Morton School of Excellence

Similar documents
Marcus Moziah Garvey Elementary School

Jackie Robinson Elementary School

Everett McKinley Dirksen Elementary School

Amos Alonzo Stagg Elementary School

Wendell Smith Elementary School

Architecture, Construction, and Engineering Technical Charter

John Harvard Elementary School of Excellence

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

Daniel S Wentworth Elementary School

Philip Rogers Elementary School

Charles N Holden Elementary School

Alexander Graham Bell Elementary School

EPIC Academy High School

John Milton Gregory Elementary School

University of Chicago Charter - Carter G Woodson

John Spry Elementary Community School

Richard J Oglesby Elementary School

Andrew Carnegie Elementary School

Disney II Magnet School

William Penn Elementary School

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom

Robert Fulton Elementary School

Jonathan Burr Elementary School

Cyrus H McCormick Elementary School

George Washington Elementary School

Rufus M Hitch Elementary School

George W Tilton Elementary School

Langston Hughes Elementary School

Joseph E Gary Elementary School

Arthur A Libby Elementary School

George Washington High School

University of Chicago Charter - NKO

Legacy Charter Elementary School

Norman A Bridge Elementary School

Walt Disney Magnet Elementary School

Brian Piccolo Elementary Specialty School

Phoenix Military Academy High School

Academy for Global Citizenship Elementary School

Disney II Magnet High School

John Hancock College Preparatory High School

Urban Prep Academy for Young Men - West

North Lawndale College Prep Charter - Collins

Henry H Nash Elementary School

Theodore Roosevelt High School

John F Kennedy High School

Amandla Charter High School

Arthur E Canty Elementary School

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

John L Marsh Elementary School

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Richard T Crane Medical Preparatory HS

Multicultural Academy of Scholarship

Betty Shabazz Intl Charter - DuSable Leadership

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

William Howard Taft High School

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657

Emmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622

Bowen High School. Definitions EXTERIOR E 89th St Chicago, IL Co-locating on This Campus: Bowen HS and Noble St Chtr-Orange

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609

James Shields Middle School 2611 W 48th St Chicago, IL 60632

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612

John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

Franklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610

Joseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630

Lorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647

James Otis Elementary School 525 N Armour St Chicago, IL 60642

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645

James Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647

William J Onahan Elementary School 6634 W Raven St Chicago, IL 60631

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

Manley Career Academy High School 2935 W Polk St Chicago, IL 60612

Charles Allen Prosser Career Academy High School 2148 N Long Ave Chicago, IL 60639

SITE $1,539,659. Item - Type Quantity Unit Rank Cost. Entrance Control - Audio and Video 2 EA Exterior Doors - Exterior Wood Door 2 EA

Wendell Phillips Academy High School 244 E Pershing Rd Chicago, IL 60653

Francis W Parker Elementary Community Academy 6800 S Stewart Ave Chicago, IL Co-locating on this campus are AMANDLA and PARKER

William Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631

OCPS Submittal Register for Product Data and Shop Drawing Reviews

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

U of I Facilities Standards Updates for 2017

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

BUILDING PLAN REVIEW REQUIREMENTS

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. : The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Concrete/ Stucco Canopy Metal Canopy CHIMNEY Brick Chimney - Concrete/ Mortar Liner 6 GRE 6 3,334 GRE 6 259 6 GRE 6 5 45 7 7 3,334 SF $94,399 259 SF $6,233 $100,632 50 LF $31,460 $31,460 Assessment Date: 4/5/2013 Page 1 of 16

DOORS Exterior Steel Door Side Lite Transom Lite ENTRANCE 6 GRE 6 52 GRE 6 9 1 7 52 EA $17,177 9 EA $2,039 1 $3,115 $22,330 Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio Entrance Controls - Audio and Video Power Door Operator and Controls Ramp Handrails Stone Stairs 6 GRE 6 60 7 0 GRE 7 2 GRE 6 25 5 60 LF $6,435 10 LF $429 2 EA 25 LF 15 LF $2,681 $9,545 FOUNDATION Concrete Foundation 6 7 GRE 7 951 951 LF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 6 7 GRE 7 9 5 9 EA 15 EA LINTELS Lintels - Concrete 6,081 7 1,081 LF Assessment Date: 4/5/2013 Page 2 of 16

