ASS 70 FD folding / sliding door. Installation Guide

Similar documents
ASS 70 FD folding/sliding door installation guide

ASS 70.HI Lift/Sliding and Sliding Doors Installation Guide

Pvcu Bi Folding Doors Fitting Instructions.

Installation Guide. Bi-fold Doors

For Installer. Duration Windows. Assembly Guide Durafold 1000

Installation - Sub Cills

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

FITTING INSTRUCTIONS FOR FOLDING SLIDING DOOR SYSTEM SF75H

SMART SYSTEMS VISOGLIDE+ INSTALLTION GUIDE

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

FITTING INSTRUCTIONS FOR FOLDING SLIDING DOOR SYSTEM SF55 & SF75 WITH WEATHERED OR FLUSH TRACK

Folding Sliding door system

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

Side Light Frame Pack Assembly Instructions

Liniar Window. installation guide

Curtain Wall Installation Guide

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

Side Light Frame Pack Assembly Instructions

Installation Guide. WarmCore. Folding Sliding door system. Glass Packing. Pre-Installation. Removing the Existing Door.

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

Portofino Installation Guide

Deauville Installation Guide

Panoramic Door Block Frame Installation Manual

Installation Instructions

Portofino Case2 Installation Guide

patio door installation guide

Deauville Installation Guide

Pocket Door Installation Instructions

Heavy Wall Applied Stop Tube Frame and Door Installation

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

method of build Komfire-75 partitioning system 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims KOMFORT

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

INSTALLATION INSTRUCTIONS FOR A&L PRODUCTS

Panoramic Door. Block Frame Installation Manual Aluminum top and bottom track with either aluminum or vinyl panels

PVCu FOLD & SLIDE DOOR OUTWARD OPENING

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

STACKING MULTI-SLIDE DOOR SYSTEM

Vanity Installation Instructions

DOOR BiFOLD DOOR SET (3 + 1)

Mira Premium Series Bi-Parting French Sliding Patio Door Installation Instructions

Installation Instructions for Vista Air Vertically Folding Walls

How to operate (folding)

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

INSTALLATION INSTRUCTIONS

Thermally Broken Framing and Door Installation

Installation and Glazing Guide

Alessi Installation Guide - vjun16

Method of Build 1. General

Integrity Polygon and Round Top Installation and Finishing Instructions

INSTALLATION INSTRUCTIONS DANUBE ACRYLIC NEO ANGLE

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

InStallatIon InStruCtIonS for vinyl 2-lIte PatIo door assembled

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

Vanity Installation Instructions

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS

window installation TECHNICAL GUIDE Everbrite House, Greenway, Harlow Business Park, Harlow, Essex CM19 5QJ

Curium 19.4H Installation Instructions & Parts List

Dubnium 11 Installation Instructions & Parts List

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS. UNIT No. 160/760 THIN-LINE SHOWER ENCLOSURE

INOVO 2-LITE SLIDING PATIO DOOR

Magnaline Systems Block Frame Installation Manual

VisioGlide 100 System W4F Four doors 2 fixed, 2 sliding

Curium 19H Installation Instructions & Parts List

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

ROOM FOLD SLIDING FOLDING INTERNAL DOORSET FITTING & FIXING GUIDELINES

Hinge Door + Side Panel

Unit No. 135, 735 Deluxe Pivot Inline Door & Panel Shower Enclosure

Series 7650 Installation Instructions Sliding Glass Door

Patio door. Installation guide

6400, 8400 and 9400 Series Sliding Patio Door

MULTISLIDE DOORS INSTALLATION GUIDE & SITE PREPARATION

Casement/ Casement Picture Pocket Installation (Interior) Tools: (Not Provided by Manufacturer) Fig Supplies: (Not Provided by Manufacturer)


2300 BI-FOLD INSTALLATION GUIDE

4-lite Patio Door. Installation Instructions

Method of Build 1. Fire. Sound

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

UNIT No FRAMELESS PIVOT SHOWER DOOR

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL

B A T H R O O M G L A S S

890 SERIES PIVOT STEAM DOOR

Figure #1 - VSNEO Shower Door Assembly

In-line Patio Fabrication & Installation

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Gallium 03 Installation Instructions & Parts List

Monaco Installation Guide - Surface Profiles - vjun16

Contemporary 3 Panel Classic 5 Panel French Panel

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

Monaco Installation Guide - Surface Profiles

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Laminate Cabinet Installation Instructions

