1 Managing Free Spans on Dynamic Seabed Piotr Krawczyk, Halny Ltd, Romke Bijker, Witteveen+Bos/ACRB, Zhiwen Chen, BMT Argoss, Hans Boersma, BBL Company, 1. Abstract This paper presents the strategy adopted to manage scour induced free spans on the BBL pipeline. The discussion focuses on two subjects: predicting span evolution in time and quantifying the sheltering effect of the scour trenches. Both these subjects are only partly covered by the existing span analysis methods,whichoften leads to overly conservative results being obtained and unnecessary remediation work being undertaken. It is demonstrated here that taking into account the sheltering effect of scour trenches and the span evolution in time can result in considerably longer spans being acceptable. This reduces the need for offshore intervention work and, in some cases, it may eliminate it altogether. This work is based on field measurements of scour trenches and span evolution. While the discussion is presented in the context of the experience with the BBL pipeline, it is directly applicable to any offshore pipeline susceptible to scour and dynamic seabed conditions. Keywords: pipeline, free span, scour, VIV, fatigue, span evolution 2. Introduction Pipelines laid on erodible seabed are prone to develop long free spans. This is caused by two factors: seabed scour around the pipelineand/or global seabed evolution irrespective of the pipeline (i.e.: sand wave migration).both these phenomena are of particular concern in relatively shallow water applications, like the North Sea, where the combined loading by waves and currents may result inthe span being exposed to unacceptably high environmental loads. This paper considersintegrity management of the free spans caused by seabed scour. The discussion follows two parallel developments made for the BBL pipeline. The first one focuses on improving our understanding the sheltering effect of scour trenches. The second one focuses on developing analysis techniqueswhich would allow predicting spanevolution in time. When Page 1

2 combined, these two developments resulted in significantly reduced amount of offshore intervention work required to maintain the pipeline in an acceptablecondition. This work is driven by the experience with BBL pipeline since the start of its operation in the 2006, where: Spans identified during spring time surveys and concluded to be unacceptable in the as-found configuration had disappeared, or significantly reduced in length,by the time remediation works could be undertaken in autumn the same year.this suggests that standard acceptance criteria for scour induced free spans may lead to unnecessary remediation work being undertaken. Most scour trenches are observed as consistently more narrow than the scour trenches reported in the literature and being the basis for the standard assessment methods. Thus, a dedicated assessment has been undertaken to quantify the sheltering effect of narrow scour trenches. This paper describes the present status of the studies. Further development is on-going. 3. Past developments The process of seabed scour around pipelines has been extensively investigated over the last three decades. A valuable summary of these developments can be found in an overview paper by Sumer and Fredsoe, ref.[1], which attempts to summarise the various research directions. However, despite this extensive research effort, there is still little practical guidance available to the engineers managingscour induced spans. The DNV Recommended Practice F105, ref.[2], being the most comprehensive guideline for free span analysis, is clearly geared towards assessing the free spans in the as-found configuration and it remains silent on how to address span evolution in time. A nominal safety margin is recommended for scour induced spans (to cater for future span growth), but this is rather simplistic approach and it has been concluded to lead to unnecessary remediation work being undertaken. Furthermore, the sheltering effect of scour trenches is only partly included in the DNV-RP-F105 methodology. It is defined for cross-flow VIV and direct wave action, but it is missing entirely for in-line VIV, which tends to govern free span fatigue estimates. It will be shown here that the sheltering effect of scour trenches is also applicable to in-line VIV and that taking this effect into account can further reduce the requirement for span rectification. The work presented in ref.[4]introducesprobabilistic analysis techniques to determine the acceptability of scour induced spans developing as a result of pipeline self-lowering. This can be used to enhance to the default DNV-RP- Page 2

3 F105 methodology. However, it should be realised that the method relies on a number of important assumptions such as: (1) fatigue limit state is assumed to govern at all times and (2) it is assumed that the pipeline develops a large number of spans,all of which evolve rapidly and behave in a similar manner. These assumptions are generally appropriate for effectively self-lowering pipelines (pipelines self-lowering in relatively short time). However, it should not be assumed that all scour induced spans behave in this manner. Experience with the BBL project suggests that some of the most onerous scour induced spans behave in an entirely different manner, for which statistical analysis may not be the most appropriate approach. An alternative approach is therefore developed for these spans. 4. Sheltering Effect of Scour Trenches The sheltering effect of scour trenches is investigated here using an advanced Computational Fluid Dynamics (CFD) model presented inref.[6]. This model has been specifically developed to tackle large amplitude pipeline Vortex Induced Vibrations (VIV) near the seabed. This is achieved through the use of mesh-deformation and re-meshing techniques introduced in recent years in Ansys CFX software. Furthermore, the model allows for both, in-line (horizontal) and cross-flow (vertical) pipeline motion across the fluid domain. It is therefore capable of resolving pipe motions without the requirement for making any arbitrary assumptions with regards to the interaction between the two vibration modes, or the relationship between the hydrodynamic forces and the vibration amplitudes. All these interactions are automatically calculated from the first principles (i.e.: fluid mechanics and structural engineering principles are used to resolve fluid-structure interaction). Calibration results presented in ref. [6]suggest that the CFD model is capable of representing experimental results at the Reynolds number and the reduced velocity levels commonly encountered in offshore pipeline applications. Figure 1 shows a snap-shot of the CFD model. The pipeline can be seen located in a typical scour trench for the BBL pipeline (sheltering 50% of the pipe diameter and with a width of approximately two pipe diameters). The plot shows vortices being shed behind the pipeline in a steady flow simulation. These are the red and the blue oval patterns to the right hand side of the figure. As the flow is affected by the proximity of the seabed, the vortices are being shed in an alternating pattern, which results in a combined cross-flow and in-line VIV response at all times (there is no pure in-line VIV response stipulated by DNV-RP-F105 methodology). Page 3

4 Figure 1: CFD model typical vortex shedding in a steady flow from pipe sheltered by a narrow scour trench Figure 2 shows an example of the sheltering effect observed for the pipeline. Compared here are the motion patterns for the pipeline located over flat seabed and in a typical scour trench sheltering 50% of the pipe diameter (all other conditions remain the same). Pipeline located in the scour trench can be seen to experience significantly lower vibration amplitudes. It can also be noted that the motion pattern has changed considerably, from a flattened eight-shaped pattern over flat seabed to an oval vibration pattern in a scour trench. This sort of oval motion pattern has been consistently observed for all investigated trench depths and profiles. Figure 2: Pipeline motion patterns over flat seabed and in a scour trench Page 4

5 Figure 3 shows two of the scour trench profiles investigated for the BBL pipeline. Both trench profiles are a schematisation of the in-situ trench profiles recorded using Multi Beam Echo Sounding survey equipment.figure 3a shows a moderately deep, slightly asymmetric, scour trench profile sheltering 50% of the pipe diameter on the upstream side and approximately 60% of the pipe diameter on the downstream side. Figure 3b shows a deep scour trench, sheltering 65% of the pipe diameter. These two trench profiles are representative of some of the longest spans observed on the BBL pipeline, all of these spans are in the order of 50-60m long. Figure 3a Figure 3b Figure 3:Scour trench profiles Figure 4 and 5 show the response models generated based on the CFD simulations for the pipe in moderately deep scour trench (sheltering 50% of the pipe diameter). It can be noted that the cross-flow VIV response is fairly consistent with the DNV-RP-F105 predictions. However, the onset of in-line VIV is considerably delayed when compared to the predictions based on the Recommended Practice methodology. That is caused by the fact that DNV- RP-F105 methodology does not incorporate the sheltering effect of scour trenches for in-line VIV. This limitation is not explained in the Recommended Page 5

