application instructions

Similar documents
Application Instructions

PRIMED STRAND REVERSIBLE SHAKE

LP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding

Installation Instructions for Panel Siding and Soffit

Installation Instructions for TruWood Reversible Trim

The Beauty Of Wood. Made Better. Product Specifications LPZB0590

Shapes Siding. Perfection Shingles. Chalk Line

COMPOSITE SIDING INSTALLATION GUIDE

Installation Guide - Evolution Series Wood Siding

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

Technical Note No. 028

Installation Guide Classic Series Wood Siding

Technical Note No. 026

CarraraFinishes built on LP SmartSide

INSTALLATION INSTRUCTIONS

ForceField Air & Water Barrier System. installation instructions

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar

PANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS

STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS AND INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS

Installation Guide Maibec Resistech Panel, Shingle Strips and Trims Solid Colours

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

C e r t a i nte e d. FiberCement Siding

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

SIDING INSTALLATION GUIDE

HardieShingle Siding Product Description

Installation Instructions

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

MULTISHAKE LAP SIDING INSTALLATION GUIDE STORAGE AND HANDLING: PACKAGING:

KuraStone TM Installation Guide

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

lap siding Visit for the most recent version.

Installation Instructions

Installation Guide. Grayne.com

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

Eagle clad double-hung window installation instructions

Section I. Before You Start deals with numerous considerations which you should be aware of before you start installing Western Red Cedar siding.

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

Effective February, 2015

eco-shake INSTALLATION INSTRUCTION

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION

MAXISHINGLE LAP SIDING INSTALLATION GUIDE

STRAIGHT EDGE, STAGGERED EDGE NOTCHED, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.

Tools required by installer: Materials required by installer:

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

INSTALLATION GUIDE SAVANNAH SMOOTH & SIERRA PREMIUM SHAKE

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

Siding STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'

INSTALLATION PROCEDURE

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

LAP SIDING INSTALLATION GUIDE

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

Ash Brook Golf Course Scotch Plains, New Jersey

Effective April 1, 2013

UNIT 5: EXTERIOR DOORS AND WINDOWS

Installation Manual SOLID CORE SIDING

Installation of Fiberglass Windows

INSTALLATION GUIDE NICHIPRODUCTS & NICHIFRONTIER

4. Metal roof jacks at penetrations and attachments

HardieShingle Siding Product Description

Installation Manual for Thermo Panel

LAP SIDING INSTALLATION GUIDE

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

HardiePanel Vertical Siding Product Description

Florida Product Approval HardiePlank Lap Siding

PROJECT INSTRUCTIONS Roofing

Turada Hardwood Shingles and Shakes Installation instructions

HardieTrim NT3 TM board is a decorative non-load bearing trim product. Figure 3. Fasten HardieTrim Flat Tab to minimum 7/16" OSB.

ROOFING City of Grand Rapids Building Safety Division

DURABLE, STABLE AND LOW MAINTENANCE SIDING

Tapersawn Shake Installation Instructions

SECTION WOOD SHINGLES

CFDTT-01. Control Joint Study (General)

Slate Shingle Specifications

RESIDENTIAL ROOFS ADDENDUM NUMBER ONE. August 28, 2017

ROOFING APPLICATION STANDARD (RAS) No. 130

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

Appendix A. Additional Information ATTACHING JAMES HARDIE PRODUCTS TO INSULATED CONCRETE FORMS (ICF)

4/4, 5/4 Boards EFFECTIVE JULY 2011 INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS

CERACLAD.

14.0 SIDING AND SOFFITS SECTION

Integrity Polygon and Round Top Installation and Finishing Instructions

4256HM JAMES HARDIE MONOLITHIC CLADDING

3M Air and Vapour Barrier 3015 Technical guide

Transcription:

application instructions architectural collection cedar shake 76 series lap siding General At the time of manufacture, siding meets or exceeds the performance standards set forth in Composite Panel Association ANSI 135.6-2006 and has achieved code recognition under Legacy National Evaluation Report NER-626 and CCMC-12353L. For copies of these reports, call LP Customer Support at 1-800-577-4836. Minimum 6 in. clearance must be maintained between siding and finish grade. Siding applied adjacent to porches, patios, walks, etc. must have a clearance of at least 1 in. above any surface. Minimum 1" clearance at intersection with roof line Apply siding in a manner that prevents moisture intrusion and water buildup. All exposed wood substrate must be primed and painted in a manner that prevents moisture intrusion and water buildup. In non-traditional ICF and SIP assemblies, the ICF or SIP manufacturer must prescribe the fastening specifications. Note: LP does not recommend LP SmartSide for use in these non-traditional assemblies. If used, LP will not warrant for Buckling and Shrinkage. However, balance of warranty does remain intact. When using wet blown cellulose insulation, adequate drying time must be allowed prior to enclosing the wall cavity DO NOT USE STAPLES Storage Store off the ground well supported, on a flat surface, under a roof or separate waterproof covering Keep siding clean and dry. Inspect prior to application. Allow siding to adjust to atmospheric conditions before application. Stud Spacing Cedar Shake Lap Siding may be applied over sheathed walls or where building codes permit, directly to studs spaced no greater than 16" O.C. that have adequate corner bracing. In all installations over masonry walls, the wall must be furredout with top and bottom openings for convective ventilation. The maximum framing span is 16" O.C. and the furring must be a minimum of 1-1/2" thick. Moisture Moisture control and moisture vapor control are critical elements of proper housing design. Check your local building codes for application procedures for handling moisture and moisture vapor in your area. As with all wood products, do not apply engineered wood siding to a structure having excessive moisture conditions such as drying concrete or plaster. If such conditions exist, the building should be well ventilated to allow it to dry prior to the application of the siding. Siding must not be applied to green or crooked structural framing members. Do not apply siding over rain-soaked or buckled sheathing materials. Gutters are recommended for control of roof water run off. Secondary Weather Resistant Barrier A properly installed breathable water-resistive barrier is required behind the siding. Consult your local building code for s. LP will assume no responsibility for water penetration. Gaps & Sealants Seal all gaps with a high-quality, non-hardening, paintable sealant with a minimum stated service life of 30 years. Follow the sealant manufacturer s instructions for application. Flashing, Windows, Doors & Openings All openings must be properly sealed or flashed in a manner that prevents moisture intrusion or buildup. Several examples that accomplish this are shown on the following pages. Trim Trim should be thick enough so the siding does not extend beyond the face of the trim. Trim and fascia must be applied in a manner that will not allow moisture intrusion or water buildup. LP SmartSide siding is not designed and/or manufactured to be used as trim or fascia. LP SmartSide trim and fascia are available in a variety of dimensions.

Application instructions (cont.) Kick-Out Flashing Install kick-out flashing to direct the water into the gutter Install step flashing with minimum 4-inch upper leg Properly integrate flashing with the secondary water-resistive barrier. Use housewrap, flashing tape, z-flashing, or other items as needed to maintain the counterflashing principle. DO NOT extend the siding or trim into the kick-out flashing or gutter Maintain a clearance between the end of the gutter and the adjoining wall to allow for proper maintenance of the siding Paint ALL exposed cut edges LP Siding Minimum 1" clearance between trim and roofing Siding Applicator Instructions a) Apply siding over properly prepared walls (see General Information) with a maximum stud spacing of 16 in. o.c. b) Begin by nailing a starter strip (approximately 3/8 in. x 1-1/2 in.), flush with bottom edge of sill plate. For random drip edge: Starting from left to right, level and install the first course of Cedar Shake Lap Siding so bottom edge is no more than 1/2 in. below the shim. Trim left edge so that siding section fits against corner board, with a 3/16 in. gap, and so that opposite shiplap edge falls on a stud for nailing. For straight drip edge: Starting from right to left, level and install the first course of Cedar Shake Lap Siding so bottom edge is no more than 1/2 in. below the shim. Trim right edge so that siding section fits against corner board, with a 3/16 in. gap, and so that opposite shiplap edge falls on a stud for nailing. Use alignment notch in shiplap edge as automatic guide to lap each siding course. Lap a minimum of 1-3/4 in. to bottom of notch, as shown. Nail 3/4 in. from bottom edge to penetrate both siding courses. Clean rain gutter c) Start subsequent courses in same manner but trim each course to effect staggered joints. Best appearance is obtained by trimming second course starter piece 16 in. shorter than the first course and trimming the third course starter piece 32 in. shorter than the first. Repeat this same sequence every three courses. Do not run trim or siding inside of the kick out flashing Finishing Instructions DO NOT OVERDRIVE NAILS. Nail head should seat firmly to face of siding, but not be overdriven to distort the siding surface. All siding joints must fall on studs. At shiplap edges, double nailing is required. DO Prime and paint all exposed surfaces including all drip edges or where water will hang. Apply finish coat as soon as possible or within 180 days of application. High-quality acrylic latex paint, specially formulated for use on wood and engineered wood substrates, is highly recommended. Semi-gloss or satin finish oil or alkyd paints are acceptable. For flat alkyd paint, please check with the coating manufacturer for their recommendations for use on composite wood siding. Follow the coating manufacturer s application and maintenance instructions. CONDITION Snug Flush Visible fiber Countersunk 1/ 16 in.-1/ 8 in. Countersunk more than 1/ 8 in. CORRECTION OK OK Paint Seal with caulking Seal with caulk and renail DO NOT USE Semi-transparent and transparent stains. Shake and shingle paints. Vinyl-based resin formulas such as vinyl acetate, PVA, vinyl acetate/acrylic copolymer paints. d) NAILS MUST PENETRATE FRAMING MEMBERS AT LEAST 1-1/2 in. For best performance use hot-dipped galvanized nails with a minimum 0.27 in. diameter head and 0.113 in. diameter shank. Nail at all special framing members around openings (maxi-

