ALUMINUM POLE VAULT STANDARDS SPECIFICATIONS

Similar documents
7141 & NATIONAL POLE VAULT STANDARDS SPECIFICATIONS

ALUMINUM FOOTBALL GOALS INSTRUCTIONS WARNING WARNING Upright. Upright. Flag. Flag. Offset Pole.

AAE Model No. PVS-HSX High School Premier Pole Vault Standards

E LJ TJ LASER MEASURING DEVICE INSTRUCTIONS

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

Installation Instructions Kit, Base Rail Bracket Part # 31413

Equilibrium Credenza

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

Football Goal Posts MODEL SERIES: FGP400 and FGP600 series

MAG-CONV Basic, 48, 48R & Midline Front Mount

INSTALLATION INSTRUCTIONS

MODEL T28173/T28174 ROLLER TABLES INSTRUCTIONS

Assembly & Installation Instructions FOR VEHICLE MOUNT KIT USING VEHICLE CENTER MEMBER

Swerve Rack CUSTOM RACKS AVAILABLE

BISON GOOSENECK FOOTBALL 1 PAIR OF GOAL POSTS

TABLE OF CONTENTS REQUIRED TOOLS

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Installation Instruction

Installation Instructions

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

19 to 39 TV WALL MOUNT - FULL MOTION

Dream Fabric Frame Assembly Instructions

INSTALLATION INSTRUCTIONS

EDGE2 DUAL MONITOR ARM

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS

ULTRA SPACE SAVER SQUARED Installation Instructions

ASSEMBLY AND ADJUSTMENT

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

User Instructions Multiline Otter Scoreboard Caddy Assembly

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Downtown Rack. Custom logo option available

BARLOW TYRIE quality since Ref: x 3m - 12 x 10 Pavilion with Cabrio Folding Roof Step by Step Assembly Instructions

For additional assistance call

Gared Pro-S Portable Backstop

Installation Instructions

Katerack Wagon Shelving System

Dream Fabric Frame Assembly Instructions

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS

The Queen Quilter Professional Quilters Kit Frame

Sales & Service. JFK - Just For Kids. sasportonline.com. 135 Forestview Road 7879 Will Rogers Blvd.

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

Assembly Instructions. Table of Contents

Contractors Rack Assembly and Installation Instructions

Installation Instructions

Allow 60 from door face

Track Rack. * Track Racks are not lockable

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

TERRACE / TERRACE CONCEPT Retractable Classic Roof / Double Rail System Step by Step Assembly Instructions

Installation Type. Edge of Door. Pull (Hinge) Side Mounted. Hinge Edge of Door. Push (Stop) Side Mounted

Calf-Tel Pen System Assembly Instructions

MultiTable Mod-E 2 Electric Standing Desk

ASSEMBLY AND INSTALLATION INSTRUCTIONS

ULTRA SPACE SAVER Installation Instructions

Installation Instructions Kit, Base Rail Bracket Part # 31413

JUDGE'S STAND INST TOOLS: Hammer, Tape Measure, Phillips Screwdriver, 7/16" Wrench, 1/2" Wrench, 9/16" Wrench X2

INSTALLATION INSTRUCTIONS

MITCHELL WREATH RINGS NO-HAMMER ASSEMBLY INSTRUCTIONS

PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12

STEEPLE GATE BARRIER SET INSTRUCTIONS

REVIEW ENTIRE INSTALLATION GUIDE. This step gives you the opportunity to contact your dealer to answer any questions before you begin.

32 Gallon Perforated Square Receptacle

Assembly Instructions

INSTALLATION INSTRUCTIONS, AND PARTS LIST

Hiniker Company th St. P.O. Box 3407 Mankato, MN VEHICLE INSTALLATION INSTRUCTIONS FOR: CHEV/GMC 4x4: K1500 SILVERADO/SIERRA

EllisSaw.com. EllisSaw.com P.O. Box Verona, WI

TRIUMPH-LX ELECTRIC TABLE BASE

MOTORIZED STANDARD SHADE WITH CABLES Installation Instructions

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Installation Instructions for Vista Air Vertically Folding Walls

Warnings. Description. Prior to Installation Tools Needed

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Installation Instructions

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Independent Containment System (ICS)

Pickup Box Utility Rack Package Installation (Instruction ID: )

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

AndyMark DART 12.

