Appendix B Experimental equipment and procedures

Similar documents
A new method for generation of synchronised capacitive sparks of low energy

Generation of Sub-nanosecond Pulses

High Voltage Engineering

1. General Instructions 2 2. Safety 2 3. Lamp Starting Test Instrument LSTI 5 3

SENSOR AND MEASUREMENT EXPERIMENTS

Experiment 1 LRC Transients

6 - Stage Marx Generator

UMAINE ECE Morse Code ROM and Transmitter at ISM Band Frequency

High Votage Module AC/DC/Impulse Test System

SINGLE PHASE CURRENT SOURCE INVERTER (C.S.I)

Lab E5: Filters and Complex Impedance

Experiment 12: Microwaves

Pre location: Impulse-Current-Method (ICE)

Effects of improving current characteristics of spark discharge on underwater shock waves

LYRA 501 USER S MANUAL

Filters And Waveform Shaping

Determining the Dynamic Characteristics of a Process

Lab E5: Filters and Complex Impedance

Physics 310 Lab 2 Circuit Transients and Oscilloscopes

Design and Implementation of 8 - Stage Marx Generator Used for Gas Lasers

Design and construction of double-blumlein HV pulse power supply

OBJECTIVE The purpose of this exercise is to design and build a pulse generator.

HV Module Systems for Testing, Training and Research

MEASUREMENT OF THE INTERNAL INDUCTANCE OF IMPULSE VOLTAGE GENERATORS AND THE LIMITS OF LI FRONT TIMES

High Side MOSFET Gate Drive: The Power of Well. Implemented Pulse Transformers

The Tuned Circuit. Aim of the experiment. Circuit. Equipment and components. Display of a decaying oscillation. Dependence of L, C and R.

Investigation of Sensing for DTE Power Via MDI. Jennifer Rasimas, Stephen Jackson January 20, 2000

Study of Inductive and Capacitive Reactance and RLC Resonance

DEPARTMENT OF ELECTRICAL ENGINEERING DIT UNIVERSITY EHV AC AND DC TRANSMISSION

Cornerstone Electronics Technology and Robotics Week 32 Transformers

Impulse testing of coils and magnets: present experience and future plans

SAE AE-2 Lightning Committee White Paper

Lab 2: Linear and Nonlinear Circuit Elements and Networks

Resonance in Circuits

Using the V5.x Integrator

OPERATIONAL AMPLIFIERS (OP-AMPS) II

PHY3902 PHY3904. Nuclear magnetic resonance Laboratory Protocol

Possible installation effects on density meter in a fast loop sampling system.

A simple and compact high-voltage switch mode power supply for streak cameras

Voltage Probe Manual and Data North Star High Voltage, Inc. Rev January 2016

ARN-21D Solid State Modulator - A/A mode

LM78S40 Switching Voltage Regulator Applications

Measuring the Ion Current to the Substrate During Deposition of Thin Films by Hollow Cathode Plasma Jet

3.003 Lab 3 Part A. Measurement of Speed of Light

Electron Spin Resonance v2.0

User s Manual for Integrator Short Pulse ISP16 10JUN2016

HV739 ±100V 3.0A Ultrasound Pulser Demo Board

Lab E2: B-field of a Solenoid. In the case that the B-field is uniform and perpendicular to the area, (1) reduces to

A Low Impedance Marx Generator as a Test bed for Vacuum Diodes

TRT HV System Simulations

Experiment 1 Alternating Current with Coil and Ohmic Resistors

UNIVERSITY OF NORTH CAROLINA AT CHARLOTTE Department of Electrical and Computer Engineering

Electronics. RC Filter, DC Supply, and 555

Exercise 1: Touch and Position Sensing

Laboratory Exercise 6 THE OSCILLOSCOPE

Experiment 2 Determining the Capacitive Reactance of a Capacitor in an AC Circuit

LSI Computer Systems, Inc Walt Whitman Road, Melville, NY (631) FAX (631)

LABORATORY 4. Palomar College ENGR210 Spring 2017 ASSIGNED: 3/21/17

Keywords: rf, rfic, wireless, cellular, cdma, if, oscillator, rfics, IF frequencies, VCO, rf ic

