Siding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE

Similar documents
Siding Systems NOVIKSTONETM FS FIELDSTONE INSTALLATION GUIDE

Installation Manual 0318

Siding Systems NOVIKSHAKE TM HR HALF-ROUND INSTALLATION GUIDE

Installing Novi Siding Trim

Installation Guidelines

3.1 Continuous top and bottom lock 3.2 Engineered nailing hem 3.3 Temperature markings

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Installation Guidelines

Installation Guidelines

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

TRESSES INSTALLATION GUIDE

METAMORPHOSIS INSTALLATION GUIDE

INCEPTIV INSTALLATION GUIDELINES

INSTALLATION PROCEDURE

KUBIK INSTALLATION GUIDE

INCEPTIV INSTALLATION GUIDELINES

PEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals

LAMINATE FLOORING INSTALLATION INSTRUCTIONS READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION.

Installation Manual SOLID CORE SIDING

WOODWORKS Walls. Installation Instructions WALL

Firehouse Manual. Tools Needed:

INSTALLATION AND CARE INSTRUCTIONS

Installation And Care Instructions. Vertical Honeycomb Shades

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

LuxCore Installation Instructions

Install Windsor Corners

Xenon 05 Installation Instructions & Parts List

Assembly Instructions

GRID PANEL SYSTEM Installation Instructions

Installation Guide. Deckorum. Composite Decking

Curium 19.4H Installation Instructions & Parts List

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

WoodWORKS Channeled Plank

Installation Guide 2016

Siding Components. Installation Guide

SINGLE TRACK BYPASS (patent pending) barn door hardware

Cabinetry Installation

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

PRIVACY INSTALLATION FOR: Standard 6 H x 8 W Privacy Fence 4 x 4 Post Sleeve & Brackets Dog Ear or Straight-Edge Pickets 1.75 x 3.

HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels

Chapter 18. Interior Doors

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Gambrel Barn Construction Manual 8x8 through 16x24 Units

Radon 07 Installation Instructions & Parts List

Shapes Siding. Perfection Shingles. Chalk Line

Installation Guide. deckorum Composite Decking

Dubnium 11 Installation Instructions & Parts List

INSTALLATION AND CARE INSTRUCTIONS

COMPOSITE SIDING INSTALLATION GUIDE

SIDING-MASTER VINYL SIDING ATTACHMENT & ALIGNMENT SYSTEM & OVERHANG ATTACHMENT & ALIGNMENT SYSTEM INSTALLATION INSTRUCTIONS

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar

Gallium 03 Installation Instructions & Parts List

Gambrel Barn with Overhang Manual

10x12 Victorian Manual

Fitting Guide. Measuring your walls

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

DESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS

Video Wall Installation Instructions 2W X 3H, 3W X 3H

Harvest (8094) Mystic (8078) Niagara (8095) Shenandoah (8057) 2 DURATA MORTARLESS STONE DURATA FLAT KIT PROFILE #:

Vertical Honeycomb Shades

SLATTEX (Textured Slatwall) INSTALLATION GUIDE

Wall Panel Installation Instructions

Victorian Playhouse Manual

Assembly Instructions

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

If you discover that material is missing or defective, contact our customer service department immediately:

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

INSTALLATION INSTRUCTIONS

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions

E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'

Cape Cod Manual. Little Cottage Co. PO Box 455 Berlin, OH Little Cottage Co.

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

Vivian Mansion Assembly Instruction By Laser Dollhouse Designs

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL

Installation Manual for Metal Emperor Lockers

Installation Instructions. Oakmont Folding Doors

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

Curium 19H Installation Instructions & Parts List

INSTALLATION INSTRUCTIONS

Track Rack. * Track Racks are not lockable

Installation Instructions

Installation Instructions - Model V4JSD 1

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

Installing flat panels on the MPL15 wall mount

Effective February, 2015

TECHNICAL BULLETIN. 7/2017 CertainTeed Corporation

Wall Panel Systems, Inc.

