GENERAL INSTALLATION GUIDE: WARRANTY: PRODUCT INFORMATION T F

Similar documents
INSTALLATION GUIDE. 5" Balustrade System

Installation of Balustrade Systems

Balustrade Systems / Installation Instructions

Balustrades & Columns

KNEEWALL APPLICATION

INSTALLATION SUGGESTIONS LEVEL APPLICATION LIMITED WARRANTY

Balustrade System Installation - Cambridge & Huntington

PATRIOT DOCKS ASSEMBLY INSTRUCTIONS

FENCE INSTALLATION GUIDE 8 HIGH WALLS

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

ASSEMBLY INSTRUCTIONS

ALUMA-VENT AWNING REGULAR END STYLE INSTALLATION INSTRUCTIONS

300C6 CONTINUOUS HINGE SEMI-FRAMELESS DOOR KIT

The Balustrade Collection

Desk/Wall-Mount Rack

Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS

FENCE INSTALLATION GUIDE 6 HIGH FENCE

738 SERIES PIVOT SHOWER DOOR

Single-Sliding Header Mount INSTALLATION INSTRUCTIONS

Installing AZEK Evolutions Rail

PVC Column Wraps - Semi-Assembled INSTALLATION INSTRUCTIONS

Chapter 17 - Porch Trim

Install Instructions. NewAge Steel Welded Tall Locker

A Step-by-Step How To Guide

ASSEMBLY INSTRUCTIONS

2.0. Select Rail & Stair Kit Assembly and Installation Instructions BOM V2 5/13. Owner's Manual. Version

Need a little help installing your railing?

ALUMINUM FENCE. Additional freight charges may apply depending on order size. Please call for quote at

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

340 & 350 SERIES BATH ENCLOSURES

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

Oxford Stalls Installation Instructions

ASSEMBLY INSTRUCTIONS FOR HAULER II UNIVERSAL CAMPER SERIES RACKS

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

PREPARATION & TOOL CHECK LIST

Full Height Ladder Safety Gate

Continuous Handrail Kit Installation Instructions

Installation Instructions. Tools Needed. Tape measure. Level. Shovel or Post hole digger. Concrete. Drill. Stakes. Mallet or hammer.

TURBOTWISTER ASSEMBLY AND INSTALLATION INSTRUCTIONS

Models 2130 and 2140

Sonoma Outdoor Kitchen Pergola. Assembly Instructions

ProLine PL80 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

Sea Doo Spark Engine Access Kit

12, 14 & 16 Wide Enclosure Assembly Guide

LC200DS1 Double Stud Articulating Wall Mount for Flat Panel Screens up to 32" with up to 200mm x 200mm VESA Mounting Patterns

Loading Dock Safety Gate

ETCHING PRESS MANUAL

BASE & WALL CABINET SETUP GUIDE BY SUNSTONE

340 & 350 SERIES DELUXE FRAMELESS BYPASS

Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set

890 SERIES PIVOT STEAM DOOR

Models 2030 and 2040

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Flex Trim Flexible Mouldings

ASSEMBLY INSTRUCTIONS FOR HAULER II SERVICE BODY A RACK

Models 2130 and 2140

CUTTING THE PIPE: BLUE DUCT Pipe can be easily cut using a Circular Saw or Reciprocal Saw. Trim all edges as necessary.

Owner s Manual ODYSSEY BENCH MODEL. O4100B shown REV E. Southern Avenue, Phoenix, AZ USA Workhorseproducts.

00108/00110 INSTRUCTION MANUAL

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

PORCH-LOC INSTALLATION INSTRUCTIONS

ProLine PL60 - PL70 - PL80 RETURN PANEL SUPPLEMENT

Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set #

M ACS Instructions

Plans. Easy-to-Build Full-size Deluxe Murphy Bed Plan. For more plans, tools and hardware visit rockler.com

Installation and Assembly: Articulating Swivel Arm for 37" - 60" Flat Panel Displays

Balishutters. INSTALLATION guide FOR L-FRAME MOUNT INSTALL OPTIONS B OR C

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

ASSEMBLY INSTRUCTIONS

FXL-168 FIXED RACK ASSEMBLY INSTRUCTIONS SALES ORDER #

RESIDENTIAL GARAGE DOOR INSTALLATION INSTRUCTIONS UNITED

Salter Industries Spiral Stair

Installation Manual Roof Zone Ladder Rack

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant)

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

FENDER FLARE. KIT CONTAINS Qty Part Description Qty Part Description

VersaRail Gate Kit. freedomproduct.com. To register your product, please visit: INSTALLATION INSTRUCTIONS

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS

Assembly Instructions

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TYPES ACVS 6" & WIDER CEILING JOINT COVER SYSTEMS

Models 2230 and 2240

VAN STORAGE SOLUTIONS FOR THE WAY YOU WORK

ATLANTIS RAIL Contact Information

RITE-HITE RAINGUARD TM

ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT.

