Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

Similar documents
A Full Line of Pipe Products for Any Application

QUALITY ASSURANCE SPECIFICATION

A Full Line of Pipe Products for Any Application

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings.

This specification describes the minimum requirements for piping systems for the following service:

High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION SUBMITTAL PROCEDURES

001: 2007 CEB STANDARD

STEAM QUALITY TEST ELBOWS

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

This specification describes the minimum requirements for piping systems for the following service:

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

IS INTERNATIONAL STANDARD. Steel tubes - Continuous character marking and colour coding for material identification. First edition

Code for Construction of Industrial Metallic Piping Engineering

Services of a Neutral Beam Specialist for the Neutral Beam Section of the Heating & Current Drive Division of ITER. Technical Specifications

Government Recognized Export House OHSAS 18001:2007 ISO 14001:2004 PED Approved Company.

PIPING NOMENCLATURE. Header Branch connection Valve Flange Expansion joint Expansion loop Pipe support Reducer Elbow

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

SECTION SUBMITTAL PROCEDURES

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

ASME NQA-1 Quality Assurance Requirements for Nuclear Facility Applications. Prague, CR July 7 8, 2014

Fabricated Structural Steelwork. Section 8

JIS G3465 Seamless Steel Tubes for Drilling

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

East Central College

Construction Phase Project Management and Documentation

Listing Report: AB Reissue Date: 01/21/16 This report is subject to annual review

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

J O I N T I N D U S T R Y S T A N D A R D. Requirements for Soldering Pastes J Standard 005A. December 2011

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Thickness tolerances of steel plates and wide flats

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

TYPE APPROVAL PROCEDURE

Section Meetings Section Material and Equipment. None Required

United Nations Development Programme

THE KENYA POWER AND LIGHTING CO. LTD. SPECIFICATIONS for IMPULSE VOLTAGE TEST EQUIPMENT

PIP STF05121 Anchor Fabrication and Installation Into Concrete

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

WATERFLUX 3000 Quick Start

FORTRESS BOTTOM PLATE ANCHORS. Product. Scope. Building Regulations. Appraisal No. 687 [2017]

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

1. ASME A Scheme for the Identification of Piping Systems.

Use of the Graded Approach in Regulation

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

STP-NU CODE COMPARISON REPORT

ITB TECHNICAL APPROVAL AT /2011

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

A representative from Occupational Health is to be involved in the commissioning process to address any Respiratory Protection Program requirements.

SPECIFICATION FOR PIPEWORK WELDING, INSPECTION, SUPPORTING AND TESTING

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

Standards in. International Trade & Nuclear Safety. The Role of IAEA

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)

DNVGL-CP-0212 Edition March 2016

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCN 01. Page No. 1 of 2 Ref: PSER:SCT:ABJ:T1178:TCN-01 Date:

Harmonization of Nuclear Codes & Standards Pacific Nuclear Council Working and Task Group Report

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

This specification describes the minimum requirements for piping systems for the following service:

Trade of Metal Fabrication. Module 5: Pipe Fabrication Unit 3: Flanges Phase 2

LICENSING THE PALLAS-REACTOR USING THE CONCEPTUAL SAFETY DOCUMENT

Test Panel Information Sheet

SECTION SUBMITTAL PROCEDURES

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

DRAFT UGANDA STANDARD

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

A comprehensive pipework prefabrication service PES PIPEWORK ENGINEERING SERVICES LIMITED

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

Midsteel Flanges & Fittings Ltd

(Non-legislative acts) DECISIONS

ISO INTERNATIONAL STANDARD. Non-destructive testing Ultrasonic thickness measurement

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete.

CARBON STEEL BUTTWELD FITTINGS STD & XH Carbon Steel Buttweld Pipe Fitting List Prices (SBW-0118)

Quality Management system to Enhance Offshore & Subsea ESP Run life and Reliability Reda Elmahbes Baker Hughes / Mohamed Elmhabbes Saipem Libya

SUBMITTAL PROCEDURES

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

Expert 1400 / Expert 3400 Submersible Hydrostatic Level Transmitters

Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID

WHO WE ARE. ITS holds a Certificate of Authorization Permit (CAP) under the AB-5I5 program from ABSA.

