WWRC, Inc W. 7th Clovis, NM (575) Fax (575) SIERRA MIDDLE SCHOOL ADDITION & RENOVATIONS ROSWELL INDEPENDENT SCHOOL DIST.

Similar documents
ADDENDUM #2 September 12, 2018

Commercial Infill Project Guide

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM:

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

ADDENDUM TO RFP DOCUMENTS

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.

TO WHOM IT MAY CONCERN:

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC

Cabinet Planning Guide

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

Facility Services Subgroup Preface for Divisions 21` through 28

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

City of Thousand Oaks

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

FUTURE PARKING (5) LEGEND PROPERTY LIMIT CURB & GUTTER EASEMENT BUILDING RETAINING WALL WETLAND LIMITS TREELINE SAWCUT LINE SIGN PIPE BOLLARD NUMBER O

Residential Construction Checklist Single and Two Family Construction

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

Lincoln County Tax Appraisal Office Project No. RFB

State College Area School District

Residential Room Addition / Remodel Submittal Requirement Checklist

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

S T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1" = 10' - 0" SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

BUILDING PLAN REVIEW REQUIREMENTS

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1

Emmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

RENOVATION OF THE FARMERS MARKET Reference Number:

Bid No. B14-02 Building 100 HVAC Improvements

Bidding Trades shall bring this Addendum to the attention of all sub-trades and suppliers from whom they may be receiving quotations.

OCPS Submittal Register for Product Data and Shop Drawing Reviews

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

Marcus Moziah Garvey Elementary School

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

BUILDING DEPARTMENT CURRENT

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

Continuing Education Credit

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Wendell Smith Elementary School

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641

SECTION PROJECT COORDINATION VIA BIM

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

SECTION PROJECT MANAGEMENT AND COORDINATION

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Everett McKinley Dirksen Elementary School

Tri-County Commercial Application Checklist

UTSA Facilities Condition Assessment. Out Brief August XX, 2009

CS2.0 COVER SHEET VOL. 2

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

Board Members Present: Bettina M. Martin (Chair), Raymond E. Carlton, Norine H. Clarke, James L. Desjardins. of Meeting)

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE

PLAN SUBMITTAL REQUIREMENTS

Kevin O'Connor Design Kevin O'Connor CKD, CBD, CID

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Signs, Canopies & Awnings City of Oshkosh Department of Community Development

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

CAPITAL IMPROVEMENT PROGRAM

Architecture, Construction, and Engineering Technical Charter

James Shields Middle School 2611 W 48th St Chicago, IL 60632

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

Lorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647

INFORMATION FOR OBTAINING A BUILDING PERMIT

Measure I Bond Program Schedule: Additional Options for Consideration

Residential Room Additions

Andrew Carnegie Elementary School

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Transcription:

WWRC, Inc. 1716 W. 7th Clovis, NM 88101 (575)769-2618 Fax (575)742-3209 November 10, 2008 SIERRA MIDDLE SCHOOL ADDITION & RENOVATIONS ROSWELL INDEPENDENT SCHOOL DIST. MEETING MINUTES DATE OF MEETING: Tuesday November 4, 2008 In Attendance: James Dunn; J&G Electric Michael A. Green; Van Winkle Roofing, Inc. Scott Hays; WWRC, Inc. Stanley Morris; WWRC, Inc. Joe Baca; RISD Jeff Bishop; RISD Abel Natividad; Studio-D Architects by phone Josie Turner; Sierra Middle School Principal Tyler Drakulich; Armstrong Const. John King; PSFA David Eldridge; RISD Items Discussed: 1. RFI #48 was discussed concerning the existing fence East of the football field. The existing fence does not cover the entire east side of the lot as shown on the drawings. Also, David Eldridge believed that the 40 gates to be installed on the East side needed to be installed on the West side by the new parking lot so that the Portable Bldgs could be moved out. Joe Baca requested that an MCR be submitted to take care of the missing fence and to add an additional 40 gate to the West Side near the parking lot. 2. Stanley informed the Josie that the Fire Sprinkler contractor would be disarming the Fire Sprinkler system during the day to perform their work. The system would be up and running by the end of the day. This could happen throughout the project. 3. Joe Baca stated that the new bleachers for the football field were scheduled to be installed and requested that the Contractor relocate the construction fence approx. 40 to the west.