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

Rear Katerack Installation Instructions

frame bracket Dodge x 2 & 4 x 4 (6-1/2 & 8 Boxes Includes Mega Cab)

Wildeck Overhead Safety Gate. General

Loading Dock Safety Gate

SolarWedge. Installation Manual Date Modified: 9/17/07 WARNING SAFETY. Tool List

IN-30000_F. Installation Instructions

HOOP RACK HEAVY DUTY Setbacks WALL 36" WALL 42" 36" STREET 59" STREET Dero

TV WALL MOUNT ASSEMBLY GUIDE RF-TVMLPT01V2

Installation Instructions

SwingSafe Swing-Away Mailbox Support Diagram

PFW 6851 Display Wall Mount, Turn & Tilt 80 kg INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase

CAB END BEDTRAX (SIDE VIEW)

Square Wheel Belt Grinder Models: 4103, 4106, and 4126AC

Side DuraRac Installation Instructions

Leveling Feet, Base Plates and Casters

Install Instructions. NewAge Steel Welded Tall Locker

Salter Industries Spiral Stair

Transcription:

SPECIFICATIONS Specifications: All aluminum construction for superior corrosion resistance. Dual height scales provide English and Metric measurements ranging from 7' to 8'. Wide stance base for improved stability. 8 base anchors included. Meets High School and NCAA specifications. The base measures /" x 5" and allows the standard to adjust from "-" behind the 'zero' line. Up Offset Position for Upper Scale. Place crossbar on this pin. Offset Operation: To adjust the height of the riser, loosen the clamping knob, position the riser at the desired height, and re-tighten the knob. Read the height scale that corresponds to the position of the offset. The scale on one side of the upright is for the lowest pin with the offset in the down position (7'-7') and the scale on the other side is for the highest position with the offset in the up position (8'-8'). The scale reads in both English (feet and inches) and Metric (centimeters). Down Offset Position for Lower Scale. Place crossbar on this pin. Riser Caution: Over tightening the knob can result in damaged threads, which may cause the knob to seize in place and may require a new knob and/or riser. Upright Slide Base Clamping Knob Base Rail 7_spec

OFFSET ASSEMBLY INSTRUCTIONS Tools Required: 7/" wrench & pliers PART # DESCRIPTION QTY. M5 /8"- thin nylock hex nut 5 7 55mm bar rest pin 5 M8.5" SQ End Plug, BLK (fits GA) M75 Knob /8"- x /" black TPE Fasten the 55mm bar rest pins () to each offset with /8"- thin nylock hex nuts (). Use pliers to hold the pin while tightening the nylock nuts. Left offset is shown in the picture. After the pins have been attached to the offset, fasten the offsets () to the risers with the offset clamping knobs (5). When changing offsets from the Upper Scale Position to the Lower Scale Position, offsets must be switched from right to left and left to right. The bottom two hole are used for the Up Offset Position and the top two holes are used for the Down Offset Position. This maintains pin alignment to the pit side of the standards and ensures that the scale matches the pin used. Offset Use this pin. Riser Use this pin. Down Offset Position for lower scale. Up Offset Position for upper scale. 7_inst

BASE ASSEMBLY INSTRUCTIONS 5 Remove the wheel stop bolt and slide the roll base out of the base rail. Position the base rails, see last two pages. Verify the proper position of the bases before anchoring them. There should be " or 5.8M between the standards, see the last page for more details. Anchor the base rails using the provided concrete anchors, see page 5. Orient the upright so that the riser faces one of the short sides of the roll base. Fasten the upright to the slide base with bolts (), washers (), and nuts (5). See picture. Slide the slide base back into the base rail and replace the wheel stop. The risers should face inwards towards the landing pit. Slide Base 7 Part # Description Qty HDWE7 5/"-8 x " SS Truss Head Screw M78 mm skate wheel M77B Ball Bearing 8 Upright/Riser M8 5/"-8 SS Hex Nut 9 5 M587 5/-8 x.5" SS Hex Bolt, Full Thread M59 Washer, Flat, 5/ SS 8 7 M9 5/-8 SS Nylock Hex Nut 8 M PV Rail Scale, English & Metric 9 M PV Rail Scale, English & Metric M588 5/-8 x " SS Hex bolt Base Rail 9 7_inst