DNVGL-CP-0338 Edition October 2015

TECHNICAL SPECIFICATION FOR. CONTACT WIRE HARD-DRAWN COPPER 161mm2

ALLOY STEEL SOCKET SET SCREWS 1

This specification describes the minimum requirements for piping systems for the following service:

Pressure transmitter For sanitary applications Model SA-11

The surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample.

JOINT INDUSTRY STANDARD. Requirements for Soldering Pastes J Standard 005A. June 2011 Final Draft for Industry Comment

Transcription:

IDM UID: R22L3M ver 1.4 Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

Contents 1 Terms and Acronyms... 3 2 Background... 3 3 Document Scope... 3 4 Scope of Supply... 3 5 Regulatory Requirements... 5 5.1 Additional Surveillance Requirements... 5 6 Technical Requirements... 6 6.1 Tests to be Performed... 6 6.2 Chemical Composition... 6 6.3 Hydrostatic Test... 6 6.4 Leak Testing... 6 6.5 Cleanliness... 7 6.5.1 Pickling and Passivation... 7 6.5.2 Internal Cleanliness... 7 6.5.3 External Cleanliness... 7 6.6 Surface Finish... 7 6.7 Pipework Component End Preparation... 7 6.8 Repair by Welding... 7 7 Packaging... 7 7.1 Transportation Packaging... 7 7.2 End Caps... 8 7.3 Marking... 8 8 Quality Assurance... 8 8.1 Quality Plan... 8 8.2 Manufacturing and Inspection Plan... 8 8.3 Deviations and Non-Conformances... 8 9 Ordering Information... 9 10 Certification... 9 11 Delivery... 10 12 Reference... Error! Bookmark not defined.

1 Terms and Acronyms Specific terms used throughout this document with contextual meaning are given in Table 1. ASN Customer Term/ Acronym Contextual Meaning French Nuclear Safety Authority Places the task order for the pipework, responsible for payment, responsible for ensuring the manufacture, inspection, testing, cleaning, packaging and delivery of pipe work components as per the technical specification of the task order the IO. IAEA International Atomic Energy Agency IO ITER Organization, The Operator under the scope of [1] Pipework components Stainless Steel, seamless pipe & pipework fittings (tees, elbows reducers etc.) PIC Protection Important Components (as defined in [1]) Supplier / Contractor Responsible for execution of manufacture, testing, cleaning, packaging and delivery of pipework components Table 1 Specific terms 2 Background A network of pipework of approximately 10 km in length is required to interconnect between vacuum chambers, vacuum pumps and auxiliary vacuum systems. In the main pipework to be supplied under the scope of this technical specification is intended for vacuum use (0.1 MPa differential pressure, vacuum internal). Some pipework will operate with internal pressure up to 0.2 MPa and falls under the scope of Sound Engineering Practice (SEP) compliant with [2]. 3 Document Scope The scope of this document is to define the requirements pertaining to the supply of stainless steel pipes and pipe fittings (pipework components) to the IO for use on the ITER vacuum systems. 4 Scope of Supply The scope of supply includes manufacture, testing, cleaning, packaging and delivery of TP 304L pipe and WP304L pipe fittings to the IO site, France. The envisaged amount of pipe (grade, DN and schedule) are provided in Table 2. Dimensions for pipes shall comply with [3] 1. The envisaged amount of pipe fittings (grade, DN and schedule) is provided in Table 3. The dimensions of pipe fittings shall be compliant with [4] 2. Table 2 & Table 3 are provided for the purpose of costing. 1 See table for DN 150 wall thickness 2 See table for DN 150 wall thickness

