Punch List Checklist EXTERIOR LANDSCAPING. COMMON LIVING SPACES and HALLS

Similar documents
2250 S LOCUST APARTMENT IMPROVEMENTS EXPENSES

UNIT A 879 SQ. FT. FLOORS 1 TO 4 REVERSE 879 SQ. FT. FLOORS 1 TO SQ. FT.

at Fiddler s Creek Offered by

Example Report Ref: 5642 REPORT. Snagging Survey/ Investigation and Report

16 JUL 2013 Project #:

Wall Panel Installation

Chapter 22 - Cabinets & Vanities

Kevin O'Connor Design Kevin O'Connor CKD, CBD, CID

St. John s United Methodist Church Facility Stewardship Plan Last update: 9 May 2011

Safety First! Review the Safety Checklist before performing tasks in this chapter.

B L A C K B U R N R O W

Safety First! Review the Safety Checklist before performing tasks in this chapter.

222 Edgewood Crescent (Strata Lot 48) The Sequoia. 226 Edgewood Crescent (Strata Lot 49) The Douglas

Traditional Undermount: S Method (Undermount):

Abacos Oceanfront Condominium

VISTA DEL PARAISO LOT 7 SPEC BY:

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )


RIVERBANK, CALIFORNIA. DIAMOND BAR WEST diamondbarwest.com 1

Product number TS-CS/12 x 12. Please read the following before attempting to install your new 12 x 12 Contemporary cast marble panel system

UNIT 12: INTERIOR DOORS AND TRIM

CHOLLA LOT 2 SPEC BY:

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

SCHEDULE OF MATERIALS - SPRINGTOWN UNITS

The Developer. For several generations, the Abbo name has been recognized in national and international

Chapter 19. Interior Finish Work

INCLUDED FEATURES Avalon Circle, Naples, FL Avalon-Naples.com

SECOND FLOOR 1159 sq. ft.

SNAGGING REPORT TERLINGS AVENUE, GILSTON HERTFORDSHIRE

C o m m u n i t y A m e n i t i e s I n t e r i o r A m e n i t i e s

Tackling America s To- Do List: Project Steps

South Palm Place Condominium Homes

Chapter 18. Interior Doors

Installation Instructions for Mincey Marble Manufacturing s 6 x 24 - Stacked - IL Panel System. Product number TS-VS/6 x 24 - Stacked - IL

EXCEL HOMES GARNET MAIN FLOOR OPTIONS KITCHEN OPTION LOCATION OVERVIEW. excelhomes.ca

CHOLLA LOT SPEC BY:

Chapter 12 - Windows and Doors

Augusta. CRAFTSMAN 2,067 SQ. FT. (Elevation Shown with Optional Metal Roof Sections) 2 BEDS 2 BATHS 2 CAR GARAGE

36 Sample Road, County/City, Post Code

CKBD Peakes Bath Scoresheet

VISTA DEL PARAISO 2515 LOT 2 SPEC SPEC BY:

E a s t o v e r C i t y H o m e s. c o m c o n t a c t u s : a n g e l s i m o n i n i. c o m

Check in report schedule of condition

CHARLESTON. excelhomes.ca IN MAHOGANY FRONT DRIVE HOME. 3 Bedrooms 21/2 Baths Two Storey 2354 sq. ft. finished sq. ft. unfinished basement

To prevent accidents and damage please read these instructions before installation or use. Installation Instructions

FIXED PANEL SLIDER QCI5241

The DeWils Guide to Designer Series Framed Cabinetry Installation

DESIGN TO BUILD = BUILD TO DESIGN

TRIM & DOORS. Note Interior work demands more precision than framing - be exact in your measurements! Outfitting the interior.

Cabinet Planning Guide

Product number: TS-CS/6 x 24 - TB - S

SEBASTIAN TUB FAUCET INSTALLATION

SECOND FLOOR 960 sq. ft.

Chapter 12 - Windows and Doors

Installation Instructions for Mincey Marble Manufacturing s Standard 3-Piece Panels [Not Extending to the Ceiling]

HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels

2018 OPTIONS.

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft

How to Build Your Custom Teardrop Camper. 5 x 10 Trailer. 5 Tall Cabin

Cabinetry Installation

STANDARD 3-PIECE CULTURED MARBLE PANEL INSTALLATION GUIDE

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

CLUETT 3 BEDROOM 3 Bedrooms 2.5 Baths 2-car garage 1628 Sq Ft.

Cabinet is 90% assembled, all you need to do is to attach the legs, lay the glass top on the cabinet, connect the faucet, drains & ptrap.

10. Vents, Baffle Guard and Blocking

Apex Kitchen and Bath

Grenite Installation Information.

Plan 1 3 Bed / 2½ Bath / 3-Car Garage / 2,107-2,191 Sq. Ft.