Spark-Gap Tesla Transformer

process has few stages and is highly repeatable. Excellent mechanic properties and electro-magnetic compatibility. Planar design gives the height lowe

LM2462 Monolithic Triple 3 ns CRT Driver

Constant Current Control for DC-DC Converters

Technical Specification

SOLID-STATE SWITCHING MODULATOR R&D FOR KLYSTRON

High power RF capabilities at Loughborough University

ANALYSIS OF A PULSED CORONA CIRCUIT

B. Equipment. Advanced Lab

Over-voltage Trigger Device for Marx Generators

A NOVEL METHOD OF RATIO CONTROL WITHOUT USING FLOWMETERS

ETEK TECHNOLOGY CO., LTD.

CHAPTER 2. v-t CHARACTERISTICS FOR STANDARD IMPULSE VOLTAGES

Experimental Setup Descriptions

Introduction. Keywords: rf, rfdesign, rfic, vco, rfics, rf design, rf ics. APPLICATION NOTE 530 VCO Tank Design for the MAX2310.

Electromagnetic Flow Transmitter

Underwater Spark Sources: Some experimental information.

Lab #2: Electrical Measurements II AC Circuits and Capacitors, Inductors, Oscillators and Filters

ELEC 0017: ELECTROMAGNETIC COMPATIBILITY LABORATORY SESSIONS

Report on BLP Spectroscopy Experiments Conducted on October 6, 2017: M. Nansteel

LVDS Owner s Manual. A General Design Guide for National s Low Voltage Differential Signaling (LVDS) Products. Moving Info with LVDS

LM2412 Monolithic Triple 2.8 ns CRT Driver

SP6003 Synchronous Rectifier Driver

Dust removal filters for combustible dusts Information

ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING

EXPERIMENT 5 : DIODES AND RECTIFICATION

THE HIGH ENERGY LIGHTNING SIMULATOR (HELS) TEST FACILITY FOR TESTING EXPLOSIVE ITEMS

Memo. 1 Summary. 1.1 Introduction. 1.2 Experiments. 1.3 Conclusion

Experiment #2 Half Wave Rectifier

Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.com DIGITAL SUPER MEGOHMMETER DSM-8104, DSM-8542

CHAPTER 2. Development of a PXI controller based data. acquisition system for on line remote monitoring. of leakage current on RTV coated insulators

Exercise 2: Parallel RLC Circuits

Electronic Preset Delivery System. AccuLoad II TM. Installation. The Most Trusted Name In Measurement

Transistor Flasher Kit MitchElectronics 2018

Effects of Initial Conditions in a DRSSTC. Steven Ward. 6/26/09

ENGR4300 Test 3A Fall 2002

INTRINSIC SAFETY BASIC PRINCIPLES

Journal of Physics: Conference Series. Related content. To cite this article: Jaakko Paasi et al 2008 J. Phys.: Conf. Ser.

TI25 - Pre-Instructional Survey

9. How is an electric field is measured?

MAHALAKSHMI ENGINEERING COLLEGE

Transcription:

2 4 Appendix B Experimental equipment and procedures B.1 Spark generator details The detailed schematic layout for generation of high-voltage pulses used in the spark generator described in [29] is shown in Figure B-1. A triggering pulse of 5 V is used to discharge the primary capacitor through a high-voltage coil. This triggering is done with a computer using a digital I/O plug-in board (National Instruments PCI-6503). Figure B-2 shows the spark generator and the explosion chamber, in addition to pictures of the probes used for spark measurement and the surface-mounted resistors. The standard ground loops ( pigtails ) of the scope probes are not used, ensuring less influence of noise from the spark discharge. The reader is referred to [29] for additional details on the spark generator and the spark voltage and current measurement system. 10 k / 2 W Primary cap. High voltage coil 1 5 100 k / 0.5 W 1 uf / 600 V 4 8 HV pulse 230 VAC 3N256 1 3 1N4007 Fuse On/off 22 / 2 W - + 1 5 30TPS08 250 ma Direct trig. 4 8 Isolating transformer, 200 VA 1N4007 BC557B 0.01 uf / 100 V 330 47 k 6 5 4 4N33 1 2 470 10 k / 0.5 W 330 k / 0.5 W 1 uf / 100 V 1N4007 Triggering (Coax) Figure B-1. Schematic layout of the system for generation of high-voltage pulses. 123