mum spacing 16 in. o.c.). Shim, if necessary, to provide solid backing for siding fitted around windows, doors, and at rake cuts on gable ends. e) LP SmartSide siding should be sawn face up with a fine-tooth handsaw, or face down with a combination blade power saw. f) Where siding butts window trim, door casing, masonry, etc., leave a 3/16 in. gap and seal. Insulated Sheathings LP SmartSide Sidings may be installed over low-compression rigid foam or fiberglass sheathings. The following precautions must be followed: a) Adequate bracing of the wall in accordance with the International Codes or other ruling building code is required. b) For rigid foam sheathing up to 1" (25.4 mm) thick, siding may be nailed directly to the foam sheathing unless a drainage plane is required by the local building code. Nail length must be in-creased to ensure a minimum 1-1/2 (38.1 mm) fastener penetration into the structural framing. c) For rigid foam sheathing greater than 1" (25.4 mm), a minimum 1-1/2 (38.1 mm) thick by 4 (101.6 mm) wide vertical strapping or furring strip must be installed over the sheathing to provide a solid, level nailing base for the siding. The strapping must be securely fastened to structural framing spaced no greater than 16 OC (406 mm) with a minimum nail penetration of 1-1/2 inches (38.1 mm) and a maximum nail spacing no greater than the width of the siding. Louisiana-Pacific will assume no responsibility for any damage or condition arising from the use of foam sheathing. The Louisiana-Pacific Corporation ( LP ) LP SmartSide Siding (the Products ) limited warranty (the Warranty ) applies only to structures on which the Products have been applied, finished and maintained in accordance with the published application, finishing and maintenance instructions in effect at the time of application. The failure to follow such application, finishing or maintenance instructions will void the Warranty as to the portion of the Products affected by the variance (the Affected Products ). LP assumes no liability for any loss or damage sustained by the Affected Products and is expressly released by the purchaser or owner from any such loss or liability. Any modification of the Warranty s application, finishing or maintenance requirements is void and unenforceable unless approved in writing prior to application by the Siding General Manager or his designee and a member of the LP Legal Department. For a copy of the warranty or for installation and technical support, visit the LP SmartSide product support Web site at: www.lpcorp.com or for additional support call 800.450.6106. Warranty remedies are not available if requirements are not followed. Cal. Prop 65 Warning: Use of this product may result in exposure to wood dust, known to the State of California to cause cancer. 2012 Louisiana-Pacific Corporation. All rights reserved. LP and SmartSide are registered trademarks of Louisiana-Pacific Corporation. Printed in U.S.A. NOTE: Louisiana-Pacific Corporation periodically updates and revises its product information. To verify that this version is current, call 800-450-6106. LPZB0507

roof flashing 4 in. min. flashing 1 in. min. clearance from roofing Trim Min. 3/16 in. gap Paint bottom edges joint treatment 3/8 in. 1 in. over openings flash, shim, gap 3/8 in. ensure complete paint coverage of the drip edge Figure 1A Figure 1B Figure 1C Figure 1 Vapor Retarder Breathable weather resistant barrier Figure 1F Figure 1E Figure 1D gap 3/16 in. and seal gap 3/16 in. and seal starter strip outside corner inside corner bottom course

1-1/2 in. minimum 1-3/4 in. Figure 2 Breathable weather resistant barrier exposure 10 in. 3/4 in. Figure 3 Figure 4 nailing 1 in. 1-1/4 in. alignment notch 1-1/4 in. 3/4 in. Figure 5 ends of shakes must fall on studs