Inclusions Brochure Stages 3 and 4

FRAMED CABINETRY INSTALLATION MANUAL

KITCHEN OF THE WEEK. CliqStudios Designer Spotlight. Full Client Info Packet

installation AND CABINET CARE & MAINTENANCE GUIDE

BUILDERS ONE Framed Cabinet. Installation Manual

Wall Installations. Chapter 16 Wall Installations 16. 1

Kitchen and Bath Design Planner

Where rustic meets modern, New York style loft

Southwest Florida s Most Experienced Home Builder For Over 40 Years

ProLine PL60 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

Manchester 3 Bed / 2½ Bath / 3-Car Garage / 2,107-2,191 Sq. Ft. Bristol at Whitney Ranch ELEVATION C PRELIMINARY

SINKS AND LAVATORIES. Steps to completion: These items are essential for installing all sinks:

SECOND FLOOR 1353 sq. ft.

The URBAN CHIC Tiny Home. Designer: Hannah Nail

If you have a pool, keep it sparkling and leaf-free.

SINGLE SECTION HOMES NORTHWOOD SERIES

inspired colors. innovative organization. incredible strength. INSTALLATION AND CABINET CARE & MAINTENANCE GUIDE

D. Product Certificates: Signed by manufacturers of casework certifying that products furnished comply with requirements.

Residence 1 2 BED / 2.5 BATH / APPROX. 1,122 SQ. FT.

20 Cricket Field Grove Crowthorne RG45 7ES

ROTUNDA WALL-MOUNT FAUCET INSTALLATION

INSTALLATION INSTRUCTIONS FREE STANDING TUB FILLERS

Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB. Job # BID-CDBG #16

For Further Information, contact:

3/8 FRAMELESS BYPASS SLIDING SHOWER ENCLOSURE

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Bi-Pass And Bi-Fold Sliders

How-to-Measure Guide. for Kitchens & Baths

Installation Instructions

Laminate Cabinet Installation Instructions

Richland Ranch Homes. Homes Worth Looking Into!

Kitchen and Bath Design Tutorial

Transcription:

EXTERIOR o Exterior body paint touch up complete o Fascia and eves termite damage repaired o Fascia and eves paint touch up complete o Fence gates open and close properly without sticking or rubbing o Pergola paint complete o Top of pergola painted o All hardware including bolts and hangers painted o All exterior lights operational with working light bulbs o Newly constructed fence is clear coated o Deck painted or clear coated (based on SOW) o All exterior doors painted properly and touched up o All exterior doors open and close properly and latch o All exterior doors hardware installed correctly o No plumbing leaks from any exterior plumbing LANDSCAPING o No dead spots in grass o Sprinklers work and are not spraying house o No dead plants o Bark in planters has even covering and is not messy o Yard cleaned and not messy COMMON LIVING SPACES and HALLS CEILINGS o Ceiling texture complete and without imperfections o Ceiling drywall patches completed and without imperfections o Ceiling paint touch ups complete WALLS o Walls texture completed and without imperfections o Wall drywall patches completed and without imperfections o Wall touch up paint completed ELECTRICAL o All light switches installed correctly and securely (not loose or wiggly) o All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down) o All outlets wired correctly and operational CABINETS o All cabinets open and close correctly o Cabinets painted correctly including inside (and clean) o Cabinet hardware installed correctly

COMMON LIVING SPACES and HALLS (continued) DOORS and CASING o All door casings are caulked correctly o All nail holes filled and painted o Painted correctly o Joints caulked correctly and no visible seam o Open and close without sticking on jam o Open and close without rubbing on floor o Latches o Hardware installed correctly and securely o Screens on sliders BASEBOARDS o Caulked correctly o All nail holes filled and painted o Painted correctly o Joints caulked correctly and no visible seam WINDOWS o Open and close o Lock o Have screens (that are not ripped) o All areas where water can get in are caulked correctly and sealed HARDWOOD FLOORS (New) o All glue cleaned up and not seeping threw seams o All joints tight o All T- bar moldings glued down completely with now glue visible HARDWOOD FLOORS (Existing) o All gaps filled correctly o Sealed correctly o Stained correctly CARPET o All edges nailed down correctly o Not loose anywhere o No threads visible o No stains TILE FLOORS o Installed correctly o Grout lines filled correctly o No loose tiles o No broken tiles o No chipped tiles

BEDROOMS 1 2 3 4 CEILINGS Ceiling texture complete and without imperfections Ceiling drywall patches completed and without imperfections Ceiling paint touch ups complete WALLS Walls texture completed and without imperfections Wall drywall patches completed and without imperfections Wall touch up paint completed ELECTRICAL All light switches installed correctly and securely (not loose or wiggly) All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down) All outlets wired correctly and operational DOORS and CASING Caulked correctly All nail holes filled and painted Painted correctly Joints caulked correctly and no visible seam Open and close without sticking on jam Open and close without rubbing on floor Latches Hardware installed correctly and securely Screens on sliders Closet doors work properly Closet door hardware properly installed Closet door floor track installed BASEBOARDS Caulked correctly All nail holes filled and painted Painted correctly Joints caulked correctly and no visible seam WINDOWS Open and close Lock Have screens (that are not ripped) All areas where water can get in are caulked correctly and sealed