PORTA-FAB Cleanroom Wall Systems

L182 - Installation Sheet Modular Wine Rack ( Wall Mount )

RhinoArt Decor Polystyrene Mouldings

Installation and Assembly: Flat Video Wall Mount For 40" to 65" Flat Panel Displays

METALWORKS TARTAN PANELS General Installation Instructions

R Form No MILLENNIUM GONDOLA / WALLCASE ASSEMBLY

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

InstallatIon InstructIons for 2-lIte PatIo Door unassembled

Pilaster with J-Channel Back Plate

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual. Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B

Transcription:

Siding Systems NOVIKSTONETM DS DRY STACK STONE

GENERAL INFORMATION CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION/CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS WILL ALLOW FOR THE EXPANSION / CONTRACTION OF THE MATERIAL. 1-Always begin the installation at the lowest part of the structure, from left to right. Figure 1 Central hole Installation hole Maximum 16 (40,64cm) 2-Always nail through the installation holes. These holes include a polymer film, which permits for precise centering of the nail, allowing the expansion and contraction of the material. Each complete panel must be nailed through the center hole, at both extremities and have a minimum of 5 nails in the nailing channel at maximal intervals of 16 (40,64cm) or less and one nail in each lateral hole (Figure 1). If panels are installed on a furring wall, furring strips should be at 8 (20,32cm) center to center and a furring strip is required behind each nail. Always use non-corrosive nails or screws with a head of 0.4 (1cm) in diameter and a body of 0.150 (0,38cm) in diameter and penetrate a minimum of 1 1/4 (3,18cm) into a solid surface. Figure 2 1/16 (0,16cm) Lateral holes Minimum 1/2 3-Never hammer the nails in completely; leave a gap of 1/16 (0,16cm). The stoppers located around the holes help to stop the hammer from driving the nails in too far, and provides the required gap. (Figure 2) Minimum 1 1/2 (3,81cm) Figure 3 4-Make sure that all pieces are proprely joined together (Figure 3). 5-When using finition trim (i.e. NovikTrim1, J-trim, etc.) leave a gap of 1/4 (0,64cm) between the trim and the siding (Figure 4). The required opening for finition trim is 1 1/8 (2,86cm). Figure 4 Note: -To cut the material, it is recommended to use a circular saw with a finishing blade. -Keep the R-E-L number of your products (ex: REL-123456) for future reference. 1/4 (0,64cm) NovikTrim1 1/4 (0,64cm) 1 1/8 (2,86cm) J-trim Some elements of the image above were partly removed to facilitate understanding. p. 2/9

INSTALLATION STEPS 1-First install the decorative corners if needed (see corners installation section). Then install the starter strips at the lowest point of the structure. Make sure that the horizontal starting line is perfectly leveled and square with the wall. Leave a 1/2 gap at each end of the wall when using NoviTrim1 (1). If the lowest installation point is against the floor you must leave a gap of 1 13/16 (4,61cm) between the starter and the floor (2). If the lowest installation point is not against the floor, starter strips should be flush with this lowest point. Nail the starter strips through the nailing holes at maximal intervals of 8 (20,32cm) or less. Do not forget to nail through the center hole (3). Install the next starter strip by sliding it leftward to the stopper in the previous strip and nail it as mentioned above (4)(Figure A). Note: For an installation with NoviTrim1 at the bottom of the wall, refer to Tips & Advices section at the end of the guide. Figure A 1/2 8 MAX. (20,32cm) 1 13/16 (4,61cm) 3 4 Wall Floor 1 13/16 (4,61cm) Center hole 2-Cut the left side of a panel in a clean straight line as this cut will be visible. Insert the panel onto the starter strip using the hooks on the back of the panel and slide it up to the decorative corners. It is not necessary to leave a gap between the corners and the panel (Figure B). When using NoviTrim1, cut the left side of a panel in a straight line, insert the cut side of the panel into the NoviTrim1. Leave a space of 1/4 (0,64cm) between the inside wall of the trim and the panel (Figure C). Notes: Measure the wall length to determine where to cut your first panel in order to avoid having a very small piece at the right end of the wall. Be sure to align adjacent walls. For a better look, it is recommended to cut panels which are pressed again the corners with a 3 angle. Figure B Front Back 3 angle cut Figure C NoviTrim1 1/4" (0,64cm) Some elements of the image above were partly removed to facilitate understanding. p. 3/9

