To Order Superquilt direct at Lowest prices in the UK or Europe UK Customers Call From outside the UK Call

Similar documents
Multi-layer Insulation Blanket for

Multi-layer Insulation Blanket for

Multi-layer Insulation Blanket for Roofs

Multi-layer Insulation Blanket for Roofs, Walls & Floors The Highest Performing Certificated MultiFoil on the Market

Multi-layer Insulation Blanket for use in Roofs

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

August 2008: Issue 1. Non - Residential New Build Pitched Roofs - Rafter Level

Pitched roofs rafter level

June Non - Residential Refurbishment Pitched roofs - rafter level

June Residential Refurbishment Pitched roofs - rafter level

Certificate No: EW560

TRISO-SUPER 10 Installation Guidelines

Installation. Openings: Valley: Installation on timber roofs (new buildings) 1. Fit a support (noggins) around the opening.

GV Standard Pitchglaze

manthorpe Roll-Out Dry Fix Ridge System building products Fixing Instructions MBP 8265e

GV Standard PitchVent

Acceptable Standards of Domestic Construction

Installation guide. Step-by-step instructions

NEW equinox INSTALLATION GUIDE Issue

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25

NEW equinox INSTALLATION GUIDE Issue

Roll-Fix Kit The complete dry hip kit RFIG

SUPER-UNDERLAY SHEET

INSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1

Installation Instructions

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

Installation Manual. This installation is for the Odyssey H1800 Series Ventilation System.

The Leka System Installation Guide

Guardian warm roof conversion system. Installation Guide

SANERI 3 º. Self-adhesive SBS-elastomer bitumen cap sheet

SpeedDeck. Fixing and Handling Guide

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

The Firestone QuickSeam Reinforced Perimeter Fastening Strip needs to be installed with appropriate fasteners at maximum centres of 300 mm.

Glidevale eaves ventilation

Glidevale eaves ventilation

COLORBOND steel clad. Details for bushfire-prone AS BAL-FZ sites

Inspire Aledora Slate Application Guidelines

FIXING GUIDE. Designed for Garages & Sheds, Houses, DIY, Flat Roofs, Industrial & Agricultural Buildings etc. IS THE LONG TERM ROOFING SOLUTION

How-To-build guide Garden shed

INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials...

... the reflective insulation!

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

Dry Verge System. For more information on CEMEX visit

AS TESTED TBA FIREFLY TBA FIREFLY BAL-FZ BUSHFIRE ROOF SYSTEM INSTALLATION GUIDE EASY TO INSTALL EASY TO CARRY EASY TO TRANSPORT

ROOFING DESIGN AND FIXING GUIDE

YWY M08 The new VELUX solution

PROFESSIONAL PITCHED ROOFING ANCILLARIES

Installation Guidelines

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

Three layer Felt Roofing using cold applied adhesive

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales

OptiLiner Banded Liner System Bi-Directional Banding

TECHNICAL BULLETIN 28

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008)

Shingle Installation Guidelines

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

BUILDERS RESPONSIBILITY

Egger Roofing Board Fast, Easy, Safe: With this board you can reach the top.

IMAGINATION SOLAR LTD. Installation Guide A1. Planning The Collector Installation

OptiLiner Banded Liner System Bi-Directional Banding

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

Retrofit OptiLiner Banded Liner System

Universal Installation Instructions. Preparation and Safety Information. Natural Lighting by Monodraught. Dust. Scaffolding

for Flexi Sun Lite Planning the layout

Installation guide for 20/20

GLOSSARY. A useful collection of definitions for commonly used terms in tile roofing.

1. Tile Roof Installation:!

Attic Installation Tips:

orientation Conergy SunTop Instructions for professional installation

SIM. Mass Loaded Vinyl

Base : (1 - batten spacing, 2 - bottom row batten spacing, 3 - ECOTILE, 4 - batten, 5 - rafter, 6 - fixing method)

SmartVent Eave Edge Installation Instructions

for Rigid Sun Lite Planning the layout

Installation Guide GRP Dormer

equinox INSTALLATION GUIDE Issue CONTENTS If in doubt at any stage BE SAFE WHEN WORKING AT HEIGHT

Installer s Handbook. Pocket Guide to Roofline & Cladding Installation BBA BRITISH BUILDING PRODUCTS

4 Position the Suntile to the x tile s position and mark the felt around the square box flange. Then remove the Suntile

Everbright E610 polycarbonate light panels Installation guidance

Instructions for Installation on a Pitched Roof LIGHTWAY optical tube LW 260, LW 320, LW 520, LW 760