Lintels - Steel PARAPET GRE 6 48 48 LF $1,812 $1,812 Coping - Metal 6 7,236 1,236 LF ROOF SYSTEM Asphalt Gravel Ballast Roof Interior Downspouts Metal Roof Roof Structure: Concrete 6 GRE 6 32,387 GRE 6 252 BLU 5 80 7 GRE 7 35,387 32,387 SF $206,558 252 LF 80 SF $1,430 35,387 SF $207,988 SUPERSTRUCTURE Concrete 6 7 GRE 7 71,504 71,504 SF WALLS Brick Concrete Block Prefabricated Metal Panel Wall Stucco WINDOWS Curtain wall - Glazed Double Pane Curtain wall - Insulated panel 6 6,609 GRE 6 47 GRE 6 3,876 GRE 6 395 6 GRE 6 6,666 GRE 6 465 7 7 16,609 SF $109,729 47 SF $311 3,876 SF $32,924 395 SF $2,824 $145,787 6,666 SF $62,914 465 SF $4,389 Assessment Date: 4/5/2013 Page 3 of 16

Window - Guards perforated Windows - Sash Aluminum Double-pane EXTERIOR,946 94 1,946 SF 194 SF $67,302 $586,857 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency generator below 60 KW natural gas - Outdoor Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - CCTV Security System - Intrusion detection 6 7 GRE 7 2 GRE 6 3,638 3,158 GRE 6 6,840 GRE 6 2,812 GRE 7 7 GRE 7 33 6 GRE 7 71,504 GRE 7 71,504 GRE 7 71,504 2 EA 3,638 SF $4,942 13,158 SF $5,645 6,840 SF $3,619 2,812 SF $1,206 $7,508 7 EA 33 EA 7 EA $233 71,504 SF 71,504 SF 71,504 SF $23,153 MAIN SERVICE 6 7 Main Electrical service 1000 A and below 120/208/3PH YEL 4 1 $96,096 $96,096 POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp 6 7 GRE 6 2 4 6 12 EA $13,728 Assessment Date: 4/5/2013 Page 4 of 16

Main distribution panels above 600 amp ELECTRICAL $13,728 $132,977 FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System FIRE PROTECTION 6 7 GRE 7 71,504 GRE 6 71,504 71,504 SF 71,504 SF $86,913 $86,913 $86,913 MECHANICAL AIR CONDITIONING Window A/C AIR HANDLING SYSTEMS 6 20 7 2 $6,435 $6,435 Air Handling Package - Single Zone - Hot Water 4,000 to 8,000 cfm Air intake for all Air Handling s except built up AHU Roof Top - Single Zone - Gas-Heating 21 to 30 tons BLU 5 4 6 7 GRE 7 2 BLU 5 1 4 EA $62,920 2 EA $35,750 $98,670 BOILER SYSTEMS Boiler Assembly - Non-Condensing Scotch Marine Hot Water Boiler 3,001MBH-4,000 MBH Boiler Auxiliary Non-Condensing Hot Water Boiler 3,001MBH-4,000 MBH Chemical Pot Feeder - Hot Water BLU 5 2 BLU 5 2 6 7 2 EA $185,900 2 EA $61,490 $300 Assessment Date: 4/5/2013 Page 5 of 16

Combustion Dampers HEATING DEVICES YEL 4 2 Morton School of Excellence 2 EA $11,154 $258,844 Cabinet Heaters With Hot Water Coils Fin Tube Hot Water MECHANICAL PLUMBING 6 1 GRE 6 4 10 158 7 1 $5,506 172 LF $4,256 $9,761 6 7 Piping - Hydronic Supply and Return - Copper BLU 5 400 400 LF $27,170 Pumps - Hot Water 11 to 20 HP BLU 5 2 2 EA $21,450 $48,620 TEMPERATURE CONTROL Pneumatic System Thermostats - Pneumatic UNIT VENTILATION 6 BLU 5 12 34 7 71,504 SF $511,254 46 EA $12,756 $524,009 6 7 Ventilators - Hot Water-Heating BLU 5 48 48 EA $343,200 $343,200 VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof Mounted above 8,000 cfm Exhaust Fans - Roof mounted less than 500 CFM 6 GRE 6 9 BLU 5 3 2 GRE 6 3 BLU 5 1 1 7 $501 9 EA $3,861 5 EA $7,322 3 EA $6,435 2 EA $1,730 Assessment Date: 4/5/2013 Page 6 of 16