INSTALLATION STEPS (CONTINUATION) 3-For each panel, before beginning nailing, make sure to position the left side of panel in order to have an optimal appearance between panels. Hold in place and nail the left end of the nailing channel. Thereafter, while maintaining the panel down to preserve optimal appearance of the lower joint, nail down the center hole. This will ensure even movement of panel in both directions during expansion and contraction. Repeat to nail the right end of the nailing channel and the two lateral holes (Figure D). If the panel is installed on a wall with furrings, a furring strip is required behind each nail. Each full length panel should be secured with a minimum of 5 nails. Note: If a panel piece does not have the initial center hole, drill a new center hole of 1/8 (0,32cm) diameter at the same height as the other installation holes in the middle of the piece. Figure D 1 Installation hole 1x Or 2 Central hole 1x Installation hole 4-Install the following panel by hooking onto the starter strip and sliding into the previous panel. Make sure that the tabs on both sides are locked together. It is not necessary to leave a gap between the panels, you can butt them upto each (Figure E). Repeat this step until the end of the wall. 3 Installation hole 3x Lateral holes 5-Start the second row by cutting the first panel with 16 (40,6cm) increment from the cutting line of the first row. Slide the bottom of the panel into the continuous slot on top of the previously installed row. Proceed with this row and subsequent ones following steps 3, 4 and 5 taking care with each new row to alternate the position of the cut on the first panel (Figure F). Figure E Figure F p. 4/9

INSTALLATION STEPS (CONTINUATION) 6-For the last row or places where you may need to attach siding after removing the installation holes, choose a concealed spot on the panel, and use a knife to create new 1/2 slots (Figure G); the slot must be wider than the nail but not as wide as the nail head. Although not set in installation holes, this type of slots will allow the expansion/contraction movement. Note: To straighten the panel, add some shims as required behind these new nailing slots. Figure G 1/2 Maximum 16 (40,64cm) Roof Wall 1/2" Some elements of the image above were partly removed to facilitate understanding. DECORATIVE CORNERS INSTALLATION 1-To begin the decorative corners installation, join two decorative corner sections together so as to form an inside or an outside corner as required. One corner assembly has a linear coverage of 15.1 (38,35cm) (Figure H). Figure H = 2-Install a first corner assembly at the bottom of the wall and nail the central hole and both extremities on each piece. If the corner is installed at the base of a wall butt the bottom of the corner assembly against the floor. If there is no floor, install the corner flush with the lowest installation point. (Figure I). Note: To enhance the appearance of the finished product, refer to Tips & Advices section at the end of the guide for an alternative installation without the tab at the bottom of the product. x 2 or = Figure I p. 5/9

CORNERS INSTALLATION (CONTINUATION) 3-Install another corner assembly on the wall by inserting it into the lower one and nailing as mentioned in the previous step (Figure I). Repeat until the top of the wall. Figure J 4-For the last corner only, cut the excess, insert it into the lower one and nail it into the wall. If there is no center hole, only nail the two extremeties (Figure J). 5-Start siding installation as mentioned in step no:1 of the guide. ALTERNATIVE FINISHES AT THE BASE OF WALLS 1-You may install the first rows of panels with NoviTrim1 at the wall s base in order to have a neater appearance. To do this, install starter strips at 2 1/4 (5,72cm) from wall s base or above the lowest installation point and install NoviTrim1 Base at 3/16 (0,48cm) from wall s base or above the lowest point (1). Continue the usual installation of the guide from step no:2. Once the first row of wall is completed, install a NoviTrim1 Top to the desired depth (2) (Figure K). Figure K 1 8 MAX. (20,32cm) Wall 2 1/4 (5,72cm) 3/16 (0,48cm) 1/2 2 1/4 (5,72cm) Floor 2 2-You may install the first rows of panels and corners by cutting the tab at the bottom of the parts in order to have a neater appearance. To do this, only cut the parts required for the installation of the first row of the walls. Make sure to do a straight cut without burrs (Figure L). Then follow the installation steps of the guide from the first step by installing starter strips 1/2 lower than the specified measure at this step. Wall Floor Figure L p. 6/9

