PRIMED STRAND REVERSIBLE SHAKE

Similar documents
application instructions

Application Instructions

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Installation Instructions for Panel Siding and Soffit

LP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information

Installation Instructions for TruWood Reversible Trim

Technical Note No. 028

The Beauty Of Wood. Made Better. Product Specifications LPZB0590

Shapes Siding. Perfection Shingles. Chalk Line

Technical Note No. 026

COMPOSITE SIDING INSTALLATION GUIDE

Installation Guide - Evolution Series Wood Siding

PANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Installation Guide Classic Series Wood Siding

Installation Instructions

Installation Instructions

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

KuraStone TM Installation Guide

ForceField Air & Water Barrier System. installation instructions

INSTALLATION GUIDE SAVANNAH SMOOTH & SIERRA PREMIUM SHAKE

Installation Guide Maibec Resistech Panel, Shingle Strips and Trims Solid Colours

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Effective February, 2015

eco-shake INSTALLATION INSTRUCTION

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

C e r t a i nte e d. FiberCement Siding

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

LAP SIDING INSTALLATION GUIDE

Turada Hardwood Shingles and Shakes Installation instructions

MULTISHAKE LAP SIDING INSTALLATION GUIDE STORAGE AND HANDLING: PACKAGING:

Tools required by installer: Materials required by installer:

INSTALLATION GUIDE NICHIPRODUCTS & NICHIFRONTIER

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.

ROOFING APPLICATION STANDARD (RAS) No. 130

Ash Brook Golf Course Scotch Plains, New Jersey

MAXISHINGLE LAP SIDING INSTALLATION GUIDE

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016

INSTALLATION PROCEDURE

STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS AND INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS

Installation Manual SOLID CORE SIDING

Flashing Materials. Rough Opening Preparation

Effective April 1, 2013

UNIT 5: EXTERIOR DOORS AND WINDOWS

Installation Guidelines

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

Sun Windows General Information New Construction Hinged Door Installation Instructions

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

lap siding Visit for the most recent version.

Section I. Before You Start deals with numerous considerations which you should be aware of before you start installing Western Red Cedar siding.

Appendix A. Additional Information ATTACHING JAMES HARDIE PRODUCTS TO INSULATED CONCRETE FORMS (ICF)

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

NichiProducts Installation Guidelines

Installation Manual for Thermo Panel

INSTALLATION GUIDE NICHIPRODUCTS

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Engineered Hardwood Flooring Installation Instructions

ROOFING City of Grand Rapids Building Safety Division

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

LAP SIDING INSTALLATION GUIDE

PROJECT INSTRUCTIONS Roofing

LAP SIDING INSTALLATION GUIDE

SIDING INSTALLATION GUIDE

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

4/4, 5/4 Boards EFFECTIVE JULY 2011 INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS

Installation Guide. Grayne.com

Slate Shingle Specifications

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

4. Metal roof jacks at penetrations and attachments

Installation Guidelines

HardieTrim NT3 TM board is a decorative non-load bearing trim product. Figure 3. Fasten HardieTrim Flat Tab to minimum 7/16" OSB.

Inspire Aledora Slate Application Guidelines

HardieShingle Siding Product Description

DIVISION 6 WOOD AND PLASTICS

Five Star Panel Installation Instructions

Installation Instructions for Siding

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

Installation of Fiberglass Windows

CarraraFinishes built on LP SmartSide

Vinyl Windows Manufactured by VPI Quality Windows

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

CFDTT-01. Control Joint Study (General)

ARCHITECTURAL WALL PANELS AUGUST KuraStone Installation Guide 1

How To Install Windows: Nail-Fin Application

Load Tables, Technical Data and Installation Instructions

Siding STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS

Transcription:

PRIMED STRAND REVERSIBLE SHAKE PRIOR TO INSTALLATION Inspect product for any issues before installing (breakage, surface defects, foreign objects). Do not install questionable product. Report any problems you may have to your dealer BEFORE installing. STORAGE Store siding flat on a dry, clean and well supported surface. Protect material from direct exposure to weather. STORE UNDERCOVER Do not store directly on the ground. All products must be kept dry and covered at all times. Only carry multiple pieces of siding: face-to-face or back-to-back. Support the product when you cut large pieces. Sealed product could become saturated if not protected during storage. If the product becomes saturated, do not install it until it dries out completely. GENERAL GUIDELINES **Note: DO NOT USE STAPLES. Minimum 6" clearance must be maintained between siding and finish grade. Siding applied adjacent to porches, patios, walks, roof lines, etc. must have a 1 clearance above any surface. 3/8" clearance should be left between siding and horizontal flashings. All exposed wood substrate must be primed and painted to prevent moisture intrusion and water buildup. Best practice for blind or exposed nailing is to use only 316 stainless steel nails within 15 miles of the seacoast. Beyond 15 miles, either 304 stainless steel or hotdipped galvanized is acceptable. See Alternate Fastening Options for fastening lap siding to SIP, ICF and Steel Frame assemblies. (PG 4) Adequate drying time must be allowed prior to enclosing the wall cavity when using wet blown cellulose insulation. With wet blown cellulose insulation, the insulation must not be in direct contact with the siding and it will need time to dry, a minimum of 24 hours or longer if specified by the insulation manufacturer. It is recommended to face the board up when using a combination blade power miter saw. Do NOT force or spring siding into place. Where siding butts window trim, door casing, masonry, etc., leave a 3/16" gap and caulk. DO NOT caulk butt joints. Seal all gaps with a paintable sealant that meets ASTM-C920 Specification, it is recommended to use DAP Spec Line 920. STUD AND SPACING It is REQUIRED that Primed Strand Reversible Shake must be installed over nailable structural sheathing. When installing over masonry walls, the wall must be furred out with wood framing spaced 16" on center and with a adequate thickness to accept the full length of the recommended nail. GAPS AND SEALANTS Note: DO NOT apply sealant to butt joints. Seal all gaps with a paintable sealant that meets ASTM C920 Specification, it is recommended to use DAP Spec Line 920. 1 Primed Strand Shake Installation Instructions \\ Wausau Supply Co. 5.18

INSULATED SHEATHINGS Primed Strand Reversible Shake may be installed over low-compression rigid foam or exterior gypsum sheathings. The following precautions must be followed: Nailable structural sheathing must be behind the insulated sheathing. Make sure to brace the wall accordingly to the required international and other building codes. For rigid foam sheathing up to 1" thick, siding may be nailed directly to the foam sheathing unless a drainage plane is required by the local building code. Nail length must be increased to ensure a minimum 1-1/2" fastener penetration into the structural framing. Note: Primed Strand Reversible Shake may also be installed in compliance with category 8140-Exterior wall siding and sheathing for Wildland Urban Interface applications atop LP FlameBlock sheathing. Refer to FlameBlock installation instructions and product data sheets. Primed Strand Reversible Shake may be installed as exterior siding in Wildland Urban Interface applications. It can be installed over one layer 5/8" Type X gypsum sheathing applied behind the exterior covering or cladding on the exterior side of the framing. They may also be installed over the exterior portion of a 1-hour fire-resistive exterior wall that has been assembly designed for exterior fire exposure which also includes assemblies using the gypsum panel and sheathing products listed in the Gypsum Association Fire Resistance Design Manual. For rigid foam sheathing that is greater than 1", a minimum 1-1/2" thick by 3-1/2" wide vertical strapping or furring strip must be installed over the sheathing to provide a solid, level nailing base for the siding. The strapping must be securely fastened to structural framing spaced no greater than 16" o.c. with a minimum fastener penetration of 1-1/2". LP Smartside will not assume any responsibility for conditions arising from the use of foam sheathing or damage. MOISTURE Moisture and vapor control are critical elements of proper housing design. Check local building codes for application procedures for handling moisture and moisture vapor in your area. Do not apply engineered wood siding to a structure having excessive moisture conditions such as drying concrete or plaster or wet blown cellulose insulation. If conditions exist, the building should be well ventilated to ensure the substrate is completely dry prior to siding. Siding must not be applied to any green or crooked structural framing members. Do not apply siding over rain-soaked or buckled sheathing materials. We recommend protection for your home from rainfall with gutters and downspouts. Always be sure that your drainage system is free of debris and working properly. WEATHER-RESISTANT BARRIER It is required to have a water-resistant, properly breathable barrier behind the siding. When integrating flashing with a water resistive barrier (WRB), be sure to follow the WRB installation instructions. LP Smartside will not assume responsibility for water penetration. Consult local building codes for more details. Housewrap Tape Window Housewrap Flap Head Jamb Sill 2 Primed Strand Shake Installation Instructions \\ Wausau Supply Co. 5.18

