carrying capacity: 4,750 tonnes Max. discharging depth: 600 m Optional turntable capacity: 4,000 tonnes AHC crane capacity: 25 tonnes DANIEL BERNOULLI TRENCHING AND OFFSHORE SUPPORT VESSEL Dynamic Positioning: DP2 Rock carrying capacity: 4,750 tonnes Max. discharging depth: 600 m Optional turntable capacity: 4,000 tonnes AHC crane capacity: 25 tonnes LA BOUDEUSE and TIGER Dynamic Positioning: DP Rock carrying capacity: 3,500 tonnes Max. discharge depth: 130 m LA BOUDEUSE equipped with vertical fall pipe ROV and inclined fall pipe TIGER equipped with inclined fall pipe for large diam. rock POMPEI SIDE STONE INSTALLATION VESSEL Dynamic positioning: DP Rock carrying capacity: 1,350 tonnes Mooring system: 6 point anchoring TRENCHING EQUIPMENT UTV1200 SUNFISH MOONFISH STARFISH TRENCHING ROV PLOUGHING VEHICLE INTERTIDAL TRENCHING VEHICLE ELEVATED EXCAVATOR Operating weight: 48 tonnes Power: 900 kw (1200 hp) Max. trenching depth chain cutter: 1.6 m Max. trenching depth jetting mode: 3 m Max operating depth: 500 m Operating weight: 130 tonnes Power: 200 kw V-shaped plough width: 460 mm Max. burial depth: 1.5 m Max. operating depth: 9.5 m Operating weight: 121 tonnes Power: 600 kw Chain cutter trencher width: 400 mm Max. burial depth: 6 m Max. operating depth: 250 m Operating weight: tonnes Power: kw Operating water depth: m 8 SUBSEA ROCK INSTALLATION V OCT

25 OFFSHORE SERVICES JAN DE NUL GROUP SEABED INTERVENTION

26 SEABED INTERVENTION Services for the offshore oil, gas and renewable energy industries are a key part of the services provided by Jan De Nul Group and are playing an ever increasing role. They can be divided into four main components: seabed intervention, rock installation and ballasting, offshore wind farms installation, and the installation of subsea cables and umbilicals. For more than 60 years, Jan De Nul Group has executed international dredging projects from start to finish, making it the ideal partner to execute offshore dredging services for the oil & gas industry, and for the offshore renewable energy market. Excavating trenches for submarine pipelines, backfilling trenches to protect pipelines, dredging sub sea excavations for wellhead protection, and realizing shore approaches, including possible installation of a cofferdam and pipe pulling, aren t holding any secrets for Jan De Nul Group. trenches with sand and gravel, the dredge pipe can be used as a fall pipe. To tackle the hardest and most difficult soil conditions during shore approach dredging, Jan De Nul Group can rely on 14 Cutter Suction Dredgers with a total installed diesel power varying up to 27,240 kw. The suitable equipment will be selected or can be adapted to meet the client s demands. To execute these dredging services the Group can rely on 28 Trailing Suction Hopper Dredgers with a hopper capacity varying from 2,320 m³ to 46,000 m³. These types of dredgers use a dynamic tracking system which allows the drag head to follow a predefined trench at low tolerances, resulting in minimum quantities being trenched at a lesser cost. The hoppers are able to dredge up to 155 m deep. For backfilling of THE LARGE SEAGOING DREDGING AND OFFSHORE VESSELS OFFER THE POSSIBILITY TO WORK IN SEA STATE CONDITIONS AND WATER DEPTHS WHICH WERE PREVIOUSLY NOT POSSIBLE. 2 SEABED INTERVENTION

27 Jan De Nul Group executed wellhead protection excavation for Husky Energy on the White Rose Project in Canada. The project was located approximately 200 nautical miles south east of Newfoundland on the Grand Banks of the Atlantic Ocean. The excavations provide wellhead protection against iceberg scouring. Jan De Nul Group mobilized its Trailing Suction Hopper Dredger Vasco da Gama in 2003, at that time the world s largest Hopper Dredger, to execute the first campaign. With a 9 m depth and dimensions of 50 X 60 m, this central excavation was the largest to be excavated. In 2012, Jan De Nul Group performed similar excavations with the current largest Trailing Suction Hopper Dredger in the world, Cristóbal Colón, equipped with two suction pipes for 155 m water depth. WHITE ROSE, CANADA PNG LNG, PAPUA NEW GUINEA The PNG LNG Project was an integrated development that included gas production from operating fields in the Southern Highlands and Western Provinces of Papua New Guinea. To build these facilities the installation of a 407 km long offshore pipeline was required. Jan De Nul Group was in charge of the 3 km trenching works at the landfall at Caution Bay, as well as the 52 km trenching works up to the landfall at the Omati River, located approximately 24 km up river from the Gulf of Papua. 3 SEABED INTERVENTION

28 To meet the growing energy requirements of the United Kingdom a new offshore pipeline from Norway s gas-rich fields to the eastern coast of the UK was laid. The 44inch diameter pipeline crosses 1,200 km, making it the longest offshore pipeline ever built. Jan De Nul Group executed the shore approach and landfall works and was responsible for the offshore dredging and rock placement. The offshore trench, some 20 km long and 1.5 to 2 m deep, was excavated using the Cutter Suction Dredger J.F.J. De Nul in boulder clay. The backfilling of the trench was performed using the Trailing Suction Hopper Dredger Filippo Brunelleschi, which also carried out the pre-sweeping of the offshore sand dunes. LANGELED, NORWAY - UK SAKHALIN, RUSSIA In Sakhalin, Russia, the first offshore project was executed in 2004 and included the trenching and backfilling of submarine pipelines and cables and the installation of cofferdams for the landfalls at Lunskoye and Aniva. 4 SEABED INTERVENTION