VERTICAL INSTALLATION CAUTION: THE FOLLOWING INSTRUCTIONS ARE FOR INDOOR INSTALLATION REFERENCE. USE INGENUITY TO INSTALL THE PANELS VERTICALLY AND NEVER FORGET THAT THE POLYMERS UNDERGO EXPANSION AND CONTRACTION WITH VARIATIONS OF TEMPERATURE. 1-For vertical installation, install from the left end of the wall to the right end. Start at the highest point of the structure and assemble down a vertical row at a time. Figure M 2-First install the decorative corners where applicable as per standard corners installation steps (see corners installation section). Then install starter strips vertically only at the right side of corners. Make sure that the starter strips are perfectly aligned and leave a 1 13/16 (4,61cm) gap between corners and starter strips. Nail the starter strips through the center hole and all along the nailing holes at maximal intervals of 8 (20,32cm) or less (Figure M, #1). Note: You may install the first row of panels by cutting the tab at the bottom of the parts in order to have a neater appearance. To do this, only cut the parts required for the first row make sure to do a straight cut without burrs as this cut will be visible. Then install starter strips a 1/2 closer to the corners (Figure M, #2). 1 13/16 (4,61cm) 1 5/16 (3,33cm) 3-Cut the left side of a panel in a clean straight line as this cut will be visible. Insert the panel onto the starter strip using the hooks on the back of the panel and slide it up to ceiling (Figure N). Nail as described in standard installation step #3. Figure N p. 7/9

VERTICAL INSTALLATION (CONTINUATION) 4-Install the following panel by hooking onto the starter strip and sliding into the previous panel. Make sure that the tabs on both sides are locked together. It is not necessary to leave a gap between the panels, you can butt them upto each other. Repeat this step until the end of the wall (Figure O, #1). Figure O 5-Start another row by cutting the left end of the first panel at a 16 (40,6cm) increment from the cutting line of the previous row. Slide the bottom of the panel into the continuous slot of the previously installed row. Proceed with this row and subsequent ones following steps 16, 17 and 18 taking care with each new row to alternate the position of the cut on the first panel (Figure O, #2). 6-For the last row, cut the excess of the panels in a clean straight line as this cut will be visible. Insert panels into the previous row. Nail panels through lateral holes and fasten the side of panels with small screws in concealed spots (Figure P). Figure P p. 8/9

VERTICAL INSTALLATION - WITHOUT CORNERS 1-For a vertical installation without corners, first install all vertical NoviTrim1 as per their installation instruction. Then follow the vertical installation steps for the siding by sliding the panels into NoviTrim1 (Figure Q). No gap required between the end wall of NoviTrim1 and the panels. Figure Q 3 4 2-To have a more discreet appearance of the NoviTrim1, you may use only the NoviTrim1 top part installed on its side. To do this, simply turn the top part and press it against the wall s corner. Nail directly through the top (Figure R). Note: It will be easier to slide the panels into the NoviTrim1 top part by removing all the inside small tabs. Figure R 3 INSTALLATION NEAR HEAT SOURCES Note: When installing near a heat source such as a fireplace, an electric baseboard heater, etc., the installer is responsible to ensure that the installation is at a safe distance such that the panels will not exceed 176 F(80 C). p. 9/9