Component Grade Diameter Schedule(SCH.) Meters Nominal (DN) Pipe TP 304L 25 10s 2600 *Where specified as DN 150 sch. 20 wall thickness = 6.35 mm Component Grade Diameter Nominal (DN) 32 10s 200 40 10s 300 65 10s 200 100 10s 620 150 10s 1300 20s* 20 40s 20 250 10s 140 20s 250 300 20s 150 Table 2 Indicative quantities - pipe Schedule (SCH.) Elbow WP 304L Standard Radius Long Radius Number of Units 25 10s 550 550 32 10s 25 25 40 10s 180 150 65 10s 10 70 100 10s 90 40 150 10s 165 110 20s* 10 10 40s 10 10 250 10s 40 10 20s 60 20 300 20s 40 5 Tee WP 304L 25 10s 80 32 10s 25 40 10s 5 65 10s 5 100 10s 10 150 10s 15 20s* 15 40s 15 250 10s 5 20s 5 300 20s 5 Reducer Tee 100x100x40 WP 304L 10s 5

Reducer Tee 150x150x65 Reducer Tee 250x250x150* 10s 60 10s 5 20s 40s 5 Concentric Reducer 300x150* 20s 10 40s 10 Concentric Reducer 250x150* 10s 5 20s 5 Concentric Reducer 100x40 Concentric Reducer 65x40 10s 30 10s 35 Cap 150 10s 10 *Where specified as DN 150 sch. 20 wall thickness = 6.35 mm 20s* 5 40s 5 Table 3 Indicative quantities - fittings 5 Regulatory Requirements Some pipe and pipework fittings procured under the scope of this contract shall perform a confinement function 3. As defined in the French Order of 7 th February 2012 establishing the general rules for licensed nuclear installations [1] components which perform a safety function (e.g. provide confinement) are classified as Protection Important Components (PIC) and hence shall satisfy the requirements of the said order. PIC pipework components shall satisfy the requirements of QC1 arising from [5]. Where pipework components are to comply with the French Order [1] it will be clearly stated as such on the Customer Order. 5.1 Additional Surveillance Requirements ITER Organisation is the Nuclear Operator and has the ultimate responsibility for the application of the INB Order [1] within the IO and in its chain of suppliers. IO must undertake additional surveillance for those components which are classified as Protection Important Components. The Supplier shall therefore grant access to the IO and ASN representatives to its facilities and records and those of its subcontractors for the purposes of surveillance of defined requirements during the design, construction, manufacturing, commissioning, assembly, maintenance and surveillance of a PIC. This surveillance shall also include the examination of all protective important actions and follow-up and verification of any corrective actions which are to be implemented. 3 Confinement is the term used for the physical enclosure of hazardous substances (e.g. tritium).

6 Technical Requirements Vacuum pipework systems are being designed to ASME B31.3 fluid category M [6]. Under the scope of the contract, where specified in this technical specification the Supplier shall supply to the IO, vacuum pipework components which satisfy the requirements as specified in Table 4 and other additional requirements as described in this technical specification. Component Schedules DN Material Requirements Seamless (SML) pipe TP304L [7] Seamless (S) Pipe fittings 10, 20,40 25 to 300 [8] WP304L (tees, elbows, reducers) Table 4 Generic Requirements In accordance with [7], [8] The M designation (SI units) shall prevail. 6.1 Tests to be Performed Pipework components shall be subjected to testing as defined in Table 5. Test Category Extent of Test Number of test pieces per test sample Chemical Analysis - heat 1 per heat 1 Chemical Analysis - product 2 per heat Tensile test 2 per lot 1 2 Surface finish 2 per lot 2 Flattening Test 5% pipe per lot, not less than two lengths Dimensional Inspection According to [7] for pipes and [8] Varies by lot size 1 Visual inspection for fittings Cleanliness check Leak Check Non-destructive electrical test Lot definition [7] for pipe and [9] for fittings. Follow lot definition for tensile testing [9]. Each product 100% each component Table 5 Tests to be performed, test units and extent of testing 6.2 Chemical Composition Pipe and pipework fittings shall meet the chemical composition requirements for materials as specified in [7], [8] respectively. In addition pipework components shall meet the requirements pertaining to chemical composition as detailed in Table 6. Chemical Compositions (max wt%) Co Ta Nb 0.20 0.05 0.10 Table 6 Chemical Composition 6.3 Hydrostatic Test Pipe shall not be subjected to hydrostatic testing. Pipe shall be subjected to non-destructive electrical test in accordance with [7]. 6.4 Leak Testing Where specified in the Customer order, the vacuum performance with respect to helium leak rate shall be confirmed by leak testing in accordance with the ITER Vacuum Handbook [10]. The Supplier shall submit with the reply to the call for tender a procedure for leak testing of components.