29 MAURITIUS In Mauritius Jan De Nul Group installed an ocean outfall of which 140 m onshore and 700 m offshore. Also a trench of almost 300 m needed to be dredged for the installation of a pipeline of 1,400 mm nominal diameters. The Backhoe Dredger Jerommeke was used to remove the basalt rock and the Side Stone Dumping Vessel Pompei was mobilized to backfill the trench with concrete and rock to protect the pipeline against cyclones. Islay, a subsea gas and condensate reservoir, is located in 122 m water depth, approximately 6 km northeast of the Forvie Manifold in the far North Sea and has been developed by Total E&P Ltd. In October 2010 Technip, the main contractor, awarded Jan De Nul Group a subcontract to carry out deep water precision dredging to a slope with a strict vertical tolerance to mitigate against pipeline free spans. The work was carried out successfully using Jan De Nul Group s Trailing Suction Hopper Dredger Cristóbal Colón. TOTAL ISLAY, UK 5 SEABED INTERVENTION

30 In the 90s Norway and France entered into an agreement to transport natural gas from Draupner to Dunkirk. As a result, the NorFra transportation system was planned. This 42 inch diameter, 835 km long, high pressure natural gas pipeline was laid from the Draupner E platform in the Norwegian Continental Shelf to the Northern coast of France. Four separate dredging packages were tendered for this project and a combined contract was awarded to Jan De Nul Group. The total dredging scope involved offshore pre-sweeping of sand dunes on the seabed over a distance of 230 km, pre-trenching in stiff clay at the location of the crossing of the Westhinder Shipping Lane, and dredging, backfilling and civil works related to the shore approach, beach crossing and pipe pull at Dunkirk. NORFRA, FRANCE-NORWAY 6 SEABED INTERVENTION

31 SEABED INTERVENTION REFERENCE LIST START DATE LOCATION PROJECT NAME 2018 Indonesia BP Tangguh project 2018 Germany Nord Stream 2 German landfall 2017 Albania & Italy Trans Adriatic Pipeline project 2017 Belgium, France & UK NEMO interconnector 2017 Saudi-Arabia & Bahrain Saudi-Bahrain Pipeline Project 2017 Turkey Trans Anatolian Pipeline project 2016 Denmark Gravity Based Sub-Structures for AC and Combined Grid Solution CGS Offshore Substations (OSS) for Kriegers Flak 2016 UAE Hail Field Development Project 2016 Saudi Arabia Al Khafji Desalination plant 2016 United Kingdom Race Bank Offshore Wind Farm (ROW) 2016 Korea Ulsan Buoy Relocation 2015 Australia ICHTHYS GEP: Offshore Rock Installation & pre-sweeping 2014 Saudi Arabia Abu Ali Power Supply Project 2014 Argentina Vega Pleyade 2013 Canada Hebron Bundwall Removal 2013 Belgium Northwind OWF - trenching and backfilling for export cable installation 2012 Myanmar Pre-trenching and Mechanical Backfilling for Zawtika Pipeline Installation Project 2012 Canada White Rose Area Glory Hole (SWRX) 2012 Australia Wheatstone - stabilisation of subsea flowlines and pipelines 2012 Qatar Barzan Offshore Project 2011 Australia Macedon Gas Project 2011 Russia Kirinskoye Gas and Condensate Field - trenching, backfilling and subsea rock installation 2011 India Offshore Trenching Services for ONGC North Tapti Gas Field Development Project 2010 Papua New Guinea PNG LNG EPC2 Offshore Pipeline Project: Pre-trenching, Backfilling and Subsea Rock Installation 2010 United Kingdom Total Islay - Seabed Conditioning by Deep Dredging 2010 Bahamas South Riding Point - Pipeline Modification Project 2010 Myanmar Offshore Trench Dredging for MOGE Project Yadana 2009 Algeria Arzew Project GNL3Z 2009 United Kingdom New Tyne Crossing 2009 Algeria Beni Saf Desalination Plant 2009 Iran Landfall trenching South Pars gas field development - Phases 15 & Algeria Terga Power Plant Water intake 2009 United Kingdom North Sea Viking Transportation Project 2008 Saudi Arabia Dredging Works for SA LTA - BI 3008-RPO-2 - Installation of Safaniyah Shallow Water Pipelines 2008 Qatar Shell Pearl GTL Offshore Project 2007 Qatar Dredging & Backfilling Works for the Qatargas - 3 & 4 Offshore Facilities Project 2007 Canada White Rose Development Project - Wellhead Protective Glory Holes 2007 Saudi Arabia Manifa Oil Field Development Project: Construction of 27 islands with causeway 7 SEABED INTERVENTION

32 OFFSHORE CONSTRUCTION VESSELS VOLE AU VENT TAILLEVENT WIND TURBINE INSTALLATION VESSEL WIND TURBINE INSTALLATION VESSEL Main crane capacity: 1,500 tonnes Max. water depth for jacking: 50 m Max. cargo weight: 6,500 tonnes Cargo deck: 3,535 m² Main crane capacity: 1,000 tonnes Max. water depth for jacking: 40 m Max. cargo weight: 6,000 tonnes Cargo deck: 3,600 m² TAILLEVENT SIMON STEVIN ADHÉMAR DE SAINT-VENANT TRENCHING AND OFFSHORE SUPPORT VESSEL Rock carrying capacity: 31,500 tonnes Max. discharge depth: 2,000 m Optional turntable capacity: 3,500 tonnes Dynamic Positioning: DP2 Rock carrying capacity: 4,750 tonnes Max. discharging depth: 600 m Optional turntable capacity: 4,000 tonnes AHC crane capacity: 25 tonnes JOSEPH PLATEAU DANIEL BERNOULLI TRENCHING AND OFFSHORE SUPPORT VESSEL Rock carrying capacity: 31,500 tonnes Max. discharge depth: 2,000 m Optional turntable capacity: 3,500 tonnes AHC crane capacity: 40 tonnes Dynamic Positioning: DP2 Rock carrying capacity: 4,750 tonnes Max. discharging depth: 600 m Optional turntable capacity: 4,000 tonnes AHC crane capacity: 25 tonnes ISAAC NEWTON LA BOUDEUSE and TIGER CABLE AND UMBILICAL INSTALLATION VESSEL Turntable capacity: 7,400 tonnes + 5,000 tonnes AHC crane capacity: 40 tonnes Dynamic Positioning: DP Rock carrying capacity: 3,500 tonnes Max. discharge depth: 130 m LA BOUDEUSE equipped with vertical fall pipe ROV and inclined fall pipe TIGER equipped with inclined fall pipe for large diam. rock WILLEM DE VLAMINGH POMPEI CABLE AND UMBILICAL INSTALLATION VESSEL SIDE STONE INSTALLATION VESSEL Turntable capacity: 5,400 tonnes AHC crane capacity: 40 tonnes Dynamic positioning: DP Rock carrying capacity: 1,350 tonnes Mooring system: 6 point anchoring TRENCHING EQUIPMENT UTV1200 SUNFISH MOONFISH STARFISH TRENCHING ROV PLOUGHING VEHICLE INTERTIDAL TRENCHING VEHICLE ELEVATED EXCAVATOR Operating weight: 48 tonnes Power: 900 kw (1200 hp) Max. trenching depth chain cutter: 1.6 m Max. trenching depth jetting mode: 3 m Max operating depth: 500 m Operating weight: 130 tonnes Power: 200 kw V-shaped plough width: 460 mm Max. burial depth: 1.5 m Max. operating depth: 9.5 m Operating weight: 121 tonnes Power: 600 kw Chain cutter trencher width: 400 mm Max. burial depth: 6 m Max. operating depth: 250 m Operating weight: tonnes Power: kw Operating water depth: m 8 SEABED INTERVENTION V JUL