The better way to build TM. Installation Manual ROOF SIPs

Verge Flashing. Verge Flashing. Only use if flashings requirements can be site measured before ordering. Verge Clip

A Shell construction

Insuvent Designed to ensure ventilation in existing roofs when insulation quilts are installed

3M Air and Vapour Barrier 3015 Technical guide

HOW TO Fix Onduline Corrugated Bitumen Sheets

NAIMA. Insulation Between (filling) Purlins and Over Purlins. What Does Metal Building Insulation Do? Installation Instructions for New Construction

Armourvent Multi application guide

Installation Instructions

Installation manual. novotegra for tiled roofs

Inclined Roof System Trimoterm SNV

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

Installation. ng Kitt

Installation Instructions for New Construction. Installation Instructions for New Construction

installation guide Villa

Bitumen Roofshingles ARMOURVENT MULTI APPLICATION GUIDE VENTILATION

REGENCY TIMBER BUILDINGS

Dura-Lock Roof System

Timber joist. Timber joist ceilings and separating / compartment floors. Timber joist.

ZIP System Roof Sheathing INSTALLATION MANUAL A REVOLUTION IN ROOFING

Transcription:

Data Sheet for Fitting Superquilt Under or over Rafters to Roofs To Order Superquilt direct at Lowest prices in the UK or Europe UK Customers Call 0844 9919949 From outside the UK Call 0044 1143230474 Meets requirements of L1A, L1B 2010 Pitched roof insulation Fully certificated Hot box tested meets requirements of BR443 High thermal resistance of 2.71m²K/W Class 1 Surface spread of flame Ideal for New build & Refurbishment Effective solar over-heating barrier Lightweight, thin & flexible Fast and simple installation Vapour control layer Roofs Multi-layer Insulation Blanket for Thermal Insulation in a thin, flexible, multi-layer membrane BDA Agrément Nr. BAR 09-346 BAR 09-347 BAR 09-348 RD850111 194186 www.ecohome-insulation.com

INSULATION FOR USE IN ROOFS Benefits Meets requirements of L1A and L1B 2010 addition Fully certificated High thermal resistance of 2.71m²K/W Effective solar over-heating barrier Effective in summer and winter Lightweight, thin & flexible Fast and simple installation Tear Resistant For pitched roofs 18 O or above is a very flexible, easy to fit, multilayer insulation that offers tremendous thermal benefits. Hot box testing confirms high thermal resistance of 2.71m²K/W for accompanied by a 25mm air cavity either side of the material. How does Work? Due to the special composition of multi-layers of insulation, effectively deals with all forms of energy transfer (i.e. conduction, convection and radiation). works most effectively by reflecting infra-red radiation. This means that not only is effective in winter by reflecting heat back into the building and cold out, but also in summer, is a very effective solar over-heating barrier reducing the need for artificial cooling systems, preventing uncomfortable build up of heat in the building. General Fixing Instructions Installation of for pitched roof applications and additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. must be installed with a 50mm overlap with all joints taped with YBS 75mm foil tape. can be cut with a craft knife or a sharp pair of scissors. can be easily fixed with staples at regular intervals. Minimum 14mm stainless steel or galvanised staples are recommended. is most effective with a minimum 25mm air gap on either side. Battens can be used to create this gap. No protective clothing/handling required Page 1

Under Rafter Application & Combined Method (W/m 2 K) 0.18 Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) Outside Surface - - 0.040 Slate / Tile 10.00 - - Batten Cavity 25.00 - - Breather Membrane - - - Rafter Cavity 40.00-0.274 65.00 0.022 2.995 Rafter Cavity 65.00-2.71 Batten Cavity Plasterboard 12.50 0.190 0.066 Inside Surface - - 0.100 Total Resistance 6.145 Fixing Instructions *See installation video at www.ecohome-insulation.com Installation of for under rafter applications and additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the rafter height, pulled tight and stapled onto the rafters at minimum 300mm centres. should be overlapped at each joint by approx. 50mm and stapled onto the rafters, the joints should be sealed using YBS Foil Tape.Additionally, at the eaves is cut around the rafters and sealed to the Cavity wall insulation or wall plate. Perpendicular battens, recommended 25mm by 38mm are fixed to the rafters. Battens must always be fixed around the perimeter of windows. The plasterboard is fixed over the and onto the battens in the usual manner. table All calculations are based on 50mm rafters. For individual calculation please contact the technical team on 0871 917 0044 Description (rafters at 400mm centres) and 70mm (0.022 W/mk) and 110mm Glasswool (0.040 W/mK) and 100mm (0.022 W/mk) and 165mm Glasswool (0.040 W/mK) Description (rafters at 600mm centres) and 65mm (0.022 W/mk) and 105mm Glasswool (0.040 W/mK) and 95mm (0.022 W/mk) and 155mm Glasswool (0.040 W/mK) Page 2