6 Practice. However, reviewing the background literature, ref.[3], it can be noted that the effect is missing simplybecause it has not been investigated at the time when therecommended Practice was published. Figure 4: In-Line VIV in scour trench sheltering 50% OD Figure 5: Cross-Flow VIV in scour trench sheltering 50% OD Page 6

7 Figure 6 and 7 show the response models generated based on the CFD simulations for the pipe in the deep scour trench (sheltering 65% of the pipe diameter). Here, the pure in-line VIV response is essentially non-existent. Appreciable VIV amplitudes are only observed for reduced velocities in excess of 3.5. Interestingly though, in-line VIV for higher flow velocities (V r >4.5) is notably higher than that predicted by DNV-RP-F105. This effect, associated with so-called cross-flow induced in-line VIV, has been consistently observed for all investigated scour trench profiles. Cross-flow VIV response is fairly consistent with DNV-RP-F105 predictions, albeit the amplitudes are lower. That is probably the result of BBL scour trenches being somewhat narrower than those investigated in ref.[3]. Figure 6: In-Line VIV in scour trench sheltering 65% OD Page 7

8 Figure 7: Cross-Flow VIV in scour trench sheltering 65% OD The above results suggest that fatigue predictions for scour induced free spans can improve considerably when taking into account the sheltering effect of scour trenches. This effect is not fully captured by the existing methods of analysis, which results in overly conservative results being obtained. BBL Company used advanced Computational Fluid Dynamics simulation techniques to quantify the sheltering effect of in-situ scour trenches observed during survey and to refine the DNV-RP-F105 span analysis method by introducing custom response models for scour induced free spans. The result of this improvement is illustrated in Table 1, where fatigue predictions are compared for the default DNV-RP-F105 response models and for the custom BBL response models. It can be noted that considerably longer spans can be tolerated when the trench effect is fully accounted for. Longer acceptable span lengths translate to less remedial work being required to maintain the pipeline in an acceptable condition. In some cases, entire clusters of spans have been demonstrated not to require any remediation at all. Page 8

9 Table 1: The effect of scour trench on span fatigue predictions Scenario Span over Span in a moderate scour Span in a deep scour flat seabed trench, sheltering 50% OD trench, sheltering 65% OD Response Model DNV-RP- DNV-RP- DNV-RP- BBL F105 F105 F105 BBL Span Length (L/D) Fatigue estimate for the free span horizontal direction (in-line VIV + Direct Wave Action) yr 6.1 yr 2,699 yr 6.1 yr 5,448 yr yr 0.6 yr 872 yr 0.6 yr 1,700 yr yr 0.1 yr 305 yr 0.1 yr 578 yr yr 0.0 yr 98 yr 0.0 yr 188 yr Span Length (L/D) Fatigue estimate for the free span vertical direction (cross-flow VIV) 46 7,175 yr 100,000+ yr 100,000+ yr 100,000+ yr 100,000+ yr yr 4,990 yr 89,919 yr 9,818 yr 100,000+ yr yr 347 yr 1,830 yr 654 yr 100,000+ yr yr 93 yr 124 yr 174 yr 13,562 yr The results presented in Table 1 are truncated at non-dimensional span lengthl/d = 59, as longer scour spans are not likely to occur. A span with L/D ratio of 59 is long enough to develop vertical sag of circa 0.8 pipe diameter.this is more than the scour trench depth (typically between 0.4 and 0.7 pipe diameter). The pipe can therefore be expected to touch the bottom of the scour trench and to self-remediate the span. As the pipeline would now be located in a very deep trench, sheltering circa 80% of the pipe diameter, it would no longer constitute an obstacle to the sea-water flow. The scouring process would therefore cease and natural backfilling of the trench would commence. 5. Span Evolution Acceptability of pipeline free spans is generally assessed using guidelines and tools, which are developed assuming stationary span configuration.such an approach is adequate for the spans caused by large, persistent seabed features (e.g.: glacier scars, boulders, or rocky outcrops), or in case of cohesive soils, which are generally less dynamic (i.e.: less susceptible to scour). For non-stationary spans ona dynamicseabed, however, the situation is very different, as the criticality of the free span is strongly linked to the persistence of the span and the prevailing environmental conditions. A realistic and reliable assessment must therefore account for:(1) the history of the span and (2) the predictions into its future development. Several studies have been carried out in the past on free span evolution, including Hansen et al (1991), Klomp et al (1995), Chen & Bijker (2001) and Page 9

10 Drago et al (2007), ref. [8], [9], [5] and [7] respectively. In these studies, free span evolution was modelled as an integral part of the pipeline self-lowering process. Model validation was generally carried out in terms of pipeline selflowering and no direct validation of the free span evolution was carried out. This was mainly due to the absence of reliable field data measurements on the evolution of the span lengths. As a result, there is still noreliable tool to actually predict free span development in time. This paper reports on the first results of an ongoing study to develop a tool for predicting span evolution in time. Thistoolis being developed on the basis of the formulations derived for self-lowering pipelines and isfurther upgraded with new formulations, to realistically account for pipe-soil interaction processes that have been observed in recent years of BBL pipeline span management. The following discussion gives an overview of the approach, the field data used for model validation and some preliminary results.the overall model structure is presented in Figure 8. Figure 8:Overall structure of the span evolution model Span celerity is calculated based on the following formulations, ref. [8] and [9]: C sn ( qcn q0n ) D (1 p) ed Page 10

11 C st q 0t D (1 p) ed Managing Free Spans on Dynamic Seabed where: C sn = span celerity due to sediment transport normal to pipeline (m/s) C st = span celerity due to sediment transport parallel to pipeline (m/s) q cn = sediment transport normal to pipeline in the corner of span (m 3 /ms) q 0n = sediment transport normal to pipeline upstream of pipeline (m 3 /ms) q 0t = sediment transport parallel to pipeline upstream of pipeline (m 3 /ms) p = porosity of seabed (-) D = pipe outer diameter (m) e = pipe embedment (m) β = coefficient for the length of span support area (-) This model was initially calibrated using experimentallaboratory data, ref. [9], and it is now refined using field measurement data for the BBL pipeline. The field data includes: (1) free span length measurements based on BBL pipeline surveys and (2) the wind and wave height measurements at the K13 platform. Free span development in time is established based on the comparison of the following surveys: the 2009spring time survey the 2010spring time survey the 2010autumn re-survey the 2011spring time survey the 2012spring time survey The wave data at the span locations are derived from the measurement data at the K13 platform. The measured winds and waves are transformed to the relevant pipeline locations using a dedicated hindcast model. Figure 9 shows typical wave height variations at a location along pipeline route where a free span of interest has been detected. The wave height distribution shown in Figure 9 is typical for the Southern North Sea, where storms with significant wave height of circa 6m are observed annually in winter time. Summer time is generally calmer, with the significant wave height rarely exceeding 3m. This wave climate dictates pipeline inspection/maintenance program, where the pipeline is surveyed in spring time, any detected free spans are assessed in summer time and remediated (if required) in autumn, before the winter storms could affect pipeline integrity. Page 11

12 Wave height Hs (m) Managing Free Spans on Dynamic Seabed Date Figure 9:Historical wave data at the span of interest The span evolution model is calibrated using the available field data for a few selected locations,where free spans of interest have been detected. These spans are typically characterized by moderate growth rates (in the order of a few meters per year). Thus, they are neither stagnant, nor fast evolving, as assumed in ref. [4]. A statistical approach to span evolution is therefore not justified and an alternative (deterministic) approach seems more appropriate. An example of calibration results for span evolution model is provided in Figure 10.The horizontal axis is the time, the blue curve shows significant wave height variation, the black rectangles show the span lengths observed during pipeline inspections and the red, dashed line shows the predications from the span evolution model. It can be noted that span growth is not uniform in time. The scour induced spans develop and grow rapidly during larger storms. During calm weather periods the spans tend to remain stagnant, or may even start backfilling. The backfilling process is not considered in current span evolution model, as this backfill material consists of very loose sand and is rapidly washed away during the next large storm. Thus, the span evolution model predicts a stagnant span in-between the storms. Page 12