B.2 Spark energy calculation (a) (b) (c) Figure B-2. (a) The spark generator, the measurement system and dust explosion chamber. (b) The current measurement probes, where the ground loops are reduced to a minimum. (c) The surface-mounted symmetry resistors, integrated in the shield around the explosion chamber. B.2 Spark energy calculation The oscilloscope traces from the high-voltage probe and the two conventional probes used for current measurements are imported into a spreadsheet, and the spark energy is calculated according to Equation (3.6). 124

Appendix B. Experimental equipment and procedures However, when calculating spark power and integrated energy, some intermediate calculations are also made: 1. The signal from the high-voltage probe is delayed 9.0 ns compared to the signal from the scope probes [29]. This is taken into account when calculating circuit power by ensuring synchronisation of current and voltage. 2. The voltages from the scope probes are interpreted as currents through the measurement resistors with an effective resistance of 2.5 Ω each (due to the 10 Ω symmetry resistor in parallel). 3. The balanced (i.e. mean value when taking polarity into account) current signal is calculated. Figure 3-9 illustrates the effect of using balanced current measurements with regards to reduction of noise. 4. Adjustment for any DC offset of the resulting current signal is made. 5. Spark power is calculated. 6. Resistor power (total resistance of 5 Ω) losses are subtracted. 7. The time scale is defined by setting the time t = 0 at first peak of the damped oscillating current trace. Energy integration is made between t = 20 and 100 ns. 8. Both cumulative circuit energy and net spark energy are calculated. A fundamental condition for this approach is that the cumulative spark energy stabilises after some time, typically about 100 ns after breakdown. If the charging resistor were too small, the spark energy would continue to increase beyond the time frame of the oscilloscope measurement, and the measurement of spark voltage and current would be of little value. B.3 Experimental procedures The experimental procedures are mainly based on the documentation for Kühner s MIKE apparatus [55], with some adjustments. The following properties are similar to MIKE: Dispersion pressure 7 bar(g). 50 cm 3 pressurised dispersion chamber. Identical explosion chamber volume (1.2 litre), shape and bottom (cup). 125

B.3 Experimental procedures Electrode diameter (2 mm) and electrode material (tungsten). The following properties of the explosion testing system are different from MIKE: The method of generating sparks, both when triggering the sparks by dust dispersion and when using electronic synchronisation between dust dispersion and sparkover, is different. Schematic circuit drawings are given in Figure 3-7 and Figure 3-8. The dispersion nozzle is modified (larger orifices than used in the MIKE apparatus) in order to allow the dust to pass through it without clogging. Most dusts were dispersed by forcing the dust sample through the nozzle (exception: the metal dusts Ti, TiH 2, ZrH 2 and Al flakes which were, due to clogging, placed in the explosion chamber cup in the same way as when using the MIKE apparatus). When triggering the sparks by dust dispersion, rounded off electrodes were used to avoid corona leakage. Figure B-3 shows the sequence for ignition testing using (a) the dust cloud itself to trigger the sparkover and (b) electronic synchronisation between dust dispersion and sparkover. The term inlet valve is used for the valve upstream of the 50 cm 3 dispersion chamber, and the outlet valve is downstream. The delay between outlet valve opening and spark discharge is labelled t d. The procedure is programmed in LabView, and a digital I/O PCI plug-in board (National Instruments PCI-6503) is used to control power onset, valves and spark triggering. The schematics of the gas mixing equipment used when testing the MIE of propane is shown in Figure B-4. The propane concentration inside the explosion chamber was considered known when the concentration of the outflow was equal to the concentration of the inflow. A propane analyser (Servomex 1400) was employed to measure the concentration. 126

Appendix B. Experimental equipment and procedures Power Inlet valve Preset voltage Outlet valve Spark detection (a) 500 ms 1000 ms t d Power Inlet valve Outlet valve Spark triggering 2000 ms 500 ms 1000 ms t d (b) Figure B-3. (a) Sequence for ignition testing when using the dust cloud itself to trigger spark discharge. The stochastic delay between dust dispersion and sparkover is t d. The discharge circuit is shown in Figure 3-7. (b) Sequence for ignition testing when using electronic synchronisation between dust dispersion and sparkover with a preset delay t d. The discharge circuit is shown in Figure 3-8. To venting system Servomex 1400 Propane analyser Flowmeter Pump Outflow Explosion chamber Flowmeter Inflow Propane Air Figure B-4. Schematics of the gas mixing equipment. 127