OFFSHORE SERVICES JAN DE NUL GROUP OFFSHORE RENEWABLES

OFFSHORE SERVICES JAN DE NUL GROUP OFFSHORE RENEWABLES OFFSHORE SERVICES JAN DE NUL GROUP OFFSHORE RENEWABLES INSTALLATION OF OFFSHORE WIND FARMS Jan De Nul Group provides services related to the installation of offshore wind farms and related subsea inter-array

More information

OFFSHORE SERVICES JAN DE NUL GROUP SEABED INTERVENTION

OFFSHORE SERVICES JAN DE NUL GROUP SEABED INTERVENTION OFFSHORE SERVICES JAN DE NUL GROUP SEABED INTERVENTION SEABED INTERVENTION Services for the offshore oil, gas and renewable energy industries are a key part of the services provided by Jan De Nul Group

More information

Jan De Nul. Neptune Shipyards BV. Zeeland Offshore. HEAVYWEIGHT LOADTESTING. High Speed Crew Tender Speed: 35 knots

Jan De Nul. Neptune Shipyards BV. Zeeland Offshore.  HEAVYWEIGHT LOADTESTING. High Speed Crew Tender Speed: 35 knots GY N ER IO EN DIT RE M E HO A FS RD OF STE AM OSI 2013 VOLUME 6 ISSUE 5 Neptune Shipyards BV OSI VOL. 6 ISSUE 5 2013 OFFSHORE ENERGY 2013 High Speed Crew Tender Speed: 35 knots HEAVYWEIGHT LOADTESTING

More information

Next generation WTG foundation and WTG installation. WindDays Rotterdam, 14 June 2018 Arnoud Bosch Engineering Director

Next generation WTG foundation and WTG installation. WindDays Rotterdam, 14 June 2018 Arnoud Bosch Engineering Director Next generation WTG foundation and WTG installation WindDays Rotterdam, 14 June 2018 Arnoud Bosch Engineering Director 18 June 2018 Subsea 7 Business Units Seaway Heavy Lifting Siem Offshore Contractors

More information

TIDEWAY OFFSHORE SOLUTIONS

TIDEWAY OFFSHORE SOLUTIONS TIDEWAY OFFSHORE SOLUTIONS Kathryn Hannis 23-11-2015 GENERAL INFORMATION TIDEWAY GENERAL INFORMATION Tideway in a nutshell: Leading world class contractor In the high precision rock dumping (fall pipe

More information

Vessels ROVs Trenchers & Ploughs. // 1,000 employees // 11 offices in 7 countries. (NL, Norway, UK, Brazil, Mexico, Singapore, Ghana)

Vessels ROVs Trenchers & Ploughs. // 1,000 employees // 11 offices in 7 countries. (NL, Norway, UK, Brazil, Mexico, Singapore, Ghana) SUBMARINE POWER CABLE INSTALLATION & PROTECTION CAPABILITIES & EXPERTISE MARCH 2017 2016 Overview Vessels ROVs Trenchers & Ploughs // Owned Vessels: 5 // Chartered: 10 // 38 ROVs // 1 ROTV // 1 AUV //

More information

9/21/2017 DeepOcean Group 1

9/21/2017 DeepOcean Group 1 9/21/2017 DeepOcean Group 1 ACT for Safety Integrated Management System covering Quality, Health, Safety, Security and the Environment System is certified by DNV according to: o o o ISO-9001 Quality Management

More information

OFFSHORE ENERGY DIVISION OFFSHORE WIND SOLUTIONS

OFFSHORE ENERGY DIVISION OFFSHORE WIND SOLUTIONS OFFSHORE ENERGY DIVISION OFFSHORE WIND SOLUTIONS 2 WHO WE ARE OFFSHORE WIND CHAPTER 3 Boskalis is a leading global dredging and marine expert. Since our founding in 1910, we have established a long track

More information

Sponsored by. Created and produced by

Sponsored by. Created and produced by Sponsored by Diamond Sponsor Supported by Created and produced by CREATING NEW HORIZONS IN OFFSHORE ENERGY BOSKALIS OFFSHORE ENERGY- FLEET DEVELOPMENTS OFFSHORE ENERGY 2018- RAI AMSTERDAM JACK SPAAN 23

More information

2017 Vattenfall Horns Rev 3 Substation Diving Works Messenger Wire and Cap installation J-Tubes

2017 Vattenfall Horns Rev 3 Substation Diving Works Messenger Wire and Cap installation J-Tubes REFERANCE LIST 2017 Vattenfall Horns Rev 3 Substation Diving Works Messenger Wire and Cap installation J-Tubes 2017 Vattenfall Horns Rev 3 Substation ROV Inspection J-Tubes 2017 DONG Energy Race Bank Diving

More information

Energy Transition Partner. Created and produced by

Energy Transition Partner. Created and produced by Energy Transition Partner Diamond Sponsor Supported by Created and produced by Energy Transition Partner Diamond Sponsor Supported by Created and produced by CREATING NEW HORIZONS IN OFFSHORE ENERGY A