13 Figure 10:Span evolution model calibration The calibration assessment presented above considered historical developments at the span. The same methodology can however be used to predict future behavior of the existing spans. This would normally consider the following two scenarios: Span development during typical winter storms, up to the next scheduled survey. Span development during an extreme, or design storm. Examples of such predictions are provided below. Span evolution for the typical winter conditions is predicted by assuming previous years environmental conditions. Span evolution during an extreme event is predicted by considering a 100-year design storm condition with a typical build-up time. Page 13

14 Figure 11:Predicted span growthassuming the 2011/2012 wave data Figure 12:Predicted span growthassuming the 100-year wave data Page 14

15 Assuming the same wave conditions as in previous years, the span evolution model predicts that the span will increase in length by approximately 7m. This is significant increment, yet the final span length is considered acceptable, due to the sheltering effect of scour trench. Considering extreme storm conditions, it can be noted that the span is expected to remain stagnant up to the point where the significant wave height would reach 4.5m. Beyond this threshold, rapid span growth is expected. It should be noted however that the span would self-remediate before the peak storm conditions could occur. This is motivated by the fact that an 80m long span would be long enough for the pipe to sag down into the scour trench and thus split the original span into two shorter ones. In fact, a 50-65m long span is already predicted to develop sufficient sag to facilitate self-remediation of scour induced spans. Thus longer spans are not expected. As mentioned before, the span evolution model is under development. The model still has the following limitations: The reliability of the model obviously depends on the reliability and accuracy of the survey data and the specialist interpretation. Uncertainties in the span data, in particular the support configuration, result in uncertainties in the span predictions. More detailed analysis of the field data is presently being performed. In addition discussions are being held with the specialists of the survey company to further improve the data quality of the free span surveys. The process is schematized and enhancements are presently being introduced. We already know form previous studies of actual self-lowered pipelines that the prediction of thebackfilling process needs improvement. From the available field data we also know that more work is required on the schematization of the seabed data, to incorporate the significant effects of compactness of sand and changes in cohesiveness due to small changes in the content of silt or clay. The model is not yet able to predict self-remediation of the spans. Additional function would need to be introduced to limit span length based on the structural span model predicting pipe deflection into the scour trench, and the scour trench depth prediction based on the storm conditions, the geotechnical data and the initial pipe embedment into the mean seabed. Further development and additional calibration of the model is therefore ongoing. Page 15

16 6. Conclusions and recommendations It is concluded that the sheltering effect of scour trenches is not sufficiently covered by the traditional span analysis methods. Taking this effect into account results in considerably longer free spans being acceptable. Thus, the requirement for remedial work at scour induced free spans can be reduced, or eliminated. The results presented in this paper confirm the observation presented in ref. [3], that the presence of a scour trench delays onset of pipeline VIV. At higher flow velocities the trench effect is less pronounced and large amplitude VIV may still be possible. Previous work on the sheltering effect of scour trenches, ref.[3], concluded that the trench effect is not sensitive to the scour trench profile. Recent work by BBL indicates that this may not always be the case. The sheltering effect of scour trench was observed to be sensitive to the trench width and profile. Further work is however required, to quantify this effect and to come up with a generalised guideline. Recent advances in modelling of turbulent flows allow for using Computational Fluid Dynamics approach to refine our understanding of VIV in general, and for studying the sheltering effect of scour trenches in particular. However, for the method to be fully accepted by the industry, it is recommended to perform further validation of the CFD predictions versus experiments. A Joint Industry Project will therefore be launched to obtain further confirmation of the CFD predictions and to come up with a generic guidance note which could be used for a wider range of pipeline applications. Limiting span lengths for pipelines are generally calculated assuming stationary free spans. This seems to be rather conservative for dynamic seabed conditions, where the criticality of free spans is strongly linked to the persistence of the spans and the prevailing environmental conditions. A realistic and reliable assessment must therefore account for (1) the history of the spans and (2) the predictions into their future development. A span evolution model is therefore being developed and the first version has successfully been calibrated for a number of free spans that have been monitored in detail for the last three years. Although limitations of the model are eminent, the predicted trend is in good agreement with the field data. Further work is on-going to enhance the reliability of the span evolution model. The new approach to managing scour induced free spanstakes into consideration the most important aspects of the erodible and dynamic seabed, being (1) the development of narrow scour trenches providing shelter to the pipeline, and (2) the erosion of free span supports and interaction with Page 16

17 dynamic bedforms. Both these aspects resulted in significant improvement of methods and models. They are combined and integrated in the free span management procedure for the BBL pipeline, which has already resulted in less remediation without jeopardising the integrity of the pipeline system. Present work is based on field measurements for the BBL pipeline. Similar approach could however be applied to any offshore pipeline susceptible to scour and dynamic seabed conditions. 7. References [1] A Review of Wave/Current-Induced Scour Around Pipelines; B.M. Sumer, J. Fredsoe; Coastal Engineering Proceedings, 1992, Chapter 217 [2] Free Spanning Pipelines, DNV-RP-F105, 2006 [3] Vibrations of a Free Spanning Pipeline Located in the Vicinity of a Trench; E.A. Hansen, M. Bryndum, K. Mork, R. Verley, L. Sortland, H. Nes; OMEA 2001, Paper No [4] A Strategy for Assessment of Non-Stationary Free Spans, K. Mork, O. Fyrileiv, H. Nes, L Sortland, Proceedings of the Ninth International Offshore and Polar Engineering Conference, 1999 [5] Interaction of Offshore Pipelines and Dynamic Seabed, Z. Chen, R. Bijker, International Association for Hydro-Environment Engineering and Research (IAHR) conference, Beijing, 2001 [6] Numerical Simulation of Pipeline VIV Near the Sea-Bed for Steady and Unsteady Currents; P. Bhattacharjee, K.K. Nielsen, G. Stewart;Proceedings of the ASME 28 th International Conference on Ocean, Offshore and Arctic Engineering; OMAE 2009 [7] Drago, M, M.Pigliapoco and T.Ciuffardi (2007), Analysis of Pipeline Fatigue Damage for Scour Induced Freespans, Proceedings of the Sixteenth (2007) International Offshore and Polar Engineering Conference Lisbon, Portugal, July 1-6, 2007 [8] Hansen E.A. Staub C. Fredsoe J. and Summer B.M. (1991) Time development of scour induced free spans of pipelines Proc. of Offshore Mechanics and Arctic Engineering Conference [9] Klomp,W.H.G., E. A. Hansen, Z. Chen, R. Bijker and M.B. Bryndum (1995), Pipeline Seabed Interaction, Free Span Development. ISOPE 1995 Page 17

Vibration Assessment of Complex Pipework

Vibration Assessment of Complex Pipework Vibration Assessment of Complex Pipework DNV GL Technology Week Aravind Nair 31 Oct 2016 1 SAFER, SMARTER, GREENER Overview Vibration Induced Fatigue- Sources, Consequence; State of the art-pipeline VIV

More information

Free-Spanning Pipelines in the Digital Age Nicholas Nielsen & Olivier Royet

Free-Spanning Pipelines in the Digital Age Nicholas Nielsen & Olivier Royet Free-Spanning Pipelines in the Digital Age Nicholas Nielsen & Olivier Royet 1 SAFER, SMARTER, GREENER 1 2 3 4 Context What are free spans? Current approach How do we estimate fatigue life? New science