BEDROOMS (continued) 1 2 3 4 HARDWOOD FLOORS (Existing) All gaps filled correctly Sealed correctly Stained correctly CARPET All edges nailed down correctly Not loose anywhere No threads visible No stains KITCHEN CEILINGS o Ceiling texture complete and without imperfections o Ceiling drywall patches completed and without imperfections o Ceiling paint touch ups complete WALLS o Walls texture completed and without imperfections o Wall drywall patches completed and without imperfections o Wall touch up paint completed ELECTRICAL o All light switches installed correctly and securely (not loose or wiggly) o All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down) o All outlets wired correctly and operational o Make sure GFCI s are installed and operational o All lights work (bulbs installed) CABINETS o All cabinets open and close correctly o Cabinets painted correctly including inside (and clean) o Cabinet hardware installed correctly o All cabinet shelves installed (not just laying in cabinet) o Cabinet hardware installed correctly o Drawers open and close properly o All cabinets and drawers cleaned inside and out APPLIANCES o Make sure all packaging material is removed from all appliances (inside and outside) o Make sure all appliances are connected and running o Run a full cycle in the dishwasher and make sure it drains properly o Make sure burners and oven are working o Run microwave and hood

KITCHEN (continued) PLUMBING o Turn on sink faucet and make sure it runs properly o Make sure there is adequate water pressure at the faucet o Make sure there is hot water o Look under the sink and make sure there are no leaks while the water is running o Make sure the sink is caulked appropriately DOORS and CASING o All door casings are caulked correctly o All nail holes filled and painted o Painted correctly o Joints caulked correctly and no visible seam o Open and close without sticking on jam o Open and close without rubbing on floor o Latches o Hardware installed correctly and securely o Screens on sliders BASEBOARDS o Caulked correctly o All nail holes filled and painted o Painted correctly o Joints caulked correctly and no visible seam WINDOWS o Open and close o Lock o Have screens (that are not ripped) o All areas where water can get in are caulked correctly and sealed BACKSPLASH o Make sure all tiles are installed correctly o No loose tiles o No broken tiles o No chipped tiles o Make sure all grout lines are full o Check edges of backsplash and make sure all tile is smooth (no rough ends) and finished o Check seam of backsplash and cabinets and make sure grout is present and full

KITCHEN (continued) HARDWOOD FLOORS (New) o All glue cleaned up and not seeping threw seams o All joints tight o All T- bar moldings glued down completely with now glue visible HARDWOOD FLOORS (Existing) o All gaps filled correctly o Sealed correctly o Stained correctly TILE FLOORS o Installed correctly o Grout lines filled correctly o No loose tiles o No broken tiles o No chipped tiles BATHROOM 1 2 3 4 CEILINGS Ceiling texture complete and without imperfections Ceiling drywall patches completed and without imperfections Ceiling paint touch ups complete WALLS Walls texture completed and without imperfections Wall drywall patches completed and without imperfections Wall touch up paint completed ELECTRICAL All light switches installed correctly and securely (not loose or wiggly) All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down) All outlets wired correctly and operational Make sure GFCI s are installed and operational All lights work (bulbs installed) VANITIES All vanities installed correctly All vanities open and close correctly No scratches or dings on vanities or countertops All vanity shelves installed (not just laying in cabinet) Vanity hardware installed correctly Drawers open and close properly All vanities and drawers cleaned inside and out

BATHROOM (continued) 1 2 3 4 PLUMBING Turn on faucets on and make sure they runs properly Make sure there is adequate water pressure at the faucet Make sure there is hot water Look under the sink and make sure there are no leaks while the water is running Make sure stoppers work Make sure the sink is caulked appropriately Make sure to use siliconized grout around the tile surround and tub and tile floor and tub Caulk all shower fixtures to prevent leaks Make sure toilet is installed properly, caulked around the base, not moving, flushes and not leaks Make sure all shower fixtures are installed properly and operational without leaks (make sure there is hot water) Make sure tub stopper is operational Fill tub above overflow and make sure there are no leaks Once tub is full drain and make sure it drains appropriately DOORS and CASING Caulked correctly All nail holes filled and painted Painted correctly Joints caulked correctly and no visible seam Open and close without sticking on jam Open and close without rubbing on floor Latches Hardware installed correctly and securely BASEBOARDS Caulked correctly All nail holes filled and painted Painted correctly Joints caulked correctly and no visible seam WINDOWS Open and close Lock Have screens (that are not ripped) All areas where water can get in are caulked correctly and sealed

BATHROOM (continued) 1 2 3 4 BATH and SHOWER SUROUND Make sure all tiles are installed correctly No loose tiles No broken tiles No chipped tiles Make sure all grout lines are full Check edges of shower surround and make sure all tile is smooth (no rough ends) and finished Check seam of shower surround and tub and make sure there is siliconized grout FLOOR TILE Installed correctly Grout lines filled correctly No loose tiles No broken tiles No chipped tiles GARAGE o Make sure there are no open electrical splices o Make sure all outlets work o Make sure all lights work and have bulbs o Make sure garage door opener works o Make sure garage door opener is plugged in directly to outlet not extension cord o Make sure there are all holes in firewall are patched o Make sure there is an appropriate fire door installed with self closing hinges