More information

Offshore Cable Installation. November 2010 John Davies Global Marine Systems Limited

Offshore Cable Installation. November 2010 John Davies Global Marine Systems Limited Offshore Cable Installation November 2010 John Davies Global Marine Systems Limited Services and Markets - Overview Both directly and through our Partnerships & Joint Ventures, we offer a wide range of

More information

forward with great confidence

forward with great confidence forward with great confidence KEY FIGURES Turnover of 1,758 million Leading EBITDA margin of 21% or EBITDA of 365 million Net profit totalling 70 million A record solvency ratio of 75% thanks to continuous

More information

RENEWABLE ENERGY SOLUTIONS. oceaneering.com

RENEWABLE ENERGY SOLUTIONS. oceaneering.com RENEWABLE ENERGY SOLUTIONS oceaneering.com 2 Oceaneering / Renewable Energy Solutions From initial site surveys through decommissioning, our products and services deliver unmatched value designed to lower

More information

Jørn Scharling Holm DONG Energy

Jørn Scharling Holm DONG Energy Jørn Scharling Holm DONG Energy 3 rd June 2016 Offshore BoP - Sub-topics and timelines Delivery by Delivery by Table Priority Table 2020-2025 Table 2025-2030 Delivery post 2030 Industrialized transport

More information

Challenges in the Construction of Offshore Wind Structures. Dr Ned Minns IT Power UK

Challenges in the Construction of Offshore Wind Structures. Dr Ned Minns IT Power UK Challenges in the Construction of Offshore Wind Structures Dr Ned Minns IT Power UK Foundations - Options Floating >60m

More information

MAERSK SUPPLY SERVICE. Actively taking part in solving the energy challenges of tomorrow

MAERSK SUPPLY SERVICE. Actively taking part in solving the energy challenges of tomorrow MAERSK SUPPLY SERVICE Actively taking part in solving the energy challenges of tomorrow Utilising our marine capabilities, Expanding to new industries At Maersk Supply Service, we use our marine expertise

More information

DONG ENERGY LEADING THE ENERGY TRANSFORMATION

DONG ENERGY LEADING THE ENERGY TRANSFORMATION Public DONG ENERGY LEADING THE ENERGY TRANSFORMATION Rena Paziorek, Local Stakeholder Manager Annual Plenary Meeting Wadden Sea Forum Wilhelmshaven, 1.&2. November 2017 0 We have become too green for our

More information

Offshore Pipelines. Capability & Experience

Offshore Pipelines. Capability & Experience Offshore Pipelines Capability & Experience Capability Overview INTECSEA is a leading engineering and project delivery company in the offshore oil and gas sector. It operates across the full project cycle

More information

Emerging Subsea Networks

Emerging Subsea Networks FIBRE-TO-PLATFORM CONNECTIVITY, WORKING IN THE 500m ZONE Andrew Lloyd (Global Marine Systems Limited) Email: andrew.lloyd@globalmarinesystems.com Global Marine Systems Ltd, New Saxon House, 1 Winsford

More information

2017 Pareto Conference Bart Heijermans CEO

2017 Pareto Conference Bart Heijermans CEO 2017 Pareto Conference Bart Heijermans CEO Recent DeepOcean presentations at Pareto Conference 2014 2016 Navigating through crowded water Weathering the prolonged oil downturn We cannot solve our problems

More information

Topaz Tangaroa Multipurpose Field and ROV Support Vessel. Vessel Specifications

Topaz Tangaroa Multipurpose Field and ROV Support Vessel. Vessel Specifications Topaz Tangaroa Multipurpose Field and ROV Support Vessel Vessel Specifications Vessel Specification DP2 IMR VESSEL WITH 120T CRANE, 82 POB AND 1,000M² DECK Length overall: Breadth moulded: Depth to main

More information

Offshore Wind Risks - Issues and Mitigations

Offshore Wind Risks - Issues and Mitigations DNV Offshore Wind Soren Karkov DNV an independent foundation Our Purpose To safeguard life, property and the environment Our Vision Global impact for a safe and sustainable future 2 More than 145 Years

More information

HEAVY LIFT SOFT SLING SOLUTIONS ON- & OFFSHORE WIND INDUSTRY

HEAVY LIFT SOFT SLING SOLUTIONS ON- & OFFSHORE WIND INDUSTRY HEAVY LIFT SOFT SLING SOLUTIONS ON- & OFFSHORE WIND INDUSTRY VERSION 2018 LIFT-TEX INDUSTRIE B.V. We from Lift-Tex Industrie B.V., a Heavy Lift synthetic fibre round sling manufacture company based in

More information

25/Sep 2018 WindEnergy, Hamburg

25/Sep 2018 WindEnergy, Hamburg 25/Sep 2018 WindEnergy, Hamburg Our heritage is in Offshore Wind. ROV FLEET INSPECTION AND LIGHT WORK-CLASS FLEET FALCON COUGAR XT PANTHER XT PLUS TIGER WORK-CLASS FLEET LEOPARD SCHILLING HD SCHILLING

More information

Subsea South-East Networking Event. 22 September 2016 Bleeding Heart Restaurant

Subsea South-East Networking Event. 22 September 2016 Bleeding Heart Restaurant Subsea South-East Networking Event 22 September 2016 Bleeding Heart Restaurant OVERVIEW 2 ABOUT US World-class provider of the technologies and services that connect the global energy market Through specialist

More information

TAIWAN WIND POWER INVESTMENT INTERNATIONAL CONFERENCE AND EXHIBITION 2016

TAIWAN WIND POWER INVESTMENT INTERNATIONAL CONFERENCE AND EXHIBITION 2016 TAIWAN WIND POWER INVESTMENT INTERNATIONAL CONFERENCE AND EXHIBITION 2016 THEO WESTGEEST BOSKALIS ENERGY TAIPEI August 1, 2014 AUGUST 2016 1 BOSKALIS COMPANY OVERVIEW 2 COMPANY OVERVIEW Leading global

More information

Arctic and Cold Climate. Capability & Experience

Arctic and Cold Climate. Capability & Experience Arctic and Cold Climate Capability & Experience Capability Overview WorleyParsons and INTECSEA are world leaders in design and construction of oil and gas production facilities located in remote, hostile