More information

ASME V&V Authors: Marcus Gamino Samuel Abankwa Ricardo Silva Leonardo Chica Paul Yambao

ASME V&V Authors: Marcus Gamino Samuel Abankwa Ricardo Silva Leonardo Chica Paul Yambao Examining the Dampening Effect of Pipe-Soil Interaction at the Ends of a Subsea Pipeline Free Span Using Coupled Eulerian-Lagrangian Analysis and Computational Design of Experiments Authors: Marcus Gamino

More information

Technical Note: Analysis of Offshore Pipeline Allowable Free Span Length. Introduction

Technical Note: Analysis of Offshore Pipeline Allowable Free Span Length. Introduction Technical Note: Analysis of Offshore Pipeline Allowable Free Span ength Downloaded from ijce.iust.ac.ir at :3 IRST on Sunday January 3th 9 Abbas Yeganeh Bakhtiary, Abbas Ghaheri and Reza Valipour 3 Assitant

More information

3. Existing uncertainties

3. Existing uncertainties Fig. 1. Cumulative and annual offshore wind installations [1]. sector, some uncertainties have not been identified yet; these will be discussed in the paper with the aim of achieving an adequate and sustainable

More information

Beyond the Code - Subsea Cable Stability

Beyond the Code - Subsea Cable Stability Beyond the Code - Subsea Cable Stability All-Energy Conference, Aberdeen 2012 Chas Spradbery Outline Company Overview Why this presentation could save you Code limitations What actually happens Going Beyond

More information

18th World Conference on Non-destructive Testing, April 2012, Durban, South Africa

18th World Conference on Non-destructive Testing, April 2012, Durban, South Africa 18th World Conference on Non-destructive Testing, 16-20 April 20, Durban, South Africa Guided Wave Testing for touch point corrosion David ALLEYNE Guided Ultrasonics Ltd, London, UK; Phone: +44 2082329102;

More information

Rapid Deployment System. subsea pipelines

Rapid Deployment System. subsea pipelines Rapid Deployment System for monitoring i slugging in subsea pipelines Agenda Issue Design criteria Design process Operating principles Qualification strategy System description Future applications 2 Pulse

More information

FOUNDATION ISSUES: OFFSHORE WIND FARMS Indian Context

FOUNDATION ISSUES: OFFSHORE WIND FARMS Indian Context FOUNDATION ISSUES: OFFSHORE WIND FARMS Indian Context R.K. Ghanekar, Head - Geotechnical Section, INSTITUTE OF ENGINEERING AND OCEAN TECHNOLOGY (IEOT), ONGC, PANVEL, NAVI MUMBAI OFFSHORE WIND ENERGY IN

More information

RISK MANAGEMENT IN THE OPERATIONS OF A SUBSEA PIPELINE

RISK MANAGEMENT IN THE OPERATIONS OF A SUBSEA PIPELINE RISK MANAGEMENT IN THE OPERATIONS OF A SUBSEA PIPELINE Graham McIntosh Principal Subsea and Pipelines Engineer (2007 2009), iicorr Ltd, Aberdeen, UK This paper presents the Integrity Management (IM) of

More information

Monopile as Part of Aeroelastic Wind Turbine Simulation Code

Monopile as Part of Aeroelastic Wind Turbine Simulation Code Monopile as Part of Aeroelastic Wind Turbine Simulation Code Rune Rubak and Jørgen Thirstrup Petersen Siemens Wind Power A/S Borupvej 16 DK-7330 Brande Denmark Abstract The influence on wind turbine design

More information

WIND-INDUCED VIBRATION OF SLENDER STRUCTURES WITH TAPERED CIRCULAR CYLINDERS

WIND-INDUCED VIBRATION OF SLENDER STRUCTURES WITH TAPERED CIRCULAR CYLINDERS The Seventh Asia-Pacific Conference on Wind Engineering, November 8-2, 2009, Taipei, Taiwan WIND-INDUCED VIBRATION OF SLENDER STRUCTURES WITH TAPERED CIRCULAR CYLINDERS Delong Zuo Assistant Professor,

More information

TOP OF THE LINE CORROSION COMPARISON OF MODEL PREDICTIONS WITH FIELD DATA

TOP OF THE LINE CORROSION COMPARISON OF MODEL PREDICTIONS WITH FIELD DATA C2012-0001449 TOP OF THE LINE CORROSION COMPARISON OF MODEL PREDICTIONS WITH FIELD DATA Ussama Kaewpradap (1), Marc Singer, Srdjan Nesic Institute for Corrosion and Multiphase Technology Ohio University

More information

Closing the Collaboration Gap

Closing the Collaboration Gap Closing the Collaboration Gap Technology for Improved Offshore Piping and Structural Analysis Projects Bilal Shah MSc Structural Engineering (Hons) Software Development Manager, Piping Mark Upston B Mechanical

More information

System Inputs, Physical Modeling, and Time & Frequency Domains

System Inputs, Physical Modeling, and Time & Frequency Domains System Inputs, Physical Modeling, and Time & Frequency Domains There are three topics that require more discussion at this point of our study. They are: Classification of System Inputs, Physical Modeling,

More information

Determining Dimensional Capabilities From Short-Run Sample Casting Inspection

Determining Dimensional Capabilities From Short-Run Sample Casting Inspection Determining Dimensional Capabilities From Short-Run Sample Casting Inspection A.A. Karve M.J. Chandra R.C. Voigt Pennsylvania State University University Park, Pennsylvania ABSTRACT A method for determining

More information

VIBRATIONAL TESTING OF A FULL-SCALE PILE GROUP IN SOFT CLAY

VIBRATIONAL TESTING OF A FULL-SCALE PILE GROUP IN SOFT CLAY VIBRATIONAL TESTING OF A FULL-SCALE PILE GROUP IN SOFT CLAY Marvin W HALLING 1, Kevin C WOMACK 2, Ikhsan MUHAMMAD 3 And Kyle M ROLLINS 4 SUMMARY A 3 x 3 pile group and pile cap were constructed in a soft

More information

DEVELOPMENT OF A STRUCTURAL SYSTEM RELIABILITY FRAMEWORK FOR OFFSHORE PLATFORMS

DEVELOPMENT OF A STRUCTURAL SYSTEM RELIABILITY FRAMEWORK FOR OFFSHORE PLATFORMS JIP: Structural reliability analysis framework for fixed offshore platforms DEVELOPMENT OF A STRUCTURAL SYSTEM RELIABILITY FRAMEWORK FOR OFFSHORE PLATFORMS May 1998 Document No. JHA003 University of Surrey,

More information

NUMERICAL STUDY ON MIXED CONVECTION AND THERMAL STREAKING IN POWER TRANSFORMER WINDINGS

NUMERICAL STUDY ON MIXED CONVECTION AND THERMAL STREAKING IN POWER TRANSFORMER WINDINGS NUMERICAL STUDY ON MIXED CONVECTION AND THERMAL STREAKING IN POWER TRANSFORMER WINDINGS Abstract E. J. Kranenborg 1, C. O. Olsson 1, B. R. Samuelsson 1, L-Å. Lundin 2, R. M. Missing 2 1 ABB Corporate Research,

More information

JIP OSCAR - Project Plan

JIP OSCAR - Project Plan JIP OSCAR - Project Plan Joint Industry Project: Offshore SCour Assessment and Remedial Measures Executive summary Scour around jack-up footings is a known phenomenon. However, no distinct guidelines are

More information

RELIABILITY OF GUIDED WAVE ULTRASONIC TESTING. Dr. Mark EVANS and Dr. Thomas VOGT Guided Ultrasonics Ltd. Nottingham, UK