4. James Dunn stated that the new electrical panels have been energized so the Contractor could inform all crew members to be careful working around the panels. With the panels energized this has activated the operation of the parking lot lights in the new parking lot. THREE WEEK LOOK AHEAD: 1. Rough in of Duct work Phase 1 & North Area Phase 2 2. Close in Phase 1 Addition 3. Begin installation of interior Drywall Phase 1 and North Area Phase 2 4. Roofing Phase 1 Addition 5. Installation of Fencing 6. Installation of drywall work in both Phase 1 and North Area Phase 2 7. Installation of ceramic tile 8. Installation of stucco on new addtion B: Items Pending: 1. (19) (SEE PRIOR MINUTES FOR COMPLETE INFO.) (JOE BACA DIRECTED ABEL TO HAVE JASON VERIFY THE TERMINATION PROCEEDURES SHOULD KEERS PRICING BE CONSIDERABLY LOWER THAT GWC. JOE ALSO STATED THAT HE DID NOT RECEIVE SQFT LAYOUT FROM STUDIO D. ABEL STATED THAT IS WAS SENT OUT LAST WEDNESDAY BUT HE WOULD RESEND.) (JOE BACA STATRED THAT EVERYTHING HAS BEEN PROVIDED TO KEERS FOR PRICING. SCOTT STATED THAT THE NEW SCOPE HAS BEEN PROVIDED TO GWC FOR REPRICING ALSO.) (MCR #28 WAS SUBMITTED FOR THE ADDITIONAL COST OF REMOVING THE LATH & PLASTER. JOE BACA STATED THAT THE QUOTE FROM KEERS WAS WELL BELOW THIS COST AND REQUESTED THAT THE CONTRACTOR REVISE MCR#28 TO CANCEL GWC S CONTRACT.) (JOE BACA STATED THAT THE REVISED PRICING WAS RECEIVED FROM KEERS AND HE DID NOT BELIEVE IT WAS A LOW ENOUGH TO WARRANT CANCELLING THE EXISTING CONTRACT. HE STATED THAT THIS WAS SUBMITTED TO THE ARCH. FOR THEIR REVIEW. SCOTT STATED THAT HE WOULD SUPPLY THE CREDIT TO CANCEL THE ABATEMENT WORK FROM THE CONTRACT FOR THE ARCH. TO REVIEW ALONG WITH KEERS QUOTE.) 2. (13) (SEE PRIOR MEETING MINUTES FOR COMPLETE INFO.) (TYLER PRESENTED A NEW RFI CONSERNING GRADES ON THE NEW BUSLANE (RFI#38). HE WILL NEED THIS RFI ANSWERED PRIOR TO COMPLETING THE NEW BUS LANE WHICH HE WOULD LIKE HIS CREWS TO BEGIN TOMMORROW.) (ABEL STATED THAT HE WOULD REVIEW RFI#38 AFTER THE MEETING AND ADISE TYLER OF THE NEW GRADES. SCOTT STATED THAT RFI#40 WAS SUBMITTED QUESTIONING THE XCEL ENERGY LIGHT POLE THAT IS IN THE WAY