More information

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines Established in 1997, Primo Marine is an independent specialist with a wealth of experience in subsea cable engineering, from landfalls to subsea marine infrastructures. With an extensive track record,

More information

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine Vincent/Enfield Conductor and Flowbase Installation Review Roy Grant, TSMarine Project scope Offshore installation Mobilised in Dampier (KBSB) on 10 October TSMarine scope is onshore project management

More information

Technical aspects of Offshore Wind Farms

Technical aspects of Offshore Wind Farms Consultations of the Guide to OWF Michał Gronert DNV - Independent foundation since 1864 offices countries employees, out of which 76% have academic degree Offshore Wind Energy - compilation of DNV competencies

More information

Inter Array Cable Technology Development. Jeremy Featherstone Product Development Director JDR Cable Systems Ltd

Inter Array Cable Technology Development. Jeremy Featherstone Product Development Director JDR Cable Systems Ltd Inter Array Cable Technology Development Jeremy Featherstone Product Development Director JDR Cable Systems Ltd 2016 NSRI/ORE Subsea Technological Challenges in Offshore Wind Aberdeen 4 th October 2016

More information

Richard Rickett, General Manager Engineering and Procurement - March Case Study

Richard Rickett, General Manager Engineering and Procurement - March Case Study Richard Rickett, General Manager Engineering and Procurement - March 2015 Case Study Case Study : Diverless Fast Track Repair of Mooring System Introduction ~ 300 floating production units in use around

More information

The future of offshore wind in the US

The future of offshore wind in the US The future of offshore wind in the US One of these things is not like the other Why is the adoption of the European Model not the best path forwards for the US offshore wind market? Arup specialists explore

More information

OFFSHORE WIND ENGINEERING

OFFSHORE WIND ENGINEERING OFFSHORE WIND ENGINEERING Jan Rønberg Market Director Jasmin Bejdic Project Manager 1 AGENDA Introduction - COWI as Design Consultant Offshore Wind Farms - Foundation Design - BTM Offshore Wind - Processes

More information

Flexible Pipe Solutions a competitive approach for Shallow water development. Sylvain Cabalery

Flexible Pipe Solutions a competitive approach for Shallow water development. Sylvain Cabalery Flexible Pipe Solutions a competitive approach for Shallow water development Sylvain Cabalery Agenda 1. Subsea at Technip in Brief and Asia Pacific presence 2. Flexible Pipes Solutions a. Main differences

More information

Local Contribution to the Aasta Hansteen development

Local Contribution to the Aasta Hansteen development Local Contribution to the Aasta Hansteen development 05th June 20 Stian Sande Who are we Presentation overview What is our role on Aasta Hansteen Onshore activites and local contribution What do we expect

More information

Passion at work. Renewables

Passion at work. Renewables Passion at work Renewables Our profile Driven by Our profile challenges Seaway Heavy Lifting is a leading offshore contractor in the global Oil & Gas and Renewables industry, offering tailored T&I and

More information

Evolution of Deepwater Subsea / Offshore Market

Evolution of Deepwater Subsea / Offshore Market Evolution of Deepwater Subsea / Offshore Market Amar UMAP Vice President, Technip COOEC Alliance DMFT 2014 Zhu Hai, China 18 October 2014 Table of contents 1. Evolution of Offshore/ Subsea Oil & Gas Industry

More information

Offshore Construction Management Services. Capability & Experience

Offshore Construction Management Services. Capability & Experience Offshore Construction Management Services Capability & Experience Capability Overview INTECSEA has a proven track record for providing solutions to problems faced when implementing frontier projects, by

More information

HELIX ENERGY SOLUTIONS

HELIX ENERGY SOLUTIONS HELIX ENERGY SOLUTIONS OFFSHORE CAPABILITIES www.helixesg.com About Us WELL OPERATIONS SUBSEA WELL INTERVENTION PRODUCTION FACILITIES The purpose-built vessels of our Well Operations business units serve

More information

THE MARINE PARTNER OF CHOICE

THE MARINE PARTNER OF CHOICE THE MARINE PARTNER OF CHOICE The expert marine team MARINE PLANT HIRE MARINE CONSTRUCTION RENEWABLES & ENERGY MARINE CONSULTANCY MARINE RECRUITMENT Red7Marine is the Marine Partner of Choice within the

More information

Ecosse Subsea Systems. Subsea Springboard 2017 David Hunt

Ecosse Subsea Systems. Subsea Springboard 2017 David Hunt Ecosse Subsea Systems Subsea Springboard 2017 David Hunt Contents Presenter Introduction ESS Company Overview SCAR Seabed System SCARJet Project Management Engineering and Design Personnel Questions ESS:

More information

Subsea Structural Engineering Services. Capability & Experience

Subsea Structural Engineering Services. Capability & Experience Subsea Structural Engineering Services Capability & Experience Capability Overview INTECSEA s subsea structural engineering team has a proven track record for providing solutions to problems in the implementation

More information

Gulfstar One FPS. Nathan Davidson. February 26, 2015

Gulfstar One FPS. Nathan Davidson. February 26, 2015 Gulfstar One FPS Nathan Davidson February 26, 2015 1 Outline > Williams Gulfstar strategy > The first Gulfstar: Gulfstar One ( GS1 ) Overview Specifications Fabrication Installation Challenges and lessons

More information

monopile gripper arms

monopile gripper arms monopile gripper arms (MGA) Fixing the position of the monopiles during lowering to the seabed for stability and safety Application + + Construction of Offshore Wind Farms (OWFs) Monopile Foundations Installation

More information

Riser Installation in Deep & Ultra Deep Water

Riser Installation in Deep & Ultra Deep Water Riser Installation in Deep & Ultra Deep Water Frank Lim 38 th Annual Offshore Pipeline Technology Conference Amsterdam, February 2015 Outline Introduction Overview of current deepwater riser systems and

More information

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa InterMoor Innovation in Action InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa InterMoor is an Acteon Company linking subsea services 3 InterMoor Services MOORINGS Rig Moves Permanent