RELIABILITY OF GUIDED WAVE ULTRASONIC TESTING. Dr. Mark EVANS and Dr. Thomas VOGT Guided Ultrasonics Ltd. Nottingham, UK RELIABILITY OF GUIDED WAVE ULTRASONIC TESTING Dr. Mark EVANS and Dr. Thomas VOGT Guided Ultrasonics Ltd. Nottingham, UK The Guided wave testing method (GW) is increasingly being used worldwide to test

More information

Deepwater design challenges

Deepwater design challenges Phillip Cooper, INTECSEA, UK, shows us how advanced numerical simulations are unravelling deepwater design challenges. Deepwater design challenges As oil and gas developments move into extreme water depths

More information

Outlines. Attenuation due to Atmospheric Gases Rain attenuation Depolarization Scintillations Effect. Introduction

Outlines. Attenuation due to Atmospheric Gases Rain attenuation Depolarization Scintillations Effect. Introduction PROPAGATION EFFECTS Outlines 2 Introduction Attenuation due to Atmospheric Gases Rain attenuation Depolarization Scintillations Effect 27-Nov-16 Networks and Communication Department Loss statistics encountered

More information

Int. J. of Marine Engineering Innovation and Research, Vol. 1(1), Dec (ISSN: ) 1. Dwi Priyanta 1, Anang Abdullah 2

Int. J. of Marine Engineering Innovation and Research, Vol. 1(1), Dec (ISSN: ) 1. Dwi Priyanta 1, Anang Abdullah 2 Int. J. of Marine Engineering Innovation and Research, Vol. 1(1), Dec. 2016. 1-5 (ISSN: 2541-5972) 1 Analysis of the Suppression Device as Vortex Induced Vibration (VIV) Reducer on Free Span using Finite

More information

ICCP Retrofit Challenges for an Offshore Jacket Complex

ICCP Retrofit Challenges for an Offshore Jacket Complex Paper No. 6012 ICCP Retrofit Challenges for an Offshore Jacket Complex Christophe Baeté, CP Manager Elsyca n.v. Vaartdijk 3/603, 3018 Wijgmaal, Belgium christophe.baete@elsyca.com ABSTRACT An offshore

More information

JOHANN CATTY CETIM, 52 Avenue Félix Louat, Senlis Cedex, France. What is the effect of operating conditions on the result of the testing?

JOHANN CATTY CETIM, 52 Avenue Félix Louat, Senlis Cedex, France. What is the effect of operating conditions on the result of the testing? ACOUSTIC EMISSION TESTING - DEFINING A NEW STANDARD OF ACOUSTIC EMISSION TESTING FOR PRESSURE VESSELS Part 2: Performance analysis of different configurations of real case testing and recommendations for

More information

Slug Flow Loadings on Offshore Pipelines Integrity

Slug Flow Loadings on Offshore Pipelines Integrity Subsea Asia 2016 Slug Flow Loadings on Offshore Pipelines Integrity Associate Professor Loh Wai Lam Centre for Offshore Research & Engineering (CORE) Centre for Offshore Research and Engineering Faculty

More information

by Tim Baker & Keith O Sullivan

by Tim Baker & Keith O Sullivan Tidal Energy Converter - Phase 2 establishing the pathway to an optimised low cost architecture to deliver long-term commercial viability from tidal energy by Tim Baker & Keith O Sullivan S tudies have

More information

Performance of UT Creeping Waves in Crack Sizing

Performance of UT Creeping Waves in Crack Sizing 17th World Conference on Nondestructive Testing, 25-28 Oct 2008, Shanghai, China Performance of UT Creeping Waves in Crack Sizing Michele Carboni, Michele Sangirardi Department of Mechanical Engineering,

More information

Study on Subsea Petroleum Pipeline Design in Deepwater

Study on Subsea Petroleum Pipeline Design in Deepwater Study on Subsea Petroleum Pipeline Design in Deepwater Abd Khair Junaidi, a and Jaswar Koto, a,b,* a) Department of Aeronautics, Automotive and Ocean Engineering, Mechanical Engineering, Universiti Teknologi

More information

Acoustic Emission Linear Location Cluster Analysis on Seam Welded Hot Reheat Piping

Acoustic Emission Linear Location Cluster Analysis on Seam Welded Hot Reheat Piping Acoustic Emission Linear Location Cluster Analysis on Seam Welded Hot Reheat Piping The EPRI Guidelines for acoustic emission (AE) inspection of seamed hot reheat piping were published in November 1995.

More information

2009 S. Kenny, Ph.D., P.Eng. Lecture Goals. Historical Overview. Students will be able to: Lecture 18 Pipeline Installation

2009 S. Kenny, Ph.D., P.Eng. Lecture Goals. Historical Overview. Students will be able to: Lecture 18 Pipeline Installation Lecture 18 Pipeline Installation Shawn Kenny, Ph.D., P.Eng. Assistant Professor Faculty of Engineering and Applied Science Memorial University of Newfoundland spkenny@mun.ca Lecture Goals Students will

More information

Seabed and wind farm interaction. A Research Program. B. Mutlu Sumer DTU Mekanik

Seabed and wind farm interaction. A Research Program. B. Mutlu Sumer DTU Mekanik Seabed and wind farm interaction. A Research Program B. Mutlu Sumer DTU Mekanik Will tell you about a current research program on Interaction between seabed and offshore wind farms Start off with A small

More information

Questions and Answers

Questions and Answers EKS Technology Development Program EKR-DT Process Process Optimisation Program COSIA Presentation Questions and Answers May 30, 2017 This document addresses some of outstanding questions that are related

More information

System Coupling 14.0 Twoway FSI with ANSYS FLUENT and ANSYS Mechanical

System Coupling 14.0 Twoway FSI with ANSYS FLUENT and ANSYS Mechanical System Coupling 14.0 Twoway FSI with ANSYS FLUENT and ANSYS Mechanical ANSYS Regional Conference 1 Fluid-Structure Interaction Applications Floating thin film Wind Turbine Mitral valve 2 Fluid-structure

More information

SeaGen S 2MW Anglesey Skerries

SeaGen S 2MW Anglesey Skerries Presenter Phil Wilkinson SeaGen S 2MW Foundations @ Anglesey Skerries Answers for energy. Introduction Page 2 Introduction Phil Wilkinson 20 years experience in offshore marine construction, large diameter

More information

ACCURACY OF PREDICTION METHODS FOR SOUND REDUCTION OF CIRCULAR AND SLIT-SHAPED APERTURES

ACCURACY OF PREDICTION METHODS FOR SOUND REDUCTION OF CIRCULAR AND SLIT-SHAPED APERTURES ACCURACY OF PREDICTION METHODS FOR SOUND REDUCTION OF CIRCULAR AND SLIT-SHAPED APERTURES Daniel Griffin Marshall Day Acoustics Pty Ltd, Melbourne, Australia email: dgriffin@marshallday.com Sound leakage

More information

Into Deepwater and Back Again: New Challenges for Current Profile Characterisation

Into Deepwater and Back Again: New Challenges for Current Profile Characterisation Into Deepwater and Back Again: New Challenges for Current Profile Characterisation Dr Gus Jeans Oceanalysis Ltd Into Deepwater and Back Again New Challenges for Current Profile Characterisation A key input

More information

Analysis of the noise and vibration in the pipe near PIG Launcher

Analysis of the noise and vibration in the pipe near PIG Launcher Analysis of the noise and vibration in the pipe near PIG Launcher JaePil Koh Research & Development Division, Korea Gas Corporation, Il-dong 1248, Suin-Ro, Sangnok-Gu, Ansan-City 425-790, Korea, jpkoh@kogas.or.kr