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

Modular XP Ramp Assembly Manual

ALL SEASON PATIO COVER

PROTECT HOME & FAMILY LOCK IT UP WITH OUR ADVANCED PET DOOR SECURITY COVER INSTALLING YOUR NEW WATCHDOG SECURITY PET DOOR COVER TOOLS NEEDED

INSTALLATION INSTRUCTIONS FOR BALCO, INC. NBR SERIES EXPANSION JOINT COVER SYSTEMS

DRIVEWAY SERIES D554 D560

10x10 Trellis Pergola

Lodge II Pergola. Manual and Installation Instructions. Please read these instructions before removing parts from crate

Installation Instructions/Operation and Maintenance Manual. PS DOORS Contact Information. Website psdoors.com

Rockwell 4-in-1 Sliding Door

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

CABINETRY Assembly Instructions

Transcription:

GENERAL INSTALLATION GUIDE: Unless otherwise indicated, all Seven Oaks M.U. Architectural Products materials are to be used for decorative purposes only. All products must be installed using ample amount of urethane-based adhesives such as PL Premium and non-corrosive mechanical fasteners. All products are supplied with a factory applied primer coat. Any exposed surfaces that do not have these coatings (such as cut or sanded surfaces) must be primed and painted immediately before applying the final finish coatings on site. All products can be patched and repaired using a high-quality, exterior, non-shrinking wood patch compound or regular Bondo. After patching the damaged area, sand the patch smooth, prime and paint. Broken pieces can be re-attached using urethane-based adhesive. All products must be acclimatized for a minimum of 24 hours prior to installation. ALL INSTALLATION PROCEDURES LISTED IN THIS CATALOG ARE TO BE USED AS GUIDELINES ONLY! SEVEN OAKS MOLDED URETHANE, LLC ASSUMES NO LIABILITY FOR ANY DAMAGES, INCLUDING BUT NOT LIMITED TO PERSONAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES RESULTING FROM THE USE OR INSTALLATION OF ITS PRODUCTS. WARRANTY: SOMU, LLC Limited Lifetime Warranty, warrants to the original purchaser, it s HDP material will be free from defects in material and workmanship for as long as the original purchaser resides in the home that the product was installed, when the polyurethane is installed, finish painted, and used under recommended conditions and instructions. SOMU, LLC also warrants to the original purchaser, for a period of one (1) year from the date of purchase, it s exterior primer paint applied to the polyurethane, will be free from blistering and peeling, when used, installed, and finish painted under recommended conditions and instructions. The Balustrades and Columns are warranted for a period of five (5) years from the date of purchase. The original purchaser and their Installer(s) must inspect every piece prior to installation and mark any damages on the freight ticket at time of delivery. Both parties must waive all defects which could have been discovered by reasonable inspection prior to installation. Warranty will automatically be void if a SOMU, LLC approved adhesive is not used. Failure to follow SOMU, LLC storage and handling instructions will void this warranty. In the event that a claim is made under this warranty and conditions have been met, the Original Purchaser must notify SOMU, LLC in writing within thirty (5) days of making the discovery. SOMU, LLC reserves the right to inspect the defective product on site, or request that the original purchaser at their expense, return the defective product to the SOMU, LLC factory for inspection. SOMU, LLC will then determine if the product failed, and whether or not it will repair, replace, or refund said defective parts. SOMU, LLC shall have no liability to any person, firm, or corporation whatsoever for incidental or consequential damages such as, but not limited to, labor, finishing, parts damaged in transit, freight charges, installation, lost profits, lost sales, acts of nature, civil unrest, or acts of terrorism. No purchaser may take any deduction or credits against any amount owed to SOMU, LLC, or make any charge back with regards to a warranty claim. This limited warranty is exclusive, and made in lieu of all other express warranties, whether written, oral, or implied (including any warranty of merchantability or fitness for purpose), and extends only to the original purchaser s purchase. PRODUCT INFORMATION 37