Type I Exhaust Hood - Kitchen or Culinary Arts Type II Exhaust Hood - Warming Kitchen MECHANICAL $1,716 $21,564 $1,311,104 PLUMBING HOT WATER Hot Water Heater - Gas more than 300,000 BTU/HR Storage Tank less than 500 gallons 6 7 $1,859 $1,859 PIPING 6 7 Domestic Piping - Cold Water from Risers to Fixtures 71,504 SF $23,518 Domestic Piping - Cold Water Risers 71,504 SF $46,013 Domestic Piping - Hot Water from Riser to fixtures 71,504 SF $15,338 Domestic Piping - Hot Water Return Risers 71,504 SF $32,720 Domestic Piping - Hot Water Risers 71,504 SF $38,855 Domestic Piping Cold Water Horizontal lines 71,504 SF $170,759 Domestic Piping Hot Water Horizontal lines 71,504 SF $141,106 Domestic Piping Hot Water Return Lines 71,504 SF $81,801 Sanitary Piping BLU 5 71,504 71,504 SF $43,968 Storm Piping BLU 5 71,504 71,504 SF $33,743 Vent Piping BLU 5 71,504 71,504 SF $25,563 $653,382 PUMPS 6 7 Domestic Booster Pump simplex BLU 5 1 $8,580 $8,580 Assessment Date: 4/5/2013 Page 7 of 16

PLUMBING $663,821 INTERIOR ADMINISTRATIVE SUITES Ceiling - Plaster/Drywall Ceiling - Splined Flooring - Tile/Sheet Lighting - Pendant/Surface Walls - Concrete Block Walls - Structural Glazed Tile AUDITORIUM - DEDICATED Stage Curtains Stage Lighting System DOORS 6 68 49 2,243 49 2,411 GRE 6 43 GRE 6 374 4,547 GRE 6 705 6 0 GRE 6 2 7 7 168 SF $476 2,392 SF $5,655 2,560 SF $4,291 43 SF $31 4,921 SF $15,828 705 SF $5,041 $31,322 10 EA $113,256 2 EA $228,800 $342,056 Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Transom Window 6 10 7 GRE 6 3 40 127 84 08 1 $3,303 170 EA $12,741 184 SF $3,421 108 SF $2,008 $21,473 DRINKING FOUNTAINS Single Fountain 6 7 GRE 6 2 9 1 $772 $772 Assessment Date: 4/5/2013 Page 8 of 16

GYMNASIUM / AUDITORIUM Ceiling - Exposed Flooring - Wood Lighting - Pendant/Surface Walls - Concrete Block KITCHEN Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Pendant/Surface Wall - Structural Glazed Tile LIBRARY Casework Ceiling - Splined Flooring Tile/ Sheet Lighting - Pendant/ Surface LUNCHROOM Ceiling - Splined Flooring - Tile/Sheet Lighting - Pendant/Surface Serving Line Wall - Plaster/Drywall Wall - Structural Glazed Tile 6 GRE 6 4,500 GRE 6 4,500 GRE 6 24 BLU 5 6,106 6,217 35 1,082 GRE 6 25 GRE 6 2,048 6 GRE 6 71,347,347 GRE 6 29 6 GRE 6 2,340 GRE 6 2,340 GRE 6 50 GRE 6 20 GRE 6 340,617 7 7 7 7 4,500 SF $34,234 4,500 SF $33,977 24 EA $2,917 6,106 SF $130,974 $202,102 1,217 SF $4,594 1,217 SF $2,312 25 SF $18 2,048 SF $14,643 $21,567 71 LF $2,178 1,347 SF $2,889 1,347 SF $1,926 29 SF $21 $7,014 2,340 SF $5,019 2,340 SF $3,346 50 SF $36 20 LF $858 340 SF $802 1,617 SF $11,562 Assessment Date: 4/5/2013 Page 9 of 16

$21,623 MDF/IDF 6 7 Finishes BLU 5 20 20 SF $224 Ventilation and Cooling BLU 5 20 20 EA $140,140 $140,364 MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room STAFF RESTROOM 6,010 BLU 5 4,025 GRE 6 694 1,151 7 1,010 SF $4,766 4 SF $45 1,025 SF $4,837 1,845 SF $13,292 $22,940 Accessories Ceiling - Plaster/Drywall Floor Drain Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Pendant/ Surface Partitions Urinals Wall - Concrete Block Wall - Structural Glazed Tile Water Closet 6 7 03 2,944 GRE 6 245 2,915 GRE 7 8 GRE 6 54 803 1,756 BLU 5 63 40 GRE 7 8 GRE 6 3 45 GRE 6 4 61 GRE 7 44 GRE 7 37 GRE 6 252 GRE 6 216 5,807 1,484 GRE 6 3 44 3,047 SF $795 3,160 SF $9,641 8 EA 2,613 SF $2,893 103 SF $414 8 EA 48 EA $1,115 65 SF $3 44 EA 37 EA 252 SF $721 7,507 SF $51,713 47 EA $1,115 $68,411 Assessment Date: 4/5/2013 Page 10 of 16