OF ONE OF THE EXITS. JOE STATED THAT HE HAS CONTACTED XCEL AND INSTRUCTED THEM TO REMOVE THE POLE. TYLER STATED THAT IF XCEL COULD DISCONNECT THE LINES ARMSTRONG WOULD REMOVE THE POLE. DISCUSSION WAS ALSO MADE CONCERNING THE TEMPORARY BUS AND PARENT DROP OFFS. DISCUSSED POSSIBLE REROUTING OF THE BUS ROUTES. JOE AND JOSIE STATED THAT THEY WOULD MONITOR THE SITUATION.) (TYLER STATED THAT THE PAVING FOR THE PARENT DROPOFF IS TO BE COMPLETE BY FRIDAY. JOE DIRECTED TO REMOVE THE SMALL ISLAND FOR THE CANOPY IN THIS AREA PER RFI#46. REQUESTED A CREDIT FOR THE DELETION OF THIS WORK.) (JOSIE STATED THAT THERE WAS STILL HEAVY MACHINERY IN OPERATION DURING THE AFTERNOON DISMISSAL OF CLASSES. TYLER STATED THAT HE WOULD INFORM HIS CREW TO STOP ALL OPERTION OF HEAVY MACHINERY BETWEEN 3:00PM AND 3:30PM.) 3. (5)Scott stated that he would be submitting an RFI concerning range hoods that are shown on the architectural drawings stating see mechanical and are not shown on the mechanical drawings. (RFI#29 AND RFI#30 WERE SUBMITTED.) (AWAITING INFO FROM THE ARCH. ABEL REQUESTED INFO ON THE FUME HOOD FOR THE SCIENCE CLASSROOM.) (AWAITING INFORMATION TO PRICE AN MCR FOR RFI#29 FOR THE RANGE HOODS AND NEED TO KNOW MORE INFORMATION CONCERNING THE EXHAUST FAN AND POSSIBLY AN EXHAUST VALVE FOR THE FUME HOOD.) (STILL AWAITING INFORMATION. STANLEY STATED THAT THE ROOFING WORK ON THIS AREA IS COMPLETE.) 4. (5)Josie Turner issued concerns that she was under the impression that this contract included the addition of electrical outlets to the existing classrooms. Joe stated that the Design contract included this request. Abel stated that he would review the documents and advise. (IT WAS DETERMINED THAT AN MCR WOULD NEED TO BE PRODUCED TO INSTALL ADDITIONAL OUTLETS IN THE EXISTING CLASSROOMS. ABEL WAS GOING TO HAVE HIS ENGINEERS PROVIDE A LAYOUT FOR THE ADDITIONAL OUTLETS AND PANEL BOXES IF REQUIRED.) (AFTER MUCH DISCUSSION, JAMES DUNN SUGGESTED THAT THE SCHOOL DIST. PROVIDE INFORM THE ARCH EXACTLY WHAT IS REQUIRED FOR THE EXISTING CLASSROOM. ONCE A LAYOUT FOR EACH ROOM IS PROVIDED HIS OFFICE COULD PRICE THE REQUIRED PROPOSAL. MCR#16 DELT WITH CLASSROOM A102. THE CLASSROOMS WOULD PROBABLY RESEMBLE THIS WORK.) (JAMES DUNN STATED THAT HE WOULD PROVIDE THE SCHOOL DISTRICT A BALLPARK NUMBER PRIOR TO THE ENGINEER PROVIDING A DESIGN.) (JAMES PROVIDED JOE BACA A BALLPARK FIGURE PRIOR TO THE MEETING. JOE DIRECTED THE ARCH. TO PROCEED WITH ADDITIONAL DESIGN FOR NEW OUTLETS.) 5. (4)Michael McClain with J&G Electric and Jeff Bishop with RISDs Voice/Data systems all attended the meeting to discuss Voice/Data issues on the project. Michael stated that the existing data and fiber optics in the existing building are not installed in cable trays and are just laying on top of the ceiling. There are no