ARCHITECTURAL SPECIFICATIONS 1.0 GENERAL 1.1 DESCRIPTION A. SOMU high-density polyurethane ( HDP ) products are pressure molded polyurethane to achieve a density similar to white pine B. HDP Products shall be factory primed with exterior latex primer to receive exterior latex top-coat on jobsite. ARCHITECTURAL SPECIFICATIONS 2.0 PRODUCTS 3.0 EXECUTION 1.2 SUBMITTALS A. Product data: Submit manufacturer s descriptive literature, specifications, installation instructions and warranty. B. Shop drawings: Submit full-size details and method of installation. C. Samples: Provide samples of standard design or profile of custom design (custom designs submitals only available in form of CAD) 2.1 ACCEPTABLE MANUFARCTURER A. Seven Oaks Molded Urethane, LLC PO Box 4045 Wheaton, IL 60189-4045 T. 888-319-7477 F. 877-509-7495 www.somuhdp.com 3.1 INSTALLATION A. Follow manufacturer's detailed installation procedures, available to download on the website, or call 888-319-7477 3.2 WARRANTY A. Our High Density Polyurethane products have a limited warranty on the product. For in depth warranty information please send an email to sales@somuhdp.com 38

Step 1: Using Existing or Alternate Attachment Supports for your Railing System 1.1 If existing or alternate supports, newel posts, porch posts, etc. will be used for attaching a Seven Oaks Molded Urethane railing system, please install them according to the manufacturer s specifications, and skip to Step 3. Step 2: Positioning Seven Oaks Molded Urethane Newel Posts 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Temporarily place the Newel Posts in the proper locations on your substrate, or measure the O/S dimensions of your posts. Draw (or trace) these measurements in the proper locations on your substrate. Make sure these markings are straight and square. Carefully and accurately, measure the distance(s) between each newel post(s). These measurements will be used to cut your rails to the appropriate lengths. Remove the newel posts revealing the markings on your substrate. Determine the center point of each newel post on your substrate by drawing intersecting diagonal lines from each corner of your marked newel post locations. Concrete Substrate: If your substrate is not concrete, skip to 2.7. 2.6.1 Drill a 7/8 diameter hole 2 1/4 deep at this center point. 2.6.2 Using a hammer, insert the concrete anchor and tap flush with the substrate surface. 2.6.3 Continue with Step 3. Wood and Composite Substrate: 2.7.1 Locate the round anchor plate with a center-mounted nut. 2.7.2 Center this plate on your centerline newel post markings and mark the location of the four bolt holes. 2.7.3 Remove the plate and drill four small 3/16 pilot holes at these locations. 2.7.4 Replace the round metal anchor plate and bolt it to the substrate using four (4) 5/16 x 3 lag bolts. Step 3: Securing Angle Brackets to Supporting Posts 3.1 3.2 3.3 3.4 3.5 3.6 3.7 Determine the placement of your top and bottom rails. You will need: 3.1.1 Height of Baluster (not including pipe) 3.1.2 Height of Bottom Rail 3.1.3 Distance between bottom rail and substrate 3.1.4 Four (4) Aluminum L-brackets 3.1.5 Eight (8) 1/4 Hex Head bolts 3.1.6 Eight (8) 1/4 Lock washers 3.1.7 Eight (8) 1/4 Hex Head nuts The position of the top L-bracket will be at the height of the sum of the three measurements above (3.1.1 + 3.1.2 + 3.1.3). The top of the lower L-bracket should be positioned below the bottom rail that you measured in 3.1.2. Center and mark the position of the aluminum L-brackets (3.1.4) on the face of the newel (or other support) post (Normal fastening methods mount the L-brackets to the underside of the rails). 1/2 WIDTH OF NEWEL POST PRE-DRILL 1/4"Ø HOLE (X2) CENTERED ON NEWEL POST TYP TOP RAIL AND BOTTOM RAIL HEX NUT TYP X2 EACH ANGLE LOCK WASHER TYP X2 EACH ANGLE SPAN FROM CHART OVER-ALL SPAN Mark the hole locations of the brackets (use the non-tapered holes) on the face of the newel (or other support post. Remove the brackets and drill four (4) 1/4 holes into the newel post and through the internal pipe (other support structures may require alternate attachment hardware and fastening techniques). Secure the brackets to the Seven Oaks Molded Urethane newel posts using the 1/4 bolts (3.1.5), washers (3.1.6) and nuts (3.1.7). SPAN FROM CHART OVER-ALL SPAN NEWEL POST WIDTH 1/4" HEX HEAD BOLT X2 EACH ANGLE 39