More information

Walney Wind Farm. Track record

Walney Wind Farm. Track record Walney Wind Farm Track record 2016 Applied system Topside Intershield 300 @ 175μm Intershield 300 @ 175μm Interthane 870 @ 60μm Jacket Interzone 954 @ 300μm Interzone 954 @ 300μm Interthane 990 @ 80μm

More information

Torgeir Ramstad Managing Director, Fred. Olsen United. European projects: Being part of the global supply chain

Torgeir Ramstad Managing Director, Fred. Olsen United. European projects: Being part of the global supply chain Torgeir Ramstad Managing Director, Fred. Olsen United European projects: Being part of the global supply chain European projects: being part of the global supply chain Torgeir Ramstad, Managing Director

More information

Summary of Changes and Current Document Status

Summary of Changes and Current Document Status DNV SERVICE DOCUMENTS Summary of Changes and Current Document Status FEBRUARY 2012 FOREWORD DET NORSKE VERITAS (DNV) is an autonomous and independent foundation with the objectives of safeguarding life,

More information

Innovative marine & offshore solutions

Innovative marine & offshore solutions Innovative marine & offshore solutions Member of the DEME Group Knowledgeable. Experienced. Equipped. Ready for any offshore challenge, anywhere in the world Safety and quality always come first. GeoSea

More information

Before the EPA Trans-Tasman Resources Ltd Ironsands Extraction Project

Before the EPA Trans-Tasman Resources Ltd Ironsands Extraction Project Before the EPA Trans-Tasman Resources Ltd Ironsands Extraction Project In the matter of the Exclusive Economic Zone and Continental Shelf (Environmental Effects) Act 2012 And In the matter of a board appointed

More information

Floating Systems. Capability & Experience

Floating Systems. Capability & Experience Floating Systems Capability & Experience Capability Overview INTECSEA has more than 30 years of extensive experience with all types of floating systems: TLPs, spars, monohulls and semi-submersibles. Key

More information

Seabed preparation on Edradour Glenlivet project campaigns

Seabed preparation on Edradour Glenlivet project campaigns PAU, FRANCE 5-7 APRIL 2016 Seabed preparation on Edradour Glenlivet project 2014-2015 campaigns Loic Delebecque, TOTAL E&P EDRADOUR GLENLIVET PROJECT Edradour and Glenlivet are gas condensate fields located

More information

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States Headquartered in the United States, InterMoor has facilities across the globe: Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States Mooring Capabilities For

More information

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States Headquartered in the United States, InterMoor has facilities across the globe: Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States Mooring Capabilities For

More information

Angola Brazil Mooring Egypt Equatorial Guinea Capabilities Malaysia Mexico Norway Singapore United Kingdom United States

Angola Brazil Mooring Egypt Equatorial Guinea Capabilities Malaysia Mexico Norway Singapore United Kingdom United States Mooring Capabilities InterMoor. The Global Mooring Specialist. Deepwater mooring technology has evolved in the past 20 years, and much of the industry s progress has been pioneered by InterMoor, an Acteon

More information

Marine Risers. Capability & Experience

Marine Risers. Capability & Experience Marine Risers Capability & Experience Capability Overview INTECSEA now offers, in a single company, industry leading capability for all marine riser systems including top-tensioned risers (TTRs) for direct

More information

Volve Subsea Removal. Trond Hofseth Subsea Operations Conference. Haugesund

Volve Subsea Removal. Trond Hofseth Subsea Operations Conference. Haugesund Volve Subsea Removal Trond Hofseth Subsea Operations Conference Haugesund 08.08.2018 Recovery and disposal of: STL loading buoy Mid-Water Arch (MWA) 9 off mooring lines Approximately 1.600m of exposed

More information

INTERNATIONAL. June 2017 Volume 13. A Buoyant Future. Reducing Cost and Risk in Floating Offshore Wind

INTERNATIONAL. June 2017 Volume 13. A Buoyant Future. Reducing Cost and Risk in Floating Offshore Wind INTERNATIONAL June 2017 Volume 13 No. 4 A Buoyant Future Reducing Cost and Risk in Floating Offshore Wind Reducing Cost and Risk in Floating Offshore Wind By Robert Proskovics and Gavin Smart, A Buoyant

More information

A WORLD-LEADING SEABED-TO-SURFACE PARTNER

A WORLD-LEADING SEABED-TO-SURFACE PARTNER A WORLD-LEADING SEABED-TO-SURFACE PARTNER 4 What we do 6 Why choose Subsea 7? 7 Project management and engineering expertise 8 A selection of our key projects 10 High-quality, fully integrated offshore

More information

5.1 Optimal integrated combination of foundation concept and installation method

5.1 Optimal integrated combination of foundation concept and installation method WE@SEA 5.1 Optimal integrated combination of foundation concept and installation method Results of We@Sea research in perspective December 1 2, Den Helder, The Netherlands Goal and Partners The project

More information

CREATING YOUR NEW HORIZON

CREATING YOUR NEW HORIZON Royal Boskalis Westminster N.V. Rosmolenweg 20 P.O. Box 43 3350 AA Papendrecht The Netherlands royal@boskalis.com T +31 78 6969000 F +31 78 6969555 www.boskalis.com CREATING YOUR NEW HORIZON 2 3 WHO WE

More information

Arctic Experiences and Challenges. PTIL seminar 25. mars 2014 Lars Myklebost Business Manager WGK Norge

Arctic Experiences and Challenges. PTIL seminar 25. mars 2014 Lars Myklebost Business Manager WGK Norge Arctic Experiences and Challenges PTIL seminar 25. mars 2014 Lars Myklebost Business Manager WGK Norge Wood Group Kenny - A world leader in subsea engineering 45,000 employees 50+ Countries $7 Billion

More information

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA Dagang Zhang COTEC Offshore Engineering Solutions China Offshore Oil Engineering Company 2011 China-America Frontiers of Engineering Symposium San Diego, USA Presentation Outline Current Status of Deepwater

More information

The potential for windpower in the Baltic Sea

The potential for windpower in the Baltic Sea 4th September 2013 Stanisław Paszkowski/Michał Gronert DNV An Independent Foundation 300 offices 100 countries 10,500 employees 2 Offshore Wind - Combining DNV competences + = 25+ years of hands-on experience

