(Issued 1 Sept. 1971) CRD-C METHOD OF TEST FOR VERIFYING MACHINES FOR USE IN FLEXURAL STRENGTH TESTS OF CONCRETE MATTRESSES

Similar documents
Procedure for Wrench Calibration and Snug Tightening

Procedure for Testing Direct Tension Indicators (DTI) Assemblies

Structural Bolting. Notice the Grade 5 has a much smaller head configuration and a shorter shank then the grade A325 structural bolt.

7141 & NATIONAL POLE VAULT STANDARDS SPECIFICATIONS

MODEL 36 Di-Acro Hand Shear

HAND SHEARS NO. 12 AND NO. 24

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

CAM SYSTEM. Eccentric self-locking clamping devices. Set. CAM SYSTEM t. CAM SYSTEM t. Set. CAM SYSTEM s pag CAM SYSTEM s pag.

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

Special Z-Axis Ballscrew Replacement

An Adjustable Threading Feed Attachment for a Lathe Without Metric Threading Capability, by Ted Clarke

Mate Pilot Turret Calibration System

BEARING AND TYPES OF BEARING

PORTABLE PULL TESTER

ALUMINUM POLE VAULT STANDARDS SPECIFICATIONS

CSS Central Mount System

Thread protection accessories are installed at the MODIX production factory and delivered with couplers.

Tightening of Structural Joints

SB-WM-ART1-M-BL. Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL

Standard Test Procedures Manual

By C.W. Woodson From the pages of Model Craftsman magazine June, 1937

ANSI ORIFICE FLANGES METAL-KOREA

USER MANUAL MODEL MZ-100 BOLT TENSION CALIBRATOR

Fluid Sealing Association

Referencing 0,0 position

Mounting Instructions For 3-Piece Namur Style Mounting Bracket To 2-Way 60 Series Valves

Installing CNC Stepper Motor Mounts On A Sherline Lathe

The jigs and fixtures are the economical ways to produce a component in mass production system. These are special work holding and tool guiding device

Mate Pilot. Turret Calibration System. Mate Tooling Lasts Longer

MSP-WRTIDSKY1 Light Weight Suspended Ceiling Kit for use with Island Display Skybox

Chapter Tests and Problems

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

SHERLINE Lathe Digital Readout

SB-WM-ART2-L-BL SB-WM-ART2-XL-BL

BHJ Products, Inc. Parts List & Instructions

M-RAIL Sismet Road, Mississauga, L4W 1V6 TEST REPORT FOR MLEVEL GUARD SYSTEMS

WHAT? WHERE? HOW?

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Monoprice Adjustable Tilt/Swivel Flat Panel Wall Mount Model MLB-109B/RLB-102B (PID# 4926)

EDGE2 DUAL MONITOR ARM

EXPERIMENT 1 TO CHECK WHETHER THE MEASURING INSTRUMENTS ARE ACCURATE, PRECISE OR BOTH.

customraider.net GPS Accessory Handlebar Mount Installation Manual Install Instructions Revision E 07/31/2011 8/8/2011

Page 1. SureMotion Quick-Start Guide: LARSACC_QS 1st Edition - Revision A 03/15/16. Standard Steel Bolt/Screw Torque Specifications

SQ2 User Instructions SQ2 Overview:

Leveling Feet, Base Plates and Casters

Swing over bed 17.3" Center height 8.6" Swing over cross slide 9.4" Distance between centers 39.3" Width of bed 11.8"

Installing CNC Stepper Motor Mounts On A Sherline Mill

PART MATERIALS. Section Fencing Materials. Description

Ceiling Tile Installations Part 1. Sheetrock Installations Part 2. WolfVision Support 2055 Sugarloaf Circle, Suite 125 Duluth, GA 30097

ULTRA SPACE SAVER SQUARED Installation Instructions

O-Sullivan King 4 Poster Bed O-Sullivan Queen 4 Poster Bed Parts and Hardware List