THEATER Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/ Surface Stage Wall - Concrete Block Wall - Plaster/Drywall VERTICAL CONVEYANCE 6 GRE 6 3,638 GRE 6 2,787 5 4 GRE 6 851 GRE 6 4,675 GRE 6 505 7 3,638 SF $31,110 2,787 SF $3,985 15 SF $17 14 SF $23 851 SF $3,614 4,675 SF $40,112 505 SF $4,333 $83,194 Elevator - Roped Holeless Hydraulic 6 7 VOCATIONAL SHOP Work Sink INTERIOR 6 7 GRE 6 8 6 14 EA $3,089 $3,089 $965,928 ROOM ADMIN_WALL Administrative Office Walls CASEWORK 6,117 7 1,117 SF $2,636 $2,636 Casework 6 7 GRE 6 431 6 437 LF $15,408 Assessment Date: 4/5/2013 Page 11 of 16

$15,408 CEILING Splined Ceiling 6 7 GRE 6 6,226 20,871 27,097 SF $13,355 $13,355 CORRIDORS Concrete Block Concrete Epoxy/Painted Drinking Fountains Pendant/Surface Plaster/Drywall Splined Stair Handrails Stairs Structural Glazed Tile Student Lockers Terrazzo Tile/Sheet Flooring Walls 6 GRE 6 2,492 BLU 5 93 7 GRE 7 2 GRE 6 28 4,302 8,856,315 GRE 6 4,301 9,758 GRE 6 228 BLU 5 10 GRE 6 2,441 16,232 GRE 7 496 GRE 7 846 GRE 6 28 4,208 10,284 GRE 6 578 2,492 SF $7,127 93 SF $439 2 EA 13,186 EA $3,166 1,315 SF $3,103 14,059 SF $9,226 228 LF 10 EA $501 18,673 SF $17,453 496 EA 846 SF 14,520 SF $6,176 578 SF $1,364 $48,554 CORRIDORS CEILING Plaster/Drywall 6 7 GRE 6 66 1,352 1,418 SF $187 $187 FLOOR Floor Tile/Sheet 6,126 7 GRE 6 4,722 2,392 20,497 1,126 SF $4,831 27,611 SF $30,160 Assessment Date: 4/5/2013 Page 12 of 16

$34,991 LIBRARY_WALL Concrete Block Structural Glazed Tile LIGHTING 6,735 03 7 1,735 SF $4,962 103 SF $736 $5,699 Pendant/Surface 6 7 GRE 6 20 618 638 EA $1,430 $1,430 LUNCH_WALL Lunchroom Walls MARKER BOARD 6 10 7 110 SF $315 $315 Marker Board 6 7 YEL 4 832 36 40 908 LF $102,159 $102,159 RESTROOM_FLOOR Restroom Floor RESTROOM_LIGHT 6 GRE 6 444 7 444 SF $1,130 $1,130 Restroom Lighting 6 7 7 17 EA Assessment Date: 4/5/2013 Page 13 of 16

STAIRS Terrazzo WALL 6 12 7 112 SF $1,268 $1,268 Concrete Block Metal/Folding Panel Plaster/Drywall Structural Glazed Tile Wall ROOM 6 7 GRE 6 4,179 22,636 GRE 7 240 GRE 6 470 GRE 6 30 830 GRE 6 438 26,815 SF $11,952 240 SF 470 SF $1,109 860 SF $215 438 SF $1,033 $14,309 $241,440 SITE ATHLETIC 6 7 Basketball - Asphalt YEL 4 6,283 6,283 SF $47,439 $47,439 CIVIL/DRAINAGE Catch Basin Site Manhole 6 7 GRE 7 5 GRE 7 8 5 EA 8 EA FENCING Chain Link Ornamental Iron 6 7 GRE 6 206 102 140,180 448 LF $8,827 1,180 LF $22,274 Assessment Date: 4/5/2013 Page 14 of 16

$31,101 LANDSCAPE Asphalt Play Area/Hardscape Grass Hardscape - Concrete Parkway trees 6 GRE 6 4,205 7 GRE 7 20,671 GRE 6 252 GRE 7 28 4,205 SF $3,608 20,671 SF 252 SF $476 28 EA $4,084 PARKING LOT Asphalt Trash Enclosure 6 BLU 5 6,283 6,608 7 GRE 7 384 12,891 SF $59,578 384 SF $59,578 PLAYGROUND Playground Equipment - School Age 5-12 Playground Surfacing - Poured Surface 6 7 GRE 7 2,050 2,050 SF SIDEWALKS Perimeter Sidewalks SIGNAGE 6 GRE 6 650 9,022 7 9,672 SF $29,299 $29,299 Flag Pole Marquee - Building Mounted Back Lighted Marquee - Free Standing Back Lighted 6 7 Assessment Date: 4/5/2013 Page 15 of 16

SITE Campus Need ² ³ $171,501 $4,160,541 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 4/5/2013 Page 16 of 16