plans to install these items in cable trays under this contract. Scott stated that this could be a problem with the demolition of the ceiling in these areas. Jeff was also informed that the School district was responsible for final terminations of the Voice/Data equipment per contract and confirmation of RFI#1. Jeff stated that he knew nothing about that and requested that an MCR be produced for the Special Systems contractor to install. (JEFF STATED THAT HE WOULD REQUIRE A DATA DROP IN THE CUSTODIAL ROOM AND HE BELIEVED THAT HE WOULD NEED AIR CONDITIONING IN THE ELECTRICAL ROOM. JASON STATED HE WOULD REVIEW THE AIR IN THE ELECTRICAL ROOM. STANLEY THOUGHT THAT THE ROOM HAD A TRANSFER AIR GRILLE.) (JOE BACA STATED TO PROCEED WITH PRICING FOR A NEW DATA DROP IN THE JANITORS ROOM ONLY.) 6. (3)Scott stated that RFI#34 & #35 needed to be reviewed and answered concering the SK-1 and Sk-2 sink designations. There is no SK-2 sink scheduled and the SK-1 sinks are scheduled as a single compartment sink and the drawings show a double compartment sink in the designated locations. This needs to be answered so that the plumbing fixtures can be released. (MCR#27 WAS SUBMITTED. SCOTT STATED THAT HE RECEIVED ADDITIONAL INFO FROM THE ENGINEER JUST PRIOR TO THE MEETING WANTING TO CHANGE THE SET UP FOR THESE FIXTURES AND TO STATE THAT THE SK SINKS ARE NOT ADA ACCESSABLE.) (NEW PRICING WILL BE SUBMITTED TO REFLECT THE ENGINEER S CHANGES. SCOTT ASKED THAT ABEL CHECK TO SEE IF SK SINKS NEED TO BE ADA ACCESSABLE AND IF A SOLIDS INTERCEPTOR WOULD BE REQUIRED.) 7. (3)RFI#37 was submitted concerning the existing water meter that is located in the area of the new bus lane. The existing box the meter is locate in is not traffic rated. Joe stated that he would prefer that the meter be relocated. The new bus lane work cannot begin until this RFI is resolved. (SCOTT STATED THAT HIS PLUMBING MANAGER WAS MEETING WI TH THE WATER COMPANY THIS MORNING. AFTER THE MEETING JOE, JASON, SCOTT, STANLEY, TYLER, & ALTON COX MET AT THIS LOCATION AND DETERMINED THAT THE WATER METER WOULD NEED TO BE RELOCATED NORTH OF THE BUS LANE AND THAT ARMSTRONG WOULD CREDIT THE PAVING WORK ON THE NORTH SIDE TO ALLOW 2 LANES OF BUS TRAFFIC TO CONTINUE AS DESIGNED AND TO PROVIDE AN ADDITIONAL CURB AT THIS AREA AND TO ALSO REPLACE THE BROKEN CURB NORTH OF THE EXISTING SIDEWALK.) (THE COST TO RELOCATE THE METER WILL BE REVIEWED AFTER AN ALTERNATE PRICE IS SUBMITTED TO PROVIDE A TRAFFIC RATED BOX ON THE EXISTING METER.) 8. (2)RFI#43 was discussed concerning the lack of a backflow preventer on the new 4 domestic water line. Jason stated that CME stated that a backflow preventer was not required per the Uniform Plumbing Code. He stated that it may be a requirement for the City of Roswell. Scott stated that he would have his Plumbing Manager, Alton Cox, contact the Water Dept. to see if this was a city requirement. The City Water Dept. stated that this was not a requirement but was highly recommended on an line of this size. (SCOTT STATED THAT HE

WOULD CONTACT THE MECHANICAL INSPECTOR AND HAVE HIM PROVIDE A WRITTEN DETERMINATION FOR THE SPECIFIC CODE REQUIREMENT.) 9. (2)RFI#42 was discussed. The drawings show connecting to the existing 5 medium pressure gas line for the gas service to the new addition. The existing gas service is not medium pressure it is a low pressure service. Information will need to be provided to PNM to see if they will upgrade the gas service, if not then the gas lines to the new addition will not be large enough to provide the proper service to the new addition. Until this is resolved, there will be no heat in the new addition. (SCOTT STATED THAT ALL BTU INFORMATION WAS PRESENTED TO PNM FOR THERE REVIEW OF POSSIBLY INSTALLING A MEDIUM PRESSURE SERVICE TO THE BUILDING PER THE ENGINEER S DIRECTION. DAVID ELDRIDGE STATED THAT PNM HAS NOT AGREED TO PROVIDE THIS ADDITIONAL SERVICE IN THE PAST. THIS IS A HIGH PRIORTY ISSUE.) 10. (2)Joe Baca stated that he would like the contractor to submit an RFI concerning the lack of a washer and dryer hook ups in the Home Ec. Room. 11. (2)Joe Lovato stated that the pipe bollards by the loading dock were being used as trash cans. Tyler stated that he would have the bollards filled. (THERE IS ONE BOLLARD REMAINING THAT HAS NOT BEEN FILLED.) 12. (2)Scott stated that he still needed information on RFIs #26,29,30,36,&37. (RFI#30 WAS THE ONLY RFI REMAINING UNANSWERED FROM THIS ITEM.) Next Meeting Tuesday 11/11/08 at Sierra Middle School Library located in Portable bldg. Meeting to begin @ 9:00 AM.