More information

Wind Turbine Decommissioning in the UK Offshore Zone

Wind Turbine Decommissioning in the UK Offshore Zone Wind Turbine Decommissioning in the UK Offshore Zone BWEA - Annual Conference 2001 Presented by Dan Pearson Presentation Introduction: Why this topic? Life Cycle of an Offshore Wind Turbine Decommissioning

More information

The offshore wind market deployment: forecasts for 2020, 2030 and impacts on the European supply chain development

The offshore wind market deployment: forecasts for 2020, 2030 and impacts on the European supply chain development Available online at www.sciencedirect.com Energy Procedia 24 (2012 ) 2 10 DeepWind, 19-20 January 2012, Trondheim, Norway The offshore wind market deployment: forecasts for 2020, 2030 and impacts on the

More information

Van Oord is changing the world around you

Van Oord is changing the world around you Let s stay in touch Look around Address Schaardijk 211 3063 NH Rotterdam The Netherlands Telephone +31 88 8260000 Postal address PO Box 8574 3009 AN Rotterdam The Netherlands E-mail info@vanoord.com Van

More information

Table of contents TEMPORARY WORKS DESIGN BV 1

Table of contents TEMPORARY WORKS DESIGN BV 1 Table of contents Table of contents... 1 1 Company... 2 2 Overview of offshore wind design services... 3 2.1 Naval architecture: motion, stability and mooring analyses... 3 2.2 Seafastening equipment...

More information

Subsea Pipeline IMR. PT Hallin Marine June 18 th, 2014!

Subsea Pipeline IMR. PT Hallin Marine June 18 th, 2014! PT Hallin Marine June 18 th, 2014! Introduction Issues and Risks Inspection, Maintenance & Repair Case Study Conclusions and Recommendations 2 Introduction Subsea Pipeline IMR q Obtain data to assess the

More information

2009 S. Kenny, Ph.D., P.Eng. Lecture Goals. Historical Overview. Students will be able to: Lecture 18 Pipeline Installation

2009 S. Kenny, Ph.D., P.Eng. Lecture Goals. Historical Overview. Students will be able to: Lecture 18 Pipeline Installation Lecture 18 Pipeline Installation Shawn Kenny, Ph.D., P.Eng. Assistant Professor Faculty of Engineering and Applied Science Memorial University of Newfoundland spkenny@mun.ca Lecture Goals Students will

More information

A marginal field (re-)development using several alternative methodologies 1

A marginal field (re-)development using several alternative methodologies 1 Bart Heijermans Helix ESG Chief Operating Officer Company The Phoenix Update Project A marginal field (re-)development using several alternative methodologies 1 Our Mission Helix Producer I Helix Energy

More information

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015 Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general

More information

ENVIRONMENTAL IMPACT ASSESSMENTS RECEIVED FOR THE PERIOD ENDING August 31 st 2017

ENVIRONMENTAL IMPACT ASSESSMENTS RECEIVED FOR THE PERIOD ENDING August 31 st 2017 ENVIRONMENTAL IMPACT ASSESSMENTS RECEIVED FOR THE PERIOD ENDING August 31 st 2017 Click on the hyperlinked CEC# for more details No. CEC # 154 2824 / 2010 06-10-2010 Ministry of Works and Transport Consultants

More information

Getting to Grips with Deepwater Handling Operations

Getting to Grips with Deepwater Handling Operations Getting to Grips with Deepwater Handling Operations Mark Wood, Regional Manager SE Asia, First Subsea Ltd Agenda First Subsea Trends in Offshore Handling Deepwater Handling Challenges Ball and Taper Technology

More information

Subsea 7 Norway. Monica Th. Bjørkmann Sales and Marketing Director

Subsea 7 Norway. Monica Th. Bjørkmann Sales and Marketing Director Subsea 7 Norway 28.06.2012 Monica Th. Bjørkmann Sales and Marketing Director Agenda Subsea 7 Norway What We Do Our Assets Market Going Forward Closing 27-Jun- 12 Page 2 Our new beginning A combination

More information

Subsea Tooling Services UK Ltd Engineered Subsea Solutions

Subsea Tooling Services UK Ltd Engineered Subsea Solutions Subsea Tooling Services UK Ltd Engineered Subsea Solutions Who we are: Subsea Tooling Services - What We Do Dredgers Subsea Baskets Project Tooling HPU s Clump Weights Supplying our clients with advanced

More information

OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING

OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING Red Marine provides intelligent engineering solutions to global clients working in the oil & gas, nuclear and renewable energy industries. With a broad

More information

North East England: Offshore wind market opportunities

North East England: Offshore wind market opportunities North East England: Offshore wind market opportunities 1 UK overview The UK offshore wind programme is the largest in the world, and is expected to form around half of the European market in the next 10

More information

Renewable Energy / Oil & Gas Worldwide Track Record

Renewable Energy / Oil & Gas Worldwide Track Record Scope of Work Client Location Seabed Material Harbour Deepening & Clearance & RS2 Cable De burial & Post Trenching T Cable Post Trenching Cable De burial & Post Trenching T Cable De burial Out of Service

More information

Innovative marine & offshore solutions

Innovative marine & offshore solutions Innovative marine & offshore solutions Member of the DEME Group DEME: creating land for the future KNOWLEDGEABLE. EXPERIENCED. EQUIPPED. READY FOR ANY OFFSHORE CHALLENGE, ANYWHERE IN THE WORLD Safety and

More information

Oil & Gas Professional Recruitment Solutions

Oil & Gas Professional Recruitment Solutions Oil & Gas Professional Recruitment Solutions Quality means a lot for us, too! IMRA In Brief IMRA Group is an international group of Personnel Management, Recruitment & Staffing companies with over 20 years

More information

Risk Management of the First Deepwater Project in China Asia Offshore Energy Conference September 27, 2012

Risk Management of the First Deepwater Project in China Asia Offshore Energy Conference September 27, 2012 Risk Management of the First Deepwater Project in China Asia Offshore Energy Conference September 27, 2012 1 Advisories Forward-Looking Statements Certain statements in this presentation are forward-looking