Where a leak test is specified the maximum allowable leak rate is 1 x 10-10 Pa.m 3.s -1 at ambient temperature with 0.1 MPa (±20%) helium differential pressure with helium applied to external surface of pipework components. 6.5 Cleanliness In addition to the requirements as specified in [7] (for pipe) & [8] (for fittings) the following requirements pertaining to cleanliness shall be satisfied. 6.5.1 Pickling and Passivation Pipework components shall be pickled. Pickling shall be followed by passivation. Picking and passivation of pipework components shall comply with the requirements of the ITER Vacuum Handbook [10]. 6.5.2 Internal Cleanliness Pipework components shall be internally cleaned in compliance with the ITER Vacuum Handbook [10]. The Supplier shall submit with the reply to the call for tender a draft cleaning procedure which the Supplier will follow in order to meet the requirements of this technical specification 4. The cleanliness of the internal surfaces of pipework components shall be confirmed by a wet wipe test in accordance with the IO standard wipe test for cleanliness [11]. The wipe test shall be performed at a distance, when measured from any end of the component, of no less than the 2DN of the component. The test can be performed on any internal surface of the pipework component. 6.5.3 External Cleanliness The external surfaces of pipework components shall be scale free and free of gross contamination. The cleanliness of external surfaces of the pipework components shall be confirmed by dry wipe test in accordance with [11]. The test shall be performed at a distance, when measured from any end of the component, of no less than the 2DN of the component. The test can be performed on any external surface of the pipework component. 6.6 Surface Finish The maximum average (internal and external) surface roughness, Ra, of pipework components shall be 12.5 µ. The measurement of the surface roughness shall be performed using the electric stylus measurement technique in accordance with [12]. 6.7 Pipework Component End Preparation Pipework components shall be supplied with square (plain) ends free from burrs. 6.8 Repair by Welding Repair of pipework components by welding is not permitted. 7 Packaging 7.1 Transportation Packaging The packaging for the pipes and fittings shall meet the minimum requirements of Level C for overseas shipment in accordance with [13]. 4 There is no requirement to vacuum condition (bake) components supplied under the scope of this contract.

7.2 End Caps Clean Pipe component ends shall be capped to prevent the ingress of material to the component internal. In accordance with [14] the ingress protection shall be IP66. Caps shall be fabricated from stainless steel or non-halogenated material. 7.3 Marking In addition to the requirements for marking specified in [7], [8] the following requirements pertaining to marking the pipework components shall be satisfied; Marking of pipework components shall utilize marking paint or ink. Marking paint or ink shall only be applied to the external surfaces of the pipework components. Fluids used for marking shall be approved by the IO and shall have a halogen content <200 ppm. Pipework components shall be marked with heat and lot number of pipe material. 8 Quality Assurance The Supplier s Quality Assurance Programme (QAP) is subject to approval by the IO in accordance with the ITER QA Programme and shall be applied to all work carried out as a result of any contract arising from this specification. The ITER QA Programme is based on IAEA Safety Standard GS-R-3 and on conventional QA principles and integrates the requirements of the French Order dated 7 th February 2012 [1] on the quality of design, construction and operation of Licensed Nuclear Installations. For this purpose, the Supplier shall ensure that any subcontractors carrying out work placed under the prime contract are in compliance with the QA requirements under the relevant QA classifications. The general requirements are detailed in ITER Integrated Safety, Quality and Security Management System [15] and ITER Procurement Quality Requirements [16] whilst the specific requirements for the overall supervision plan of external intervener s chain for Protection Important Components, Structures and Systems and Protection Important Activities detailed in [17]. 8.1 Quality Plan Prior to commencement of the work, a Quality Plan [16] must be submitted for IO approval giving evidence of the above and describing the organisation for this task; the qualification and experience of the workers involved including named individual(s) who will act as Independent Reviewer(s) and Checkers(s) and any anticipated sub-contractors. 8.2 Manufacturing and Inspection Plan Prior to the commencement of any manufacturing, a Manufacturing and Inspection Plan [18] must be approved by ITER. As some of the pipework components to be supplied are PIC a specific management system must be implemented by the Supplier and any subcontractor working on Protective Important Activities (as defined in [1]), on the basis of activities defined and executed by the Supplier and Subcontractor. This system could be included in the Manufacturing and Inspection Plan or the Quality Plan. 8.3 Deviations and Non-Conformances All deviations and non-conformities must strictly follow the procedure detailed in ITER Requirements Regarding Suppliers Deviations and Non Conformities [19].