B.3 Experimental procedures When performing MIE tests, the procedure when using the dust cloud itself to trigger the spark [30], is as follows. At first, the voltage at which the electrode gap is preset is found by trial and error, ensuring stable spark triggering for the electrode gap and dust in question. The spark energy is 1 2 estimated by the gross capacitor energy prior to breakdown ( 2CV ). Ten ignition trials are performed at each energy level, enabling plots of frequency of ignition as a function of capacitor energy. When synchronised sparks are used [33], a different approach is taken. Because the spark energy is measured for each trial and this energy is somewhat unpredictable, even though the discharge capacitor and electrode gap are held constant, the frequency of ignition can only be presented as histograms (Figure 5 in [33]). Alternatively, the method of presentation shown in Figure 4 and 6 in [33] can be chosen. In this case, the region of ignition uncertainty is illustrated by the overlap of points indicating ignition and the points indicating no ignition. For both methods, a certain variation in some key parameters is made in order to achieve the lowest possible ignition energies. This applies to e.g. dust concentration, electrode gap length, electrode shape and delay between dust dispersion and sparkover; the latter only applies when using synchronised sparks. However, to keep the number of trials at a reasonable level, the degree of variation has to be limited. An example of a test procedure involving the use of the dust cloud itself to trigger the spark is shown in Table B-1. For synchronised sparks the equivalent procedure is shown in Table B-2. 128

Appendix B. Experimental equipment and procedures Table B-1. Test procedure for determination of MIE of dust clouds, using the dust cloud itself to trigger the spark. 1. Ensure that the dispersion pressure is 7 bar(g). 2. Start with a 0.9 g sample of powder and put it in the dust chamber (exception: dusts that clog the dispersion pipe and nozzle should be placed directly in the explosion chamber cup). 3. Determine the lowest electrode voltage at which the spark is triggered for the chosen electrode gap configuration. 4. Start with a relatively large discharge capacitor, e.g. 3000 pf. 5. Perform 10 ignition trials with successful spark triggering and record the frequency of ignition at this energy level. Also, record the delay between dust dispersion and sparkover t d (see Figure B-3a). 6. Lower the spark energy by a factor of ~2 and repeat the ignition trials until the dust cloud no longer ignites in 10 successive tests. 7. Vary some of the key parameters in order to achieve optimal conditions for ignition, e.g. dust concentration, electrode gap length and shape, and perform 10 new tests at the spark energy level that yielded no ignition. The entire procedure should be performed twice for every dust: Once with an inductance and once without an inductance (if a series inductance can be added in the discharge circuit). 129

B.3 Experimental procedures Table B-2. Test procedure for determination of MIE of dust clouds, using sparks that are synchronised with the dust dispersion. 1. Ensure that the dispersion pressure is 7 bar(g). 2. Start with a 0.9 g sample of powder and put it in the dust chamber (same exception as in Table B-1). 3. Choose an ignition delay time (t d ) of 120 ms (see Figure B-3b). 4. Ensure that the charging resistor matches the discharge capacitor by manually triggering the spark and importing the oscilloscope traces into the computer. The integrated spark energy should stabilise within ~100 ns after breakdown, otherwise a larger charging resistor must be chosen (the time constant RC should be > 1 µs). 5. Perform 10 ignition trials at each discharge capacitance level, starting at a relatively high energy level. Record whether the dust cloud is ignited or not. In every trial, the spark energy must be calculated from the oscilloscope traces. 6. Lower the spark energy in steps until no ignition occurs for 10 ignition trials, or until the spark energy cannot be reduced any further. 7. Vary some of the key parameters in order to achieve optimal conditions for ignition, e.g. dust concentration, ignition delay time, electrode gap length and shape, and perform 10 new tests at the capacitance level that yielded no ignition. 8. Represent the ignition data as histograms, showing the probability of ignition within given energy ranges. 130