KICK-OUT FLASHING Note: DO NOT extend the siding or trim into the kick-out flashing or gutter. Install kick-out flashing to direct the water into the gutter. We recommend DryFlekt Kick-Out Diverters. Install step flashing with minimum 4 upper leg. Properly integrate flashing with the secondary water-resistive barrier. Use house wrap, flashing tape, z-flashing, or other items as needed to maintain the counter flashing principle. Maintain the proper clearance between the end of the gutter and the adjoining wall to allow for proper maintenance of the siding. Paint ALL exposed cut edges. CONDITION Snug Flush Visible fiber Countersunk 1 16" - 1 8" Countersunk more than 1 8" WHERE TO FASTEN - SIDING CORRECTION Fasteners will be exposed on the siding located immediately below window sills, fascia boards, and horizontal trim. Fasteners below window sill shall be spaced a maximum of 8" on center. Face nailing may be required as necessary in order to obtain satisfactory installations. Best practice for blind or exposed nailing is to use only 316 stainless steel nails within 15 miles of the seacoast. Beyond 15 miles, either 304 stainless steel or hot dipped galvanized is acceptable. Nail at all special framing members around openings. Nail from the center of the siding toward the ends, or from one end to the other end. NEVER nail from the ends of the siding toward the middle. Shim siding at studs as needed, to avoid drawing siding against uneven walls. When installing siding over up to 1" rigid foam sheathing be careful not to drive fasteners so hard as to compress the foam and distort surface of the siding. For info on fastening any of the shake products in high wind speed areas, please refer to ICC-ES Report ESR-1301. The transverse windload design values in table 4 of the APA Product Report PR- N124 may be used when the following fasteners specifications are met. HOW TO FASTEN: Staggered/Straight Shakes & Straight/ Straight Shakes can be installed blind fastened. It is recommended to fasten into framing where ever possible. Do NOT place fasteners into bottoms of grooves or shiplaps. DO NOT OVERDRIVE NAILS. Nail head should seat firmly to the face, or flush with face of siding, but not be over-driven to distort the siding surface. For screws, fasten 12" on center using a minimum #8 corrosion resistant tapered head wood screw. For nails, fasten 8" on center using a minimum of 6d (0.09 shank diameter) corrosion resistant ring shank nail. 3 Primed Strand Shake Installation Instructions \\ Wausau Supply Co. 5.18 OK OK Paint Apply sealant Apply sealant & re-nail

ALTERNATIVE FASTENING OPTION: FOR WOOD STRUCTURAL PANELS + 24 O.C. STUD SPACING OR SIP ASSEMBLIES The sheathing must be a min. 7/16" thickness with APA rating. The Engineered Wood Association that contains the consensus standard DOC PS2. Note: Must be fastened with either corrosion resistant screws or corrosion resistant ring shank nails. Minimum 6d (0.091 inch shank diameter) hot-dip galvanized ring shank nail with a 0.200 inch diameter head, spaced a maximum of 8" O.C. 4" min. flashing Figure 1 Figure 1A Figure 1B Figure 1C ROOF FLASHING DETAIL JOINT TREATMENT OVER OPENINGS 1" min. clearance from roofing Trim Min. 3/16" gap Paint bottom edges Vapor Retarder Breathable weather resistant barrier ALTERNATIVE FASTENING OPTION: OVER ICF ASSEMBLIES Minimum #8 hot-dip galvanized tapered head self-drilling screw with a 0.270 diameter head. Minimum penetration of 3/8" beyond the thickness of the nailing flange. GAP 3/16" AND SEAL GAP 3/16" AND SEAL Note: Larger screws may be required by the I.C.F. Manufacturer based on the following minimum withdrawal requirements. Starter Strip Keep a minimum withdrawal value of I.C.F. nailing flange must be 50 lbs. with a maximum 12" O.C. screw spacing. OUTSIDE CORNER DETAIL Figure 1F INSIDE CORNER DETAIL Figure 1E BOTTOM COURSE DETAIL Keep a minimum withdrawal value of I.C.F. nailing flange must be 31 lbs. with a maximum 6" O.C. screw spacing. 4 Primed Strand Shake Installation Instructions \\ Wausau Supply Co. 5.18