9 Ordering Information Supply Orders for material in accordance to this specification shall include the following as required: Customer Technical Specification Component description Quantity (meters, or number of lengths, number of units) Name of material and grade Process (seamless) Size (DN) Length (where applicable) Schedule Supplementary requirements (Cleanliness, leak testing, internal surface finish etc.) End finish 10 Certification The Supplier shall provide material certification of type 3.1 in accordance with [20]. The certificate shall; Identify to a specific pipework component Reference to the Customer technical specification for supply Identify the Contract and/or Supply order number and a description of the items as ordered, provided and certified in satisfaction of the Contract and/or Supply order and all applicable agreed upon changes Identify any procurement requirements that have not been satisfied with reference to any relevant non-conformance or deviation requests Identify the heat number of the component Test reports including: - Heat number - Heat analysis - chemical composition - Product analysis - chemical composition - Tensile properties - Non-destructive electrical test method and acceptance - Dimensional inspection report and acceptance - Flattening test report and acceptance - Results of supplementary requirements (Cleanliness, leak testing, internal surface finish etc.) - Pickling and passivation reports - End finish

11 Delivery Pipework components shall be delivered to the IO in Cadarache, France. 12 Reference [1] Order dated 7 February 2012 relating to the general technical regulations applicable to INB - EN (ITER_D_7M2YKF). [2] French Decree 99-1046 concerning pressure equipment- Pressure Equipment Directive 97/23/EC [ESP/PED]. [3] ASME B36.10M, 2004. [4] ASME B16.9M, 2012. [5] Quallity Classification Determination (ITER_D_24VQES v4.1). [6] ASME B31.3, 2010. [7] ASTM A312M, 2013. [8] ASTM A403M, 2013. [9] ASTM A960, 2013. [10] ITER Vacuum Handbook (ITER_D_2EZ9UM). [11] Standard Wipe Test for Cleanliness (ITER_D_3PEAK3). [12] ISO 4287: 2000. [13] ASME NQA-1-2012, Quality Assurance Requirements for Nuclear Facility Applications. [14] IEC standard 60529. [15] ITER Integrated Safety, Quality and Security Management System (ITER_D_4HCWJU v3.0). [16] ITER Procurement Quality Requirements (ITER_D_22MFG4 v4.0). [17] Overall supervision plan of external interveners chain for Protection Important Components, Structures and Systems and Protection Important Activities (ITER_D_4EUQFL v5.0). [18] Requirements for Producing a Manufacturing and Inspection Plan (ITER_D_22MDZD v3.0). [19] Requirement for DA / Supplier/ Subcontractors Deviations and Nonconformities (ITER_D_22F53X v6.1). [20] EN 10204, 2004. [21] MQP Deviations and Non Conformities (ITER_D_22F53X v6.1). [22] Order dated 7 February 2012 relating to the general technical regulations applicable to INB - EN (ITER_D_7M2YKF v1.6).

[23] Overall supervision plan of external interveners chain for Protection Important Components, Structures and Systems and Protection Important Activities (4EUQFL v5.0). [24] Requirements for Producing a Contractor Release Note (ITER_D_22F52F v5.0).