More information

Life Cycle Management of Station Equipment & Apparatus Interest Group (LCMSEA) Getting Started with an Asset Management Program (Continued)

Life Cycle Management of Station Equipment & Apparatus Interest Group (LCMSEA) Getting Started with an Asset Management Program (Continued) Life Cycle Management of Station Equipment & Apparatus Interest Group (LCMSEA) Getting Started with an Asset Management Program (Continued) Projects sorted and classified as: 1. Overarching AM Program

More information

Fact File 57 Fire Detection & Alarms

Fact File 57 Fire Detection & Alarms Fact File 57 Fire Detection & Alarms Report on tests conducted to demonstrate the effectiveness of visual alarm devices (VAD) installed in different conditions Report on tests conducted to demonstrate

More information

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced

More information

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants OFFSHORE SPECIALIST ENGINEERING SERVICES ZEE Engineering Consultants With experienced engineers, with advanced knowledge in FEA modeling and backed by state of the art software, ZEE Engineering Consultants

More information

Effect of Pile Bending Stiffness on Static Lateral Behavior of a Short Monopile in Dry Sand

Effect of Pile Bending Stiffness on Static Lateral Behavior of a Short Monopile in Dry Sand INTERNATIONAL JOURNAL OF COASTAL & OFFSHORE ENGINEERING JCOE No. 5/ Winter 217 (25-32) Effect of Pile Bending Stiffness on Static Lateral Behavior of a Short Monopile in Dry Sand Saeed Darvishi Alamouti

More information

DNV GL s 16 th Technology Week

DNV GL s 16 th Technology Week OIL & GAS DNV GL s 16 th Technology Week Advanced Simulation for Offshore Application 1 SAFER, SMARTER, GREENER AGENDA Time Topic Instructor 09:00 Welcome Aravind Nair 09:15 1 Erosion and Corrosion for

More information

Horizontal propagation deep turbulence test bed

Horizontal propagation deep turbulence test bed Horizontal propagation deep turbulence test bed Melissa Corley 1, Freddie Santiago, Ty Martinez, Brij N. Agrawal 1 1 Naval Postgraduate School, Monterey, California Naval Research Laboratory, Remote Sensing

More information

Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications

Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications Smitha G, Mahesh Bhat GE Oil & Gas, Bangalore Abstract: In deep-sea oil fields, metal seals play an important role to facilitate

More information

Experimental study on moonpool resonance of offshore floating structure

Experimental study on moonpool resonance of offshore floating structure csnak, 2013 Int. J. Naval Archit. Ocean Eng. (2013) 5:313~323 http://dx.doi.org/10.2478/ijnaoe-2013-0135 Experimental study on moonpool resonance of offshore floating structure Seung-Ho Yang 1,2 and Sun-Hong

More information

New Multi-Technology In-Line Inspection Tool For The Quantitative Wall Thickness Measurement Of Gas Pipelines

New Multi-Technology In-Line Inspection Tool For The Quantitative Wall Thickness Measurement Of Gas Pipelines New Multi-Technology In-Line Inspection Tool For The Quantitative Wall Thickness Measurement Of Gas Pipelines A. Barbian 1, M. Beller 1, F. Niese 2, N. Thielager 1, H. Willems 1 1 NDT Systems & Services

More information

ASSESSING THE EFFECTS OF DROPPED OBJECTS ON SUBSEA PIPELINES AND STRUCTURES

ASSESSING THE EFFECTS OF DROPPED OBJECTS ON SUBSEA PIPELINES AND STRUCTURES Proceedings of Conference ASME International Offshore Pipeline Forum October -4, 007, Houston, Texas USA ASSESSING THE EFFECTS OF DROPPED OBJECTS ON SUBSEA PIPELINES AND STRUCTURES Chris Alexander Stress

More information

Acoustic Filter Copyright Ultrasonic Noise Acoustic Filters

Acoustic Filter Copyright Ultrasonic Noise Acoustic Filters OVERVIEW Ultrasonic Noise Acoustic Filters JAMES E. GALLAGHER, P.E. Savant Measurement Corporation Kingwood, TX USA The increasing use of Multi-path ultrasonic meters for natural gas applications has lead

More information

Characterization of Train-Track Interactions based on Axle Box Acceleration Measurements for Normal Track and Turnout Passages

Characterization of Train-Track Interactions based on Axle Box Acceleration Measurements for Normal Track and Turnout Passages Porto, Portugal, 30 June - 2 July 2014 A. Cunha, E. Caetano, P. Ribeiro, G. Müller (eds.) ISSN: 2311-9020; ISBN: 978-972-752-165-4 Characterization of Train-Track Interactions based on Axle Box Acceleration

More information

Pipeline Design & Installation Systems

Pipeline Design & Installation Systems Pipeline Design & Installation Systems Rigid pipeline subsea tie-backs new operational challenges Paul Georgeson Operations Support Manager Wood Group Kenny Agenda - Overview - Materials - Inspection -

More information

SImulation of MONopile installation - JIP SIMON

SImulation of MONopile installation - JIP SIMON SImulation of MONopile installation - JIP SIMON Ahmed Elkadi Deltares 14 February 2019 MOTIVATION Vanbeekimages.com 14 februari 2019 Matchmaking Day 2019 2 Global substructure statistics/trends 2016 Offshore

More information

Late life management of onshore and offshore pipelines

Late life management of onshore and offshore pipelines Late life management of onshore and offshore pipelines By Nathan Baranello SUT Engineering Solutions for Mature Subsea & Pipeline Assets, July 2016 Introduction Australia s first oil & gas boom: 1960 s

More information

Comparing Guided Auger Boring Techniques under Challenging Conditions

Comparing Guided Auger Boring Techniques under Challenging Conditions North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 TM1-T4-02 Comparing Guided Auger Boring Techniques under Challenging Conditions Matthew

More information

Generic noise criterion curves for sensitive equipment

Generic noise criterion curves for sensitive equipment Generic noise criterion curves for sensitive equipment M. L Gendreau Colin Gordon & Associates, P. O. Box 39, San Bruno, CA 966, USA michael.gendreau@colingordon.com Electron beam-based instruments are

More information

Emerging Subsea Networks

Emerging Subsea Networks FIBRE-TO-PLATFORM CONNECTIVITY, WORKING IN THE 500m ZONE Andrew Lloyd (Global Marine Systems Limited) Email: andrew.lloyd@globalmarinesystems.com Global Marine Systems Ltd, New Saxon House, 1 Winsford

More information

Scaled Laboratory Experiments of Shallow Water Acoustic Propagation

Scaled Laboratory Experiments of Shallow Water Acoustic Propagation Scaled Laboratory Experiments of Shallow Water Acoustic Propagation Panagiotis Papadakis, Michael Taroudakis FORTH/IACM, P.O.Box 1527, 711 10 Heraklion, Crete, Greece e-mail: taroud@iacm.forth.gr Patrick

More information

Mitigation and Control of Wellhead Fatigue

Mitigation and Control of Wellhead Fatigue Mitigation and Control of Wellhead Fatigue Workshop Geotechnical Input to Well Integrity Assessment BP Helios Plaza Building (Houston ) 29 April 2016 Kim Mittendorf Kim.Mittendorf@vulcanoffshore.com Overview

More information

The spatial structure of an acoustic wave propagating through a layer with high sound speed gradient

The spatial structure of an acoustic wave propagating through a layer with high sound speed gradient The spatial structure of an acoustic wave propagating through a layer with high sound speed gradient Alex ZINOVIEV 1 ; David W. BARTEL 2 1,2 Defence Science and Technology Organisation, Australia ABSTRACT

More information

General Consideration about Current Distribution and Potential Attenuation Based on Storage Tank Bottom Modeling Study

General Consideration about Current Distribution and Potential Attenuation Based on Storage Tank Bottom Modeling Study C2012-0001155 General Consideration about Current Distribution and Potential Attenuation Based on Storage Tank Bottom Modeling Study Jean Vittonato TOTAL E&P CONGO Pointe Noire Republic of Congo Jean.vittonato@total.com

More information

AGN 008 Vibration DESCRIPTION. Cummins Generator Technologies manufacture ac generators (alternators) to ensure compliance with BS 5000, Part 3.