PRIMED STRAND REVERSIBLE SHAKE GENERAL: Apply the siding over properly prepared walls. It is REQUIRED to apply Shakes over nailable structural sheathing. This product can be installed with either the staggered or straight edge down. All cut ends should be primed or re-sealed with touch up. HOW TO BEGIN: Begin by nailing on a starter strip such as RigidStack Metal Starter to shim out the bottom of the shake, or by overlapping a previous course of lap siding. If not installing over a previous course of lap siding the preferred way to begin Primed Strand Reversible Shake is to install a row of Straight/Straight Shakes first then all subsequent rows of Staggered/Straight Shakes. DO NOT CUT OFF THE BOTTOM FACTORY END OF STAGGERED/STRAIGHT SHAKES TO START A STRAIGHT ROW. THIS PRACTICE WILL VOID SUBSTRATE WARRANTY. STAGGERED EDGE: (RECOMMENDED) For Staggered drip edge: (Using Straight/Straight Shakes & Staggered/Straight Shakes) Starting from left to right. Trim left edge of the Straight/ Straight Shake so that siding section fits against corner board, with a 3/16" gap. Level and install the first course of Straight/ Straight Shakes. Continue row, working left to right. Next install the remaining subsequent courses of Staggered/Straight Shakes with the staggered edge down, working from left to right. Fastening ¾" down from the top of the panel. (OPTIONAL) For Staggered drip edge: (Using Staggered/Straight Shakes) Level and install the first course of Staggered/ Straight Shakes WITH THE STRAIGHT EDGE DOWN working from right to left. Trim the right edge so that siding section fits against corner board, with a 3/16" gap. Continue row, working right to left. Fasten at a horizontal point no more than 1-1/4" below the top of the leading edge as shown below. Next install the 2 nd course with the staggered edge down. The MINIMUM overlap for the 1st and 2nd course is 2-5/8". Install the remaining subsequent courses with the staggered edge down, working from left to right. Butt joint seams are not required to land on studs. 5 Primed Strand Shake Installation Instructions \\ Wausau Supply Co. 5.18

STRAIGHT EDGE: For Straight drip edge: (Using Staggered/Straight Shakes) Starting from right to left, level and install the first course of Staggered/Straight Shakes with the straight edge down. Trim right edge so that siding section fits against corner board, with a 3/16" gap. Fasten at a horizontal point no more than 1-3/4" below the top of the leading edge. Continue row, working right to left. Install the remaining subsequent courses of Staggered/Straight Shakes with the straight edge down, working from right to left. Butt joint seams are not required to land on studs. STRAIGHT EDGE: (USING Straight/Straight Shakes) Starting from left to right. Trim left edge so that siding section fits against corner board, with a 3/16" gap. Level and install the first course of Straight/Straight Shakes. Continue row, working left to right. Install the remaining subsequent courses of Straight/ Straight Shakes with the straight edge down, working from left to right. Butt joint seams are not required to land on studs. INSTALLATION : Overlap shiplap butt ends without any gap. (Figure 4e) Gap all shakes 3/8" off of flashings, 1" off roof lines, 6" off finished grade. Snap horizontal level lines to set course elevations. Follow minimum overlap as shown on diagram for your situation. Start subsequent courses in same manner but trim each course to effect staggered joints. Best appearance is obtained by trimming second course starter piece 16" shorter than the first course and trimming the third course starter piece 32" shorter than the first. Repeat this same sequence every three courses. This ensures the rain lines do not stack on top of each other. Shiplap butt ends Figure 4e 16" or 24" o.c. Framing HOUSE WRAP 16" Offset 16" Offset Nailable Structural Sheathing 16" Offset Trim Board 6 Primed Strand Shake Installation Instructions \\ Wausau Supply Co. 5.18

FINISHING INSTRUCTIONS: DO: Prime and paint all exposed surfaces including all drip edges or where water will hang. Apply finish coat as soon as possible or within 180 days of application. High-quality acrylic latex paint, specially formulated for use on wood and engineered wood substrates, is highly recommended. Semi-gloss or satin finish oil or alkyd paints are acceptable. For flat alkyd paint, please check with the coating manufacturer for their recommendations for use on composite wood siding. Follow the coating manufacturers application & maintenance instructions DO NOT USE Semi-transparent & transparent stains Shake & shingle paints. Vinyl-based resin formulas such as: vinyl acetate, PVA, vinyl acetate/acrylic copolymer paints. 7 Primed Strand Shake Installation Instructions \\ Wausau Supply Co. 5.18