STRUCTURAL ATTACHMENTS

KIT ASSEMBLY INSTRUCTIONS

PFT CABLE GYM INSTRUCTION MANUAL

Model: 3-IN-1/1067x1.5 Model: 3-IN-1/1320x1.5

Standard Test Method for Measuring Warpage of Ceramic Tile 1

INSTALLATION INSTRUCTIONS / DODGE RAM CREW CAB 2500/3500

Replacement of Pitch Link Retainer and Service Improvement of the Pitch Control System. Effectivity: Helicopters manufactured prior to January, 1981

BHJ Products, Inc. Parts List & Instructions

Installation Instructions for Solar Snow Pad (SSP-T-3)

3D PRINTER. Pack 11. Anything you can imagine, you can make! 3D technology is now available for you at home! BUILD YOUR OWN

Leveling Foot RB210. Leg Extender RLT66

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NSCL Z

CRP700 Benchtop Basic CNC Machine Assembly Instructions. Updated 10/24/2014 SHEET 1 of 24

Product Information. Brass & Cast Bedsteads

HQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions 1

Page 1 Parts List for AL-51G (L160) 07/08/201. Headstock Assembly

APPENDIX FENCE GENERAL NOTES

ASSEMBLY AND ADJUSTMENT

ZIP CLOUD SUSPENDED INSTALLATION MANUAL

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Daily Maintenance. 2. Insert bobbin cases in to rotary hooks. Make sure bobbin thread is not over 2 inches long. Close bobbin case covers.

1904, 1904Pg, 1904PgSB, and 1906SB High Capacity Ratchet Knockout Drivers

Hydrajaws Safety Lifeline Tester

V-Groover SIMPLEX INSTRUCTION AND OPERATION MANUAL M O DEL 703. For best results use only authentic Logan blades.

Installation Instructions TMW Antenna Tower Mount for 4ft (1.2m) Antennas.

ASSEMBLY AND ADJUSTMENT

Installation Instructions

PET*STAR 4 OPERATOR MANUAL

AFB (AIR FAN BEARING) INSTALLATION GUIDE

Installation Instructions

Sport-Thieme. Full-Size Goal. Assembly instructions. 7,32x2,44 m, Portable

SPECIFICATION FOR HIGH STRENGTH STRUCTURAL BOLTS

Field Inspection Gage. Instruction Manual

PMT-L31 (for Low Ceilings) PMT-H35 (for High Ceilings)

INSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM

Copyright 2010, by Walker Edison Furniture Co., LLC. All rights reserved.

E LJ TJ LASER MEASURING DEVICE INSTRUCTIONS

CV1B Sliding Table Installation and Setup Guide

FACULTY OF ENGINEERING DESIGN AND PRODUCTION ENGINEERING DEPARTMENT. Credit Hour System Metrology Lab 1 MDP 240. Sine Bars. Metrology laboratory

KNOB LATCH. Specifications: Glass-To-Wall Installation CAT NO. LAT001 C.R. LAURENCE CO., INC. PROFESSIONAL QUALITY

TECH SHEET PEM - REF / AXIAL THREAD CLEARANCE. SUBJECT: Method for providing adequate axial thread clearance

ISH-R150 MANUAL ROCKWELL HARDNESS TESTER OPERATION MANUAL

Instruction Sheet For: SCM-2

Comparative Measurement

electric Cortical Contusion Injury

J D SQUARED INC. NOTCH MASTER Tube and Pipe Notcher Operating Instructions

25000 Series Lo-T TM Butterfly Control Valve Instructions

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260

USER S MANUAL. Horizontal inclinometer system Model TES-AN-25H

Transcription:

1. Scope (Issued 1 Sept. 1971) CRD-C 517-71 METHOD OF TEST FOR VERIFYING MACHINES FOR USE IN FLEXURAL STRENGTH TESTS OF CONCRETE MATTRESSES C 517 Revised 29 April 1971 1.1 This method describes the procedures for verifying machines which are used in determining the strength of articulated concrete mattresses for bank protection work. 2. Apparatus 2.1 Calibrated ring.- A 3000-lbcapacity ring, complying with the applicable requirements of CRD-C 512, that has either a micrometer or a dial gage to indicate deflection shall be used. 2.2 Centering apparatus.- An appropriate apparatus for properly centering the proving ring during verification testing shall be used. The apparatus described below has been found satisfactory. It is illustrated in Figs. 1-3 and consists of the following items. 2.2.1 A metal cap (A) designed to fit snugly over the ram of the tester, having a small concave depression in the center of the upper surface, with a maximum diameter of 3/8 in. and a depth of 1/8 in. 2.2.2 A 7/16-in.-diameter hardened steel ball (B) to fit into the concavity on the top of the cap. 2.2.3 A load application frame having the following parts. 2.2.3.1 Four threaded screwposts 19 in. long and threaded the same as the regular frame bolts on the tester (C). 2.2.3.2 Eight nuts which fit the screwposts and can be screwed in position against the machine body below, and the crossbeam attachments above to steady the centering device (D). 2.2.3.3 Two upper crossbeam attachments that tie together the screwposts at either end and have cogwheels above which turn independently of the main body of the crossbeams (E). 2.2.3.4 A crossbar below each crossbeam suspended by means of a spring and bar which allow for long axis, the lower part of the bar rounded in the direction of rotation (F). 2.2.3.5 A link-chain to fit around the cogwheels on the crossbeam, with projection knobs to facilitate turning (G). 2.2.3.6 An upper metal bearing plate with a cylindrically shaped depression on its bottom surface to fit over the top of a proving ring, a concavity similar to that on the metal cap described in Paragraph 2.3.1 on its top surface, and holes and bolts to secure the plate in position below a ball in the center of the stirrup described below (H). 2.2.3.7 A stirrup to fit under the crossbeam attachments, provided with a centrally positioned 3/4-in. steel ball to fit directly above the concave depression on the upper surface of the upper metal bearing plate, and the stirrup also provided with four clampon attachments with grooved top surfaces to fit below the rounded lower surface of the crossbars (I). 2.2.3.8 Two flat steel bars with holes 18 in. apart designed to fit over the upper ends of opposite screwposts (J). 3. Procedure 3.1 The procedure for verification shall be essentially as described in CRD-C 516. 3.2 The detailed procedure shall be as follows. 3.2.1 Remove the frame used for testing mattresses, the four long screwposts attached to the machine body, and the bottom loading bar, leaving the machine body and upper surface of the ram exposed. 3.2.2 Install the centering device, using its four screwposts and the eight nuts to anchor and steady it, being sure it is centered over the ram, and the four screwposts are screwed into

2 VERIFYING MACHINES FOR FLEXURAL STRENGTH TESTS (C 517-71) the machine bed the same distance. 3.2.3 Center the metal cap above the loading ram. 3.2.4 Insert the 7/16-in.-diameter steel ball in the concave depression in the steel cap and line up the proving ring and upper bearing plate. 3.2.5 Take a zero reading on the proving ring with the stirrup in place. 3.2.6 Turn the link-chain until the crossbars make contact with four clamp-on cushions on the stirrups. 3.2.7 Start loading the machine and record readings of the ring at each verification load. The standard loads shall be 500, 1000, 1500, 2000, and 2400 lb. 3.2.8 Convert the readings of ring deflection to corresponding load in pounds, and compare this with the indicated machine loads. The machine error (E), in percent, shall be calculated using the formula: where R = ring indicated load in lb, and M = the machine indicated load in lb. 4. Report 4.1 The report shall indicate those loads at which verifications were made, whether the error was within the allowable limits, and a graph, plotting machine error in percent as the ordinate and machine load in lb as the abscissa.

C 517 VERIFYING MACHINES FOR FLEXURAL STRENGTH TESTS (C 517-71) 3

4 VERIFYING MACHINES FOR FLEXURAL STRENGTH TESTS (C 517-71)

VERIFYING MACHINES FOR FLEXURAL STRENGTH TESTS (C 517-71) 5