4: Preparing the Rails 4.1 4.2 4.3 4.4 Lay out your rails and determine how they will be assembled with the proper surfaces facing up and down according to the Seven Oaks Molded Urethane product drawings. Determine how many balusters will be required for each span by dividing the total rail length by the On-Center (O/C) spacing measurement found in the catalog for each baluster. Round UP if your measurement is not an even number. The O/C measurement is the MAXIMUM distance between the center-point of each baluster that guarantees that your finished railing will comply with the national 4 ball rule. If you DID NOT have to round up, skip to Step 5. If you DID round up, you have to re-calculate your O/C measurement. Take the total length of your span and divide it by the number of balusters that you calculated (after you rounded up). This is the O/C spacing that you will use for each baluster placement. Step 5: Pre-drilling and Baluster Placement 5.1 5.2 5.3 5.4 Where do you drill the first baluster hole? Use the O/C measurement you calculated from Step 4, and divide it in half. Use this measurement as your starting point from the end of the rail (it should calculate to be the same as the space left after your last baluster at the opposite end of the rail). Using a pencil, mark these spacing points along the UNDERSIDE of the top rail and the TOP of the bottom rail along the centerline. Be VERY CAREFUL to mark exactly the same locations on both rails so that the balusters sit perfectly vertical after assembly. Double-check your measurements and baluster quantities. Check the Seven Oaks Urethane product drawings to determine the diameter of the pipe extending from each end of the baluster. Bore out a hole of the corresponding diameter to a depth of 1 1/2 also penetrating the internal pipe inside the rails. Remove any excess product from the holes. Step 6: Attaching the Balusters to the Rails 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 Use Seven Oaks Molded Urethane s polyurethane based adhesive PL-Premium or approved equal (and optional mechanical fasteners) for this assembly process. Check the length of all of the balusters. Some sanding or trimming may be required in order to make sure the balusters are all consistent. Apply a generous bead of adhesive to all contact surfaces such that it will spread across the entire contact surface. Place these balusters into your pre-drilled holes on the bottom rail first and ensure that they are turned straight and aligned. Line up the balusters to your pre-drilled holes in your top rail and drop it in place. Use a rubber mallet to tap the top rail down ensuring a tight fit. Toe-nail the balusters in place to prevent the balusters from turning while the adhesive sets up. Use multiple cargo or ratchet straps to clamp the railing system together during this adhesive drying time. Follow the adhesive manufacturers recommended curing time and clean up procedures. Remove excess adhesive as soon as possible (before it has set up). This will make the finishing process much easier. After the adhesive has set up, sand and patch any irregularities using an exterior, non-shrinking spackle, Bondo or equivalent wood filler. TOP RAIL APPLY ADHESIVE BALUSTER APPLY ADHESIVE BOTTOM RAIL Note: This diagram is showing only a segment of railing and is for display purposes only. 40

PRE-DRILL UNDERSIDE OF TOP RAIL AND UNDERSIDE OF BOTTOM RAIL USING 3/16"Ø DRILL BIT TO 1/2" DEPTH Step 7: Attach railing sections to the Newel Posts 7.1 Attach the top and bottom rails to the newel post brackets that you installed in Step 3 using the screws provided with your rail hardware kit. Step 8: Secure completed railing system onto substrate 8.1 8.2 8.3 8.4 Set your railing system into place over the previously marked newel post locations and mounting hardware from Step 2. Insert the 1/2 threaded rod though the center of the newel posts and into the substrate anchors that were installed in Step 2. Thread the rod firmly into these substrate anchors. Slide the top Tie Down bracket over the threaded rod and position the bracket into the pre-cut newel post grooves so that the top of the bracket is flush with the top of the newel post. Secure this attachment with the 1/2 lock washer and nut. Using a hacksaw, mark and remove any excess threaded rod that may extend past the top of the newel post. Step 9: Support Blocks 9.1 In order to ensure the stability and integrity of the balustrade system, support blocks should be placed under the bottom rail for any span that exceeds 48. Anchor these support blocks using adhesive on all contact surfaces and Toe-Nail screws. Step 10: Decorative Balls and Caps 10.1 10.2 10.3 10.4 Locate and test-fit the caps and/or ball tops that you have chosen to complete the top of your newel posts. Apply adhesive to all contact surfaces between the newel post and cap/ball top. Center the cap on the post, and use screws to secure the cap until the adhesive has cured. Patch, sand and prime all areas of your balustrade system where installation marks or holes have been made. Bottom Mounting Plate Tie Down Bracket Substrate 2 1/2" SELF TAPPING SCREW X2 EACH BRACKET Newel Post Concrete Substrate Concrete Anchor Your balustrade system is now ready for finishing. All Seven Oaks Urethane products are supplied with a white double primed coating, ready for customer applied finish topcoat. High quality latex or oil based paints should be used. 41