AGN 008 Vibration DESCRIPTION. Cummins Generator Technologies manufacture ac generators (alternators) to ensure compliance with BS 5000, Part 3. Application Guidance Notes: Technical Information from Cummins Generator Technologies AGN 008 Vibration DESCRIPTION Cummins Generator Technologies manufacture ac generators (alternators) to ensure compliance

More information

PCB Trace Impedance: Impact of Localized PCB Copper Density

PCB Trace Impedance: Impact of Localized PCB Copper Density PCB Trace Impedance: Impact of Localized PCB Copper Density Gary A. Brist, Jeff Krieger, Dan Willis Intel Corp Hillsboro, OR Abstract Trace impedances are specified and controlled on PCBs as their nominal

More information

The impact of the parabolic dish concentrator on the wind induced heat loss from its receiver

The impact of the parabolic dish concentrator on the wind induced heat loss from its receiver The impact of the parabolic dish concentrator on the wind induced heat loss from its receiver M. Uzair 1, 2, T.N. Anderson 1, and R.J. Nates 1 1 School of Engineering, Auckland University of Technology,

More information

Solution of Pipeline Vibration Problems By New Field-Measurement Technique

Solution of Pipeline Vibration Problems By New Field-Measurement Technique Purdue University Purdue e-pubs International Compressor Engineering Conference School of Mechanical Engineering 1974 Solution of Pipeline Vibration Problems By New Field-Measurement Technique Michael

More information

The Treadmill Speeds Up.

The Treadmill Speeds Up. The Treadmill Speeds Up. March 7, 2016 Brian Hamm 1. Notes and Disclaimers 2. Recent History of Canadian Upstream Production 3. Historical Decline Rates How Fast was the Treadmill Spinning? 4. Forecasting

More information

Geophysical Survey Rock Hill Bleachery TBA Site Rock Hill, South Carolina EP-W EPA, START 3, Region 4 TABLE OF CONTENTS Section Page Signature

Geophysical Survey Rock Hill Bleachery TBA Site Rock Hill, South Carolina EP-W EPA, START 3, Region 4 TABLE OF CONTENTS Section Page Signature Geophysical Survey Rock Hill Bleachery TBA Site Rock Hill, South Carolina EP-W-05-054 EPA, START 3, Region 4 Prepared for: Tetra Tech EM, Inc. October 12, 2012 Geophysical Survey Rock Hill Bleachery TBA

More information

Pre- and Post Ringing Of Impulse Response

Pre- and Post Ringing Of Impulse Response Pre- and Post Ringing Of Impulse Response Source: http://zone.ni.com/reference/en-xx/help/373398b-01/svaconcepts/svtimemask/ Time (Temporal) Masking.Simultaneous masking describes the effect when the masked

More information

Broadband Temporal Coherence Results From the June 2003 Panama City Coherence Experiments

Broadband Temporal Coherence Results From the June 2003 Panama City Coherence Experiments Broadband Temporal Coherence Results From the June 2003 Panama City Coherence Experiments H. Chandler*, E. Kennedy*, R. Meredith*, R. Goodman**, S. Stanic* *Code 7184, Naval Research Laboratory Stennis

More information

A CAS Forum Activity Report Looking at Hair Tension as a Design Parameter for Violin Bows

A CAS Forum Activity Report Looking at Hair Tension as a Design Parameter for Violin Bows A CAS Forum Activity Report Looking at Hair Tension as a Design Parameter for Violin Bows JOSEPH REGH 36 Sherwood Heights, Wappingers Falls, NY 12590 reghj@aol.com Friday, November 2, 2007, 3:15 pm Joseph

More information

NALYSIS OF STABILIZING SLOPES USING VERTICAL PILES

NALYSIS OF STABILIZING SLOPES USING VERTICAL PILES NALYSIS OF STABILIZING SLOPES USING VERTICAL PILES Mahmoud S. Abdelbaki: Lecturer, Gehan E. Abdelrahman: Lecturer, Youssef G. Youssef :Assis.Lecturer, Civil Eng. Dep., Faculty of Eng., Cairo University,

More information

Investigations of spray painting processes using an airless spray gun

Investigations of spray painting processes using an airless spray gun ILASS Europe 2011, 24th European Conference on Liquid Atomization and Spray Systems, Estoril, Portugal, September 2011 Investigations of spray painting processes using an airless spray gun Q. Ye 1, B.

More information

Statistical analysis of nonlinearly propagating acoustic noise in a tube

Statistical analysis of nonlinearly propagating acoustic noise in a tube Statistical analysis of nonlinearly propagating acoustic noise in a tube Michael B. Muhlestein and Kent L. Gee Brigham Young University, Provo, Utah 84602 Acoustic fields radiated from intense, turbulent

More information

RECOMMENDATION ITU-R F *

RECOMMENDATION ITU-R F * Rec. ITU-R F.699-6 1 RECOMMENATION ITU-R F.699-6 * Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from

More information

CND INCORPORATED Massillon, OH

CND INCORPORATED Massillon, OH Report on Vibratory Stress Relief Prepared by Bruce B. Klauba Product Group Manager CND INCORPORATED Massillon, OH 9500 HP FAN HOUSINGS Large distortion during separation of 9500 HP Fan Housing halves

More information

Amplitudes Variation of GPR Rebar Reflection Due to the Influence of Concrete Aggregate Scattering

Amplitudes Variation of GPR Rebar Reflection Due to the Influence of Concrete Aggregate Scattering More Info at Open Access Database www.ndt.net/?id=18402 Amplitudes Variation of GPR Rebar Reflection Due to the Influence of Concrete Aggregate Scattering Thomas KIND Federal Institute for Materials Research

More information

SPECTRAL HOLE BURNING EFFECTS AND SYSTEM ENGINEERING RULES FOR SYSTEM UPGRADES

SPECTRAL HOLE BURNING EFFECTS AND SYSTEM ENGINEERING RULES FOR SYSTEM UPGRADES SPECTRAL HOLE BURNING EFFECTS AND SYSTEM ENGINEERING RULES FOR SYSTEM UPGRADES Richard Oberland, Steve Desbruslais, Joerg Schwartz, Steve Webb, Stuart Barnes richard@azea.net Steve Desbruslais, Joerg Schwartz,

More information

Integrity testing of a very large number of piles

Integrity testing of a very large number of piles Integrity testing of a very large number of piles Klingmueller, O. & Mayer, C. GSP mbh, Mannheim Germany Keywords: low- strain integrity testing, classification system, coring, wave velocity ABSTRACT:

More information

Learn more at

Learn more at Deepwater Riser System Challenges and Issues David Walters 2H Offshore Presentation Objectives Review riser system options Update on current industry status Highlight key issues Discuss current industry

More information

Available online at ScienceDirect. Procedia Engineering 114 (2015 )

Available online at   ScienceDirect. Procedia Engineering 114 (2015 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 114 (2015 ) 385 392 1st International Conference on Structural Integrity Faceted monopile design suitable for mass production