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

Transcription:

ASS 70 FD folding / sliding door Installation Guide

IMPORTANT! These doors should be fitted by competent and trained installers. Please read these instructions thoroughly before beginning the installation. Follow the instructions and recommendations given otherwise the system may not function properly and any warranty written or implied may be void. As regulations governing the use of glazed windows, doors, shop fronts and / or partitions vary widely, it is the responsibility of the building owner, architect, contractor or installer to ensure the selected products conform with all applicable codes and regulations. Preparation: Tools: In addition to normal installation tools the following will be required: 1. 3.2mm long reach drill bits for the adjuster fixing screws 2. T15 and T20 torx bit screwdrivers for the adjuster and hinge screws. 3. Schueco two part adhesive and applicator for outer frame corner joints if joined on site. 4. Nail drift for corner cleats. Checking the opening: The frame must be fitted plumb and level within the opening. Sizes given for manufacture of the frame should be the tightest point of the opening minus10mm fitting tolerance. The structural integrity of the lintel is critical for the proper functioning of the unit. The deflection of he header under full load should be limited to 3-4mm maximum. The opening should be level, plumb and square at all points. There should be no unevenness or owing. Ensure the lintel is not twisted and that the floor is even. The sides should be the same and not offset from each other. A laser or other similar precise measuring equipment should be used to check these requirements and find the fitting points. If a flush threshold is to be used it should be fitted on to a sub sill to facilitate correct drainage and levelling (see page 6) To avoid later problems do not install the unit until the opening has been fully and correctly prepared! Please also refer to your order confirmation for opening direction / door leaf information! 2

Preparation for outer frame assembly: Lay out the four outer frame profiles flat on the floor to assemble them, making sure the area is clear of debris to prevent damage to the profiles / powder coating. Take into account the opening direction and whether the doors open inwards or outwards. Check that the drain holes are to the outside. Head profile x 1. Pre-cut as per order. Jamb profile x 2. Pre-cut as per order. Bottom profile with track x 1. Pre-cut as per order, either rebated frame or flush threshold. Rebated frame Flush threshold 3

Assembling the outer frame: 1. The corner cleats must be inserted in the correct position so the holes in the frame line up for the nails. The cleats have a triangle stamped on one side which should face towards the thermal break. Note there is also a chevron to be fitted in the profile upstand. 2. Put sealant across the face of the profile mitres. cleats chevron 3. Ensure the profiles are correctly aligned and not offset before inserting the nails with a hammer and drift. WARNING! Once inserted the pins cannot be removed! Ensure surfaces are correctly aligned 4

4. The final strength of the joint in ensured by the application of the Schueco two part adhesive which is injected into the two remaining holes. The glue is pumped in until it appears in the nail hole positions. Two part adhesive and applicator for mitre joints 5. Clean off mitres. Seal over nail holes. Frame with flush threshold 1. Seal ends of flush threshold 3.9 x 38 5

Frame with flush threshold In preparing the opening for a flush threshold it is recommended that a box section of aluminium or galvanised steel is fixed into the structure to provide a level and flat fixing ground. It is important to ensure that the threshold is carefully lined through and not bowed laterally or vertically. For external applications careful consideration must be given in the design of the opening to provide measures to minimise the possible ingress of water. Internal carpeted floor coverings should not be used. Section through flush threshold showing example of drainage 6

Installation of outer frame into opening: 1. Place the frame in the opening and adjust until the frame is square, plumb and level. The top and bottom tracks must be parallel and the jambs must not be offset from each other. It is very important to fit the outer frame correctly otherwise problems will be encountered when fitting the door leaves. Make sure that the opening direction has been taken into account and that the water drain holes face to the outside. 2. Use suitable screws and plugs (to suit sub-structure) and fix the frame to the opening. Fix through the aluminium and not the thermal break. The first fixing should be 150mm up the corner utilising packers if required to make sure frame is level and plumb in the opening. Then fix at 300-400mm centres until frame is fully fixed allround. Pack fixings as necessary Fixing through aluminium 150 300 400mm fixing centres 300 400mm fixing centres Fix 150mm in from corners 150 300/400mm fixing centres 300 400mm fixing centres 150 3. Check again that the frame is level and plumb. A laser or other similar precise measuring equipment should be used to check these requirements. 7