Over Rafter Application & (600mm Centres) Combined Method (W/m 2 K) 0.18 Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) Outside Surface - - 0.040 Slate / Tile 10.00 - - Batten Cavity 25.00 - - Breather Membrane - - - Batten Cavity 65.00-2.540* Rafter Cavity 70.00 0.022 3.182 Rafter Cavity 40.00-0.274 Plasterboard 12.50 0.190 0.066 Inside Surface - - 0.100 Total Resistance 6.202 Fixing Instructions * Calculated to include timber bridging *See installation video at www.ecohome-insulation.com Installation of for over rafter applications and additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the rafter height, pulled tight and stapled onto the rafters at minimum 300mm centres. should be overlapped at each joint by approx. 50mm and stapled onto the rafters, the joints should be sealed using YBS Foil Tape. Additionally, at the eaves is cut around the rafters and sealed to the Cavity wall insulation or wall plate. Parallel battens, recommended 25mm by 38mm are fixed to the rafters. Battens must always be fixed around the perimeter of windows. A breather membrane is fitted in accordance with the manufacturers fixing details above the battens before tile battens and tiles. table All calculations are based on 50mm rafters. For individual calculation please contact the technical team on 0871 917 0044 Description (rafters at 400mm centres) and 75mm (0.022 W/mk) and 130mm Glasswool (0.040 W/mK) and 110mm (0.022 W/mk) and 180mm Glasswool (0.040 W/mK) Description (rafters at 600mm centres) and 70mm (0.022 W/mk) and 120mm Glasswool (0.040 W/mK) and 100mm (0.022 W/mk) and 170mm Glasswool (0.040 W/mK) Page 3

Two Layer Application Two Layers (600mm Centres) Combined Method (W/m 2 K) 0.18 Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) Outside Surface - - 0.040 Slate / Tile 10.00 - - Batten Cavity 25.00 - - Roofing Membrane - - - Rafter Cavity Rafter Cavity 125.00-4.929* Batten Cavity Insulated Plasterboard 22.00-0.350 Inside Surface - - 0.100 Total Resistance 5.419 ROOF COVERING (TILES SHOWN) * Calculated to include timber bridging BATTEN OR STAPLE RAFTERS *See installation video at www.ecohome-insulation.com PERPENDICULAR BATTEN INSULATED PLASTERBOARD Fixing Instructions Installation of for under rafter applications and additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. For recessed installation please see page 5. For under rafter installation please see page 2 fixing instructions. When installing two layers of an air space should be maintained between layers at all times. table All calculations are based on 50mm rafters. For individual calculation please contact the technical team on 0871 917 0044 Description (rafters at 400mm centres) (2 Layers) with 30mm Insulated Plasterboard (0.550 m 2 k/w) (2 Layers) and 25mm (0.022 W/mk) (2 Layers) and 50mm Glasswool (0.044 W/mK) (2 Layers) and 40mm insulated plasterboard (1.070 m 2 k/w) Description (rafters at 600mm centres) (2 Layers) with 22mm Insulated Plasterboard (0.350 m 2 k/w) (2 Layers) and 25mm (0.022 W/mk) (2 Layers) and 50mm Glasswool (0.044 W/mK) (2 Layers) and 40mm insulated plasterboard (1.070 m 2 k/w) Page 4