More information

Dry trees for cost effective solution with the Wellhead Barge: WHB

Dry trees for cost effective solution with the Wellhead Barge: WHB Dry trees for cost effective solution with the Wellhead Barge: WHB Benjamin MAURIES SAIPEM PAU, FRANCE 5 7 APRIL 2016 Dry Tree Solution for Mild Environments Dry Tree solutions have been developed and

More information

The WindFloat Project. February 2010

The WindFloat Project. February 2010 February 2010 Why Offshore Wind? Why Offshore Wind? Higher wind resource and less turbulence Large ocean areas available Best spots in wind onshore are becoming scarce Offshore wind, including deep offshore,

More information

NURTURING OFFSHORE WIND MARKETS GOOD PRACTICES FOR INTERNATIONAL STANDARDISATION

NURTURING OFFSHORE WIND MARKETS GOOD PRACTICES FOR INTERNATIONAL STANDARDISATION NURTURING OFFSHORE WIND MARKETS GOOD PRACTICES FOR INTERNATIONAL STANDARDISATION Summary for POLICY MAKERS SUMMARY FOR POLICY MAKERS The fast pace of offshore wind development has resulted in remarkable

More information

Rexroth launches a new generation of hydraulic Active Heave Compensators

Rexroth launches a new generation of hydraulic Active Heave Compensators Reducing the Downtime of Offshore Operations to a Minimum Rexroth launches a new generation of hydraulic Active Heave Compensators The expression time is money is intensely relevant in the offshore, maritime

More information

SUBMARINE TECHNOLOGY COMPLETE CABLE SOLUTIONS FOR SUBSEA APPLICATIONS

SUBMARINE TECHNOLOGY COMPLETE CABLE SOLUTIONS FOR SUBSEA APPLICATIONS SUBMARINE TECHNOLOGY COMPLETE CABLE SOLUTIONS FOR SUBSEA APPLICATIONS FOCUS ON QHSE ABOUT NEXANS NORWAY Nexans focus on health and safety meets the most demanding requirements in the energy, and oil and

More information

Subsea Positioning In deep water

Subsea Positioning In deep water Subsea Positioning In deep water PETRONAS - PETRAD - INTSOK CCOP DEEPWATER SUBSEA TIE-BACK Damai Puri Resort & Spa, Kuching, Sarawak, MALAYSIA 24TH - 26TH January, 2011 Supplier to the oil & gas industry

More information

The Active Heave Compensation (AHC) system makes the raising, lowering and handling of loads on floating vessels much safer and easier.

The Active Heave Compensation (AHC) system makes the raising, lowering and handling of loads on floating vessels much safer and easier. Reducing the downtime of offshore operations to a minimum Rexroth hydraulic Active Heave Compensators The expression time is money is intensely relevant in the offshore, maritime and dredging sectors.

More information

Integrity Monitoring using AUVs

Integrity Monitoring using AUVs Integrity Monitoring using AUVs Andrew McMurtrie Business Development Manager NCS Survey Limited Subsea Europe, 27-28 October, in Paris Content Introduction to NCS Survey Low logistics, man-portable AUVs

More information

Offshore Trends Deep Pockets, Deepwater. Presented by: Mark Peters Group Publisher

Offshore Trends Deep Pockets, Deepwater. Presented by: Mark Peters Group Publisher Offshore Trends Deep Pockets, Deepwater Presented by: Mark Peters Group Publisher January 24, 2013 1 Factors Shaping Energy Expansion for the Next Decade: Peak Oil Climate Change Energy Nationalism Growth

More information

NSRI/ORE Subsea Technological Challenges in Offshore Wind

NSRI/ORE Subsea Technological Challenges in Offshore Wind NSRI/ORE Subsea Technological Challenges in Offshore Wind Programme Prime 4, Kingswells 4 th October 2016 Organised by 9:00 Registration 9:45 Welcome Gordon has been working in the Subsea sector since

More information

CONSOLIDATED KEY FIGURES 2015

CONSOLIDATED KEY FIGURES 2015 Marine Capability 8 BESIX GROUP IN 2015 CONSOLIDATED KEY FIGURES 2015 RETURN ON EQUITY 0.7% SOLVENCY RATIO 24.4% NET CASH POSITION 26.4 TOP-LINE GROWTH 8.0% in EUR million IN EUR MILLION 2010 2011 2012

More information

Prelude FLNG Project. DOT conference presentation. November Jaap de Vries, Prelude FLNG Project Director FINAL

Prelude FLNG Project. DOT conference presentation. November Jaap de Vries, Prelude FLNG Project Director FINAL Prelude FLNG Project DOT conference presentation Jaap de Vries, Prelude FLNG Project Director FINAL Copyright of Royal Dutch Shell plc 1 Prelude FLNG: the largest offshore floating facility ever The Prelude

More information

SUBMARINE TECHNOLOGY C OM PLETE CABLE S O L U T IO N S F OR SUBS EA APPLICA T IO N S

SUBMARINE TECHNOLOGY C OM PLETE CABLE S O L U T IO N S F OR SUBS EA APPLICA T IO N S SUBMARINE TECHNOLOGY C OM PLETE CABLE S O L U T IO N S F OR SUBS EA APPLICA T IO N S ABOUT NEXANS NORWAY Nexans Norway was established in 1915 and is a leading supplier of submarine cables and cabling

More information

Engineering and Procurement We are designing and purchasing everything we can firmly identify

Engineering and Procurement We are designing and purchasing everything we can firmly identify Tamar Field Development NPC PROJECT UPDATE 13 JUNE, 2010 1 Engineering and Procurement We are designing and purchasing everything we can firmly identify Offshore and Onshore FEED Studies Subsea FEED Engineering

More information

RENEWABLE ENERGY TECHNOLOGY ACCELERATOR (RETA) PROJECT

RENEWABLE ENERGY TECHNOLOGY ACCELERATOR (RETA) PROJECT RENEWABLE ENERGY TECHNOLOGY ACCELERATOR (RETA) PROJECT PROJECT FUNDED BY: PROJECT PARTNERS: RENEWABLE ENERGY TECHNOLOGY ACCELERATOR (RETA) Innovation in the supply chain is vital to the success of the

More information