UPRIGHT/RISER ASSEMBLY The riser will ship assembled. However, there may be circumstances that require knowledge of the inner working parts. These parts are called out in the drawing to the left. Riser 5 7 8 PART # DESCRIPTION QTY. M77.5" x " End Plug, Black, (- ga) 7 Upper Riser Guide, 7 M5 Felt Dot, " dia x /8" thick, adhesive backed 9 HDWEE /8- x " Hex Bolt, GR5 Plated 5 M9 /8"- Nylock hex nut, standard height M9 PV "Gill" offset down decal 7 M PV "Gill" offset up decal 8 M PV SCALE SET 7' to 8', blk on wht 9 M8 Knob /8"- x ", Nylon tip, black TPE, Logo M7 " Velcro hook, adhesive backed M8 PV warning/read here decal M79.5" Sq End Plug, Black (-GA) 9 Upright 7_inst

REPLACEMENT PARTS P7 Slide Base Painted base Decals Mounting Hardware P7 Single Wheel Wheel Bearings Bolt with nuts P7 Single Rail Assembly Rail frame with decals Bolt and nut M8 Clamping knob with nylon tip P7 55mm Bar Rest Pin wih nut P79 75mm Bar Rest Pin with nut M75 Offset clamping knob P75 Single Offset with hardware Offset with cap Pins Nuts Mounting Knobs P7 Riser only Decals Felt dots Caps P7 Upright only Decals End cap P7L & P7R Complete Standard 7_inst

BASE RAIL ANCHORING INSTRUCTIONS Tools Required: () Drill () 7/8" Masonry Bit () Hammer () /" Wrench or Socket Instructional information from www.mktfastening.com.. Proper alignment of standards is critical before drilling anchor holes. See the last two pages for Open end of standard. more information. After standards have been properly positioned, mark the hole placement.. Drill recommended diameter hole to depth of shield.. Clean hole of debris. Pins face the pit.. Insert shield in hole threaded end first and tap with hammer for proper positioning. 5. Place base rail back over holes. Runway Pit. Insert included /"- bolt and /" washer through rails into shield and tighten. Open end of standard. 7_inst5

P I T T I P 8 P I T T I P 8 ALIGNMENT PV STANDARD LOCATION INSTRUCTIONS ALIGNMENT & SPACING cm F m (m & m) D (m & m) A m F cm C C You will need: () people -, & () tape measure - m or longer Something to mark the track surface 5m m 5m.... If the pit is already setup, move the front sloped sections out of the way. Point A is the middle of the top of the back of the box. Person holds the m and m mark on the tape measure at point A. Person holds the m mark on the tape measure and locates point B in the center of the runway. It is important that this point is in the middle of the runway even if the box is not perfectly square. Person holds onto the tape measure at the 9m mark and walks out 9 to the left or right of the box. When the tape is taught at all three points, the third person should mark his position (point C) on the track. The line connecting point A and point C is the line. Repeat this process on the other side. cm E (m) B (m) 7. 8. 5. Point D is cm behind point. It is still lined up with the center of the runway. Person holds the m & m marks on the tape measure at point D.. Person holds the m mark on the tape measure and locates point E in the center of the runway. The tape should go over point A from before to ensure that the line is still centered on the runway. Person holds onto the tape measure at the 9m mark and walks out 9 to the left or right of point D. When the tape is taught at all three points, the third person should mark his position (point F) on the track. The line connecting point C and point F will help adjust the standards so that they are parallel to the runway. Repeat on the other side. SPACING PV RAIL SCALE, INCHES (-) PV RAIL SCALE, METRIC (-8) 5.8M ( ) (7 and 7 standards) PV RAIL SCALE, INCHES (-) PV RAIL SCALE, METRIC (-8) Use parallel line established above to ensure the standards are parallel with the runway. 5.M ( ) (7 and 7 standards) LINE (Inside edge of box) By rule the distance between the pegs should be.m -.7m (~9.5-7 ). In order to achieve this distance the bases should be located as shown above. Distances given are measured between the side walls of the bases. Gill recommends you double check that the distance between the pegs meets the rules before the concrete anchors are installed. Gill Athletics accepts no responsibility for incorrectly installed standards. If you have questions please call - for assistance. /8/9 Copyright 8 by Gill Athletics. All rights reserved. LOCATION_INST