More information

ENGI 8673 Subsea Pipeline Engineering Lecture 03

ENGI 8673 Subsea Pipeline Engineering Lecture 03 Shawn Kenny Ph D P Eng ENGI 8673 Subsea Pipeline Engineering Lecture 03: Pipeline Route Selection Assistant Professor Faculty of Engineering and Applied Sc ence Memorial University of Newfoundland spkenny@mun

More information

Ultrasonic Phased Array Crack Detection Update

Ultrasonic Phased Array Crack Detection Update Ultrasonic Phased Array Crack Detection Update By A. Hugger, D. Allen, I. Lachtchouk, P. Senf (GE Oil & Gas, PII Pipeline Solutions) and S. Falter (GE Inspection Technology Systems) 1 Abstract This paper

More information

Advancement simulation of parallel tunnels and their interchange with two other subway lines using a new FEM approach, a case study

Advancement simulation of parallel tunnels and their interchange with two other subway lines using a new FEM approach, a case study Geotechnics for Sustainable Development - Geotec Hanoi 0, Phung (edt). Construction Publisher. ISBN 978-60-8-00-8 Advancement simulation of parallel tunnels and their interchange with two other subway

More information

Detecting and Preventing Instabilities in Plasma Processes

Detecting and Preventing Instabilities in Plasma Processes Detecting and Preventing Instabilities in Plasma Processes D.C. Carter and V.L. Brouk, Advanced Energy Industries, Inc., Fort Collins, CO ABSTRACT RF driven plasmas commonly used in enhanced CVD deposition

More information

The Impact of Very High Frequency Surface Reverberation on Coherent Acoustic Propagation and Modeling

The Impact of Very High Frequency Surface Reverberation on Coherent Acoustic Propagation and Modeling DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. The Impact of Very High Frequency Surface Reverberation on Coherent Acoustic Propagation and Modeling Grant B. Deane Marine

More information

19 th INTERNATIONAL CONGRESS ON ACOUSTICS MADRID, 2-7 SEPTEMBER 2007

19 th INTERNATIONAL CONGRESS ON ACOUSTICS MADRID, 2-7 SEPTEMBER 2007 19 th INTERNATIONAL CONGRESS ON ACOUSTICS MADRID, 2-7 SEPTEMBER 2007 MODELING SPECTRAL AND TEMPORAL MASKING IN THE HUMAN AUDITORY SYSTEM PACS: 43.66.Ba, 43.66.Dc Dau, Torsten; Jepsen, Morten L.; Ewert,

More information

LC Resonant Circuits Dr. Roger King June Introduction

LC Resonant Circuits Dr. Roger King June Introduction LC Resonant Circuits Dr. Roger King June 01 Introduction Second-order systems are important in a wide range of applications including transformerless impedance-matching networks, frequency-selective networks,

More information

Loss prophet. Predicting stray losses in power transformers and optimization of tank shielding using FEM

Loss prophet. Predicting stray losses in power transformers and optimization of tank shielding using FEM Loss prophet Predicting stray losses in power transformers and optimization of tank shielding using FEM JANUSZ DUC, BERTRAND POULIN, MIGUEL AGUIRRE, PEDRO GUTIERREZ Optimization of tank shielding is a

More information

Experimental investigation of crack in aluminum cantilever beam using vibration monitoring technique

Experimental investigation of crack in aluminum cantilever beam using vibration monitoring technique International Journal of Computational Engineering Research Vol, 04 Issue, 4 Experimental investigation of crack in aluminum cantilever beam using vibration monitoring technique 1, Akhilesh Kumar, & 2,

More information

UNDERSTANDING THE IMPORTANCE OF PUNCH LENGTH AND CUP DEPTH

UNDERSTANDING THE IMPORTANCE OF PUNCH LENGTH AND CUP DEPTH WHITEPAPER UNDERSTANDING THE IMPORTANCE OF PUNCH LENGTH AND CUP DEPTH { Manufacturing tablets to a uniform hardness, weight, and thickness requires tablet press punches of consistent length. We will describe

More information

7. Consider the following common offset gather collected with GPR.

7. Consider the following common offset gather collected with GPR. Questions: GPR 1. Which of the following statements is incorrect when considering skin depth in GPR a. Skin depth is the distance at which the signal amplitude has decreased by a factor of 1/e b. Skin

More information

PRIMARY LOOP ACOUSTIC EMISSION PROCEDURE: AN UPGRADED METHOD AND ITS CONSEQUENCES ON THE IN-SERVICE-INSPECTION

PRIMARY LOOP ACOUSTIC EMISSION PROCEDURE: AN UPGRADED METHOD AND ITS CONSEQUENCES ON THE IN-SERVICE-INSPECTION PRIMARY LOOP ACOUSTIC EMISSION PROCEDURE: AN UPGRADED METHOD AND ITS CONSEQUENCES ON THE IN-SERVICE-INSPECTION Laurent Truchetti, Yann Forestier, Marc Beaumont EDF CEIDRE, EDF Nuclear Engineering Division;

More information

Rec. ITU-R P RECOMMENDATION ITU-R P *

Rec. ITU-R P RECOMMENDATION ITU-R P * Rec. ITU-R P.682-1 1 RECOMMENDATION ITU-R P.682-1 * PROPAGATION DATA REQUIRED FOR THE DESIGN OF EARTH-SPACE AERONAUTICAL MOBILE TELECOMMUNICATION SYSTEMS (Question ITU-R 207/3) Rec. 682-1 (1990-1992) The

More information

4.0 MECHANICAL TESTS. 4.2 Structural tests of cedar shingles

4.0 MECHANICAL TESTS. 4.2 Structural tests of cedar shingles 4.0 MECHANICAL TESTS 4.1 Basis for the test methodology The essence of deterioration is that while it may be caused by insects, weather, fungi or bacteria, the decay is not identical. Further, no two physical

More information

Score grid for SBO projects with a societal finality version January 2018

Score grid for SBO projects with a societal finality version January 2018 Score grid for SBO projects with a societal finality version January 2018 Scientific dimension (S) Scientific dimension S S1.1 Scientific added value relative to the international state of the art and

More information

Dependence of Predicted Dewatering on Size of Hydraulic Stress Used for Groundwater Model Calibration

Dependence of Predicted Dewatering on Size of Hydraulic Stress Used for Groundwater Model Calibration Proceedings of Mine Water Solutions 2018 June 12 15, 2018, Vancouver, Canada Published by the University of British Columbia, 2018 Dependence of Predicted Dewatering on Size of Hydraulic Stress Used for

More information

Integrating ocean modelling to R&D projects in marine technology: future perspectives for the O&G Industry

Integrating ocean modelling to R&D projects in marine technology: future perspectives for the O&G Industry Integrating ocean modelling to R&D projects in marine technology: future perspectives for the O&G Industry Rafael Schiller, PhD Department of Offshore Hydrodynamics MARINTEK do Brasil Norsk Marinteknisk

More information

Evaluation Methodology on Vibration Serviceability of Bridge by using Non-Contact Vibration Measurement Method

Evaluation Methodology on Vibration Serviceability of Bridge by using Non-Contact Vibration Measurement Method Evaluation Methodology on Vibration Serviceability of Bridge by using Non-Contact Vibration Measurement Method Ki-Tae Park 1, Hyun-Seop Shin 2 1 Korea Institute of Construction Technology 2311, Daehwa-Dong,

More information

Using Critical Zone Inspection and Response Monitoring To Prove Riser Condition. M Cerkovnik -2H Offshore

Using Critical Zone Inspection and Response Monitoring To Prove Riser Condition. M Cerkovnik -2H Offshore Using Critical Zone Inspection and Response Monitoring To Prove Riser Condition M Cerkovnik -2H Offshore Agenda 1. Introduction 2. High level methodology 3. Verifying condition 4. Defining requirements

More information