Installation of adjuster profile: The ASS 70 FD door benefits from a unique frame width adjustment aid. Once the frame is fitted plumb and level, the hinge side frame adjuster can be fitted using the Torx screws supplied in the pack. The frame adjuster allows a lateral adjustment range for the frame from 0 8mm. Adjuster profile The adjusters should be wound out to allow the frame adjuster to be positioned with a 5mm gap all the way down between the frame and the adjuster. Then tighten the fixings screws. If the last leaf is floating and shuts onto the adjuster then this side can be fitted after the doors have been hung. Once all doors have been hung the adjuster can then be fitted and adjusted as necessary. 0-5mm -5mm 5 Adjustment range 0 8mm +3mm 8 Replace gasket after final adjustment Frame/leaf (inward opening shown) Frame/access door (inward opening shown) 8

Installation of leaves: 1. Attach the frame-hinged leaf first by joining the hinge parts together and tapping in the hinge pins from the top. 2. Then attach the next leaf joining the hinge parts and carry on with remaining leaves. Do not forget that the roller body has to fit with the hinge parts on the roller body. If there is an access door hinged to the folding leaves then a retaining catch must be fitted to this door and the adjoining leaf. Before opening folding the doors with an access door it should be hinged back on to the next leaf so the catch engages. The remaining doors can then be folded open. Retaining catch 9

Glazing: door unit supplied unglazed If the folding/sliding unit has been supplied unglazed OR if a glass unit is to be exchanged at a later date use the following procedure. Correct packing of the glass is essential to the proper functioning of the installed doors and to ensure that the leaves are square. Glazing beads and gasket are included with the delivery of the unit, together with glazing bridges on which the glass packers sit. Use plastic glazing packers only, timber or rubber ones should not be used. Glazing should be fitted into the installed, closed unit. The glass packers are positioned to provide support for the glass load and also as spacers and must be placed as shown in the diagrams (see page 11). The glass packers sit on the glazing bridges supplied which clip into the frame. On all leaves the lower glass support packers must always be placed in the corner on the hinge side, opposite to the locking mechanism. Recommended glazing sequence (toe and heeling the glazing units) 1. Lock all the leaves in the frame in the closed position. 2. Start glazing with the first folding leaf hinged to the frame. 3. Measure the vertical beading and the height of the glass pane. The difference divided by 2 indicates the required thickness of packer (packers of different thickness may need to be combined). 4. Place the first packer at a distance of 100mm in from the bottom corner on the hinge side of the leaf attached to the outer frame. 5. Set the glass into the frame and make sure it is standing properly on the packer. (with insulating glass make sure the packer is wide enough to support the full thickness of the glass unit). 6. Insert another packer on the vertical side also at a distance of 100mm from the leaf bottom corner. 7. Now insert a packers into the opposite corners 100mm in from the leaf corner vertical then top horizontal). 8. Check that the leaf is plumb and square and add additional packers if necessary. 9. Now fit spacer packers as shown in the glazing diagrams. These are a push fit and help maintain the squareness of the leaf. 10. Use silicone to secure packers and spacers to prevent them slipping (the silicone must not touch the edge seal of the double glazing unit). 11. Clip beading into position and push in the glazing gasket. Failure to pack the glass correctly may result in the unit touching the bottom or top frame and not folding correctly. 10

Positioning the glass support and spacer packers Glazing bridge Glazing bead clip 1 Glass support packer 2 Spacer packer 11

Glazing: door unit supplied factory glazed If the folding/sliding unit has been supplied factory glazed then either de-glaze before installation and following the glazing sequence (see previous pages) or install and check that the glazing is correctly toe and heeled. In either case the glazing beads should be removed with a thin spatula after first removing the internal glazing gasket (on re-fitting the beads make sure the plastic bead clips are in place). Correct packing of the glass is essential to the proper functioning of the installed doors and to ensure that the leaves are square. Important: outward opening access doors Where door units are outward opening and have an access leaf (see example below), consideration should be given to restraint of this leaf if left open in windy conditions. The customer should be consulted on this point. Final inspection Before leaving site: test the unit and make sure tracks are clean and clear of any debris that could damage or affect the operation of the rollers. Remove any debris from the track area Explain operation and locking functions to the user. Ensure all keys are left with user. Leave door Operation & Maintenance Guide with user. 12 01.2013