Recessed Detail over rafter under rafter application ROOF COVERING (TILES SHOWN) BREATHER MEMBRANE ROOF COVERING (TILES SHOWN) ROOFING FELT ON TOP OF RAFTERS A B BATTEN OR STAPLE PLASTERBOARD AND FINISH C D RAFTERS INSULATION JOINTS YBS FOIL TAPED Where roof height is critical can be recessed between the rafters. A. is stapled to the top of the first rafter. B. is recessed into the rafter void and fixed with staples or with battens. C. The material is then fixed to opposite rafter as per instruction B. D. is then wrapped around the rafter and the procedure starts again. Once all the is fitted, all joints should be taped using YBS Foil Tape. A breather membrane is then fitted in accordance with the manufacturers fitting instructions. Tile batten and tiles can then be fitted. 1 2 3 BATTEN OR STAPLE PLASTERBOARD AND FINISH 4 RAFTERS INSULATION JOINTS YBS FOIL TAPED Ensure that there is an airspace above the at all times. 1. is stapled to the underside of the first rafter. 2. is recessed into the rafter void and fixed with staples or with battens. 3. The material is then fixed to opposite rafter as per instruction 2. 4. is then wrapped around the rafter and the procedure starts again. Once all the is fitted, all joints should be taped using YBS Foil tape. Plasterboard can then be fixed directly to the underside of the rafters below the. Purlins Detail Between purlins Around purlins ROOF COVERING (SLATE SHOWN) ROOF COVERING (SLATE SHOWN) BREATHER MEMBRANE ROOFING FELT RAFTER RAFTER INSULATION JOINTS YBS FOIL TAPED INSULATION JOINTS YBS FOIL TAPED PLASTERBOARD & FINISH PLASTERBOARD & FINISH PERPENDICULAR 25MM BATTENS PERPENDICULAR 25MM BATTENS PURLIN PURLIN is fixed horizontally or vertically and stapled to the underside of the the rafters. At the purlins the is turned up at stapled in place. Perpendicular Battens are fixed through the into the rafters, at the purlins the battens are fixed into the rafters crushing the tightly against the purlins. Plasterboard can then be fixed to the battens. Page 5 is fixed horizontally or vertically and stapled to the underside of the the rafters. At the purlins the is cut and pushed behind the purlins then taped to the next piece at the opposite side of the purlin. Perpendicular Battens are fixed through the into the rafters. Plasterboard can then be fixed to the battens.

Detailing Vents / light-pipes Flashing Rooflight Collar/Flashing Tiles/Slate Tile/Slate Batten Breather Membrane Flashing Tiles/Slate Tile/Slate Batten Breather Membrane Rooflight Frame Flashing Tiles/Slate Tile/Slate Batten Breather Membrane Counter Batten Counter Batten Counter Batten Rafter Rafters Rafters Fixing Instructions is fixed above rafters as per fixing details and turned up at the vent/wall/rooflight and sealed with YBS Foil Tape. Battens are placed on the rafters above the. A breather membrane is fixed above the battens and finished by turning up at the vent/wall/rooflight and sealing to the vent/wall/rooflight. Tile battens are fixed in place. The flashing/collar for the vent/wall/rooflight is fitted above the tile battens and then tiles. Eaves Tiles Battens Counter Battens Foil Taped Joints Breather Membrane Rafter Plasterboard Timber Wallplate Over Rafter Fixing Details is stapled to the rafters. At the eaves the is cut and taken down between the rafters to the cavity wall insulation or the wall plate. The needs to be sealed with staples and taped to the rafters and the cavity wall insulation or wall plate to create an airtight envelope. Under Rafter Fixing Details is stapled to the underside of the rafters. At the eaves the is cut and taken down between the joists to the cavity wall insulation or the wall plate. The material needs to be sealed with staples and taped to the joists and the cavity wall insulation or wall plate to create an airtight envelope. Valleys Tiles Tile Battens Felt Membrane Counter Battens Mortar Pointing Downlighters YBS recommend fire hoods are used with all sunken lights. Lead Gutter Rafters Perpendicular Battens Plasterboard Page 6 A circular hole is cut in the to create a minimum 25mm clearance from the downlighter. The cut edge must be completely sealed using YBS Foil Tape.

Product Description 19 Components Thickness Technical Properties 40mm approx. Weight 88 0g/m 2 Mechanical Properties Value Reference Standard Thermal performance 2.71m 2 K/W BS EN 12667 Flammability Class 1 BS 476-1 Class E BS EN 13501-1 Water vapour resistance 1569MNs/g BS EN 12572 Emission coefficients of surfaces 0.05 ASTM C 1371 Tensile strength 142KPA BS EN 1608 Packaging 15m 2 10m 2 Width 1.5m 1.5m Length 10m 6.667m Weight 13.5Kg 9Kg Foil taped joins should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joints should be sealed using YBS 75mm Foil Tape. Vapour control layer When all joints are sealed using foil tape also works as a vapour control layer. Cutting can easily be cut using either a stanley knife or a good pair of scissors. UK & European online supplier www.ecohome-insulation.com UK Ordering 0844 9919949 European Ordering 0044 1143230474 Page 7 Yorkshire Building Services (WHITWELL) Ltd. YBS 200 V9 02/2011